Laserfiche WebLink
f <br />DIVISION 1 GENERAL NOTES <br />DIVISION 2 SITE WORK <br />i THERMAL AND MOISTURE <br />DIVISION -1 THERMAL MOISTURE <br />DIVISION S DOORS AND WINDOWS <br />ION <br />TIOAND <br />SECTION 01340 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES <br />SEE STRUCTURAL <br />FFART2 <br />SECTION 01320 ONE PIECE MISSION "S" CLAY ROOFING TILE <br />SECTION 0S111 STANDARD STEEL DOORS AND FRAMES <br />S <br />PART 1 GENERAL <br />PART I GENERAL <br />PART I GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />B. PROVIDE EIFS COMPONENTS FROM SINGLE SOURCE MANUFACTURER OR APPROVED SUPPLIER <br />1.01 SECTION INCLUDES <br />1.01 GENERAL <br />A. SUBMIT SHOP DRAWINGS, PRODUCT DATA AND SAMPLES REQUIRED BY CONTRACT DOCUMENTS, OR AS <br />C. ALTERNATES TO THE APPROVED MANUFACTURER WILL BE CONSIDERED ONLY IF SUBMITTED TO ARCHITECT <br />A. FORMED CLAY ROOFING TILES, COMPLETE WITH COMPONENTS AND OTHER REQUIRED ACCESSORIES AS NEEDED FOR A <br />A. PROVIDE DOORS AND FRAMES COMPLYING WITH STEEL DOOR INSTITUTE "RECOMMENDED SPECIFICATIONS <br />NECESSARY WHERE NOT INDICATED, SO ARCHITECT CAN REVIEW, SELECT, CHECK FOR CONFORMANCE, <br />DIVISION 3 CONCRETE <br />10 DAYS PRIOR TO BID IN WRITING. SUBMITTED SYSTEM MUST INCLUDE SUBSTANTIATION OF SPECIFIED SYSTEM <br />COMPLETE AND PROPER INSTALLATION. <br />STANDARD STEEL DOORS AND FRAMES" AN5I/5DI-100. <br />ETC., AS REQUIRED. <br />PERFORMANCE, PRODUCT COMPONENT PERFORMANCE AND PRODUCT COMPONENT DESCRIPTIONS. <br />B. UNDERLAYMENT, EAVE, VALLEY, RAKE, AND RIDGE PROTECTIONt NAILERS, SHEET METAL FLASHINGS AND TILE FASTENING. <br />B. MANUFACTURER TO BE A MEMBER OF THE STEEL DOOR INSTITUTE. IE: CECO BUILDING PRODUCTS, REPUBLIC <br />BUILDERS PRODUCTS OR STEEL CRAFT. <br />102 RELATED REQUIREMENTS <br />SEE STRUCTURAL <br />. <br />202 ADHESIVE <br />REFERENCES <br />N0. <br />C. SUPPLIER TO BE A STOCKING DISTRIBUTOR FOR ONE OF THE LISTED MANUFACTURERS WITH NO LESS THAN <br />A. DESIGNATED IN THE CONSTRUCTION SCHEDULE, OR IN A SEPARATE COORDINATE SCHEDULE, THE DATES <br />A. BTS PLUS, AONE-COMPONENT, FACTORY-PROPRTIONED, POLYMER -MODIFIED, CEMENT -BASED ADHESIVE WITH <br />A. A. ICBM REPORT 3523 -CLAY ROOFING TILES. <br />FIVE YEARS OF DISTRIBUTION FOR SAME MANUFACTURER SUPPLIER TO HAVE A "UL" OR "WARNOCK <br />FOR SUBMISSION AND THE DATES THAT REVIEWED SHOP DRAWINGS, PRODUCT DATA AND SAMPLES WILL <br />FIBER REINFORCEMENT (FOR USE OVER EXTERIOR GYPSUM SHEATHING, DENS GLASS GOLD SHEATHING, <br />B. A57M STANDARD SPECIFICATIONS <br />1. C144 - AGGREGATE FOR MASONRY MORTAR <br />HERSEY" CERTIFIED FABRICATION SHOP. <br />BE NEEDED. ALLOW SUFFICIENT TIME IN THE SCHEDULE FOR ARCHITECT REVIEW AND POSSIBLE <br />EXTERIOR CEMENTATION SHEATHING, CONCRETE, MASONRY OR PLASTER SURFACES. NOT RECOMMENDED OVER <br />2. C150 - PORTLANDCEMENT. <br />RESUBMITTAL5 IF REQUIRED. <br />WOOD SURFACE5). <br />3. D226 - ASPHALLTT-SATURATED ORGANIC FELT USED IN ROOFING AND WATERPROOFING. <br />1.02 DOORS <br />4. 