My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7840 Wheat Stone Dr
Zephyrhills
>
Building Department
>
Building Plans
>
7840 Wheat Stone Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 7:52:23 AM
Creation date
2/24/2025 10:14:48 AM
Metadata
Fields
Template:
Building Plans
Street #
7840
Location
Wheat Stone Dr
Contractor
D R Horton
Building Plans - Permit #
2427
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1, 1 '1 I ..._ '1:'1 IT V' T.°Cal:i'rrn I�Ir <br />DocuSign Envelope ID: 57BBOB27-E2C4-46E5-A844-3005B71 F9F46 <br />EXISTING EXTERIOR CMU <br />MIN. 3" EDC <br />STRIP OF WWF FROM F.F.E. TO <br />MIN. 6" BELOW GRADE. WWF TO <br />EXISTING FOUNDATION FACE w/ <br />(2) ROWS OF 3/6' DIA. TAPCONS <br />OR CUT NAILS @ 24" O.C. COVE[ <br />FLUSH w/ 3000psi CONCRETE <br />p <br />FOUNDATION. <br />8" CMU WALL OVERHANGS LESS THAN 1" <br />GROUT BOTTOM 3 COURSES <br />OF EXISTING CMU WALL FOR <br />LENGTH OF OVERHANG. FILL <br />TO BOTTOM OF WINDOW SILL <br />WHERE NEEDED <br />MIN. 3" EDC <br />STRIP OF WWF FROM F.F.E. TO <br />BOTTOM OF FTG. WWF TO <br />EXISTING FOUNDATION FACE w/ <br />(2) ROWS OF 3/s' DIA. TAPCONS <br />OR CUT NAILS @ 24" O.C. COVEF <br />FLUSH w/ 3000psi CONCRETE. <br />D <br />EXISTING FOUNDATION <br />8" CMU WALL OVERHANGS 2.5" OR LESS <br />NOTES: <br />• IF EXISTING REBAR DOES NOT MEET 3" EDGE DISTANCE REQUIREMENT, <br />REMOVE INSIDE FACE SHELL OF EXISTING CMU WALL AT ADJECENT CELL <br />AND DRILL & EPDXY NEW FULL HT. VERTICAL #5 DOWEL W/ 12" EMBED INTO <br />EXISTING FOUNDATION AND 4" EMBED INTO EXISTING BOND BEAM. <br />• IF MORE THAN (3) BARS DO NOT MEET THE REQUIRED 3" EDGE DISTANCE, <br />CONTACT EOR. <br />CONCRETE SLAB W/ 6x6 <br />W1.4 x W1.4 WWF OR <br />FIBERMESH <br />0'-0" A.F.F. SEE ARCH <br />(MAX 20" <br />° d ° DEEP) <br />a d <br />4" <br />4" EXTENSION <br />UNDER BRICK VENEER <br />12" UNDER 1 STORY WALL <br />VAPOR BARRIER <br />6 BEARING CURB STEP SECTION <br />CONCRETE SLAB w/ 6x6 <br />W1.4 x W1.4 WWF OR <br />FIBERMESH <br />° d <br />° \�'4 //\// <br />\\/�\ 4 ° 4.. <br />in <br />VAPOR BARRIER <br />*KARIING WALL FOOTING SECTION <br />LAP #5 CONTINUOUS BAR AS <br />NEEDED, MIN 12" LAP AS SHOWN <br />NO.5 BAR BEND 90 DEGREE <br />TOP OF FOOTING <br />L_ <br />CONTINUOUS CONCRETE <br />FOOTING, SEE PLAN <br />TYPICAL STEP IN FOOTING DETAIL <br />CONCRETE SLAB W/ <br />8" CMU CHAIR <br />6x6 W1.4 x W1.4 WWF <br />OR FIBER MESH <br />TOP OF SLAB BLOCK W/ (1) #4 OR #5 CONT. <br />-- -— — — — — — — cn <br />LLJ <br />\\ \\\i\\ 0 ¢ O <br />VAPOR BARRIER // � 0 <br />#4 OR #5 VERT REINFORCING\\� //\\//\// <br />UP TO 3 COURSES: 72" O.C.