Laserfiche WebLink
#5 CORNER BAR W/ 3W LAP FOR EACH <br />COURSE OF BOND BEAM <br />VERTICAL REBAR W/ 1WHOOK <br />3(r TYPICAL <br />#5 BAR IN BOND BEAM <br />OPEN FACE SHELL SO <br />AS TO ALLOW BENT <br />BAR TO BE PLACED IN <br />UPPER AND LOWER <br />SONDBEAM <br />CORNER <br />REINFORCING OF BOND BEAM <br />SCALE 3fV=V-O" <br />CORNER BARS <br />AT CORNER STEP <br />1441 N , RONALD REAGAN B1 <br />LONGWOOD, FIL 32750 <br />PH: 407-774-6078 <br />FAX: 407-7744078 <br />www.abdesigngroup. m <br />AA 0. 0003325 <br />2. IF BOTTOM STEEL 1 <br />3. PLACE MASONRY U <br />PLACE STEEL HEIGHT <br />REINFORCING (1-2) 4, THE LAST COURSE <br />AS DEPICTED HEREIN. STRUCTURE. A DOUB <br />TWO COURSES ARE <br />5. SHOULD THE DOU <br />COURSE OF BOND BE <br />REINFORCINGFORT <br />TOP OF THE LINTEL. <br />N C MPOSITE <br />Eu. <br />F FILLED W/ GROUT <br />& U UNFILLED <br />NOMINAL # OF #5'S IN 2ND BOND <br />WIDTH BEAM CI3URSE <br />K. I —lT/1 IAI�B <br />6 <br />NOMINAL <br />HEIGHT #OF #5-S TOP <br />IT IS THIS E GINEER'S INTENT BOND BEAM COURSE <br />THAT XFXX - ITil MIOB INDICATES A DOUBLE BOND BEAM # OF #5'S, BOTTOM <br />ANDXFXX.IT XIS INDICATES A SINGLE BOND BEAM PLACED IN LINTEL <br />IT IS THIS ENGIN ER'S INTENT <br />A 0 XUXX - lT/lM/0B INDICATES A DOUBLE BOND BEAM ABOVE UNFILLED <br />LINTEL <br />NOTES TO THE INSPECTOR/CONTRACTOR TYP. W'W' <br />I PLACE LINTEL ACROSS TOP OF OPENING. BOND BEAM <br />S REQUIRED PLACE #5 BAR IN LINTEL. <br />NITS AS REQUIRED TO ACHIEVE THE REQUIRED BEARING <br />WILL BE A BOND BEAM WITH (1) #5 BAR CONTINUOUS AROUND <br />LE BOND BEAM MAY BE SPECIFIED SO THAT THEN THE LAST <br />BOND BEAMS WITH A #5 BAR IN EACH COURSE. TYP. 9�1161 <br />OLE BOND BEAM COINCIDE WITH A LINTEL THE BOTTOM BONDBEAM <br />AM IS OMITTED AND A LINTEL IS PLACED. THE STEEL <br />HE BOTTOM BOND BEAM IS TO BE CONTINUOUS THROUGH THE <br />MASONRY BEAM 15 TO BE NOT LESS THAN 19'DEEP. <br />WINDOW <br />PRE -CAST <br />WINDOW <br />SILL <br />SLOPE <br />TYPICAL MASONRY WINDOW <br />SILL CONSTRUCTION <br />SX16 OBL BOND TOP OF-$, <br />'). M <br />BEAM W/ ( BAR BOND BEA <br />EACH COURSE <br />&8 BOND BEAM TOP 0 <br />W/ (1) #5 BAR BOND MAIO— <br />GROUT SOLID FROM 4TOP <br />LINTEL TO TOP OF BOND OF OPENING <br />BEAM, IF FILLED LINTEL <br />SEE NOTE 5 <br />8x8 PRE -CAST CONCRETE <br />(1) #5 