My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7761 Sail Clover Ln
Zephyrhills
>
Building Department
>
Building Plans
>
7761 Sail Clover Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 11:56:06 PM
Creation date
2/24/2025 9:22:33 AM
Metadata
Fields
Template:
Building Plans
Street #
7761
Location
Sail Clover Ln
Contractor
D R Horton
Building Plans - Permit #
2867
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALL 6' SELF -ADHERING <br />hEMSRMIE FLASHING OVER <br />TOP, 61DE(6) AND BOTTOM <br />FLANGES OF NON -MOVABLE <br />FRAME OF THE E:X 4"T. <br />�n owe OF FLAft9W1 Tl26E: <br />;X[ <br />1. BOTTOM. 2- SIDES, 3. TOP <br />VENT CAP IS TO BE SET IN BED <br />OF eEALANT AT TOP AND <br />60166 ONLY. SEALANT IS TO BE <br />TOOLED 60 AS TO DEFLECT <br />'X- <br />WATER AWAY PROM JOINTS. <br />E-Z BEAD ALL AROUND <br />VENT -APPLY SEALANT ALL <br />i <br />JOINTS AND INTERSECTIONS <br />1 <br />APPLY SEALANT AT PERIMETER OF <br />BACKER ROD <br />NON -MOVABLE FRAME AND STUCCO <br />% AL SIDES,Y; CAULKING • JOINT <br />ROtAJD <br />I I <br />I I <br />PER SECTION <br />I I <br />E16nbr MtlIYw NrM W6Merino <br />BACKER ROD <br />I I <br />Exterior use of portland cement plaster <br />shall comply with the application <br />requirements of ASTM C 926-18b. <br />IX, <br />1 <br />r <br />Installation of exterior lathing and framing <br />shall comply with ASTM C 1063-19a, <br />or ASTM 1787. <br />WRB LAYER M, <br />1 <br />STUCCO WR 4P <br />I <br />( <br />HOODED VENT <br />3 COAT CEMENT <br />PLASTERTHICK, <br />METAL LATH <br />WRB LAYER 02, FORTPIBER <br />BUILDING PAPER <br />11OOD 61 EATWM <br />DRYER VENT <br />(FRAME) <br />> SHEATHING <br />IAYER M, <br />CO WRAP <br />LAYER 02, FOR I FIBER <br />—METAL LATH <br />S' a1J VINYL CASING BEAD <br />6' RAISED BAND <br />xR>go <br />6' WDE STRIP Way <br />AD4E61VE PLASHMG, CLEAN <br />MASONRY BEFORE APPLYING <br />Z FLASHING <br />&TONE VENVER <br />OVER SCRATCH COAT <br />HORIZONTAL WEEP SCREED <br />W/STONE VENEER <br />(FRAME TO BLOCKI <br />LEGEND <br />DRAINAGE PLANE (WRB <br />LAYER 01, STUCCO WRAP) <br />WRB LAYER 02 (FORTIFIBER - - - - - - - - <br />BUILDING PAPER) <br />METAL LATH x—x—x—x <br />STUCCO <br />WOOD OR '1/16' ZIP WALL <br />SHEATHING <br />SELF-ADHESIVE FLASHING - — — — - <br />NOTE: <br />METAL LATH: LATH TO BE PER SECTION <br />R103.1.1 / ASTM C-641-14a, MIN. 2.5 LBS. <br />PER SQ. YARD (UTILITY OR NOMINAL <br />LATH DOES NOT MEET SPECIFICATIONS) <br />ELEC. METEI <br />VERIFY LC <br />FINISH <br />6' SELF ADHESIVE <br />OVER TOP 4 SIDES <br />FLASHING <br />UNIT <br />PREMANUF. DRYER <br />VENT CAP (SET IN <br />CONT. SEALANT) <br />SEALANT • <br />TOP 4 SIDES <br />6B DRYER VENT (BLOCK) <br />BUILDING PAPER <br />OVER 'CiUICK <br />FLASH' <br />PIPE THROUGH / <br />WALL <br />i <br />6' SELF ADHESIVE — <br />FLASHING (INSTALL <br />PER MANUF. SPECS.) <br />BUILDING PAPEI <br />UNDER 'QUICK FLASH <br />A VENT PENETRATION <br />SCALE: N.T.B. <br />STUCCO SCRATCH COAT <br />4 1 COAT OF PAINT W/5ACK- <br />ROLL PRIOR TO <br />ELEC. METER INSTALLATION <br />I <br />ELEC. METER FIELD <br />VERIFY LOCATION <br />CONSTRUCTION <br />WOOD SHEATHINCs <br />WRB LAYER 01, <br />STUCCO WRAP <br />WRB LAYER 02, FORTIFIBER <br />BUILDING PAPER <br />j' THICK, 3 COAT CEMENT <br />PLASTER <br />V TO V MID -WALL <br />WEEP SCREED <br />6' SELF-ADHESIVE <br />FLASHING <br />WOOD FRAMED <br />J---vrm WALL <br />HORIZONTAL WEEP SCREED <br />( FRAME TO FRAME) <br />APPLY STUCCO SCRATCH COAT <br />AND ONE (1) LAYER OF PAINT <br />PRIOR TO INSTALLINCs ELEC. <br />METER <br />CAVITY TO BE FILLED <br />WITH RIGID POLYMERIC <br />ISOCYANOTE-POLYBLEND FOAM <br />I— A- """'• 'WR SIMILAR) <br />APPLY A SILICON <br />BASE SEALANT AT POINT <br />THAT ELEC. WIRE PENETRATES <br />-O SCRATCH <br />COAT LARGER THAN THE ELEC. <br />METER CAN OR METER CAN <br />COMBO OR METER CAN AND <br />DISCONNECT <br />O ELECTRICAL CONDUIT <br />PENETRATION <br />CUT OPENING IN <br />APPROVED HOUSEWRAP <br />FOR BOX INSTALLATION <br />UM LAYER M, <br />STUCCO WRAP <br />WOOD SHEATHINCs— <br />APPROVED— <br />HOUSEWRAP <br />BELOW <br />CUT SUCH THAT - <br />NO MEMBRANE <br />ENTERS BOX, <br />APPLY TO PACE <br />EDGE <br />APPLY E-Z BEAD <br />OVER 60 MIN <br />GRADE 'D' <br />FELT -PROVIDE <br />SEALANT AT ALL <br />JOINTS AND <br />INTERSECTIONS <br />WOOD SHEATHING <br />LAYER N, <br />STUCCO WRAP <br />LAYER 7, FORTIFIBER <br />BUILDING PAPER <br />METAL LAT14 <br />WOOD <br />CON6TRICTION FlINI6F1 WOOD <br />FASTEN TO WOOD 6TMJCTURAL <br />r091 EER • T' = MAX <br />6' CIU <br />7i' Torr_& CI2111666 <br />we <br />ADHESIVE K.ASWWA CLEAN <br />MASONRY DO —OW APPLYING <br />�B HORIZONTAL WEEP SCREED <br />(FRAME TO BLOCK) <br />STEP 03 <br />6' <br />WRB LAYER M, <br />STUCCO WRAP <br />WRB LAYER M, <br />STUCCO WRAP <br />6 APPLY 60 MM <br />GRADE 'D' FELT <br />MEMBRANE FLASHING <br />® MEMBRANE FLA <br />— OVER <br />SELF -ADHERING <br />FLASHING OVER <br />APROVED <br />HOUSEWRAP <br />L Ilk <br />wR8 LAYER 02, FORTIFOER <br />BUILDING PAPER <br />STEP #4 <br />ELASTOMERIG <br />COATING OVER <br />STUCCO/ C.v. FINISH <br />(SEE TYPICAL WALL <br />I. <br />SECTION) <br />_ <br />METAL LATH <br />STEP 05 STEP 06 <br />n9 ELECTRICAL RECEPTACLE <br />•1 N. RONALD REAGAN 81 <br />LONGWOOD, FL32750 <br />PH: 407-774-6078 <br />FAX: 407-774.4078 <br />www.abdeslgngroup.com <br />AA 0003325 <br />h <br />E <br />4 <br />sLJSDIV. & LO1! <br />ABBOTT PARK <br />LOT# 31 <br />BLaK�.► 7 <br />0181�.000-31071 <br />a�aszs <br />4EWB <br />"1499-FREEPORT" <br />dARAiGM swaak <br />RIGHT <br />PACM <br />WALL <br />ASSEMBLY <br />DETAILS <br />%160 MPH EXR. C <br />
The URL can be used to link to this page
Your browser does not support the video tag.