Laserfiche WebLink
TIE VERTICAL REBAR <br />TO HORIZONTAL <br />REBAR W/1D"HOOK is <br />a <br />GROUTED BOND BEAM N <br />a . 4 'a . <br />• I 44. <br />'i <br />5 <br />CLEAN OUT REQUIRED <br />FOR INSPECTION <br />_A '•' I <br />TIEVERTICALREBAR <br />• 4� b • • <br />TO HORIZONTAL <br />. <br />4.: <br />REBAR W/10"HOCK <br />d— <br />BAR SIZE <br />148 BAR DIA <br />#3 <br />8' <br />�U <br />#4 <br />24" <br />#5 <br />#6 <br />30' <br />36' <br />HORIZONTAUVERTICAL <br />#7 <br />4z' <br />REINFORCING <br />� <br />w <br />I <br />NEW REINF. BAR <br />SECURED W/2-PART <br />EPDXY. MIN. EMBED <br />6", UNO <br />i d <br />FOLLOW ALL MANF. <br />SPECIFICATIONS FOR <br />I <br />USE AND <br />PREPARATION OF <br />J <br />HOLE. <br />,a <br />y . <br />:. <br />STEELREINF. OF <br />BOND.BEAM <br />ADDING BAR TO <br />4 BOND BEAM <br />OFFSET METHOD CONTINUOUS BAR SIZE 48 BAR DIA <br />METHOD #4 24' <br />HORIZONTALNERTICAL #5 3W <br />7 <br />REINFORCING #6 ' <br />2 #7 4 <br />STEEL REINFORCING IN GROUTED <br />CELL SEE PLAN FOR SIZE AND <br />SPACING REQUIREMENTS <br />a� <br />O B" CMU WALL <br />bYE <br />EXT. PORCH 9LAB <br />SEE SLAB SCHEDULE <br />4" CHAMFER (I -STORY <br />BAR SIZE 48 BAR DIA �w <br />h <br />W/ l/2" ISOLATION <br />" <br />6" CHAMFER (2STORY) <br />#3 1V' <br />JOINT (WHERE <br /># <br />24 <br />APPLICABLE) <br />- <br />MATCH STEEL <br />#5 30' <br />B" PVC CHASE <br />!, <br />REINFORCEMENT <br />PER SCHEDULE <br />THRU FOOTING <br />SEE SCHEDULE <br />FOR BAR BAR SIZE <br />AND BAR pL1ANfITV <br />PVC CHASE <br />THRU FOOTING <br />SCALE: 3/4"=1'-0' <br />#5 BARS <br />B" <br />0 <br />o7o J-- <br />Fol <br />1'{1' <br />c <br />T 1 0 <br />• CMU UNIT DIMENSIONS <br />ARE NOMINAL SIZES <br />O /^ MASONRY SYMBOLS <br />3 <br />1 1 SCALE: 314•'=1'-0' <br />4' TOP OF SLAB <br />4 <br />6" PVC CHASE THRU FOOTING <br />MATCH STEEL <br />REINFORCEMENT <br />PER SCHEDULE <br />1441 N. RONALD REAGAJBLVD. <br />LONGWOOD, FL32PH: 407-774-607FAX: 407-774-407www.ebdeBiBnBroup <br />AA #: 000332B <br />b <br />4 <br />F <br />Busa:v ae LOT. <br />ABBOTT PARK <br />LOT #6 <br />BLK #14 <br />PHASE #4C <br />P!lOJECTM <br />04181.04C-06141 <br />MODZ .: <br />4EHB <br />"2605- HAYDEN" <br />GARAGE BWENG: <br />RIGHT <br />PAGE: <br />DETAILS <br />%160 MPH EXP. C <br />