Laserfiche WebLink
A55REVIATIONS <br />GENERAL NOTES <br />WILDIWu CODE INFORMATION <br />MEX OF: DRAUJINC33 <br />APPLICABLE CODES AND STANDARDS <br />4 <br />AND <br />FADA <br />FLORIDA ACCESSIBILITY <br />O.D. <br />OUTSIDE DIAMETER, <br />1. <br />ALL WORK SHALL CONFORM TO THE LATEST ADOPTED EDITION OF THE NATIONAL FIRE <br />TI <br />TITLE SHEET <br />81.1 <br />STRUCTURAL SPECIFICATIONS <br />THE FLORIDA BUILDING GODE: SIXTH EDITION (2017) <br />L ANGLE CODE OVERALL DIMENSION <br />CODE "FLORIDA BUILDING CODE," "FLORIDA PLUMBING CODE," "FLORIDA MECHANICAL <br />T2 <br />CODE I1-OWATION AND DRAWING INDEX <br />81.2 <br />WIND DESIGN CRITERIA AND TYPICAL DETAILS <br />AT <br />F.N.A. <br />FAMINE NAPKIN DISPOSAL <br />O.F,C.I. <br />OWNER FURNISHED, <br />CODE," "NATIONAL ELECTRICAL CODE," AND ALL OTHER APPLICABLE LOCAL, STATE, AND <br />e ACCESSIBILITY <br />513 <br />SCHEDULES <br />CENTERLINE <br />F.N.V. <br />FAMINE NAPKIN VENDOR <br />CONTRACTOR INSTALLED <br />FEDERAL CODES AND ORDINANCES, AND ALL AUTHORITIES HAVING LOCAL JURISDICTION. <br />e BUILDING <br />A$I <br />OVERALL ARCHITECTURAL SITE PLAN <br />52.1 <br />SOUTH WING FOUNDATION PLAN <br />m <br />DIAMETER OR ROUND <br />FPRF. <br />FIRE PROOFING) <br />O.F.O.I. <br />OWNER FURNISHED, <br />• ENERGY CONSERVATION <br />NUMBER OR POUND <br />F.R. <br />FIRE RATED <br />OWNER INSTALLED <br />2. <br />THE GENERAL CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE <br />• EXISTING BUILDING <br />A52 <br />ARCHITECTURAL SITE PLAN <br />82.2 <br />NORTH WING FOUNDATION PLAN <br />A.B. <br />ANCHOR BOLT <br />FR. <br />FRAME <br />O.H. <br />OVERHEAD, OPPOSITE <br />CURRENT EDITION OF THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION" <br />• FUEL GAS <br />A63 <br />ARCHITECTURAL SITE DETAILS <br />823 <br />SOUTH WING 2ND FLOOR FRAMING PLAN <br />A/C. <br />AIR CONDITION <br />FT. <br />FOOT OR FEET <br />O.1-I.CAB. <br />OVERHEAD CABINET <br />AIA DOCUMENT A201, <br />• MECHANICAL <br />A54 <br />ARCHITECTURAL SITE DETAILS <br />62.4 <br />NORTH WING 2ND FLOOR FRAMING PLAN <br />ACOUS. <br />ACOUSTIC (AL) <br />FTG. <br />FOOTING <br />OPNG. <br />OPENING <br />• PLUMBING <br />525 <br />SOUTH WING ROOF FRAMING PLAN <br />ACT, <br />ACOUSTICAL LAY -IN TILE <br />FURR. <br />FURRING <br />OPP. <br />OPPOSITE <br />3, <br />THE CONTRACTOR SHALL, UPON DISCOVERY, GIVE WRITTEN NOTICE TO THE ARCHITECT OF <br />. TEST PROTOCOLS FOR HIGH VELOCITY HURRICANE ZONES <br />ADJ. <br />ADJUSTABLE, ADJACENT <br />FUT. <br />FUTURE <br />O.S. <br />OVERFLOW SCUPPER <br />ANY MATERIALS, EQUIPMENT, OR DESIGN FEATURES WHICH HE BELIEVES TO BE INADEQUATE <br />LSI <br />IST FLOOR LIFE SAFETY PLAN <br />82.6 <br />NORTH WING ROOF FRAMING PLAN <br />A.D.O. <br />AUTOMATIC DOOR OPENER <br />F.W. <br />FLUSH WOOD <br />O.R. <br />OPERATING ROOM <br />OR UNSUITABLE, IN VIOLATION OF LAWS, ORDINANCES, OR RULES AND REGULATIONS OF THE <br />FLORIDA FIRE PREVENTION CODE: SIXTH EDITION <br />L82 <br />2ND FLOOR LIFE SAFETY PLAN <br />S21 <br />HIGH ROOF FRAMING PLAN <br />NFPA 101: LIFE SAFETY CODE FLORIDA 2017 EDITION <br />A.F.F. ABOVE FINISH FLOOR PNT. PAINT <br />AUTHORITIES HAVING JURISDICTION OVER THE WORK, AND OF ANY NECESSARY ITEMS OR <br />52B <br />EAST PORTE COCHERE FOUNDATION / ROOF FRAMING PLAN <br />4.H.U, <br />AIR HANDLER (UNIT) <br />GA. <br />GAUGE <br />PF. <br />PREFABRICATED <br />WORK OMITTED FROM THE DRAWINGS. <br />Ala <br />IST FLOOR - OVERALL FLOOR PLAN <br />82.9 <br />WEST PORTE COCHERE FOUNDATION / ROOF FRAMING PLAN <br />AL. <br />ALUMINUM <br />GAL. <br />GALLON <br />PL, <br />PLASTIC LAMINATE <br />NFPA 70: NATIONAL ELECTRICAL CODE 2014 EDITION <br />A.L. <br />ACOUSTICAL LAY -IN <br />GALV, <br />GALVANIZED <br />PL45. <br />PLASTER <br />4. <br />ALL SUBCONTRACTORS SHALL USE ONLY SKILLED CRAFTSMEN, EXPERIENCED IN THE WORK <br />Alb <br />IST FLOOR - PARTIAL FLOOR PLAN <br />83.1 <br />WALL SECTIONS <br />2010 ADA STANDARDS FOR ACCESSIBLE DESIGN <br />4L7, ALTERNATE G.B. GRAB BAR PLBG. PLUMBING <br />OF THEIR TRADE, TO ENSURE FIRST CLASS WORKMANSHIP. ANY WORK NOT EQUAL TO BEST <br />Ala <br />IST FLOOR - PARTIAL