\/\\ /\\/\\ ` <br />4 TO 5 COURSES: 48" O.C. <br />\\/ N L <br />\\/� <br />FOOTING TO BEAR ON FIRM � . //� / ADDITIONAL #4 OR <br />UNDISTURBED SOIL #5 IN BRICK LEDGE <br />VERTICAL REINFORCEMENT 4" OPT BRICK LEDGE <br />TO HAVE 6" BEND AT BOTTOM NOTED ON FND PLAN <br />CAST -IN -PLACE FOOTING SPECS <br />1-STORY: 8" x 16" W/(2) #4 OR (2)#5 CONT <br />2-STORY: 10" x 20" W/(3) #4 OR (2) #5 CONT <br />02 STEMWALL SECTION <br />1. SPECIAL CARE SHOULD BE EXERCISED BY CONTRACTOR WHEN BACK <br />FILLING BEHIND A STEM WALL, PARTICULARLY WHEN IT IS OVER 4 <br />COURSES HIGH. SHOULD THIS CONDITION EXIST, RECOMMENDATIONS <br />MAY BE OBTAINED FROM THE ENGINEER OF RECORD. <br />2. SCREW IN ANCHORS ALLOWED IN MONOLITHIC FOOTINGS ONLY. EPDXY <br />ANCHORS MUST BE USED IN STEMWALL FOUNDATIONS. <br />0'-0" A.F.F. <br />(BEYOND) <br />FLOATING CONCRETE -- w U-BLOCK W/ <br />SLAB W/ 6x6 W1.4xW1.4 w v J (1) #4 OR #5 <br />WWF OR FIBERMESH > ¢ ¢ cn CONT <br />y uJ <br />a U co <br />w <br />— — —c. D FINISH <br />\//\//\//\//\ - ±a - \/\/\ PTO GRADE <br />#4 OR #5 VERT REINFORCING \\ <br />UP TO 3 COURSES: 72" O.C. �• \/\\/\\/ <br />4 TO 5 COURSES: 48.1 O.C. <br />FOOTING TO BEAR ON FIRM <br />UNDISTURBED SOIL -_ ADDITIONAL #4 OR <br />#5 IN BRICK LEDGE <br />VERT REINFORCEMENT TO 4" OPT BRICK LEDGE <br />HAVE 6" BEND @ BOTTOM NOTED ON FND PLAN <br />CAST -IN -PLACE FOOTING SPECS -- <br />1-STORY: 8" x 16" W/(2) #4 OR (2)#5 CONT <br />2-STORY: 10" x 20" W/(3) #4 OR (2) #5 CONT <br />7 STEMWALL CURB SECTION <br />1. SPECIAL CARE SHOULD BE EXERCISED BY CONTRACTOR WHEN BACK <br />FILLING BEHIND A STEM WALL, PARTICULARLY WHEN IT IS OVER 4 <br />COURSES HIGH. SHOULD THIS CONDITION EXIST, RECOMMENDATIONS <br />MAY BE OBTAINED FROM THE ENGINEER OF RECORD. <br />2. SCREW IN ANCHORS ALLOWED IN MONOLITHIC FOOTINGS ONLY. EPDXY <br />ANCHORS MUST BE USED IN STEMWALL FOUNDATIONS. <br />CMU STEMWALL MONO LITHIC SLAB 3'/i' CONCRETE SLAB W/ 6x6 <br />_._._ (1) #4 OR #5 CONT W1.4 x W1.4 WWF OR FIBERMESH <br />8" CMU CHAIR BLOCK W/ (1) #5 <br />CONTINUOUS TO EXTEND MIN 24" MINIM 24" (1) #4 OR #5 90° BEND @ 48" O.C. <br />INTO MONOLITHIC THICKENED EDGE <br />MIN 24" LAP d °, <br />36" MAX VARIES PER —° — — — — — — <br />4" CEONCR TE.4 LLAB / J� ARCH PLANS ° 4 d <br />6x6 \/�\\ <br />_ OR FIBER MESH <br />��\T\/�� ° \\ <br />w z — — — — — — — - — a °-.� a ° — ° d VAPOR BARRIER <br />// / / 12" MIN d \ <br />FOOTING TO BEAR j —. .