01002 - SILICONE SEALANT. <br />A. EXTERIOR DOORS TO BE GRADE II, MINIMUM 18 GA. A60 GALVANNEALED FACE SHEET WITH 16 GA STEEL <br />1.03 SHOP DRAWINGS <br />/y� /� /��p�/ <br />DIVISION 4 MASONRY <br />2.03 INSULATION BOARD <br />5. D2626 - ASPHALT -SATURATED AND COATED ORGANIC FELT BASE USED IN ROOFING. <br />HINGE CHANNEL, FLUSH TOP CHANNEL AND INVERTED BOTTOM CHANNEL. CORE TO BE HONEYCOMB OR <br />A. DRAWINGS SHALL BE PRESENTED IN A CLEAR AND THOROUGH MANNER <br />1 <br />A NOMINAL 1.0 Ib/CuFt. (16 Kg/M EXPANDED POLYSTYRENE (EPS) INSULATION BOARD IN COMPLIANCE WITH <br />6. 02822 - ASPHALT ROOF CEMENT. <br />POLYSTYRENE. DOOR TO HAVE FACTORY APPLIED PRIMED INVERTED TOP, CHANNEL WITH SHOP APPLIED <br />1. DETAILS SHALL BE IDENTIFIED BY REFERENCE TO SHEET AND DETAIL, SCHEDULE OR ROOM NUMBERS <br />A$TM C 518 TYPE I REQUIREMENTS AND EIMA GUIDELINE SPECIFICATION FOR EXPANDED POLYSTYRENE (EPS) <br />CAP IS NOT ACCEPTABLE. <br />SHOWN ON CONTRACT DRAWINGS. f <br />SEE STRUCTURAL <br />INSULATION BOARD, 1-1/2" THICK <br />123 SUBMITTALS <br />B. INTERIOR DOORS TO BE GRADE 11, MINIMUM 20 GAGE COLD ROLLED STEEL FACE SHEET WITH 16 GAGE <br />2. SHEET SHALL BE LABELED WITH CORRECT JOB NAME, LOCATION, ARCHITECT'S PROJECT NUMBER, AND <br />A. SUBMIT UNDER PROVISIONS OF SECTION 01300. <br />STEEL HINGE CHANNEL. CORE TO BE HONEYCOMB OR POLYSTYRENE. <br />SUBCONTRACTOR'S COMPANY NAME, ADDRESS, PHONE NUMBER AND NAME OF RESPONSIBLE <br />2.04 BASE COAT <br />B. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS SHOWING DETAILS ON HIP, RIDGE, VALLEY AND RAKE CONFIGURATIONS, <br />REPRESENTATIVE OF COMPANY, <br />A. BTS PLUS, AONE-COMPONENT, FACTORY -PROPORTIONED, POLYMER MODIFIED GEMENTITOUS BASE COAT WITH <br />AND COLLABORATED DETAILS OF RELATED WORK <br />METHODS OF FASTENING, C. PRODUCT DATA: SUBMIT MANUFACTURER'S DATA ON TILE PROPERTIES, CONFIGURATIONS AND COLORS. <br />1.03 FRAMES <br />3. DRAWINGS, DETAILS, ETC. SHALL CLEARLY ILLUSTRATE ALL COMPONENTS AND ADJACENT COMPONENTS <br />FIBER REINFORCEMENT AND LESS THAN 33 PERCENT PORTLAND CEMENT CONTENT BY WEIGHT t0 BE <br />D. SAMPLES: SUBMIT TWO TILE SAMPLES ILLUSTRATING COLOR, SURFACE FINISH AND TEXTURE, AND TILE CONFIGURATION <br />A EXTERIOR DOOR FRAME TO CONFORM TO SDI/ANSI A250B-1998. FABRICATED OF 16 GA. A60 GALVANNEALED <br />OF THE WORK <br />APPLIED AT 1/16" DRY THICKNESS. <br />FOR ARCHITECT'S APPROVAL. <br />STEEL. COMERS TO BE FACE WELDED AN[) GROUND SMOOTH. PAINT AREA WITH A RUST INHIBITING PRIMER. <br />DIVISION 5 METAL6 <br />B. STO FLEXYL-FIBER REINFORCED ACRYLIC BASE COAT MIXED WITH PORTLAND CEMENT (FOR USE AS A <br />ANCHORS TO BE CONCEALED. <br />1.04 PRODUCT DATA <br />WATERPROOF BASE COAT TO WATERPROOF FOUNDATIONS, SLOPED EIFS SHAPES AND PARAPETS. STO <br />ID4 QUALITY ASSURANCE <br />B. INTERIOR DOOR FRAME TO CONFORM TO SDI/ANSI A2503-1998. FABRICATED OF 16 GA. GOLD ROLLED <br />A PREPARATION: <br />PRIMER IS REQUIRED OVER STO FLEXYL PRIOR TO APPLYING FINISH COAT. <br />A. USE ADEQUATE NUMBER OF SKILLED WORKMEN WHO ARE THOROUGHLY SKILLED AND EXPERIENCED IN THE NECE55ARY <br />STEEL. CORNERS TO BE FACE WELDED AND GROUND SMOOTH. PAINT AREA WITH A RUST INHIBITING PRIMER <br />1. CLEARLY MARK EACH COPY TO IDENTIFY PERTINENT PRODUCTS OR MODELS WHICH ARE SPECIFICALLY <br />NONE SPECIFIED <br />CRAFTS AND WHO ARE