FLOOR PLAN <br />53.2 <br />WALL SECTIONS <br />&NOD. <br />ANODIZE([)) <br />G.C. <br />GENERAL CONTRACTOR <br />PLYWD. <br />PLYWOOD <br />TRADE STANDARDS SHALL BE REMOVED AND REPLACED AT NO ADDITIONAL C057. <br />Ald <br />IST FLOOR -DIMENSIONED FLOOR PLAN -SHELL <br />S33 <br />WALL SECTIONS <br />4.P. <br />ACCESS PANEL <br />G.M. <br />GALVANIZED METAL <br />FOL. <br />POLISHED <br />SHOULD ANY SUBCONTRACTOR REFUSE TO REMOVE AND REPLACE UNSATISFACTORY WORK, <br />4PPROX. APPROXIMATE <br />G.M.L. <br />GALVANIZED METAL LATH <br />PR. <br />PAIR <br />THE GONTRACTOR MAY REMOVE AND REPLACE IT, AND CHARGE THE COST TO THE <br />Ale <br />IST FLOOR - PARTIAL DIMENSIONED FLOOR PLAN <br />54.1 <br />SECTIONS AND DETAILS <br />ARCH. <br />ARCHITECT <br />G.M.S. <br />GALVANIZED METAL STUD <br />P.A. <br />PARKING SPACE <br />SUBCONTRACTOR. <br />USE AND OCCUPANCY CLASSIFICATION <br />Alf <br />IST FLOOR - PARTIAL DIMENSIONED FLOOR PLAN <br />842 <br />SECTIONS ,AND DETAILS <br />AUTO. <br />AUTOMATIC <br />GNp. <br />GROUND <br />PT. <br />POINT <br />Al g <br />IST FLOOR - ENLARGED TOILET PLAN AND DETAILS <br />643 <br />SECTIONS AND DETAILS <br />FBG CHAPTER 3 -SECTION 304: GROUP "B" -BUSINESS <br />GR. GRADE P.A. PRESSURE TREATED <br />5. IT IS THE GENERAL CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION <br />A1h <br />IST FLOOR -ENLARGED TOILET PLAN AND DETAILS <br />$4.4 <br />SECTIONS AND DETAILS <br />B.G. <br />BUMPER GUARD <br />GYP. <br />GYPSUM <br />P.A.D. <br />PAPER TOWEL DISPENSER <br />PROCEDURE AND SEQUENCE TO ENSURE THE SAFETY OF PEOPLE AND OF THE BUILDING <br />BLDG. BUILDING GWB. GYPSUM WALLBOARD PTN. PARTITION <br />AND ITS COMPONENT PARTS DURING CONSTRUCTION. THIS INCLUDES, BUT IS NOT LIMITED <br />All <br />IST FLOOR - ENLARGED TOILET PLAN AND DETAILS <br />$45 <br />SECTIONS AND DETAILS <br />BM, <br />BEAM <br />H.B. <br />HOSE BIB <br />P.V.C. <br />POLYVINYL CHLORIDE <br />TO, THE ADDITION OF WHATEVER TEMPORARY BRACING OR TIE DOWNS THAT MAY BE <br />Ali <br />IST FLOOR - ENLARGED TOILET PLAN AND DETAILS <br />Sob <br />SECTIONS AND DETAILS <br />GENERAL BUILDING HEIGHTS AND AREAS <br />BOTT. BOTTOM HBD. HARDBOARD <br />NECESSARY. SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN THE PROPERTY OF <br />A2a <br />2ND FLOOR - OVERALL FLOOR PLAN <br />B.U,R. <br />BUILT-UP ROOF <br />H.A. <br />HOLLOW CORE OR <br />Q.T. <br />QUARRY TILE <br />THE CONTRACTOR AFTER COMPLETION OF THE PROJECT, <br />Alb <br />2ND FLOOR - PARTIAL FLOOR PLAN <br />FPO <br />FIRE PROTECTION SPECIFICATIONS, NOTES t LEGEND <br />TABLES 5043504.45062 <br />MAX. <br />PROVIDED <br />HANDICAP <br />GAB. CABINET HGWD. HOLLOW CORE WOOD R. RISER OR RADIUS <br />6. ALL PRODUCTS AND PARTS SHALL FIT TOGETHER NEATLY, WITHOUT DAMAGE OR <br />A2a <br />2ND FLOOR - PARTIAL FLOOR PLAN <br />FPI <br />IST FLOOR FIRE PROTECTION PLAN <br />C.B. <br />CATCH BASIN <br />DOOR <br />R.C. <br />RUNNER CHANNEL <br />DISFIGUREMENT. EXCEPT FOR SPECIFIED CURVED SURFACES, ALL PRODUCTS AND PARTS <br />, , <br />ALLOWED <br />A2d <br />2ND FLOOR - DIMENSIONED FLOOR PLAN - SHELL <br />FP2 <br />2ND FLOOR FIRE PROTECTION PLAN <br />C.C,T. <br />CUBICAL CURTAIN TRACK <br />HDW. <br />HARDWARE <br />R.G.P, <br />REINFORCED CONCRETE <br />SHALL BE CONSTRUCTED/ FABRICATED AND INSTALLED TRUE, IN LINE, AND PLUMB. ALL <br />A2is <br />2ND FLOOR -PARTIAL DIMENSIONED FLOOR PLAN <br />FP3 <br />FIRE PROTECTION DETAILS <br />C,G.U. <br />CORONARY CARE UNIT <br />HDWD. <br />HARDWOOD <br />PIPE <br />NON CONFORMING WORK SHALL BE REJECTED AND RE -ACCOMPLISHED BY THE GENERAL <br />BUILDING AREA <br />A2f <br />2ND FLOOR - PARTIAL DIMENSIONED FLOOR PLAN <br />CER. <br />CERAMIC <br />HGT. <br />HEIGHT <br />R.D. <br />ROOF DRAIN <br />CONTRACTOR AT NO ADDITIONAL COSTS TO THE OWNER. <br />FIRST FLOOR AREA <br />15,(676 S/F <br />C.F.C.1, <br />CONTRACTOR FURNISHED- <br />H.M. <br />HOLLOW METAL <br />RE, <br />RELATIVE TO <br />SECOND FLOOR AREA <br />14,671 S/F <br />A2g <br />2ND FLOOR - ENLARGED TOILET PLAN AND DETAILS <br />PI <br />IST FLOOR - PARTIAL PLUMBING PLAN <br />CONTRACTOR INSTALLED <br />HORIZ. <br />HORIZONTAL <br />RECEP. <br />RECEPTACLE <br />1, <br />ALL WORK SHOWN ON THE DRAWINGS SHALL BE CONSTRUCTED OF NEW COMPONENTS. <br />A2h <br />2ND FLOOR - ENLARGED TOILET PLAN AND DETAILS <br />P2 <br />IST FLOOR - PARTIAL PLUMBING PLAN <br />T07AL BUILDING AREA - EQUATION 5-2 <br />54,000 S/F <br />30,353 S/F <br />C,G. CORNER GUARD H.PT. HIGH POINT REF. REFERENCE <br />A21 <br />2ND FLOOR - ENLARGED TOILET PLAN AND DETAILS <br />P3 <br />2ND FLOOR - PARTIAL PLUMBING PLAN <br />G,I. <br />CAST IRON C.J. CONTROL <br />HR. <br />HOUR <br />REFR. <br />REFRIGERATOR <br />8. <br />ALL BIDS SHALL BE PREPARED FROM A COMPLETE SET OF CONSTRUCTION DOCUMENTS. <br />COMPLETE SETS OF DOCUMENTS SHALL NOT BE BROKEN UP FOR BID PURPOSES. SUCH <br />A2J <br />2ND FLOOR -ENLARGED TOILET PLAN AND DETAILS <br />P4 <br />2ND FLOOR -PARTIAL PLUMBING PLAN <br />BUILDING HEIGHT <br />60'-0" <br />42'-0" <br />JOINT <br />G.L. <br />CENTER LINE <br />H.R. <br />N.R.S. <br />HANDRAIL <br />HEALTH AND REHABILITATE <br />REG. <br />REINF. <br />REGULATE, REGULAR <br />REINFORCING <br />ACTION MAY RESULT IN A LACK OF INFORMATION IN REFERENCE TO THE SCOPE OF WORK <br />A3a <br />IST FLOOR - PARTIAL REFLECTED CEILING PLAN <br />PS <br />SANITARY RISER DIAGRAM, WATER DEMAND <br />GLG. <br />CEILING <br />SERVICES <br />READ, <br />REQUIRED <br />TO BE PERFORMED. <br />NUMBER OF STORIES <br />3 <br />2 <br />,A3b <br />IST FLOOR - PARTIAL REFLECTED CEILING PLAN <br />SCHEDULES AND PLUMBING DETAILS <br />• TOTALS REFLECT AREA MODIFICATION AS FOLLOWS: <br />CLO. CLOSET H.S. HEAT STRENGTHENED REV. REVI6iON5 <br />A3a <br />REFLECTED CEILING PLAN - CANOPY AND DETAILS <br />C.M.U. <br />COL. <br />CONCRE-E MASONRY UNIT <br />COLUMN <br />H.S.v. <br />HTG <br />HEAT STEAMED VINYL <br />HEAT;NG <br />R.N. <br />RM. <br />ROBE NOOK <br />ROOM <br />9, <br />IT SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY TO PERSONALLY FIELD <br />INSPECT THE PROJECT SITE PRIOR TO THE PREPARATION AND SUBMITTAL OF HIS BID, <br />FRONTAGE INCREASE PER FBC 506.3 0.00i <br />A3d <br />IST FLOOR - REFLECTED CEILING PLAN DETAILS <br />Ml <br />IST FLOOR - PARTIAL MECHANICAL PLAN <br />TYPES OF CONSTRUCTION <br />GOM. COMMON H.V.A.C. HEATING, VENTILATION, 4 R.D ROUG-» OPENING <br />THIS INSPECTION IS REQUIRED SO THAT THE CONTRACTOR SHALL BE TOTALLY FAMILIAR <br />A4a <br />2ND FLOOR - PARTIAL REFLECTED CEILING PLAN <br />M2 <br />IST FLOOR - PARTIAL MECHANICAL PLAN <br />CONC. <br />CONCRETE <br />AIR CONDITIONING <br />WITH THE EXISTING CONDITIONS AND THEIR INTERFACE WITH THE NEW CONSTRUCTION AS <br />A4b <br />2ND FLOOR - PARTIAL REFLECTED CEILING PLAN <br />M3 <br />2ND FLOOR - PARTIAL MECHANICAL PLAN <br />GON <br />CONSTRUCTION <br />S.A.B. <br />SOUND ATTENUATING <br />DEFINED IN THESE CONSTRUCTION DOCUMENTS. <br />A4a <br />2ND FLOOR - REFLECTED CEILING PLAN DETAILS <br />M4 <br />2ND FLOOR - PARTIAL MECHANICAL PLAN <br />GONT. T. <br />CONTINUOUS <br />LG.U, <br />INTENSIVE CARE UNIT <br />BLANKET <br />TYPE OF CONSTRUCTION V-B SPRINKLERED <br />CONTR. <br />CONTRACTOR <br />I.D. <br />INSIDE DIAMETER <br />S.B. <br />SET BACK <br />10. <br />UNLESS OTHERWISE SPECIFIED, THE G.G. SHALL FURNISH A WRITTEN GUARANTEE FOR ALL <br />A4d <br />2ND FLOOR - REFLECTED CEILING PLAN DETAILS <br />M5 <br />MECHANICAL SCHEDULES AND DETAILS <br />GORR. <br />CORRIDOR <br />IN. <br />INCHES) <br />S.C. <br />SOLID CORE <br />WORK (EQUIPMENT, MATERIALS, AND LABOR), AGAINST ANY DEFECTS IN SAID WORK FOR A <br />TABLE 601 - FIRE RESISTANCE RATING FOR BUILDING ELEMENTS <br />Asa <br />ROOF PLAN <br />G.O. <br />CASED OPENING/ CLEAN <br />INCL. <br />INCLUDE(DXING) <br />SCED. <br />SCHEDULE <br />PERIOD OF ONE (1) YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION, WITH ALL <br />A5b <br />ROOF DETAILS <br />ESI <br />ELECTRICAL SITE PLAN <br />BUILDING ELEMENT <br />REQUIRED <br />PROVIDED <br />OUT <br />INFO, <br />INFORMATION <br />SCWD <br />SOLID CORE WOOD DOOR <br />APPROPRIATE REPAIRS OR REPLACEMENTS AT NO ADDITIONAL COST TO THE OWNER. <br />A6a <br />EXTERIOR ELEVATIONS <br />Eta <br />IST FLOOR -OVERALL ELECTRICAL FLOOR PLAN <br />CPT. <br />C.S. <br />CARPET <br />CONCRETE SEALED <br />INSUL. <br />INT. <br />INSULATION <br />INTERIOR <br />SEAL. <br />SECT. <br />SEALANT <br />SECTION <br />11. <br />IT SHALL BE THE RESPONSIBILITY OF THE G.G. AND/OR CONTRACTORS TO COMPLY WITH <br />PRIMARY STRUCTURAL FRAME <br />O HR <br />0 HR <br />Abb <br />EXTERIOR ELEVATIONS <br />Elb <br />IST FLOOR - PARTIAL ELECTRICAL PLAN (SOUTH) <br />BEARING WALLS - EXTERIOR <br />0 HR <br />0 HR <br />C.S.W. CAVITY SHAFT WALL I.P. ISOLATION PANEL S.F. SQUARE FOOT (FEET) <br />ALL THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 BY THE <br />Ala <br />STAIR I - PLANS AND DETAILS <br />Etc <br />IST FLOOR - PARTIAL ELECTRICAL PLAN (NORTH) <br />C.T. <br />CERAMIC TILE <br />I.P.S <br />INSIDE PIPE DIAMETER <br />SH. <br />SHELVING, SHELF <br />U.S. DEPARTMENT OF LABOR, AND REQUIRE ALL ITS SUBCONTRACTORS AND EMPLOYEES <br />Alb <br />STAIR 2 -PLANS AND DETAILS <br />Eld <br />IST FLOOR -PARTIAL ELECTRICAL PLAN (CANOPIES) <br />GTR. <br />COUNTER, CENTER <br />I.T. <br />ISOLATION TRANSFORMER <br />SPIT, <br />SHEET <br />TO COMPLY WITH THIS LAW, AND ANY RELATED STATE OR LOCAL LAWS. <br />BEARING WALLS - INTERIOR <br />0 HR <br />0 HR <br />Alc <br />ELEVATOR SHAFT - PLANS AND DETAILS <br />Eta <br />2ND FLOOR - OVERALL ELECTRICAL FLOOR PLAN <br />NONBEARING WALLS AND PARTITIONS - EXTERIOR <br />0 HR <br />0 HR <br />G.S. <br />TOMOGRAPH <br />COMPUTED AXIAL <br />I.V,T, <br />INTRAVENOUS TRACK <br />SIM. <br />S.M. <br />SIMILAR <br />SHEET METAL <br />12, <br />THE DATA GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED. <br />ASa <br />WALL SECTIONS <br />E2b <br />2ND FLOOR - PARTIAL ELECTRICAL PLAN (SOUTH) <br />NONBEARING WALLS AND PARTITIONS - INTERIOR <br />0 HR <br />0 HR <br />SCANNER JAN. JANITOR 5,M,5, SHEET METAL SCREW <br />THEIR ABSOLUTE ACCURACY IS NOT GUARANTEED, AND THE G.C. SHALL OBTAIN EXACT <br />ASb <br />WALL SECTIONS <br />E2c <br />2ND FLOOR - PARTIAL ELECTRICAL PLAN (NORTH) <br />CTSK. <br />COUNTER SUNK <br />JT. <br />JOINT <br />S.P.B. <br />SPECIMEN PASS BOX <br />LOCATIONS, 1-1EA5UREMEN78, LEVELS, ETC, AT THE 6I7E AND SHALL SATISFACTORILY <br />Aft <br />WALL SECTIONS <br />E3a <br />IST FLOOR - OVERALL ELECTRICAL LIGHTING PLAN <br />C..W. <br />CERAMIC TILE WAIN5COAT <br />SPEC, <br />SPECIFIGATION(S) <br />ADAPT HIS WORK TO THE ACTUAL CONDITIONS OF THE BUILDING. DO NOT SCALE PRINTS. <br />FLOOR CONSTRUCTION AND SECONDARY MEMBERS <br />0 HR <br />0 HR <br />A8d <br />WALL SECTIONS <br />E3b <br />IST FLOOR - PARTIAL ELECTRICAL LICsHTMG PLAN (SOUTH) <br />C.A. CLEAN UTILITY K.P. KICK PLATE 5PF. SOUNDPROOF <br />VERIFY ALL DIMENSIONS WITH THE ARCHITECT PRIOR TO COMMENCING WORK. <br />KS. <br />KNEE SPACE <br />545 <br />STAINED AND SEALED <br />ROOF CONSTRUCTION AND SECONDARY MEMBERS <br />0 HR <br />1 0 HR <br />Aft <br />WALL SECTIONS <br />E3C <br />IST FLOOR - PARTIAL ELECTRICAL LIGHTING PLAN (NORTH) <br />D.A. <br />DELAYED ACTION <br />S.S. <br />STAINLESS STEEL <br />13. <br />THESE DOCUMENTS AND THE INFORMATION CONTAINED HEREIN SHALL NOT BE ALTERED IN <br />A8f <br />WALL SECTIONS <br />E3d <br />IST FLOOR - PARTIAL ELECTRICAL LIGHTING PLAN (CANOPIES) <br />TABLE 602 - FIRE RESISTANCE RATING FOR EXTERIOR WALLS BEARING <br />DBL. <br />DOUBLE <br />L. <br />LENGTH <br />5TA, <br />STATION <br />ANYWAY BY THE CONTRACTOR OR THE OWNER. ALTERATIONS SHALL BE MADE ONLY BY <br />AND NON BEARING BASED ON FIRE SEPARATION DISTANCE <br />ABg <br />WALL SECTION DETAILS <br />LIGHTING ALLOWANCE CALCULATIONS AND FIXTURE SCHEDULE <br />D.E. <br />DOUBLE EGRESS <br />LAB, <br />LABORATORY <br />STD, <br />STANDARD <br />THE ARCHITECT OF RECORD. <br />A8h <br />WALL SECTION DETAILS <br />E4 <br />ELECTRICAL LEGEND AND DETAILS <br />DEPT. <br />DEPARTMENT <br />L.A. <br />LAY -IN ACOUSTICAL <br />STL. <br />STEEL <br />FIRE SEPARATION DISTANCES <br />REQUIRED <br />PROVIDED <br />DET. <br />DETAIL <br />LAM. <br />LAMINATE <br />5TOR, <br />STORAGE <br />ASI <br />WALL SECTION DETAILS <br />E4a <br />2ND FLOOR - OVERALL ELECTRICAL LIC-04TiNG PLAN <br />LESS THAN 5'-0" <br />1 HR <br />N/A <br />D.A. DRINKING FOUNTAIN LAV. LAVATORY