My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7839 Sail Clover Ln
Zephyrhills
>
Building Department
>
Building Plans
>
7839 Sail Clover Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 7:49:00 AM
Creation date
2/24/2025 9:40:14 AM
Metadata
Fields
Template:
Building Plans
Street #
7839
Location
Sail Clover Ln
Contractor
D R Horton
Building Plans - Permit #
2658
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRAMING NOTES: <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETAL20 WI (14) 10d x 1 1/2" HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />SIMPSON LTA2 WI (8) 10d x 1 1/2" HOG NAILS, WOOD TO WOOD: <br />SIMPSON HIOA OR LGT2 W/ 10d x 1 1/2" HDG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />CONNECTERS ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />CONCRETE LINTELS. <br />S. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />7. LINTELS SHALL HAVE 4" NOMINAL BEARING IV). <br />8. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />9. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 P8SM, .177" " x 2 7/8" LONG, WITH WASHER ® 16" O.C. <br />10. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />12. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR, UNLESS <br />NOTED OTHERWISE. <br />HEADER SCHEDULE <br />MARK <br />DE8♦L'RB lRm <br />REMARK <br />I <br />Q <br />(2) 2X8 <br />BEAM SCHEDULE <br />INDICATES OPENING BELOW / T.O.B. = TOP OF SEAM/ S.O.L. = BOTTOM OF UNTEL / T.O A = TOP OF ARCH / T.O.S = TOP OF SLAB <br />ABBREVIATIONS E.E. = EACH END, O/C = ON CENTER, F.E.S. = FROM EACH SUPPORT, T.O. = THROUGHOUT <br />MARK <br />DESCRIPTION <br />( P-I) <br />SIZE <br />WH' <br />REINFORCEMENT <br />STIRRUPS <br />REMARKS <br />BTM. <br />TOP <br />MID <br />SIZE <br />SPACING <br />BB1 <br />MASONRY <br />3DOO <br />8.8 <br />(1)iS <br />N/A <br />GROUTED SOLID <br />SEE SHEET <br />S2.2A FOR <br />SAFE LOAD TABLES <br />1 o BFi6.1 TIOM/OB 8F16-lT/0M 8F18.1T/OM/OB------------------ <br />--------------- <br />mi <br />------- <br />I <br />1 <br />1 <br />q%% <br />p <br />2 <br />o� <br />9 <br />1� <br />�% <br />I <br />UNO, PROVIDE BB1 WHERE <br />ROOF TRUSSES BEAR, TOP <br />OF WALL EL. 8'4', UNO. <br />I '® <br />+g o <br />4 <br />o <br />8RF14- % <br />1 1T/0M/OB o <br />1 0 5'4" O <br />1 1 % <br />1 1 % <br />1 1 <br />1 1 %% <br />! 1 % <br />1 ! � <br />1 8F16.1T/OM10B ! <br />1 Bf8- <br />1 TIOM/OB <br />------------- <br />LIFT BEAM PLAN <br />SCALE: 1/4" = 1'•0" <br />i N. RONALD REAGAN BL <br />LONG WOOD, FL 32750 <br />PH: 407.774-6078 <br />FAX: 407-7744078 <br />www.abdesigngroup.com <br />AA M: 0003325 <br />Y <br />aulwiv. as LOT <br />ABBOTT PARK <br />LOT #23 <br />BLK #7 <br />I'M <br />ROJECT04181.00 23071 <br />4EAB <br />"1672—ARIA" <br />ARAQE SMMO: <br />RIGHT <br />[160—MPH <br />GE <br />IFT BEAM <br />PLAN AND <br />NOTE <br />C <br />Dw 06/14/21 <br />DIEM" <br />
The URL can be used to link to this page
Your browser does not support the video tag.