Laserfiche WebLink
)ocuSign Envelope ID: 2E7D828C-2E90-441F-BAA6-5C620B3CCED4 <br />\ v ■ <br />I � <br /><r <br />M <br />(V <br />I j <br />I <br />a <br />c- <br />70'-0" <br />8.41 <br />— <br />59'-10" <br />— <br />————— — — — — —� I T-2.ID <br />0, <br />I <br />I �j f� A <br />1 <br />1 — - - - -- -- UNDER DOOR <br />I <br />1 I -9 1/2" <br />4'-7 112" 4'-6" 2'4" 1 V-5" I 2'-4 1/2" 20'-8 1/2" <br />;c ND <br />29'-6" <br />r ■ I I 011 <br />/ T-2.lD I I 16' I <br />�� 5 <br />N o I I I I T-2.D T-2.D l i■ <br />+ —v— --- I� ---� L——————— — — — — —I — — — — — — — -- — —— <br />---------—--... _i� <br />5 <br />SIM 9" CURB I ' <br />T-2.D VERIFY AC COND <br />o LOCATION W/ <br />SITE PLAN <br />ISO UNDA IIO N PIA N <br />T = V-0" WHEN PRINTED ON 22"x34" <br />2020 V1.0 <br />GENERAL FOUNDATION NOTES: 0 <br />> <br />CONCRETE SLAB ON GRADE SHALL BE MINIMUM 3 1/2 THICK AND O <br />HAVE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 2500 PSI UNO. O O <br />• EARTH AND EARTH FILL SUPPORTING SLABS GRADE N APE <br />O <br />ASSU(49t D TO HAVE A MINIMUM BEARING CAPACITY OF 2,000 psf, AND � 0 <br />SHALL BE FREE OF ORGANIC MATERIAL AND COHESIVE SOILS. N U <br />COMPA.CT THE FILL. IN 12" LIFTS TO AT I -EAST 95% OF MODIFIED 00 N <br />PRCCTOR MAXIMUNI DRY DENSITY'. IT IS THE OWNER'S OR <br />CONTRACTOR'S RESPONSIBILITY TO CONFIRM THESE ASSUMPTIONS. O O <br />• IF GONTRACTOR OR BUILDING OFFICIAL DETERMINES THAT THE O cl <br />cl <br />5011 1S NOT SUITABLE FCR 2.000 PSF BEARING CAPACITY, CONTACT ' <br />EOR:. ADDITIONAL FOUNDATION WORK MAY BE REQUIRED. <br />• SL:DING GLASS DOOR FRAMES MUST BE RECESSED INTO THE SLAB <br />N <br />IN ACCORDANCE WITH THE BUILDING CODE. CONSULT N <br />Af<C liTE CTURAL FLANS FOR LOCATION OF SLIDING GLASS DOORS. <br />• MASONRY STEMWALL AND MONOLITHIC FOOTINGS ARE -J <br />INTERCHANGEABLE. SEE SHEET ST-2D FOR ALTERNATE STEMWALL LL <br />SECTIONS W <br />• 24" LONG #4 BAR IS RECOMMENDED TO BE INSTALLED AT ALL J tds -6 <br />RE -EN TRANT CORNERS. SEE "RE. -ENTRANT CORNER DETAIL" ON -J N <br />SHEET' S -2n true design studios <br />z <br />O <br />- - U) <br />9000 REGENCY SQUARE BLVD. O <br />FOUNDATION KEYNOTES: DC1 U c <br />Q SUITE 100, JACKSONVILLE, FL 32211 <br />mo'fES APPLICABLE ONLY WHERE SPECIFIED ON PLAN O <br />;;EEP THICKENED I 12" DFEP FTG UNDER BOX CDfnL;t; F r 11 #4 CON'T I a , COLUMN, FTG TO BE v' <br />PROJECTED MIN 6" AS SHOWN Lli MONNAMMOM C <br />_ ® � <br />24'(3) #X4 E DEEP FTG U) N <br />C; 1+3 <_ c:dx 12" DEEP FTG L_� w/ 3 #4 EW � a a � <br />3u"�iQx20" DEEP FTG F I 36"SQx20" DEEP FTG > AweefiAW <br />%,/ T41 #4 EW �_-A W/ (4) #4 EWm <br />48"SQx24" DEEP FTG #5 VERTICAL DOWEL TYP W <br />w;' (5) #4 EW. T&B I H AS SHOWN, SEE MASONRY 0� <br />NOTES ON ST-1 Q <br />1 11/2" SLAB EXTENSION D <br />0 <br />AT FULL ROUGH U) Q <br />OPENING WIDTH U <br />z <br />LU <br />W <br />O <br />O <br />O <br />• NOTE TO CONTRACTOR— a) <br />Dt.. HORTON DOES NOT ALLOW FIBERMESH AS AN <br />At. TERNA.TIVE TO VrM/F AS SPECIFIED IN THIS PLAN SET LO <br />CE? OTHER DR HORTON APPROVED WOOD DESTROYING Z <br />Q cn <br />Ok __�AMSM I RE:ATMENT 1'0 LIE APPLIED AS DIRECTED BY PRODUCT U) <br />MANUFAC17URFR AND DR HORTON. U) =' <br />- - - - - - - - -- --- - W <br />z J Z W <br />`/) O U)co <br />co LLJ <br />W Q c <br />W G <br />w O <br />z <br />(> Q Q <br />z W <br />W W w <br />0 ® W W ti <br />O cl� x <br />x <br />z Z <br />O O <br />H 0 <br />XW <br />O I-_ <br />CL z <br />O a <br />U � <br />Q W <br />� <br />Abbott Park JQ <br />Oj --- nT---AA U) <br />ILLThisitLQ 44-001cally 0 <br />Q s4pedand realed by Justip M 1 nPier, W <br />PE on the date and/or time stamp Q <br />U shown using a digital signature. <br />Ilz z U <br />1 �\A�� O PROJECT NO: WW <br />N' 1 2020.004113 LL <br />O 0 <br />i ! Z DRAWN <br />= DO o <br />(D <br />W CHKD LO <br />X EAF U) <br />W W <br />;X f <br />V .� <br />l J <br />X <br />Jo`�.�`���(IN' LAN �'�i, v) <br />I �pt� I 1- ��� �J5 • ' •E �F,9 <br />TO co• ��� NSF'• Z <br />� ,� <br />A\ No 85166 <br />Z UopuSign•d by: <br />1 ' ' W C�iil D CbEF4 e U) <br />Q �,� �`S; •' O R �• �' • Gam`.` z <br />.,GO _ AN .., Y Z ��� S/O N A <br />ti <br />O 06-01-2020 0 <br />W <br />REVISIONS: <br />Q I No. Description Date ~ <br />W <br />U) -- J <br />- I Q <br />-- U) <br />SA N �rIA RY NO M E UC ° _ ~ <br />O <br />O - -- - <br />U <br />W <br />I— <br />X <br />W ST=2 <br />W <br />CMUMETAL CONNECTOR ENGINEERING¢ <br />r _ <br />