STRL. STRUCTURAL <br />Aga <br />DOOR SCHEDULES AND DETAILS <br />E4b <br />2ND FLOOR - PARTIAL ELECTRICAL LIGHTING PLAN (SOUTH) <br />DIA. <br />DIAMETER <br />L <br />LABEL <br />S.U. <br />SOILED UTILITY <br />ASb <br />DOOR DETAILS <br />E4C <br />2ND FLOOR - PARTIAL ELECTRICAL LIGHTING PLAN (NORTH) <br />FROM 5'-0" TO 10'-0" <br />1 HR <br />N/A <br />DIAG. <br />DIM. <br />DIAGONAL <br />DIMENSION <br />L.D..D.W, <br />L.F. <br />LESS DOOR WIDTH <br />LINEAR FEET <br />SUSP. <br />S.Y. <br />SUSPENDED <br />SQUARE YARD <br />Aga <br />WINDOW SCHEDULES AND DETAILS <br />E5 <br />ELECTRICAL DETAILS <br />DISP. <br />DISPENSER <br />LKR. <br />LOCKER <br />FROM 10'-0" TO 30'-0" <br />0 HR <br />N/A <br />AIO <br />MISCELLANEOUS DETAILS <br />E6 <br />ELECTRICAL DETAILS <br />Q <br />CON°STRIICTION NOTES <br />GREATER THAN 30'-0" <br />0 HR <br />N/A <br />DN, DOWN L.L, LEAD LINED, LIVE LOAD T. TREAD, TOILET <br />DR. DOOR L.P. LIGHT PROOF TA. TABLE <br />Alla <br />IST FLOOR - MILLWORK PLAN <br />El <br />ELECTRICAL RISER DIAGRAM <br />Allb <br />INTERIOR ELEVATIONS - IST FLOOR <br />ES <br />ELECTRICAL PANEL SCHEDULES <br />Dural. <br />DRAWINGS <br />LT,WT, <br />LIGHT WEIGHT <br />T.B. <br />TEST BORING <br />DWR. <br />DRAWER <br />T.C. <br />TOILET COMPARTMENT <br />Alle <br />INTERIOR ELEVATIONS - IST FLOOR <br />ES <br />ELECTRICAL PANEL SCHEDULES <br />FIRE AND SMOKE PROTECTION FEATURES <br />IMAS. MASONRY T.D. TRAVEL DISTANCE <br />Alld <br />INTERIOR ELEVATIONS - IST FLOOR <br />EIO <br />FIRE ALARM RISER AND DETAILS <br />EA, <br />E.A. <br />EACH <br />EXPANSION BOLT <br />MATL, <br />MAX. <br />MATERIAL <br />MAXIMUM <br />TEL, <br />TEMP. <br />TELEPHONE <br />TEMPERED, TEMPERATURE <br />1. <br />INTERIOR FINISH MATERIALS APPLIED TO WALL AND CEILING SHALL BE IN ACCORDANCE WITH <br />Allis <br />INTERIOR ELEVATIONS - IST FLOOR <br />E.O.S. <br />EDGE OF STEEL <br />M.B. <br />MACHINE BOLT <br />T4G <br />TONGUE 4 GROOVE <br />A5TM-E-84. ALL FINISH MATERIALS SHALL MEET A CLASS "B" INTERIOR FINISH RATING IN EXIT <br />ASSEMBLY FIRE RATINGS <br />REQUIRED <br />PROVIDED <br />Allf <br />INTERIOR ELEVATIONS - IST FLOOR <br />E.J. <br />EXPANSION JOINT <br />MECH. <br />MECHANICAL <br />THK, <br />THICKNESS) <br />AND EXIT ACCESS AREA. CLASS "C" ELSEWHERE. <br />All9 <br />INTERIOR ELEVATIONS - IST FLOOR <br />FIRE WALL - 706.1 AND TABLE 706.4 <br />N/A <br />N/A <br />EL. <br />ELEVATION <br />MED.CAB. <br />MEDICAL CABINET <br />T.P.D. <br />TOILET PAPER DISPENSER <br />2 <br />ALL EXIT DOORS SHALL BE OPERABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY, <br />Al2a <br />2ND FLOOR - MILLWORK PLAN <br />ELEC. <br />ELECTRICAL <br />MED.PREP, <br />MEDICAL PREPARATION <br />T.P.H. <br />TOILET PAPER HOLDER <br />TOOL, SPECIAL KNOWLEDGE OR EFFORT. MANUALLY OPERATED FLUSH BOLTS OR SURFACE <br />SHAFT AND EXIT ENCLOSURES - 713.4 / 1020.1 <br />I HR <br />I HR <br />Ai2b <br />INTERIOR ELEVATIONS - 2ND FLOOR <br />ELEV. <br />ELEVATOR <br />MTL. <br />METAL <br />TREAT. <br />TREATMENT <br />BOLTS SHALL NOT 8E USED. <br />LESS THAN 4 STORIES <br />Alta <br />INTERIOR ELEVATIONS - 2ND FLOOR <br />EMER. EMERGENCY MFD, MANUFACTURED T.V, TELEVISION <br />E.P. <br />ELECTRICAL PANELBOARD <br />MFR, <br />MANUFACTURE <br />TYP, <br />TYPICAL <br />OCCUPANCY SEPARATION - 707.3.c3 / 508 <br />N/A <br />--- <br />Al2d <br />INTERIOR ELEVATIONS - 2ND FLOOR <br />EPS <br />EXPANDED POLYSTYRENE <br />M.G. <br />MEDICAL GAS <br />3. <br />ALL GLAZING WITHIN A 24 INCH ARC OF DOORS WHOSE BOTTOM EDGE IS LESS THAN 60 <br />Al2e <br />INTERIOR ELEVATIONS - 2ND FLOOR <br />=Q. <br />EQUAL <br />M.G.A. <br />MEDICAL GAS ALARM <br />UC. <br />UNDERCUT <br />INCHES ABOVE THE FLOOR AND GLASS BELOW 18" A.F.F. AND ALL GLAZING IN DOORS SHALL <br />TENANT SEPARATION - 108.1 <br />N/A <br />--- <br />Al2f <br />INTERIOR ELEVATIONS - 2ND FLOOR <br />EXIT PASSAGEWAY- 707.3.4 / 1024.3 <br />N/A <br />""" <br />EQUIP. EQUIPMENT M.G.O. MEDICAL OUTLET U.C. UNDER COUNTER <br />BE SAFETY GLASS, TEMPERED GLASS OR ACRYLIC PLASTIC SHEET. PER FBC-2406.1 <br />Al3a <br />CABINET DETAILS <br />E.R. <br />EMERGENCY ROOM, <br />EMERGENCY RELEASE <br />M.G.V.B. <br />M,B,M, <br />MEDICAL GAS VALVE, BOX <br />METAL BUILDING <br />U.O.N. <br />UTIL. <br />UNLESS OTHERWISE NOTED <br />UTILITY <br />4. <br />OBJECTS PROTRUDING FROM WALLS WITH THEIR LEADING EDGES BETWEEN 27" AND 80" <br />Al3b <br />CABINET DETAILS <br />E.S. <br />EXPOSED STRUCTURE <br />MANUFACTURER <br />ABOVE THE FINISHED FLOOR SHALL PROTRUDE NO MORE THAN 4" INTO WALKS, HALLS, <br />HORIZONTAL EXIT - 707.3.5 / 1026.1 <br />N/A <br />--- <br />Al3a <br />CABINET DETAILS <br />SINGLE OCCUPANCY FIRE AREA - 10-1.3.10 <br />N/A <br />--- <br />E.T. ELAPSED TIME M.C. MANHOLE V. VINYL <br />CORRIDORS, PASSAGEWAYS, OR AISLES. OBJECTS MOUNTED AT OR BELOW 21'' ABOVE <br />FINISHED ANY AMOUNT. FREE STANDING OBJECTS MOUNTED ON <br />Al3d <br />CABINET DETAILS <br />E.W.C. <br />ELECTRIC WATER COOLER <br />MIN. <br />MINIMUM <br />V.B. <br />VINYL BASE <br />FLOOR MAY NOT PROTRUDE <br />CORRIDORS (OCCUPANT LOAD LESS <br />N/A <br />___ <br />EXP. EXPANSION MIN, MISCELLANEOUS V.G.T. VINYL COMPOSITION TILE <br />POST OR PYLONS MAY OVERHANG 12". PROTRUDING OBJECTS SHALL NOT REDUCE THE <br />Al3e <br />CABINET DETAILS <br />EXT'G <br />EXISTING <br />MLDG. <br />MOLDING <br />VERT. <br />VERTICALLY) <br />CLEAR WIDTH OF AN ACCESSIBLE ROUTE OR MANEUVERING SPACE. <br />THAN 30) - 1020.1 (UNSPRINKLERED) <br />A13F <br />CABINET DETAILS <br />ETR. <br />EXT. <br />EXISTING TO REMAIN <br />EXTERIOR <br />M.O. <br />M.O.L. <br />MASONRY OPENING <br />MORE OR LESS <br />VEST. <br />vJF. <br />VESTIBULE <br />VERIFY IN FIELD <br />5. <br />PROVIDE DEADWOOD BLOCKING WITHIN WALL CAVITIES AT LOCATIONS INCLUDING, BUT NOT <br />M.P. <br />MEDICINE PREPARATION <br />V.W.F. <br />VINYL WALL COVERING <br />LIMITED TO, WALL MOUNTED CABINETRY, FIRE EXTINGUISHER CABINETS, TOILET ACCESSORIES, <br />IDIa <br />IST FLOOR - FLOOR FINISH PLAN <br />F.A. <br />FIRE ALARM <br />M.R. <br />MOISTURE RESISTANT <br />GRAB BARS, WALL STOPS, ETC.. leGA. GALV, FLAT METAL MAY BE USED IN LOCATIONS <br />INTERIOR FINISHES <br />IDIb <br />IST FLOOR - REFLECTED CEILING FINISH PLAN <br />F.A.C. <br />FIRE ALARM CABINET <br />M.R.I, <br />MAGNETIC RESONANCE <br />W/ <br />WITH <br />APPROVED BY ARCHITECT. <br />IIC <br />EAST 4 WEST CANOPIES - REFLECTED CEILING FINISH <br />INTERIOR WALL AND CEILING FINISH REQUIREMENTS BY OCCUPANCY - TABLE e03.11 <br />F.A.P. FIRE ALARM PULL STATION IMAGE W.B. WALL BUMPER <br />F.C. FURRING M.S. METAL STUD W.C. WATER CLOSET, WALL <br />Co.ANY CONCEALED COMBUSTIBLE SPACE IN WHICH BUILDING MATERIALS HAVING A FLAME <br />PLAN - IST FLOOR ROOM FINISH SCHEDULE AND <br />F.D. <br />CHANNEL <br />FLOOR DRAIN, FIELD <br />M.S.L. <br />MEAN SEA LEVEL <br />COVERING <br />SPREAD INDEX GREATER THAN CLASS A ARE EXPOSED SHALL BE DRAFT570FPED AS <br />FINISH LEGEND <br />��� J G�"' TEAM <br />GROUP: BUSINESS GROUP "B" <br />DIMENSION <br />M.T. <br />METAL THRESHOLD <br />WIC <br />WHEEL CHAIR <br />FOLLOWS: <br />IO2a <br />2ND FLOOR -FLOOR FINISH PLAN <br />INTERIOR EX17 STAIRWAYS, INTERIOR EXIT RAMPS, AND EXIT <br />GLASS B <br />FDN. FOUNDATION MTD. MOUNTED WE). WOOD <br />6.1. EVERY EXTERIOR AND INTERIOR WALL AND PARTITION SHALL BE FIRESTOPPED AT <br />ID2b <br />2ND FLOOR -REFLECTED CEILING FINISH PLAN <br />F.A. <br />FIRE EXTINGUISHER <br />MUL. <br />MULLION <br />W.H. <br />WATER HEATER <br />EACH FLOOR LEVEL, AT THE TOP STORY CEILING LEVEL, AND AT THE LEVEL OF <br />PASSAGEWAYS <br />ID2a <br />2ND FLOOR - ROOM FINISH SCHEDULE AND FINISH <br />F.A.G. <br />FIRE EXTINGUISHER <br />M.V. <br />N.G. <br />MIXING VALVE <br />NURSE CALL <br />W,I. <br />W/O <br />WROUGHT IRON <br />WITH OUT <br />SUPPORT FOR ROOFS <br />6.2. EVERY UNOCCUPIED ATTIC SPACE SHALL BE SUB DIVIDED BY DRAFT670PS INTO <br />LEGEND <br />ARCHITECT <br />PLUMBING <br />CORRIDORS AND ENCLOSURE FOR EXIT ACCESS STAIRWAYS <br />GLASS G <br />CABINET <br />F.F.E. <br />FINISHED FLOOR ELEVATION <br />N.I.C.REAS <br />C. <br />NOT IN CONTRACT <br />W.O. <br />WHERE OCCURS <br />NOT TO EXCEED 3,000 SOFT <br />AND EXIT ACCESS RAMPS <br />NI <br />ARCHITECTURAL SPECIFICATIONS <br />OLIVERI ARCHITECTS <br />32707 