Laserfiche WebLink
DocuSign Envelope ID: 56C6F90D-EE21-449C-BBC3-18512246B1A8 <br />TRADITIONAL HARD -COAT - <br />STUCCO INSTALLED IN <br />ACCORDANCE WITH THE <br />MANUFACTURER'S OR THE <br />PORTLAND CEMENT ASSC. <br />(PCA) RECOMMENDATIONS <br />WITH THE MOST <br />RESTRICTIVE <br />CONTROLLLING. <br />VERTICAL AND HORIZ <br />CONTROL JOINTS AS REQ'D <br />FASTEN ZIP SYSTEM <br />SHEATHING AS REQUIRED BY <br />ENGINEER -OF -RECORD AND/OR <br />LOCAL BUILDING CODE <br />TOP EDGE OF WEEP SCREED TAPED TO <br />WALL SHEATHING WITH ZIP SYSTEMS <br />TAPE OR ADHESIVE BACKED FLASHING <br />(MUST MEET AC148) <br />CODE -APPROVED VINYL WEEP <br />SCREED TO LAP CMU WALL MIN 2" <br />CMU MASONRY WALL <br />*ZIP SYSTEM® SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />METAL LATH <br />ONE LAYER OF WATER -RESISTIVE <br />VAPOR -PERMEABLE BARRIER WITH A <br />PERFORMANCE AT LEAST EQUIVALENT <br />TO GRADE D BUILDING PAPER. <br />ZIP SYSTEM ® TAPE <br />(INSTALLED OVER ALL JOINTS <br />IN ZIP SYSTEM SHEATHING.) <br />WALL ASSEMBLY <br />VINYL/WOOD/FIBER CEMENT <br />SIDING (INSTALLED IN <br />ACCORDANCE WITH <br />CLADDING MANUF'S <br />INSTALLATION <br />RECOMMENDATIONS) ZIP <br />SYSTEMS ® SHEATHING <br />WOOD OR LT. GA. METAL <br />STUDS. <br />OVERLAP TAPE A MIN <br />1" AT ALL T-JOINTS <br />1/8" GAP RECOMMENDED AT 1/8" GAP RECOMMENI <br />PANELEDGES PANELEDGES <br />ZIP SYSTEM 0 TAPE <br />(INSTALLED OVER AL <br />JOINTS IN ZIP SYSTEI <br />SHEATHING.) <br />OVERLAP TAPE A MIN <br />OF 1"AT ALL T-JOINT; <br />1/8" GAP RECOMMEN <br />FASTEN ZIP SYSTEM <br />REQUIRED BY ENGIN <br />AND/OR LOCAL BUILE <br />\l4-/ -*1,- 19 b CMU M <br />ZIP SYSTEMS O SHEATHING WITH <br />HARD COAT STUCCO AT 2ND LEVEL <br />BLOCK TO FRAME TRANSITION) <br />ese construction details are provided to assist in the installation of Zip Systemroduct(s) <br />and may not apply to every situation. Manufacturer accepts no responsibility or liabili�y for the use <br />of these or other construction details. <br />"LIN `.iYS I tM W 5HtA I h11NU It AFt KUVtU I U <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />ZIP SYSTEMS U SHEATHING WITH <br />LAP SDIN I AT2ND LE <br />VEL <br />G <br />(BLOCK TO FRAME TRANSITION) i These construction details are provided to assist n the installation of Zip System ® roduct(s) <br />and may not apply to every situation. Manufacturer accepts no responsibility or liabili�y for the <br />use of these or other construction details. <br />WALL ASSEMBLY <br />VINYL/WOOD/FIBER CEMENT <br />SIDING (INSTALLED IN <br />ACCORDANCE WITH <br />CLADDING MANUF'S <br />INSTALLATION <br />RECOMMENDATIONS) ZIP <br />SYSTEMS ® SHEATHING <br />WOOD OR LT. GA. METAL <br />STUDS. <br />1/8" GAP RECOMMENDED AT <br />PANELEDGES <br />ZIP SYSTEM ® TAPE (INSTALL <br />OVER ALL JOINTS IN ZIP SYST <br />SHEATHING.) <br />OVERLAP TAPE A MINIMUM OF <br />1" AT ALL T-JOINTS <br />1/8" GAP RECOMMENDED AT F <br />FASTEN ZIP SYSTEM ® SHEA <br />ENGINEER -OF -RECORD ANDA <br />*ZIP SYSTEM® SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />ZIP SYSTEMS 0 SHEATHING WITH <br />S LAP SIDING AT LAB ON GRADE <br />These construction details are provided to assist in the installation of Zip System, ® roduct(s) <br />Manufacturer acc is no responsibility or liabilipp for the <br />and may not apply to every situation. ep p ty ry <br />use of these or other construction details. <br />TRADITIONAL HARD -COAT - <br />STUCCO INSTALLED IN <br />ACCORDANCE WITH THE <br />MANUFACTURER'S OR THE <br />PORTLAND CEMENT ASSC. <br />(PCA) RECOMMENDATIONS <br />WITH THE