Laserfiche WebLink
I <br />DocuSign Envelope ID: A41490AF-CAEF-4390-B17C-825DDB4B8BB8 <br />EXISTING EXTERIOR CMU - <br />MIN. 3" EDGE DISTANCE <br />STRIP OF WWF FROM F.F.E. TO <br />MIN. 6" BELOW GRADE. WWF TO <br />EXISTING FOUNDATION FACE w/ p p P - p <br />(2) ROWS OF 3/6" DIA. TAPCONS / OR CUT NAILS @ 24" O.C. COVER <br />FLUSH w/ 3000psi CONCRETE. P <br />EXISTING FOUNDATION. <br />p <br />p D <br />o \\ ° <br />• D <br />8" CMU WALL OVERHANGS LESS THAN 1" <br />Z) <br />CONCRETE SLAB W/ 6x6 SEE NOTES (MAX 16") <br />U <br />W1.4 x W1.4 WWF OR o <br />FIBERMESH STUCCO OR DIRECTLY ADHERED cli <br />CONCRETE SLAB W/ 6x6 STONE CLADDING FINISH - MIN 6" _� E <br />W1.4 x W1.4 WWF OR <br />FIBERMESH ALL OTHER EXTERIOR WALL V <br />q <br />CONCRETE SLAB W/ <br />0'-0" A.F.F. SEE ARCH 6x6 W1.4 x W1.4 WWF ,r\\�\\��\\/�\\\/�\\\/�\\// o a D CLADDING -MIN 8", U.N.O. ON ARCH <br />n- - - (MAX 20" OR FIBER MESH �\ AIR\ //\// // //���TT O 0 <br />a ° DEEP) 8" CMU BLOCK WH(1) #4 OR #5 CONT. VAPOR BARRIER �/� ° ° 12 MIN\\%\\%\\%\\%\\%\� Z APEX <br />'� TOP OF SLAB <br />\/� 4" - - - - - - - /%\ .� / \ \\ \\\ \\\/\\//i\%//\\%\%/\\\ W a") <br />EXTENSION �\ \\\i\\\ \\\ -X'// <br />/\ / ��� / Z 0 <br />r/ // // ¢ O FOOTING TO BEAR ON 6" OPT. EXTENSION IN BRICK U) <br />UNDER BRICK VENEER \\/\\ LU w FIRM UNDISTURBED LOCATIONS ON FND PLAN <br />VAPOR BARRIER //\/, U o LO SOIL m <br />12" UNDER 1 STORY WALL VAPOR BARRIER \i\� 12" UNDER 1 STORY WALL w/ 10, <br />#4 OR #5 VERT REINFORCING /\ \ (2) #5 OR (2) #4 CONTINUOUS ADDITIONAL NO. 4 OR NO. 5 W <br />/ / //\//\// / BAR IN BRICK LEDGE W44 <br />16" UNDER 2 STORY WALL UP TO 3 COURSES: 72" O.C.\�\\\\�\\ 16" UNDER 2 STORY WALL w/ Z <br />-"-"" ---- 4 TO 5 COURSES: 48" O.C. <br />/ (2) #5 OR (3) #4 CONTINUOUStds <br />BEARING CURB STEP SECTION ° N L - N\\ W <br />6 -- •° o �i/ (PFOLLOW <br />ONOLITHIC FOOTING SECTION _ a true design studies <br />ONTACT FOR PRIOR TO CONSTRUCTION IF ANY OF THE <br />\ ADDITIONAL #4 OR ING OCCUR: <br />FOOTING TO BEAR ON FIRM\� /r� r #5 IN BRICK LEDGE • OVERALL DEPTH OF MONOLITHIC POUR EXCEEDS 28" O <br />UNDISTURBED SOIL • GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY 1 9000 REGENCY SQUARE BLVD. 0) <br />FROM STRUCTURE STEEPER THAN 1'-0" VERTICALLY L - SUITE 100, JACKSONVILLE, FL 32211 c <br />4" OPT BRICK LEDGE Z N <br />VERTICAL REINFORCEMENT <br />TO HAVE 6" BEND AT BOTTOM O NOTED ON FND PLAN PER T-0" HORIZONTALLWO PREVENT EROSION OF SOIL, O 904.821.5200 <br />CONCRETE SLAB w/ 6x6 <br />CONCRETE SLAB w/ 6x6 <br />W1.4 x W1.4 WWF OR CAST -IN -PLACE FOOTING SPECS (2) #4 OR (2) #5 CONTINUOUS W1.4 x W1.4 