My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7587 Sail Clover Ln
Zephyrhills
>
Building Department
>
Building Plans
>
7587 Sail Clover Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 3:32:43 PM
Creation date
2/24/2025 9:24:35 AM
Metadata
Fields
Template:
Building Plans
Street #
7587
Location
Sail Clover Ln
Contractor
D R Horton
Building Plans - Permit #
4466
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AVAL#A E � <br />SHOULD SE TAKEN IN KEEPING THE VENT PROPERLY <br />e• AND 1P ALIGNED. VIM PIPE IS SEALED IF UTLIIED. NAIL IN PLACE <br />S HONN IN 4' GALVANIZED CH CORNER. RG <br />SHCkIL BE IJEOT O <br />IE!I NE t THE <br />SHOULD BEAPPUEO TO AlL SHINGLE EDGES NEAP THE <br />IXJIER EDGE AND A THE ENTIRE PERIMETER PS <br />CVTOUT GOOSENECK VENT OPENING IN THE ROOF RECOMMENDEDIN REVERERE NEATMER COASTAL <br />SHEATHING. SRE THE EP ENT IN ACCORDANCE N1TH THE CONSTRUCTION ZONES. <br />CHARTS INTHEEVENT ANECWNIGTL VENT FAN IS <br />U3ED, SIZE THE VENT OPENING N ACCORDANCE N1TH <br />THE <br />VENT FAN 1MNUFACNRE'S %FIND CONFECTION <br />INSTRUCTIONS. <br />DO NOT CUT INTO TRUSSES OR RAPIERS NHEN OUTING THE <br />OP��EMQNG IN THE <br />RR MOVE INTERFERING SHINGLE NAILS AROUND THE <br />PERIMETER OF THE OPENING SO TlUT THE HNLING FLANGE <br />OF THE VENT LAYS RAT TO THE ROOF SHEATHING. SLIDE <br />THE <br />TOP AND SA FLANGES OF THE VENT lP AND UNDER <br />THREES. INVENTFLANGES TOIAY ON <br />THESTHGLES. <br />THE TOP OF THE SHINGLES. -II_ <br />ROOF HOOD VENT DETAIL <br />B 111 WE <br />CUT HOUam~ <br />AT 40' AIVSLE <br />a <br />YIODIPIED 11. OUT <br />' <br />N HOME~ <br />LINE OF UROQU <br />OPtNNG <br />\ <br />AFFROAD HOUSE~ <br />OAR SHEATHING OVER <br />ED STUD MALL <br />STEP 1 <br />INSTALL .•- <br />MASHING <br />DHERNG <br />R.AeNNAILING OVE <br />ANGE <br />Ja•ee <br />EXTEND FLASHING MN <br />IEGILL.FLEXIBLE\J/\ FLEXIBLE RASHNG <br />DO NOT SEAL MOTTO" 1 --' <br />FIN <br />STEP 6 <br />*0. <br />TENPO <br />FOLD -I <br />HOUIE <br />TUCK P <br />at iEA <br />FOLD <br />N AT <br />INSTALL S' <br />SELF-ADFERNG <br />PLA64M OVER <br />VINYL HEAD <br />RAGWING (WTH END <br />DAMS) NAILIG <br />PLANGE <br />I <br />IDL7ED <br />SeLP-ADHERINa <br />PLAISMINIS 1• MN 11EYO <br />EEYOND DAME <br />IFL.AaIISIG <br />INSTALL VINYL PI <br />CAP <br />ASPHALT PLASTID CEMENT <br />MOLDED AROUND BASE OF <br />PIPE AND OVER FLANGE <br />ALIGN R.MIINb <br />ITV W. EDGE OF <br />SILL MO. <br />MEGHANIC-ALLY <br />FASTEN FANN IE <br />I&I MAP <br />NAILS, STAPLES; <br />INSTALL DUPONT <br />PLDGRAP AS TH <br />RASING AT THE <br />FOLD WOUBV TAP <br />COW N TAPE <br />DIAGONAL CUT l <br />ACRDSS FEAR of <br />wINDOw <br />MN <br />PLUMBING VENT DETAILS <br />RPPLY 46. <br />F SEALLA <br />AMEa Alt <br />FITLY TO <br />AFDMU NA <br />LANGE N <br />'RE-PVtH <br />IOLEIS OR <br />INSTALL V WD8 ADIEINA - <br />S ACPW R MILE