BAR <br />LINTEL W/ (1-2) MASONRY <br />LENGTH OF BAR = WIDTH OF BEAM DESIGNATION <br />OPENING - 2" <br />OR <br />8.8 PRE -CAST CONCRETE <br />LINTEL, W/O STEEL (LI) REFER <br />To PLAN FOR LOCATIONS <br />E. <br />SINGLE #5 CORNER --------- <br />BAR, 3Ox3O TURNED Up <br />OR TURNED DOWN INTO STEEL REINF. OF <br />FILLED CELL BOND.BEAM <br />rf4- PROVIDE #5 BAR <br />EACH SIDE <br />OF ELEVATION <br />ONO BEAM CHANGE <br />STE =L REINF. OF <br />B <br />CHANGEIN <br />ELEVATION OF BOND BEAM <br />MIXISECTION FASOMSPACM <br />d. =Z'MIN. 2 J� MAX <br />2 t MIN. r MAX <br />�'MIN. 2 k MAX <br />ed fMIN, 2 j- MAX <br />d. =TMIN, 2 J'MAX <br />2 i'MIN, 9" MAX <br />(2) 2z$ �'MIN, 2 � MAX' <br />k MIN, 2 J"MAX <br />d. =2" MIN, 2 t'MAX <br />% 2 ?'MIN, 9"MAX <br />(2)2it % MIN, 2 � MAX <br />ed MIN, 2 �'MAX <br />'MUST HAVE 2 OR MORE LONGITUDINAL <br />ROM OF NAILS <br />NOTE <br />ADJACENT NAILS ARE DRIVEN FROM <br />OPPOSITE SIDES OF THE COLUMN <br />ALL NAILS PENETRATE ALL <br />LAMINATIONS AND AT LEAST 1 �- OF <br />THE THICKNESS OF THE OUTERMOST <br />LAMINATION <br />WHERE <br />d.= END DISTANCE <br />, z SPACING BETWEEN ADJACENT FASTENERS <br />INAROW <br />� = SPACING BETWEEN ROWS OF FASTENERS <br />e, = EDGE DISTANCE <br />DOUBLE STUD W/ 10d NAIL ATTACHMENT <br />lu <br />Z- <br />re <br />A <br />;;Pw ul <br />to <br />0 <br />[BUDDIV. a w7l <br />ABBOTT PAIR& <br />LOT #10 <br />BLK #12 <br />PHASE4C <br />PROJECT# <br />04181.04C-10121 <br />MODEL. <br />E401 <br />2828—ENSLEY" <br />GARAGE 8VrMG: <br />LEFT <br />PAGE: <br />DETAILS <br />160 MPH EXP. C <br />LE <br />[ PRINT <br />DATE: 12/07/121] <br />SCAL.E: 1/4"=f-0" <br />SHEET <br />S2. IA <br />—#5 MIN. REQUIRED IN <br />EACH CELL HOOKED IN <br />TOP BOND BEAM Wl <br />STANDARD ACJ HOOK <br />2. IF BOTTOM STEEL 1 <br />3. PLACE MASONRY U <br />PLACE STEEL HEIGHT <br />REINFORCING (1-2) 4, THE LAST COURSE <br />AS DEPICTED HEREIN. STRUCTURE. A DOUB <br />TWO COURSES ARE <br />5. SHOULD THE DOU <br />COURSE OF BOND BE <br />REINFORCINGFORT <br />TOP OF THE LINTEL. <br />N C MPOSITE <br />Eu. <br />F FILLED W/ GROUT <br />& U UNFILLED <br />NOMINAL # OF #5'S IN 2ND BOND <br />WIDTH BEAM CI3URSE <br />K. I —lT/1 IAI�B <br />6 <br />NOMINAL <br />HEIGHT #OF #5-S TOP <br />IT IS THIS E GINEER'S INTENT BOND BEAM COURSE <br />THAT XFXX - ITil MIOB INDICATES A DOUBLE BOND BEAM # OF #5'S, BOTTOM <br />ANDXFXX.IT XIS INDICATES A SINGLE BOND BEAM PLACED IN LINTEL <br />IT IS THIS ENGIN ER'S INTENT <br />A 0 XUXX - lT/lM/0B INDICATES A DOUBLE BOND BEAM ABOVE UNFILLED <br />LINTEL <br />NOTES TO THE INSPECTOR/CONTRACTOR TYP. W'W' <br />I PLACE LINTEL ACROSS TOP OF OPENING. BOND BEAM <br />S REQUIRED PLACE #5 BAR IN LINTEL. <br />NITS AS REQUIRED TO ACHIEVE THE REQUIRED BEARING <br />WILL BE A BOND BEAM WITH (1) #5 BAR CONTINUOUS AROUND <br />LE BOND BEAM MAY BE SPECIFIED SO THAT THEN THE LAST <br />BOND BEAMS WITH A #5 BAR IN EACH COURSE. TYP. 9�1161 <br />OLE BOND BEAM COINCIDE WITH A LINTEL THE BOTTOM BONDBEAM <br />AM IS OMITTED AND A LINTEL IS PLACED. THE STEEL <br />HE BOTTOM BOND BEAM IS TO BE CONTINUOUS THROUGH THE <br />MASONRY BEAM 15 TO BE NOT LESS THAN 19'DEEP. <br />WINDOW <br />PRE -CAST <br />WINDOW <br />SILL <br />SLOPE <br />TYPICAL MASONRY WINDOW <br />SILL CONSTRUCTION <br />SX16 OBL BOND TOP OF-$, <br />'). M <br />BEAM W/ ( BAR BOND BEA <br />EACH COURSE <br />&8 BOND BEAM TOP 0 <br />W/ (1) #5 BAR BOND MAIO— <br />GROUT SOLID FROM 4TOP <br />LINTEL TO TOP OF BOND OF OPENING <br />BEAM, IF FILLED LINTEL <br />SEE NOTE 5 <br />8x8 PRE -CAST CONCRETE <br />(1) #5 BAR <br />LINTEL W/ (1-2) MASONRY <br />LENGTH OF BAR = WIDTH OF BEAM DESIGNATION <br />OPENING - 2" <br />OR <br />8.8 PRE -CAST CONCRETE <br />LINTEL, W/O STEEL (LI) REFER <br />To PLAN FOR LOCATIONS <br />E. <br />SINGLE #5 CORNER --------- <br />BAR, 3Ox3O TURNED Up <br />OR TURNED DOWN INTO STEEL REINF. OF <br />FILLED CELL BOND.BEAM <br />rf4- PROVIDE #5 BAR <br />EACH SIDE <br />OF ELEVATION <br />ONO BEAM CHANGE <br />STE =L REINF. OF <br />B <br />CHANGEIN <br />ELEVATION OF BOND BEAM <br />MIXISECTION FASOMSPACM <br />d. =Z'MIN. 2 J� MAX <br />2 t MIN. r MAX <br />�'MIN. 2 k MAX <br />ed fMIN, 2 j- MAX <br />d. =TMIN, 2 J'MAX <br />2 i'MIN, 9" MAX <br />(2) 2z$ �'MIN, 2 � MAX' <br />k MIN, 2 J"MAX <br />d. =2" MIN, 2 t'MAX <br />% 2 ?'MIN, 9"MAX <br />(2)2it % MIN, 2 � MAX <br />ed MIN, 2 �'MAX <br />'MUST HAVE 2 OR MORE LONGITUDINAL <br />ROM OF NAILS <br />NOTE <br />ADJACENT NAILS ARE DRIVEN FROM <br />OPPOSITE SIDES OF THE COLUMN <br />ALL NAILS PENETRATE ALL <br />LAMINATIONS AND AT LEAST 1 �- OF <br />THE THICKNESS OF THE OUTERMOST <br />LAMINATION <br />WHERE <br />d.