Laserfiche WebLink
FRAMING NOTES <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETA16 W/ (9) 10d x 1 112" HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />SIMPSON LTA2 W/ (8) 10d x 1 1/2" HOG NAILS, WOOD TO WOOD: <br />SIMPSON H10A OR LGT2 WI 10d x 1 1/2" HDG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />CONNECTERS ARE TO BE GALVANIZED. <br />6. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />CONCRETE LINTELS. <br />7. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />B. LINTELS SHALL HAVE 4" NOMINAL BEARING (4'). <br />9. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />10. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 PBS36, .177" ° x 2 7/8" LONG, WITH WASHER @ 16" O.C. <br />11. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />12. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />13. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR, UNLESS <br />NOTED OTHERWISE. <br />HEADER SCHEDULE <br />MARK <br />DESCRIPTION <br />REMARK <br />( <br />(2) 2X8 <br />BEAM SCHEDULE <br />MOZOM INDICATES OPENING BELOW/T.O.B. = TOP OF REAM/ B.O.L. = BOTTOM OF LINTEL I TO A, = TOP OF ARCH / T.O.S = TOP OF SLAB <br />ABBREVIATIONS <br />E.E. = EACH END, O/C = ON CENTER, F.E.S. = FROM EACH SUPPORT, TO. = THROUGHOUT <br />MARK <br />DESCRIPTION <br />fc <br />(P.I) <br />SIZE <br />WxH, <br />REINFORCEMENT <br />STIRRUPS <br />REMARKS <br />STM. <br />TOP <br />MID <br />SIZE <br />SPACING <br />BB1 <br />MASONRY <br />3000 <br />8x16 <br />(1)N5 <br />(1)#5 <br />NIA <br />GROUTED SOLID <br />BB2 <br />MASONRY <br />3000 <br />8x8 <br />(1)#5 <br />N/A <br />GROUTED SOLID <br />SEE SHEET <br />S5.1A FOR <br />SAFE LOAD TABLES <br />SECOND FLOOR LIFT BEAM PLAN <br />SCALE: 1/4" - V-0" <br />1 N. RONALD REAGAN BLVD. <br />LONGWOOD, FL 32750 <br />PH: 407-774.6078 <br />FAX 407-774.4078 <br />www.abdesigngroup.com <br />AA #: 0003325 , <br />lie <br />¢p <br />��qj <br />m <br />t� <br />M8 <br />gR <br />1 <br />1 <br />1 <br />till <br />_LLL <br />acrHaty ae LOT: <br />ABBOTT PARK <br />LOT #19 <br />BLK #12 <br />PHASE #4C <br />PROJECT# <br />04181.04C-19121 <br />MODMI.: <br />4EHB <br />"2605-HAYDEN" <br />GARAGE 9WWG: <br />RIGHT <br />PAGE= <br />SECOND <br />FLOOR <br />LIFT BEAM <br />PLAN <br />160 MPH EXP. C <br />