My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7575 Broad Pointe Dr
Zephyrhills
>
Building Department
>
Building Plans
>
7575 Broad Pointe Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 12:41:12 PM
Creation date
2/24/2025 10:06:31 AM
Metadata
Fields
Template:
Building Plans
Street #
7575
Location
Broad Pointe Dr
Contractor
D R Horton
Building Plans - Permit #
2109
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRAMING NOTES: <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETAi6 W/ (9) 10d x 1 1/2" HOG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />SIMPSON LTA2 W/ (8) 1 Od x 1 1/2" HDG NAILS, WOOD TO WOOD: <br />SIMPSON H10A OR LGT2 W/ 1Od x 1 1/2" HOG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />CONNECTERS ARE TO BE GALVANIZED. <br />6. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />CONCRETE LINTELS. <br />7. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />8. LINTELS SHALL HAVE 4" NOMINAL BEARING (4'). <br />9. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />10. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILT[ X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 P8836, .177" " x 2 7/8" LONG, WITH WASHER Q 16" O.C. <br />11. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />12, WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />13. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />HEADER SCHEDULE <br />MARK <br />DE8CRRIIP77C`N <br />REMARK <br />O <br />(2)M <br />(2) 2X12 <br />BEAM SCHEDULE <br />RZEUM INDICATES OPENING BELOW/ T.O.B. = TOP OF BEAM / B.O.L. = BOTTOM OF LINTEL / T.O.A = TOP OF CH / T.O.S = TOP OF SLAB <br />ABBREVIATIONS <br />E.E. = EACH END, O/C = ON CENTER, F.E.S. = FROM EACH SUPPORT, T.O. = THROUGHOUT <br />MARK <br />DESCRIPTION <br />(c <br />SIZEREMARKS <br />REINFORCEMENT <br />STIRRUPS <br />BTM. <br />TOP <br />I MID <br />SIZE <br />SPACING <br />BB1 <br />MASONRY <br />3000 <br />6x16 <br />(1)#5 <br />1 (1)#5 <br />1 N/A <br />I <br />GROUTED SOLID <br />8132 <br />MASONRY <br />3000 <br />6x8 <br />(1)#5 <br />N/A <br />I <br />GROUTED SOLID <br />SEE SHEET <br />S2.2A FOR <br />SAFE LOAD TABLES <br />FIRST FLOOR LIFT BEAM PLAN <br />SCALE: 1/4" - V-0" <br />IRF14-1T/OM/OB <br />3TM. C 6'-B" <br />1441 N. RONALD REAGAN BE <br />LONGWOOD,FL32750 <br />PH: 407-774-6078 <br />FAX: 407-7744078 <br />www.abdesigngroup.com <br />AA #c 0003325 <br />C <br />aUBDLv. ea L/oT <br />ABBOTT PARK <br />LOT #23 <br />BILK. #11 <br />PROJECT# <br />04181.000-23112 <br />MODWL4 <br />3EEB <br />"2260—ELSTON" <br />GARAGE OVIMO: <br />LEFT <br />PAGE: <br />FIRST FLOOR <br />LIFT BEAM PLAN <br />AND NOTES <br />160 MPH MR. C <br />PpmcT <br />DATE: 4/06/21 <br />aCAL.E: 1/4"=1'-0" <br />SHEET <br />kk s2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.