MOST <br />RESTRICTIVE <br />CONTROLLLING. <br />FOUNDATION —\ r <br />VERTICAL AND HORIZONTAL <br />CONTROL JOINTS AS NEEDED. <br />DESIGNER -OF -RECORD TO SPECIFY <br />TYPE AND LOCATION. <br />CODE -APPROVED WEEP <br />SCREED AT BASE OF WALL <br />METAL LATH <br />MORTAR SETTING BED <br />ONE LAYER OF WATER -RESISTIVE <br />TOP OF MORTAR SCRATCH <br />VAPOR -PERMEABLE BARRIER WITH A <br />COAT IN ACCORDANCE <br />PERFORMANCE AT LEAST EQUIVALENT <br />WITH MANUFACTURER'S <br />TO GRADE D BUILDING PAPER. <br />INSTALLATION <br />r—ZIP SYSTEM® SHEATHING* <br />RECOMMENDATIONS <br />*ZIP SYSTEM® SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />WOOD OR LT. GA. METAL STUDS <br />TOP EDGE OF WEEP SCREED <br />TAPED TO WALL SHEATHING WITH <br />ZIP SYSTEM® TAPE OR ADHESIVE <br />BACKED FLASHING. (MUST MEET <br />AC148) <br />ZIP SYSTEMS ® HARD COAT <br />STUCCO AT SLAB ON GRADE <br />These construction details are provided to assist in the installation of Zip System ® product(s) and may not apply to <br />every situation. Manufacturer accepts no responsibility or liability for the use of these or other construction details. <br />NATURAL OR MANUF — <br />STONE VENEER. <br />INSTALL IN <br />ACCORDANCE <br />WITH MANUFACTURER'S <br />RECOMMENDATIONS <br />FOUNDATION <br />DRIP EDGE FLASHING OR WEEP SCREED <br />IN ACCORDANCE WITH <br />MANUFACTURER'S <br />RECOMMENDATIONS AT BASE OF ZIP <br />SYSTEM WALL SHEATHING <br />ZIP SYSTEM® SHEATHING.* <br />LATH <br />*ZIP SYSTEM® SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />WOOD OR LT. GA. METAL STUDS <br />ONE LAYER OF WATER -RESISTIVE <br />VAPOR -PERMEABLE BARRIER WITH A <br />PERFORMANCE AT LEAST <br />EQUIVALENT TO GRADE D BUILDING <br />PAPER <br />TOP EDGE OF DRIP EDGE FLASHING <br />TAPED TO ZIP SYSTEM SHEATHING <br />SURFACE W/ ZIP SYSTEM TAPE OF <br />ADHESIVE <br />BACKED FLASHING. (MUST MEET AC148) <br />a •• <br />ZIP SYSTEMS ® SHEATHING w/ <br />ADHERED STONE AT SLAB ON GRADE <br />t t in the installation of Zi stem ® product(s) and may not apply to <br />These construction details are provided o ass s ep Sy p (s) y pp y <br />every situation Manufacturer accepts no responsibility or liability for the use of these or other construction details. <br />EI <br />0 a <br />0 U <br />N <br />u7 O <br />co C <br />APEX <br />r <br />r <br />r CIi <br />N <br />N <br />co <br />J <br />ILL. <br />tds <br />W � <br />J .0 <br />J_ <br />z true design studios j <br />U) <br />V <br />0 <br />9000 REGENCY SQUARE BLVD. c <br />SUITE 100, JACKSONVILLE, FL 32211 O <br />0 <br />r <br />W <br />H � <br />> U41HOMON' <br />C <br />W <br />Q <br />0 6200 LEE VISTA BLVD, STE 400 <br />ORLANDO, FL 32822 <br />U P: 407-850-5200 <br />Z N <br />W <br />0 <br />W <br />FY <br />0 <br />O <br />O <br />O <br />r <br />r- <br />LO <br />t` <br />z z rn <br />U) _ r <br />U) w <br />Z co_ <br />�_ Z A/ <br />00 W <br />W O U) <br />z <br />m Q <br />w > 0 <br />CV W <br />O J W <br />° 'q W W a <br />LI- � 0 <br />0 r' LLLU <br />0 x <br />r <br />0 z <br />U 0 <br />Q <br />p W <br />w Z <br />0 Abbott Park <br />J LILL <br />Q U_ <br />v LOT 017-02 w <br />z Q <br />0 <br />0 w <br />J PROJECT NO z2021.006636 z <br />U DRAWN: -- <br />W JAR w <br />w CHKD: U— <br />a JAC 0 <br />Q <br />o <br />O <br />U) <br />} <br />im W <br />0 J <br />w U <br />Z U) <br />� Z <br />Q <br />Z < <br />co p <br />0 r <br />05-18-2021 Z <br />U <br />Q REVISIONS: <br />L2 No. Description Date <br />U) <br />0 - 2 <br />J _ H <br />0 w <br />rLIJ — - — U <br />F- <br />X 0 <br />< A405 0 <br />0 <br />