U.S. HWY.19 <br />MDGI FLORIDA INC. <br />405 2ND STREET SOUTH, SUITE B <br />ROOMS AND ENCLOSED SPACES <br />CLASS G <br />F.N.C. FIRE H05E CABINET NO. NUMBER W.P. WATERPROOFING) <br />6.3.ANY CONCEALED SPACE BETWEEN THE CEILING AND THE FLOOR OR ABOVE ROOF <br />N2 <br />ARCHITECTURAL SPECIFICATIONS <br />PALM HARBOR, FLORIDA 34684 <br />SAFETY HARBOR, FLORIDA 34695 <br />F.I. <br />FILM ILLUMINATOR <br />NOM. <br />NOMINAL <br />W.R. <br />WASTE RECEPTACLE <br />SHALL BE DRAFTSTOPFPED FOR THE FULL DEPTH OF THE SPACE ALONG THE LINE OF <br />SUPPORT FOR THE FLOOR OR ROOF STRUCTURAL MEMBERS AND, IF NECESSARY, AT <br />N3 <br />ARCHITECTURAL SPECIFICATIONS <br />727, 781. 7525 <br />727-698-0398 <br />FIN. <br />FL. <br />FINISH <br />FLOOR <br />N.5TA. <br />N.T.S. <br />NURSE STATION <br />NOT 70 SCALE <br />WT. <br />W.W.F. <br />WEIGHT <br />WELDED WIRE FABRIC <br />OTHER LOCATIONS TO FORM AREAS N07 TO EXCEED 1,000 SQFT FOR ANY SPACE <br />FLASH. <br />FLASHING <br />W.W.M. <br />WELDED WIRE MESH <br />BETWEEN CEILING AND FLOOR, AND 3,000 SOFT FOR ANY SPACE BETWEEN CEILING <br />MEANS OF EGRESS <br />STRUCTURAL, <br />MECHANICAL <br />FLUOR. <br />FLUORESCENT <br />O.A. <br />O.C. <br />OVERALL <br />ON CENTER <br />YD. <br />YARD <br />AND ROOF <br />6.4.DRAFTSTOPPING MATERIALS SHALL BE NOT LESS THAN I/2" THICK GYPSUM BOARD, <br />MOHAN ENGINEERING, INC. <br />MDCI FLORID& INC. <br />TABLE 1004.12 - MAXIMUM FLOOR AREA ALLOWANCE PER OCCUPANT <br />15/32" PLYWOOD, OR OTHER APPROVED MATERIALS THAT ARE ADEQUATELY <br />13051 W. <br />LINEBAUGH &VE. -SUITE 102 <br />405 2ND STREET 50UTI-, SUITE B <br />SUPPORTED <br />TAMP&, <br />FLORIDA 33626 <br />SAFETY HARBOR, FLORIDA 34695 <br />51rM80L L� <br />6.5.THE INTEGRITY OF ALL DRAFTSTOPS SHALL BE MAINTAINED <br />FUNCTION OF SPACE <br />FLOOR AREA <br />SQ. FT. PER <br />OCCUPANTS <br />813.475. 5983 <br />727-698-0398 <br />1. <br />ALL PARTITIONS ENCLOSING VERTICAL OPENINGS SUCH AS STAIRWAYS, UTILITY SHAFTS, AND <br />ELEVATOR SHAFTS SHALL EXTEND FROM FLOOR TO FLOOR OR FLOOR TO ROOF. <br />OCCUPANT <br />FIRE <br />PROTECTION <br />MpCI FLORIDA INC. <br />ELECTRICAL <br />EG4p INCOPORATEp <br />BUSINESS -GROUP 'B' <br />100 SF <br />I OCCUPANT <br />8. <br />ALL RATED PARTITIONS SHALL EXTEND FROM THE TOP OF THE FLOOR TO THE CEILING AND <br />405 2ND STREET SOUTH, SUITE B <br />SAFETY HARBOR, FLORIDA 34695 <br />235 CENTRAL AVENUE, SUITE C <br />ST. PETERSBURG, FLORIDA 33-101 <br />FIRST FLOOR <br />15,616 5/F <br />157 <br />- <br />BUILDING SECTION SYMBOL <br />KEYED DRAWING NOTES <br />BE SECURELY ATTACHED THERETO. WHERE SAID CEILING IS NOT PART OF AN ASSEMBLY <br />HAVING A FIRE RESISTANCE RATING AT LEAST EQUAL TO THAT REQUIRED FOR THE PARTITION, <br />SECOND FLOOR <br />14,677 S/- <br />147 <br />727-698-0398 <br />-12-1, 289. 6215 <br />TOTALS <br />30,353 S/F <br />304 <br />THE PARTITION SHALL BE CONSTRUCTED TIGHT AGAINST THE FLOOR OR THE ROOF DECK <br />ABOVE, <br />FIRE WALLS, FLOORS, OR FLOOR/ CEILING ASSEMBLIES FOR <br />�p/'� /� SCOPE <br />VT <br />LOCATION MAID <br />O <br />DOOR <br />NUMBER SYMBOL <br />9. <br />PENETRATION OF RATED <br />�VJ <br />ELECTRICAL, TELEPHONE, PLUMBING, H.V.A.C. DUCTS, COMMUNICATION SYSTEMS OR SIMILAR <br />FACILITIES SHALL BE PERMITTED BY NON-COMBUSTIBLE PIPE OR CONDUIT WHEN ALL <br />MEANS OF EGRESS <br />REQUIRED <br />PROVIDED <br />OPENINGS AROUND THE PIPE OR CONDUIT ARE FIRESTOPPED WITH APPROVED <br />NON-COMBUSTIBLE MATERIALS OR WHEN THE PENETRATION IS PROTECTED WITH A SYSTEM <br />CONSTRUCTION OF A TWO STORY, FREE STANDING, SINGLE TENANT MEDICAL <br />EGRESS WIDTH PER PERSON (LEVEL) - 1005.3.2 <br />02" x 157 = 31.4" <br />234" <br />WALL SECTION <br />SYMBOL <br />000 <br />ROOM <br />NUMBER SYMBOL <br />OFFICE BUILDING INCLUDING BUILDING SHELL, INTERIOR MEDICAL OFFICE <br />EGRESS WIDTH PER PERSON (STAIRS) - 1005.3.1 <br />0.3" x 141 = 44.1" <br />68" <br />-- <br />WHICH HAS AN "F" RATING EQUAL TO OR GREATER THAN THE ASSEMBLY IN WHICH THE <br />SUITES, FULL SITE DEVELOPMENT AND UTILITIES. <br />PENETRATION OCCURS. <br />MINIMUM CLEAR EXIT DOOR OPENING - 1010.1.1 <br />32" <br />> 34" <br />O <br />WINDOW <br />SYMBOL <br />10. <br />WALL AND ROOF/ CEILING ASSEMBLIES NOTED AS U.L., G.A. OR OTHER APPROVED TESTING <br />ASSEMBLIES MUST <br />,z <br />Silverado Golf <br />MINIMUM CLEAR STAIR WIDTH - 1011.2 <br />44" <br />> 44" <br />AGENCIES ARE CONSIDERED PROPRIETARY. PROPRIETARY BE BUILT <br />& Country Club <br />UTILIZING THE COMPONENTS, MEANS, AND METHODS SPECIFIED BY THE TESTING AGENCY, <br />MAXIMUM COMMON PATH OF TRAVEL <br />100 FT <br /><100 FT <br />- DETAIL SYMBOL <br />I <br />11. PROVIDE AND INSTALL PORTABLE FIRE EXTINGUISHERS 45 SHOWN IN THESE DOCUMENTS OR <br />AS OTHERWISE DIRECTED BY THE LOCAL FIRE MARSHAL. <br />TABLE 1006.2.1 <br />GJ'=ARE �OTAGE 5REAKDOUN <br />pi Progress <br />`.,. <br />EXIT ACCESS TRAVEL DISTANCE -TABLE 1017.2 <br />300 FT <br />< 300 FT <br />REVISION <br />12. INTERIOR WALL AND CEILING FINISHES SHALL BE CLASSIFIED IN ACCORDANCE WITH <br />gy Services <br />-. PROJECT <br />A5TM-E-84. <br />- SITE phyrhills - <br />MINIMUM CORRIDOR WIDTH - 1020.2 <br />44" <br />> 44'' <br />Dialysis+ <br />- <br />G <br />MAXIMUM DEAD END CORRIDOR LENGTH - 1020.4 <br />50 FT <br /><50 FT <br />DETAIL SYMBOL <br />13. SUSPENDED ACOUSTICAL CEILING SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE <br />CONDITIONED <br />AREAS: <br />C'a ' :aid F �. ,: ^.':,r-i'.ind HINd <br />PROVISIONS OF ASTM-C-&35 AND ASTM-C-636, <br />FIRST <br />FLOOR CONDITIONED AREA 15,67(o SQFT <br />14. <br />MATERIAL, OTHER THAN FOAM PLASTIC USED AS INTERIOR TRIM SHALL HAVE A MINIMUM <br />SECOND FLOOR CONDITIONED AREA 14,(o77 SQFT <br />Sunshine C3ank � Circle K <br />MINIMUM NUMBER OF EXITS - 1006.2, 1006.3.1 <br />2 <br />5 <br />MINIMUM NUMBER OF SECOND FLOOR EXITS <br />WALL TYPES <br />GLASS FLAME SPREAD AND SMOKE -DEVELOPED INDEX WHEN TESTED IN ACCORDANCE <br />TOTAL CONDITIONED AREA 30,353 SQFT <br />T <br />WITH ASTM-E-84. <br />2 <br />3 <br />1006 32 <br />15. <br />INTERIOR WALL SURFACES WITHIN (2) TWO FEET OF URINALS AND WATER CLOSETS SHALL HAVE <br />UNCONDITIONED <br />AREAS: <br />SPACES WITH ONE EXIT - 1006.2.1 <br />N/A <br />--- <br />0'-0" F.F.E.ELEVATION MARK <br />A SMOOTH, HARD, NONABSORBENT SURFACE TO A HEIGHT OF (4) FOUR FEET ABOVE THE <br />EAST <br />COVERED ENTRY UNCONDITIONED AREA 2,37io SQFT <br />Cara A . <br />TOP OF SLAB <br />KEY PLAN SECTION SYMBOL <br />FINISHED FLOOR MINIMUM. THE MATERIALS USED IN SUCH WALLS SHALL BE OF A TYPE THAT <br />WEST COVERED ENTRY UNCONDITIONED AREA 806 SQFT <br />a <br />TOTAL UNCONDITIONED AREA 3,182 SQFT <br />IS NOT ADVERSELY AFFECTED BY MOISTURE. <br />NUMBER AND SIZE OF EXITS <br />Z Kimr,a Avc <br />16. <br />SIGNAGE SHALL BE PROVIDED AS REQUIRED AND AS STATED IN THE LATEST ADOPTED <br />IST FLOOR <br />TOTAL <br />AREA UNDER ROOF 33,rJ3r✓' SQFT <br />Arbor Oaks De �_ <br />� Q Gulf Regions! Hospice � <br />- Kime a Ave <br />INTERIOR ELEVATION MARK <br />FLORIDA ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION AND SHALL COMPLY WITH <br />DOUBLE ENTRANCE DOORS 66" x 2 = <br />132° <br />� M Laknta ^t <br />-/-- <br />CHAPTER 1 SECTION 103 SIGNS. <br />TENANT EXIT DOORS 34" x 3 102" <br />Jodi A e <br />TOTAL EXIT WIDTH - FIRST FLOOR 234'' <br />;entury Dr <br />C-) <br />STAIRS FROM SECOND FLOOR 34'' x 3 102" <br />J <br />REVISIONS <br />BY <br />r <br />00 <br />• Cn <br />C . <br />cJ N U <br />_ - CIJ y <br />Y <br />�., L <br />= a c <br />� N <br />1: <br />H; <br />z-M <br />U. <br />t� W <br />C <br />,a__- 1x= <br />. <br />y <br />O.• J <br />N 1i <br />tt ' o Q <br />y� <br />C, <br />CD <br />O <br />Q E <br />O w <br />G p <br />y <br />C <br />U <br />� <br />Z O <br />c J Elf N <br />Lf') <br />� M <br />.� O M <br />m E �. <br />U Q (n <br />`-' U :3- •0 <br />O U <br />- LLJ -° O <br />v :2 v Vi U <br />U <br />� <br />O <br />Q O <br />ID m <br />_ CL <br />O ofN <br />Z p v <br />J w <br />LA_ <br />Date: 02. 13. 18 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: Drawn <br />Job: 15-025 <br />Sheet <br />T2 <br />H:'Projects\Projects 2015\15025 - FMC Filand lllvd Expansion\04-CD\01-CD.A\04-Architectural\_T2 - INDFX.dwg, 2/9/2018 9:11:35 AM, JSimon, Xerox 6604 PS.pc3 <br />