= END DISTANCE <br />, z SPACING BETWEEN ADJACENT FASTENERS <br />INAROW <br />� = SPACING BETWEEN ROWS OF FASTENERS <br />e, = EDGE DISTANCE <br />DOUBLE STUD W/ 10d NAIL ATTACHMENT <br />lu <br />Z- <br />re <br />A <br />;;Pw ul <br />to <br />0 <br />[BUDDIV. a w7l <br />ABBOTT PAIR& <br />LOT #10 <br />BLK #12 <br />PHASE4C <br />PROJECT# <br />04181.04C-10121 <br />MODEL. <br />E401 <br />2828—ENSLEY" <br />GARAGE 8VrMG: <br />LEFT <br />PAGE: <br />DETAILS <br />160 MPH EXP. C <br />LE <br />[ PRINT <br />DATE: 12/07/121] <br />SCAL.E: 1/4"=f-0" <br />SHEET <br />S2. IA <br />—#5 MIN. REQUIRED IN <br />EACH CELL HOOKED IN <br />TOP BOND BEAM Wl <br />STANDARD ACJ HOOK <br />CHANGEIN <br />ELEVATION OF BOND BEAM <br />MIXISECTION FASOMSPACM <br />d. =Z'MIN. 2 J� MAX <br />2 t MIN. r MAX <br />�'MIN. 2 k MAX <br />ed fMIN, 2 j- MAX <br />d. =TMIN, 2 J'MAX <br />2 i'MIN, 9" MAX <br />(2) 2z$ �'MIN, 2 � MAX' <br />k MIN, 2 J"MAX <br />d. =2" MIN, 2 t'MAX <br />% 2 ?'MIN, 9"MAX <br />(2)2it % MIN, 2 � MAX <br />ed MIN, 2 �'MAX <br />'MUST HAVE 2 OR MORE LONGITUDINAL <br />ROM OF NAILS <br />NOTE <br />ADJACENT NAILS ARE DRIVEN FROM <br />OPPOSITE SIDES OF THE COLUMN <br />ALL NAILS PENETRATE ALL <br />LAMINATIONS AND AT LEAST 1 �- OF <br />THE THICKNESS OF THE OUTERMOST <br />LAMINATION <br />WHERE <br />d.= END DISTANCE <br />, z SPACING BETWEEN ADJACENT FASTENERS <br />INAROW <br />� = SPACING BETWEEN ROWS OF FASTENERS <br />e, = EDGE DISTANCE <br />DOUBLE STUD W/ 10d NAIL ATTACHMENT <br />lu <br />Z- <br />re <br />A <br />;;Pw ul <br />to <br />0 <br />[BUDDIV. a w7l <br />ABBOTT PAIR& <br />LOT #10 <br />BLK #12 <br />PHASE4C <br />PROJECT# <br />04181.04C-10121 <br />MODEL. <br />E401 <br />2828—ENSLEY" <br />GARAGE 8VrMG: <br />LEFT <br />PAGE: <br />DETAILS <br />160 MPH EXP. C <br />LE <br />[ PRINT <br />DATE: 12/07/121] <br />SCAL.E: 1/4"=f-0" <br />SHEET <br />S2. IA <br />—#5 MIN. REQUIRED IN <br />EACH CELL HOOKED IN <br />TOP BOND BEAM Wl <br />STANDARD ACJ HOOK <br />MIXISECTION FASOMSPACM <br />d. =Z'MIN. 2 J� MAX <br />2 t MIN. r MAX <br />�'MIN. 2 k MAX <br />ed fMIN, 2 j- MAX <br />d. =TMIN, 2 J'MAX <br />2 i'MIN, 9" MAX <br />(2) 2z$ �'MIN, 2 � MAX' <br />k MIN, 2 J"MAX <br />d. =2" MIN, 2 t'MAX <br />% 2 ?'MIN, 9"MAX <br />(2)2it % MIN, 2 � MAX <br />ed MIN, 2 �'MAX <br />'MUST HAVE 2 OR MORE LONGITUDINAL <br />ROM OF NAILS <br />NOTE <br />ADJACENT NAILS ARE DRIVEN FROM <br />OPPOSITE SIDES OF THE COLUMN <br />ALL NAILS PENETRATE ALL <br />LAMINATIONS AND AT LEAST 1 �- OF <br />THE THICKNESS OF THE OUTERMOST <br />LAMINATION <br />WHERE <br />d.