� ° ° ° $ ° 'd #4 OR #5 //\\�/��/� \ //\\// 4'' / UNDISTURBED SOI ON FIRM <br />0 ° REINFORCING PER <br />U ° d MONOLITHIC FOOTING <br />° ° SECTION 6" OPT. EXTENSION b <br />IN BRICK LOCATIONS <br />d l a< •. FOOTING TO BEAR ON UNDISTURBED SOIL ON FND PLAN 12" UNDER 1 STORY WALL W/ (2) <br />-- -- =°� < <br />\ \ ° \ �° ADDITIONAL NO. 4 OR NO. 5 #4 OR (2) #5 CONT <br />• d 4° da MIN112" //\//\//\//\//\//\//\ BAR IN BRICK LEDGE ° -- <br />/\\/\\/\\/\\/\\/\\�\\ 16" UNDER 2 STORY WALL W/ (3) <br />d <br />— ° ° �d <br />d ° /\\/\\/\\/\\� #4-OR (2) #5 CONT <br />\\ NMONOLOTH IC FOOTING SECTION - 36 MAX DEPTH <br />/ /\/\/\\/ • STEMWALL FOOTING TO EXTEND MIN <br />'� 12" BELOW MONOLITHIC FOOTING <br />'NOTE": IT IS ACCEPTABLE TO SUBSTITUTE THIS S. <br />FTG DETAIL FOR THE "1" <br />/\\//\\/�\\�\\,� • ADDITIONAL #4 OR #5 VERTICAL TO BE FTG DETAIL SPECIFIED ON THE FDN PLAN @ ANY LOCATIONS THAT THE FTG <br />LOCATED WITHIN TRANSITION ZONE DEPTH EXCEEDS 28". <br />LOCATE AND TIE INTO STEMWALL FOOTING IF GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY FROM STRUCTURE <br />REINFORCEMENT IN LAST REINFORCEMENT <br />STEMWALL CELL STEEPER THAN 1'-0" VERTICALLY PER 3'-0" HORIZONTALLY, CONTRACTOR HAS <br />TWO CHOICES: <br />1. PRIOR TO CONSTRUCTION, SEEK GUIDANCE OF FOR TO PREVENT EROSION <br />CMU STEMWALL TO MONOLITHIC TRANSITION DETAIL OF SOIL. <br />2. USE STEMWALL FOOTING <br />CONCRETE SLAB W/ 6x6 SEE NOTES (MAX 16") v <br />W1.4 x W1.4 WWF OR o <br />FIBERMESH STUCCO OR DIRECTLY ADHERED <br />STONE CLADDING FINISH - MIN 6" Q, p <br />ALL OTHER EXTERIOR WALL N <br />\ ���/\\/ cy <br />\\j p CLADDING -MIN 8", U.N.O. ON ARCH O O <br />,,� APES <br />VAPOR BARRIER �// o\\ 12" MINA\/\\/\\/\\/\\/\� N U <br />\ \ O N <br />IN, <br />� O N <br />FOOTING TO BEAR ON 6" OPT. EXTENSION IN BRICK <br />FIRM UNDISTURBEDSOIL LOCATIONS ON FND PLAN N <br />12" UNDER 1 STORY WALL w/ M <br />(2) #5 OR (2) #4 CONTINUOUS ADDITIONAL NO, 4 OR NO. 5 J <br />BAR IN BRICK LEDGE LL <br />16" UNDER 2 STORY WALL w/ LUtds <br />(2) #5 OR (3) #4 CONTINUOUS J -p <br />true design studios <br />1 MO_NOLIT_HIC FOOTING SECTION z CONTACT FOR PRIOR TO CONSTRUCTION IF ANY OF THE <br />FOLLOWING OCCUR: <br />• OVERALL DEPTH OF MONOLITHIC POUR EXCEEDS 28" U 9000 REGENCY SQUARE BLVD. C <br />• GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY es SUITE 100, JACKSONVILLE, FL 32211 ui <br />FROM STRUCTURE STEEPER THAN 1'-0" VERTICALLY 0 <br />PER T-0" HORIZONTALLWO PREVENT EROSION OF SOIL. O <br />CONCRETE SLAB w/ 6x6 cf) <br />(2) #4 OR (2) #5 CONTINUOUS W1.4 x W1.4 WWF OR W cy <br />cy <br />FIBERMESH ~ ® (f) <br />ft (1)U)Uf$H090N <br />`t3 <br />m <br />w <br />Q <br />3 BEARING WALL FOOTING SECTION z <br />w <br />w <br />CONCRETE SLAB W/ 6x6 w <br />W1.4 x W1.4 WWF OR O <br />FIBERMESH O <br />_ 