My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36763 Eiland Blvd (3)
Zephyrhills
>
Building Department
>
Building Plans
>
36763 Eiland Blvd (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 6:37:46 PM
Creation date
2/25/2025 9:41:14 AM
Metadata
Fields
Template:
Building Plans
Street #
36763
Location
Eiland Blvd
Contractor
Wallace Associates
Building Plans - Permit #
19892
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IST FLOORSCALE: - P,4WIAL DIMENSIONED FLOOD PLAN <br />WALL LEGEND <br />4 <br />TYP.`' <br />DOOR SYSTEM - REFER TO DOOR SCHEDULE - SHEET Aga <br />0 <br />® WINDOW SYSTEM - REFER TO WINDOW SCHEDULE - SHEET A9c <br />METAL STUD PARTITION - REFER TO TYPICAL NON -RATED <br />WALL PARTITION DETAIL A/AIO <br />METAL STUD SOUND INSULATED PARTITION - REFER TO <br />TYPICAL NON -RATED WALL PARTITION DETAIL A/AIO <br />...... - - - METAL STUD I-HR RATED PARTITION - REFER TO TYPICAL <br />FIRE RATED WALL PARTITION DETAIL 4/LS2 <br />-- METAL STUD LOUD WALL PARTITION - REFER TO TYPICAL <br />LOW WALL PARTITION DETAIL B/AIO <br />C.M.U. WALL SYSTEM - SEE STRUCTURAL DRAWINGS <br />DIMENSION PL4N NOTES <br />1. THIS PLAN IS FOR DIMENSIONAL PURPOSES ONLY <br />2. FOR DIMENSIONING PURPOSES, METAL STUD WALLS ARE DRAWN AT <br />4" OR 6" WIDE U.N.O. - BLOCK WALLS ARE DRAWN AT S" WIDE U.N.O. <br />3. 8" BLOCK WALLS AND 6" METAL STUD WALLS ARE DIMENSIONED TO <br />FACE OF WALL - 4" METAL STUD WALLS ARE DIMENSIONED TO <br />CENTER OF WALL, U.N.O, <br />4. GENERAL CONTRACTOR TO NOTIFY ARCHITECT AFTER LAYOUT IS <br />COMPLETE AND WALL TRACK IS IN PLACE PRIOR TO FRAMING ANY <br />WALLS <br />5. GENERAL CONTRACTOR TO NOTIFY ARCHITECT WITH ANY <br />DISCREPANCIES IN WRITING UPON DISCOVERY BEFORE <br />COMMENCING WITH ANY WORK, <br />KEY PLAN <br />REVISIONS <br />BY <br />�i <br />I <br />I <br />� � <br />N <br />1�^ <br />¢ 00 <br />r <br />N y <br />ti <br />CV �n cct 6Ui <br />o c v <br />Qj 7 <br />V T� 3 <br />3 ti 3 <br />1_� <br />O N <br />� c <br />0 <br />4 <br />L N <br />a <br />v <br />:o" <br />I oLL d <br />� 10 <br />Q <br />� <br />O <br />C k <br />� y <br />� y <br />U_ <br />Q� <br />C <br />Z <br />o <br />rn <br />J <br />IY N <br />U <br />U) <br />.� <br />� M <br />O M <br />m <br />E <br />U Q <br />N C <br />U <br />:Cq' <br />0 0 <br />° c0 <br />� <br />_ W <br />o <br />v <br />> <br />•vi <br />_ CL <br />Q <br />o <br />C) <br />m C <br />U <br />CL <br />C IV <br />z O <br />0 <br />J <br />Ej- <br />I._ <br />Date: 02. 13. 18 <br />Scale: AS NOTED <br />Project <br />Mgr: AAY <br />Drawn: JDS <br />Job: 15-025 <br />Sheet <br />A <br />1 f <br />H:\Projects\Projects 2015\15025 - FMC Eiland Blvd Expansion\04-CD\01-CD.A\04-ArchitecturaMl abcdef - 1st Floor - FLPL.dwg, 2/9/2018 8:50:53 AM, JSimon, Xerox 6604 PS.pc3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.