My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7464 Sail Clover Ln
Zephyrhills
>
Building Department
>
Building Plans
>
7464 Sail Clover Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 4:37:07 AM
Creation date
2/24/2025 9:28:51 AM
Metadata
Fields
Template:
Building Plans
Street #
7464
Location
Sail Clover Ln
Contractor
D R Horton
Building Plans - Permit #
4504
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRAMING NOTES <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETA16 W/ (9) 10d x 1 1/2" HDG NAILS. <br />CONCRETE TO. WOOD FLOOR: <br />SIMPSON LTA2 W/ (8) 10d x 1 1/2" HOG NAILS, WOOD TO WOOD: <br />SIMPSON H10A OR LGT2 W/ 10d x 1 1/2" HOG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4, ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />CONNECTERS ARE TO BE GALVANIZED. <br />6. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />CONCRETE LINTELS. <br />7. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />8. LINTELS SHALL HAVE 4" NOMINAL BEARING (4'). <br />9. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL, <br />10. PLACE 2X4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 P8S36, .17T' ° x 2 718" LONG, WITH WASHER @ 16" O.C. <br />11. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />12. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />13. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />TRUSS MANUFACTURER / ENGINEER NOTES: <br />1, ROOF GIRDERS W/ UPLIFT IN EXCESS OF 2,500 LSS SHALL BE <br />FABRICATED W/ A 2x6 BTM, CHORD (MIN.) <br />2. COORDINATE ANY TRAYICOFFERED CEILINGS, AND ATTIC ACCESS <br />WITH THE ARCHITECTURAL PLANS TRAYS AND COFFERS ARE NOT <br />SHOWN ON THIS PLAN IN ORDER TO AVOID CONFUSION AND MISTAKES. <br />3. TRUSS COMPANY / ENGINEER IS RESPONSIBLE FOR ALL TRUSS TO <br />TRUSS CONNECTIONS, <br />4, AVOID PLACING A TRUSS PERPENDICULAR TO A STEEL COLUMN. <br />MAINTAIN AT LEAST 8" FROM THE CENTER OF THE COLUMN. <br />COLUMN SCHEDULE <br />MARK <br />SIZE & <br />BASE PLATE OR <br />REMARK <br />DESCRIPTION <br />REINFORCEMENT <br />W0.1 <br />4X6 (3 Y"x5 n') SYP. <br />HTT4 W/5/8" DIA x 6' <br />5/S3.tA <br />PT., WOOD POST <br />EXP. BOLT <br />r--------t <br />FIRE <br />3/4" SUB <br />FLOOR —�, 2X4 NAILER <br />FOR DRAFT <br />PRE-ENG. STOP <br />FLR. TRUSS _ <br />ELEV. VIEW <br />PRE-ENG. FLR. JOISTS �I) <br />314" PLYWOOD - <br />DRAFT STOP �I <br />PRE-ENG. FLR. JOISTS'r7�'�v� <br />iI Ti <br />2X4 NAILER FOR <br />DRAFT STOP <br />3/4" PLYWOOD <br />DRAFT STOP <br />PLAN VIEW <br />DRAFT STOP <br />DETAILS <br />FIRST FLOOR FRAMING PLAN <br />SCALE: 1 /4" - V-0" IJOIST <br />4LL W/ <br />404M W/ (4) V x 4 <br />ORB AND (4) y' x 2 V <br />0 BM7 <br />•1 N. RONALD REAGAN BLVD. <br />LONGWOOD, FL 32750 <br />PH: 407-774,6078 <br />FAX 407-7744078 <br />www.abdesigngroup.com <br />AA#: 0003325 <br />e <br />04 <br />14 <br />14 <br />1rjQy <br />r <br />R <br />R <br />3 <br />3 <br />J <br />Midi <br />aUDDIV. do LOT <br />ABBOTT PARK <br />LOT #9 <br />BILK #14 <br />PHASE #4C <br />PROJECT <br />04181.0411-09141 <br />bcoDEia <br />4EHB <br />"2605-HAYDEN" <br />GARAGE eNING: <br />LEFT <br />PAGE: <br />FIRST FLOOR <br />FRAMING <br />PLAN <br />160 MPH EXP. C <br />ROLAPD A ABOUC AM <br />L AR NO W723 A <br />PRINT DATE: 02/07/22 <br />ECALE: 1/4"=1'-0" <br />EIiEET <br />s3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.