0' _0" A.F.F. O <br />SEE ARCH <br />° DETAILS <br />d \L <br />4 <br />LO <br />4 — r1_ <br />8" MIN O ♦ ) <br />z w <br />W <br />8"x8" THICKENED 8" <br />FTG AT w <br />STEP-DOWN, SEE VAPOR BARRIER PLAN zz J Z L� <br />4 CURB STEP SECTION co Uj _O U) <br />w inWQ O <br />8" UNDER MASONRY WALL Z <br />CONCRETE SLAB W/ 6" UNDER WOOD WALL Z ' '�I to Q <br />6x6 W1.4 x W1.4 WWF w ca W <br />OR FIBERMESH VARIES [_4 SEE ARCH < Q W LU <br />° .0 4 . ° (MAX 16") LV <br />VAPOR BARRIER <br />12" MIN%\\%\\%\\%\\%\� Z r <br />\/ '\\/\//\//\//\//\//\\ LL <br />>\ <br />LL <br />Nx <br />F- 0 <br />LLJ <br />6" OPT. EXTENSION IN BRICK Q <br />LOCATIONS ON FND PLAN N� Z_ <br />ADDITIONAL NO. 4 OR NO. 5 O a <br />BAR IN BRICK LEDGE <br />p W <br />ABBOTT PARK Q <br />GARAGE EXT WALL CURB SECTION <br />_j — "-- - <br />cn <br />5 CONTACT FOR PRIOR TO CONSTRUCTION IF ANY OF THE <br />¢ LOT 024-01 <br />w <br />FOLLOWING OCCUR: <br />LL, <br />• OVERALL DEPTH OF MONOLITHIC POUR EXCEEDS 28" <br />U <br />• GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY <br />z <br />z z <br />FROM STRUCTURE STEEPER THAN 1'-0" VERTICALLY <br />_ <br />PER T-O" HORIZONTALLWO PREVENT EROSION OF SOIL. <br />W <br />PROJECT NO <br />w <br />0 <br />CONCRETE SLAB W/ 6x6 <br />1 2021.006623 <br />W1.4 x W1.4 WWF OR <br />O <br />ILL <br />O <br />FIBERMESH <br />z - -- - <br />- " <br />0' 0" A.F.F. SEE ARCH = DRAWN. KME <br />0 <br />e ° 4 ° 4 DEEP) 0' <br />CHKD: <br />W Lo <br />° 4 ° d X MJP U) <br />z 'x/ a J <br />a •° 41 <br />X4" EXTENSION U <br />UNDER BRICK VENEER LA,�� U) <br />��% �5 • • ........ �ii� 0 <br />12" UNDER 1 STORY WALL > • �� G E N • ,'9 <br />w/ (2) #4 OR (2) #5 CONT VAPOR BARRIER m : : •'�\ S� .•• �i� Z <br />No 85166 •: <br />16" UNDER 2 STORY WALL LLIZ :• � <br />w/ (3) #4 OR (2) #5 CONT Z _ Do*cu3igned by: <br />• • r <br />BEARING CURB STEP SECTION O•,• T971CQRF..5,.��/` <br />6 - .� 0 <br />TYPICAL REINFORCING <br />BARS AT FTHICKENED FOOTING, SEE <br />MIN 24" LONG #4 OR #5 <br />BAR SET AT MID -DEPTH <br />OF SLAB, TYP ALL <br />RE-ENTRANT CORNERS <br />- -- — — — — — — — -- <br />�L—--———————-- <br />HOUSE SLAB <br />RE-ENTRANT CORNER DETAIL <br />(RECOMMENDED) <br />PLAN VIEW, DETAIL TYPICAL @ ALL <br />RE-ENTRANT CORNERS <br />cn ����rrrrr�►�����` <br />p 05-17-2021 0 <br />H w <br />U REVISIONS: <br />W— -- -- - <br />No. Description Date ~ <br />w <br />(n .J <br />O �- <br />O - Z <br />z -- <br />= o <br />w <br />I— <br />x <br />W ST=2mD <br />0- <br />CMU/METAL CONNECTOR ENGINEERINGa <br />
The URL can be used to link to this page
Your browser does not support the video tag.