Laserfiche WebLink
TIE VERTICAL REBAR <br />TO HORIZONTAL <br />REBAR W/ 10" HOOK <br />-GROUTED BOND BEAM <br />#5 BARS <br />1 <br />CLEAN OUT REQUIRED <br />FOR INSPECTION <br />V-0' FIN. FLR. <br />TIE VERTICAL REBAR <br />4� a • • <br />TO HORIZONTAL <br />...4.:' <br />REBAR W/ 10' HOOK <br />BAR SIZE 148 BAR DIA <br />#3 18" <br />i <br />#4 24" <br />hu <br />#6 30' <br />#6 36' <br />#7 47' <br />HORIZONTAUVERTICAL <br />� <br />REINFORCING <br />CMU UNIT DIMENSIONS <br />Zo ARE NOMINAL SIZES <br />MASONRY SYMBOLS <br />SCALE: 314"=1'-O' <br />STEEL REINFORCING IN GROUTED <br />2 <br />dd <br />S� <br />CELL SEE PLAN FOR SIZE AND <br />SPACING REQUIREMENTS <br />oN <br />b a <br />6" CMU WALL <br />TOP OF SLAB <br />4' <br />TOP OF SLAB <br />EXT. PORCH SLAB <br />SEE SLAB SCHEDULE <br />4" CHAMFER (1STORY) <br />BAR SIZE 48 BAR DIA. <br />.4 <br />S <br />W/ 1/2" ISOLATION <br />6" CHAMFER (2STORY) <br />#3 <br />18' <br />h <br />. . 4 <br />JOINT (WHERE <br />6 <br />#4 <br />24" <br />4 <br />. <br />APPLICABLE) <br />MATCH STEEL <br />#5 <br />30' <br />e" PVC CHASE <br />s <br />REINFORCEMENT <br />38" <br />THRU FOOTING <br />it <br />PER SCHEDULE <br />#7 <br />q7• <br />6" PVC CHASE THRU FOOTING <br />MATCH STEEL <br />SEE SCHEDULE <br />REINFORCEMENT <br />FOR MD, BAR SIZE <br />PER SCHEDULE <br />AND BAR OUMM7y <br />PVC CHASE <br />THRU FOOTING <br />4 <br />SCALE: 3/4"=1'-0• <br />QE <br />1441 N. RONALD REAGAN BLVD. <br />LONGWOOD, FL 32740 <br />PH: 407-774-6078 <br />FAX: 407-774-4078 <br />www.abdealgDgmup.coIn <br />AA #:0003324 <br />K <br />g <br />summ a LOT: <br />ABBOTT PARK <br />LOT #2 <br />BLK #12 <br />PHASE #4C <br />PROJMCTp <br />04181.04C-02121 <br />WORM a <br />4EAB <br />"1672—ARIA" <br />GARAOZ 8NING: <br />LEFT <br />PAGE: <br />DETAILS <br />160 MPH EXP. C <br />