Laserfiche WebLink
FRAMING NOTES <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETA16 W/ (9) 10d x 1 1/2" HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />SIMPSON LTA2 W/ (8) 10d x 1 1/2" HDG NAILS, WOOD TO WOOD: <br />SIMPSON H10A OR LGT2 W/ 10d x 1 1/2" HDG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />CONNECTERS ARE TO BE GALVANIZED. <br />6. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />CONCRETE LINTELS. <br />7. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />8. LINTELS SHALL HAVE 4" NOMINAL BEARING (4'). <br />9. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />10. PLACE 2X4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 P8S36, .177" " x 2 7/8" LONG, WITH WASHER Q 16" O.C. <br />11. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />12, WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />13. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />TRUSS MANUFACTURER / ENGINEER NOTES: <br />1. ROOF GIRDERS W/ UPLIFT IN EXCESS OF 2,500 LBS SHALL BE <br />FABRICATED W/ A 2X6 BTM. CHORD (MIN.) <br />2. COORDINATE ANY TRAY/COFFERED CEILINGS, AND ATTIC ACCESS <br />WITH THE ARCHITECTURAL PLANS TRAYS AND COFFERS ARE NOT <br />SHOWN ON THIS PLAN IN ORDER TO AVOID CONFUSION AND MISTAKES. <br />3. TRUSS COMPANY / ENGINEER IS RESPONSIBLE FOR ALL TRUSS TO <br />TRUSS CONNECTIONS. <br />4. AVOID PLACING A TRUSS PERPENDICULAR TO A STEEL COLUMN. <br />MAINTAIN AT LEAST 8" FROM THE CENTER OF THE COLUMN. <br />i <br />2X4 BLOCKING BETWEEN TRUSSES 24" O.C. <br />TOE NAILED TO ADJACENT TRUSSES W/ (2) 16d <br />COMMON NAILS & SECURE TO BM. W/ <br />SIMPSON LTA2 USED TO BRACE TOP OF WALL. <br />CJ3 a n n 1C a u n u a u n <br />N N A A II <br />'1 ATTACH 4'-0" LONG 2x SCAB TO <br />CJ5 �_ _ = n n I p TRUSS W/ 10d NAILS 8" O.C. n <br />A p q (4" FROM EA. END) A <br />All1 <br />EWA-Ail <br />6 _L__jmeat: <br />I I I 6 I I <br />sssss s>ssaeso}�.®a as====ss>6s _ ss:=�-tea <br />ssssm e . amem a ®� ss� s sea : A as e <br />I I I = <br />TED <br />PIiE-FABRNA <br />TRU89E$ 24" 0. MAX <br />I I I <br />yt6_ <br />e�±�.a�. sus W <br />a � <br />a® I ems. I as. I .tee <br />�sa�mia �e��®es_e��i ea®s <br />I I I <br />I I I <br />ergs : � • ee�r � 4�e� • � a maamX <br />I I I <br />I I I <br />I I I <br />�= ssysas sacs ss=x <br />e®s�6:aa�ssss® <br />I 1 <br />::e�aa��az�:ee�:aeee=e <br />I I I <br />I I I <br />seee:>az: a:s s>as=s <br />I a�a�l�:a�a I aaa®s <br />sa�a�e®�oe�a �aaa®a <br />I I I <br />I I i <br />--------------- <br />FRAMING PLAN <br />SCALE: 1/4"= 1'-0" <br />F <br />1441 N. RONALD REAGAN BLVD. <br />LONGWOOD, FL 32750 <br />PH: 407-774,6078 <br />FAX, 407-774-4078 <br />www.abdesigngroup.com <br />AA #: 0003325 A <br />d <br />u—Q}I <br />IC <br />a <br />eaQ <br />eQ� <br />BQ�YS.� <br />03 <br />AIVBDIV. as TAT: <br />ABBOTT PARK <br />TAT #18 BLK. #12 <br />PHASE: 4C <br />PROJECT* <br />04181.04C-18121 <br />MODEL <br />4EBB <br />"1828-CALI" <br />GARAGE SWING: <br />RIGHT <br />PAGE: <br />FRAMING <br />PLAN <br />160 MPH E . C <br />8 <br />R064D A. AM <br />AR NO 93 <br />DA 2/04/22 <br />scAI.E: 1/4"=1'-0" <br />9iIEET <br />kk S3 <br />