= END DISTANCE <br />, z SPACING BETWEEN ADJACENT FASTENERS <br />INAROW <br />� = SPACING BETWEEN ROWS OF FASTENERS <br />e, = EDGE DISTANCE <br />DOUBLE STUD W/ 10d NAIL ATTACHMENT <br />lu <br />Z- <br />re <br />A <br />;;Pw ul <br />to <br />0 <br />[BUDDIV. a w7l <br />ABBOTT PAIR& <br />LOT #10 <br />BLK #12 <br />PHASE4C <br />PROJECT# <br />04181.04C-10121 <br />MODEL. <br />E401 <br />2828—ENSLEY" <br />GARAGE 8VrMG: <br />LEFT <br />PAGE: <br />DETAILS <br />160 MPH EXP. C <br />LE <br />[ PRINT <br />DATE: 12/07/121] <br />SCAL.E: 1/4"=f-0" <br />SHEET <br />S2. IA <br />—#5 MIN. REQUIRED IN <br />EACH CELL HOOKED IN <br />TOP BOND BEAM Wl <br />STANDARD ACJ HOOK <br />NOTE <br />ADJACENT NAILS ARE DRIVEN FROM <br />OPPOSITE SIDES OF THE COLUMN <br />ALL NAILS PENETRATE ALL <br />LAMINATIONS AND AT LEAST 1 �- OF <br />THE THICKNESS OF THE OUTERMOST <br />LAMINATION <br />WHERE <br />d.= END DISTANCE <br />, z SPACING BETWEEN ADJACENT FASTENERS <br />INAROW <br />� = SPACING BETWEEN ROWS OF FASTENERS <br />e, = EDGE DISTANCE <br />DOUBLE STUD W/ 10d NAIL ATTACHMENT <br />lu <br />Z- <br />re <br />A <br />;;Pw ul <br />to <br />0 <br />[BUDDIV. a w7l <br />ABBOTT PAIR& <br />LOT #10 <br />BLK #12 <br />PHASE4C <br />PROJECT# <br />04181.04C-10121 <br />MODEL. <br />E401 <br />2828—ENSLEY" <br />GARAGE 8VrMG: <br />LEFT <br />PAGE: <br />DETAILS <br />160 MPH EXP. C <br />LE <br />[ PRINT <br />DATE: 12/07/121] <br />SCAL.E: 1/4"=f-0" <br />SHEET <br />S2. IA <br />—#5 MIN. REQUIRED IN <br />EACH CELL HOOKED IN <br />TOP BOND BEAM Wl <br />STANDARD ACJ HOOK <br />[BUDDIV. a w7l <br />ABBOTT PAIR& <br />LOT #10 <br />BLK #12 <br />PHASE4C <br />PROJECT# <br />04181.04C-10121 <br />MODEL. <br />E401 <br />2828—ENSLEY" <br />GARAGE 8VrMG: <br />LEFT <br />PAGE: <br />DETAILS <br />160 MPH EXP. C <br />LE <br />[ PRINT <br />DATE: 12/07/121] <br />SCAL.E: 1/4"=f-0" <br />SHEET <br />S2. IA <br />—#5 MIN. REQUIRED IN <br />EACH CELL HOOKED IN <br />TOP BOND BEAM Wl <br />STANDARD ACJ HOOK <br />