Laserfiche WebLink
FRAMING NOTES: <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETA16 W/ (9) 10d x 1 1/2" HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />SIMPSON LTA2 W/ (8) 10d x 1 1/2" HDG NAILS, WOOD TO WOOD: <br />SIMPSON H10A OR LGT2 W/ 10d x 1 1/2" HDG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />CONNECTERS ARE TO BE GALVANIZED. <br />6. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />CONCRETE LINTELS. <br />7. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />8. LINTELS SHALL HAVE 4" NOMINAL BEARING (4'). <br />9. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />10. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 P8S36, .177" ° x 2 7/8" LONG, WITH WASHER @ 16" O.C. <br />11. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />12. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />13. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />BEAM SCHEDULE <br />INDICATES OPENING BELOW/ T.O.B. =TOP OF BEAM IB.O.L.=BOTTOM OF LINTEL/T.O.A=TOP OF ARCH/ T.O.S=TOP OF SLAB <br />ABBREVIATIONS E.E. = EACH END, O/C = ON CENTER, F.E.S. = FROM EACH SUPPORT, T.O. = THROUGHOUT <br />MARK <br />DESCRIPTION <br />If. <br />�Z, <br />REINFORCEMENT <br />STIRRUPS <br />REMARKS <br />BTM. <br />TOP <br />MID <br />SIZE <br />SPACING <br />BB1 <br />MASONRY <br />3000 <br />8.8 <br />(1)H5 <br />NIA <br />GROUTED SOLID <br />SEE SHEET <br />S2.2A FOR <br />SAFE LOAD TABLES <br />81`16 MIN: lT/OM/1B <br />17'-4" <br />BTM. OF LINTEL @ T-O" <br />ABOVE FINISHED GARAGE SLAB <br />LIFT BEAM PLAN <br />SCALE: 1/4" = V-0" <br />•i N. RONALD REAGAN SL <br />LONGWOOD, FL32750 <br />PH: 407-774-6078 <br />FAX: 407-774-4078 <br />www.abdesigngroup.com <br />AA #: 0003326 <br />Pi <br />54 <br />ti <br />SUBDI`I. & LOT: <br />ABBOTT PARK <br />LOT #22 <br />BLK #11 <br />PROJECT* <br />04181.000-22111 <br />MODEU <br />4EBB <br />"1828-CALI" <br />GARAGE 9111I►MG: <br />LEFT <br />PAGE: <br />LIFT BEAM <br />PLAN AND <br />NOTES <br />160 MPH E <br />22 <br />aCAL.E: 1 /4"=1'- 0" <br />SHEET <br />s2 <br />