WWF OR <br />FIBERMESH 1-STORY: 8" x 16" W/(2) #4 OR (2)#5 CONT FIBERMESH 0 <br />2-STORY: 10" x 20" W/(3) #4 OR (2) #5 CONT a HOMON <br />° ° a 4DI' <br />°d o \��\�\\ STEMWALL SECTION '\�\�i�\r�\,�\/r�` °d a ° /j`/\\ �\ \\��\ V , <br />\ 1. SPECIAL CARE SHOULD BE EXERCISED BY CONTRACTOR WHEN BACK \�/\ Q <br />FILLING BEHIND A STEM WALL, PARTICULARLY WHEN IT IS OVER 4 <br />VAPOR BARRIER COURSES HIGH. SHOULD THIS CONDITION EXIST, RECOMMENDATIONS \// \ \ '' / 0 <br />MAY BE OBTAINED FROM THE ENGINEER OF RECORD. 16" VAPOR BARRIER O <br />16" <br />2. SCREW IN ANCHORS ALLOWED IN MONOLITHIC FOOTINGS ONLY. EPDXY LL <br />ANCHORS MUST BE USED IN STEMWALL FOUNDATIONS. Q <br />3 BEARING WALL FOOTING SECTION <br />LAP #5 CONTINUOUS BAR AS <br />NEEDED, MIN 12" LAP AS SHOWN <br />NO.5 BAR BEND 90 DEGREE <br />TOP OF FOOTING <br />CONTINUOUS CONCRETE <br />FOOTING, SEE PLAN <br />TYPICAL STEP IN FOOTING DETAIL <br />0'-0" A. F. F. - <br />(BEYOND) <br />FLOATING CONCRETE - w <br />U-BLOCK W/ <br />SLAB W/ 6x6 W1 AxW1.4 <br />> <br />v <br />Q <br />J <br />Q <br />(1) #4 OR #5 <br />CONT <br />WWF OR FIBERMESH <br />y <br />(n <br />I- <br />_ , <br />UJco <br />W <br />LU <br />FINISH <br />O <br />GRADE <br />#5 VERT REINFORCING <br />#4 OR <br />UP TO 3 COURSES: 72" O.C. <br />' <br />4 TO 5 COURSES: 48" O.C. <br />° <br />D C <br />FOOTING TO BEAR ON FIRM <br />UNDISTURBED SOIL <br />ADDITIONAL OR <br />E <br />#5 IN BRICK LEDGE <br />VERT REINFORCEMENT TO <br />HAVE 6" BEND @ BOTTOM <br />4" OPT BRICK LEDGE <br />NOTED ON FND PLAN <br />CAST -IN -PLACE FOOTING SPECS -- <br />1-STORY: 8" x 16" W/(2) #4 OR (2)#5 CONT <br />2-STORY: 10" x 20" W/(3) #4 OR (2) #5 CONT <br />7 STEMWALL CURB SECTION <br />1. SPECIAL CARE SHOULD BE EXERCISED <br />BY CONTRACTOR WHEN BACK <br />FILLING BEHIND A STEM WALL, PARTICULARLY WHEN IT IS OVER 4 <br />COURSES HIGH. SHOULD THIS <br />CONDITION EXIST, RECOMMENDATIONS <br />MAY BE OBTAINED FROM THE <br />ENGINEER OF RECORD. <br />2. SCREW IN ANCHORS ALLOWED IN MONOLITHIC FOOTINGS ONLY. EPDXY <br />ANCHORS MUST BE USED IN STEMWALL FOUNDATIONS. <br />GROUT BOTTOM 3 COURSES <br />OF EXISTING CMU WALL FOR <br />LENGTH OF OVERHANG. FILL <br />TO BOTTOM OF WINDOW SILL �° CMU STEMWALL MONO LITHIC SLAB (1) #4 OR #5 CONT. 3 %" CONCRETE SLAB W/ 6x6 <br />WHERE NEEDED 8" CMU CHAIR BLOCK W/ (1) #5 W1.4 x W1.4 WWF OR FIBERMESH <br />CONTINUOUS TO EXTEND MIN 24" MINIM 24" (1) #4 OR #5 90° BEND @ 48" O.C. <br />INTO MONOLITHIC THICKENED EDGE <br />MIN 24' LAP <br />MIN. 3" EDGE DISTANCE VARIES PER <br />r 36" MAX ARCH PLANS ° <br />._. <br />4" CONCRETE SLAB W/ <br />6x6 