R.ASHND <br />MATERIAL OVER DRIP GAP <br />.low (PROTEOTO-SNAP <br />DT-29.41, GF EOWIV) <br />STEP 7 STEP 8 141:�o <br />WINDOW FLASHING <br />INSTALLATION DETAILS <br />12 ( FULL WRAP) <br />SCALE: NTS <br />STEP 9 <br />M MASHING <br />OAR JOINT <br />VALLEY CENTERLINE <br />33• VADE VALLEY FLASHING <br />10 FMTNERS NITHIN <br />5GI OR HEAVIER FELT <br />S• OF CENTERLINE <br />XTRA FASTNERS IN <br />UNDERIAYMENT 1 <br />\ <br />END OF SHINGLE <br />I) <br />NDENDSHNGLE <br />ASPHALT <br />ATLIT 12•BEYOND <br />. VALLEYCENTERUNE <br />ROOFING <br />CDAENT <br />/I <br />• SIPPED OFF <br />_ CORNER AT OS DEGREES <br />ASWNGLES TRMV.IED2•BACK <br />FROM VALLEY CENTERLINE <br />ROOF VALLEY DETAIL <br />SCALE, <br />APPLT OSI Mal (O <br />EQUAL) SEALANT A <br />WNDOWACI'N JOINT. <br />FLUID APPLIED <br />PLAamm (LANI70 <br />WRITE -SEAL RO-N <br />OR EOILLLA <br />SLOPE SILL TO EX <br />L IT 18 THE CONTACTORS WORONa115I1-TY TO VERIFY <br />THE COFIPATIDILITT OFALL PRODUCM INDLUDINo <br />HOUSEU2RAP, SEALANTS 4 ;ELF-ADHERNG <br />M-48M 6 MATERIALS USED OURNG CONSTRUCTION <br />2. INSTALL ALL MATERIALS PER MANFAGTU ERS <br />EAITTION SPECIFICATIONS <br />SEALANTS MAY TRACT ADVERSELY F NOT <br />COMPATIELE- <br />CCLEAN AND REAL JAMS TO BILL JOINTS WITH <br />DOW IM FOLLOWING COMPLETION OF <br />EXTERIOR RETROFIT WOW <br />REPAIR SCHEME SHOU.N SHALL BE <br />IMPLEMENTED AT ALL WINDOWS WITH <br />EVIDENCE OF WATER INTRIIBION BELOW THE <br />WINDOW OPENING <br />SEAL INTERIOR PERIMETER OF WNDOW WITH <br />SEALANT <br />NOM <br />L IT IS THE CONTACTORS RESPGN8IBILTY TO VERIFY <br />THE COFPATREILITY OF ALL PRODUCTS NCLUDI G <br />IEALANTS 4 I IE P-ADFERSG R-ASHINO MATEIALS <br />RUED OUP04 CONSTRDTION. <br />2. FLASHING AT EXTERIOR 04POIG AND DOOR <br />OPFNNGS SNAIL ESE INSTALLED N ACCOImANCE <br />UIITH MARFACTI#ERS NSTALLATICN INSTRUCTION/ <br />AND APPROVED METHOD U OF MC RIODA <br />U N ACCORDANCE UNTH FENESTRATION <br />MANIFACTUIERS NSTALLATION AND R.A m <br />INSTRUCTIONS. <br />WAINN@nt WALANTO MAY REACT ADVERSELY Ilk NOT <br />!COMPATISLE. <br />WALL FLASHING INSTALLATION <br />DETAIL (MASONRY) <br />SCALE, NTB <br />1441 N. RONALD REAGAN BLVD <br />LONGWOOD, FL 32750 <br />PH: 407-774-6078 <br />FAX: 407-774-4078 <br />www.abdesigngroup.com <br />AA #: 0003325 <br />F <br />p <br />y��� <br />p0 <br />a <br />OUZO <br />C <br />Q <br />UL <br />Q <br />U <br />Lu <br />KW <br />C Ian <br />W <br />RE <br />POOR aLOT <br />ABBOTT PARK <br />LOT#3 BLK#12 <br />PHASE 4C <br />PROJECT# <br />04181.04C-03121 <br />MODEU <br />E401 <br />FT2828—ENSLEY" <br />GARAGE OWING: <br />LEFT <br />PAGE: <br />WALL <br />ASSEMBLY <br />DETAILS <br />160 MPH EXP. C <br />2 <br />I ROLAuo a n 1 <br />93M <br />AR No a J <br />PRINT 10 26 21 <br />DATE: <br />SCALE: 1/4"=V-0" <br />SHEET <br />WA5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.