WI A x W1.4 WWF -- <br />STRIP OF WWF FROM,F.F.E. TO - - - - -- - - _ _ _ _° _ -- OR FIBER MESH \\/\\ \/\\�� // \\ <br />BOTTOM OF FTG. WWF TO - - ° <br />° - ° cn - - - - - - - - - -j - -°- �= - - - - ////\/// 12" MIN �` ° ° '\ VAPOR BARRIER <br />EXISTING FOUNDATION FACE w/ ° - - - $ - o W Z ° ° ° ° ° \/\/\ \ �/ ` / <br />\ FOOTING TO BEAR ON FIRM <br />(2) ROWS FOUNDATION <br />N DIA. TAPCONS D D D p D 4_ O °� �° ° °° #4 OR #5 // // //� //\// d' • / UNDISTURBED SOIL <br />OR CUT NAILS @ 24" O.C. COVER / o p ° O Z ° ° • ° ° ° REINFORCING PER \\\' , I <br />FLUSH w/ 3000psi CONCRETE. 9 D v9 ° ° ° ° ° n S OCNOOLN HIC FOOTING 6" OPT. EXTENSION b <br />° �EXISTING FOUNDATION ° ° ° ° ° IN BRICK LOCATIONS ° FOOTING TO BEAR ON FIRM ON FND PLAN <br />-°_ - + a UNDISTURBED SOIL ' DE STORY WALL W/ (2) <br />#4OR <br />ADDITIONAL NO.4 OR NO. 5 ( ) #5 CON <br />1 ° MINI12" /\/\/\/\/\/\/\ BAR IN BRICK LEDGE <br />° //\//\//\//\//\//\//�\ 16" UNDER 2 STORY WALL W/ (3) <br />o ° ° ° //\\//\\//\\//\\//\\//\\ram <br />_ - -- - <br />11 n '-j\j\/\j\j\j\j \/\j\/\/r�j�\\/� MONOLOTHIC FOOTING SECTION - 36" MAX DEPTH <br />\ \ \ \ \ \ \ \ \ \ \ \ \ <br />8 CMU WALL OVERHANGS 2.5 OR LESS //\//\//\//\//\//\//\// //\//\//\\// STEMWALL FOOTING TO EXTEND MIN <br />\\/\\/\\/\\/\\/\\\� 12" BELOW MONOLITHIC FOOTING <br />NOTES: /\\\/\\\/�\\,�\\/��\//\ • ADDITIONAL #4 OR #5 VERTICAL TO BE "NOTE': IT IS ACCEPTABLE TO SUBSTITUTE THIS "1A" FTG DETAIL FOR THE "1" <br />/�� LOCATED WITHIN TRANSITION ZONE FTG DETAIL SPECIFIED ON THE FDN PLAN @ ANY LOCATIONS THAT THE FTG <br />• IF EXISTING REBAR DOES NOT MEET 3" EDGE DISTANCE REQUIREMENT, LOCATE VERTICAL AND TIE INTO STEMWALL FOOTING DEPTH EXCEEDS 28". <br />REMOVE INSIDE FACE SHELL OF EXISTING CMU WALL AT ADJECENT CELL REINFORCEMENT IN LAST REINFORCEMENT IF GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY FROM STRUCTURE <br />AND DRILL & EPDXY NEW FULL HT. VERTICAL #5 DOWEL W/ 12" EMBED INTO STEMWALL CELL STEEPER THAN V-0" VERTICALLY PER T-0" HORIZONTALLY, CONTRACTOR HAS <br />EXISTING FOUNDATION AND 4" EMBED INTO EXISTING BOND BEAM. TWO CHOICES: <br />1. PRIOR TO CONSTRUCTION, SEEK GUIDANCE OF FOR TO PREVENT EROSION <br />• IF MORE THAN (3) BARS DO NOT MEET THE REQUIRED 3" EDGE DISTANCE, <br />CONTACT EOR. CMU STEMWALL TO MONOLITHIC TRANSITION DETAIL OF SOIL. <br />2. USE STEMWALL FOOTING <br />3 BEARING WALL FOOTING SECTION Z <br />CD <br />CONCRETE SLAB W/ 6x6 0 This item has been electronically <br />W1.4 x W1.4 WWF OR signed and sealed by Justin M Lanier, <br />FIBERMESH O PE on the date and/or time stamp <br />Z shown using a digital signature. <br />0'-0" A.F.F. = Printed copies of this document are <br />_ SEE ARCH U not considered signed and sealed <br />° \° DETAILS W and the signature must be verified <br />o q <br />c by a 3rd Party Certificate Authority <br />on any electronic copy <br />8" MIN W /^� <br />VJ <br />8"x8" THICKENED 8" Uj W <br />FTG AT Q <br />STEP-DOWN, SEE VAPOR BARRIER � <br />PLAN00 <br />CURB STEP SECTION o = Z W <br />P <br />4 _ W o cn <br />8" UNDER MASONRY WALL 0 <br />a - <br />W <br />CONCRETE SLAB W/ 6" UNDER WOOD WALL 2 O <br />6x6 W1.4 x W1.4 WWF z > Q <br />OR FIBERMESH VARIES ° SEE ARCH G7 W <br />(MAX 16") <br />O � <br />W° LLl WX. <br />Q <br />12' M I N A\\/\\/\\/\\/\/ LL U W <br />VAPOR BARRIER \// a q Q <br />6" OPT. EXTENSION IN BRICK } <br />LOCATIONS ON FND PLAN Ur <br />12" UNDER 1 STORY WALL w/ 0 0 <br />(2) #5 OR (2) #4 CONTINUOUS ADDITIONAL NO. 4 OR NO. 5 0 0 <br />BAR IN BRICK LEDGE Z W <br />16" UNDER 2 STORY WALL w/ U f- <br />(2) #5 OR (3) #4 CONTINUOUS Z <br />Abbott Park of <br />a <br />5 GARAGE EXT WALL CURB SECTION x - <br />CONTACT FOR PRIOR TO CONSTRUCTION IF ANY OF THE W - LL <br />FOLLOWING OCCUR: a- LOT 025-02 W <br />• OVERALL DEPTH OF MONOLITHIC POUR EXCEEDS 28" -� <br />• GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY <br />FROM STRUCTURE STEEPER THAN 1'-0" VERTICALLY <br />PER 3'-0" HORIZONTALLWO PREVENT EROSION OF SOIL. <br />CONCRETE SLAB W/ 6x6 <br />W1.4 x W1.4 WWF OR <br />0'-0" A.F.F <br />FIBERMESH. SEE ARCH <br />°--� ---- �(MAX20" <br />DEEP) <br />4 q <br />/ \/�\\/� 4" <br />EXTENSION <br />UNDER BRICK VENEER <br />12" UNDER 1 STORY WALL <br />W/ (2) #4 OR (2) #5 CONT VAPOR BARRIER <br />16" UNDER 2 STORY WALL <br />W/ (3) #4 OR (2) #5 CONT <br />6 BEARING CURB STEP SECTION <br />- TYPICAL REINFORCING <br />BARS AT THICKENED <br />FOOTING, SEE PLAN <br />MIN 24" LONG #4 OR #5 <br />BAR SET AT MID -DEPTH <br />OF SLAB, TYP ALL <br />RE-ENTRANT CORNERS <br />------------ <br />HOUSE SLAB <br />RE-ENTRANT CORNER DETAIL <br />(RECOMMENDED) <br />PLAN VIEW, DETAIL TYPICAL @ ALL <br />RE-ENTRANT CORNERS <br />Q <br />U <br />W <br />W <br />PROJECT NO: <br />2021.009241 z <br />0 <br />DRAWN: <br />CD w <br />CHKD: MJP LL <br />O <br />O <br />O <br />L0 <br />` %O jj 1.1111l l" W <br />�� jkN LA/V .. W <br />i� <br />No 85166 cn <br />Docuftned by: �U) <br />Z <br />3TE71QEUEF43 <br />' All•�,` i4r,,s1,1811110 <br />ON <br />Ai E% <br />G7 <br />07-28-2021 O <br />Z <br />REVISIONS: Q <br />No. Description Date C' <br />----- -- W <br />- W <br />- H <br />- Q <br />ST <br />Z =2 ■ D O <br />0 <br />CMUIMETAL CONNECTOR ENGINEERING <br />