COMPLETELY FAMILIAR WITH THE SPECIFIED REQUIREMENTS AND METHODS NEEDED FOR <br />ANCHORS TO BE CONCEALED. PREP FRAME FOR THREE SILENCERS. <br />COVERED BY THE SUBMITTAL. REFERENCE ALL NUMBERS 70 CORRESPOND 70 THOSE IN CONTRACT <br />105 REINFORCING MESHES <br />PROPER PERFORMANCE OF THE WORK OF THE SECTION. <br />DOCUMENTS. <br />A STANDARD MESH -NOMINAL 45 oz/Sq.Yd., SYMMETRICAL, INTERLACED OPEN -WEAVE GLASS FIBER FABRIC <br />124 HARDWARE <br />2. SHOW PERFORMANCE CHARACTERISTICS AND CAPACITIES. <br />MADE WITH ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH EIF5 MATERIALS. FOR USE AT WALL AREAS <br />1D5 DELIVERY, STORAGE, AND HANDLING <br />A. ALL MATERIAL SHALL BE HANDLED AND STORED IT A MANNER WHICH WILL PREVENT ITS DAMAGE. <br />A PREPARE DOOR AND FRAME TO RECEIVE HARDWARE IN ACCORDANCE WITH THE DOOR SCHEDULE AND <br />3. SHOW DIMENSIONS AND CLEARANCES REQUIRED. <br />ABOVE FIRST FLOOR NOT SUBJECT TO PEDESTRIAN TRAFFIC. <br />B. MATERIALS SHALL BE STORED IN ORIGINAL PALLETS AND SHALL BE CLEARLY MARKED WITH THE MANUFACTURER'S <br />TEMPLATES PROVIDED BY THE HARDWARE MANUFACTURER <br />4. SHOW WIRING OR PIPING DIAGRAMS AND CONTROLS. <br />B. ARMOR MAT - ULTRA HIGH IMPACT MESH - NOMINAL 15 oz/Sq.Yd., ULTRA -HIGH IMPACT, DOUBLE STRAND, <br />5. DELETE MODEL NUMBERS, DIAGRAMS, DETAILS, ETC., NOT APPLICABLE TO THE SUBMITTAL. <br />�y� r Q, Q <br />DIVISION II& WOOD and PLASTICS <br />INTERWOVEN, OPEN -WEAVE GLASS FIBER FABRIC WITH ALKLINE RESISTANT COATING FOR COMPATIBILITY WITH <br />1.05 FIRE RATING <br />B. MANUFACTURER'S STANDARD SCHEMATIC DRAWINGS AND DIAGRAMS: <br />EIF5 MATERIALS. FOR USE ON ALL AREAS AS NOTED ON PLANS. STANDARD STO MESH 15 REQUIRED OVER <br />PART 2 PRODUCTS <br />A ALL DOOR AND FRAMES TO BE FIRE LABELED SHALL HAVE APPROPRIATE LABELS TO MEET NFPA AND <br />1. MODIFY DRAWINGS AND DIAGRAMS TO DELETE INFORMATION WHICH IS NOT APPLICABLE TO THE WORK <br />ARMOR MAT AS THE SECOND LAYER <br />LOCAL BUILDING CODES. IT SHALL BE THE RESPONSIBILITY OF THE DISTRIBUTOR 70 VERIFY ALL <br />2. SUPPLEMENT STANDARD INFORMATION TO PROVIDE INFORMATION SPECIFICALLY APPLICABLE <br />NONE SPECIFIED <br />2.01 CLAY ROOFING TILE <br />MODIFICATIONS WILL MEET THE NFPA AND LOCAL BUILDING CODES. <br />TO THE WORK <br />2D6 PRIMER (OPTIONAL COMPONENT) <br />A. WHERE INDICATED ON THE DRAWINGS, PROVIDE ONE-PIECE M1551ON 'S" CLAY ROOFING TILE AS MANUFACTURED BY US <br />A. STO SILCOPRIME, A SILICONE ENHANCED, PRIMER (FOR SILICONE ENHANCED FINISHES). TINTED TO SAME <br />TILE CO., 9W9 RAILROAD ST, CORONA, CA 92882 (800) 252-9548, IN COLOR "CHOCOLATE" WITH MATCHING HIP, RIDGE, <br />END OF SEEGTION 08111 <br />105 SAMPLES <br />COLOR AS FINISH COAT. <br />RAKES, BOOSTERS AND BIRDSTOPS. <br />A. OFFICE SAMPLES SHALL BE OF SIZE INDICATED, OR OF SUFFICIENT SIZE AND QUANTITY TO CLEARLY <br />ILLUSTRATE : <br />2D 1 FINISH COAT <br />2.02 OTHER MATERIALS <br />/�' /�,' <br />THERMAL AND MOISTURE <br />DIVISION 1 <br />1. FUNCTIONAL CHARACTERISTICS OF THE PRODUCT, WITH INTEGRALLY RELATED PARTS AND ATTACHMENT <br />/'�TI�i <br />A STO SILILIT, A SILICONE ENHANCED TEXTURED WALL COATING WITH GRADED MARBLE AGGREGATE. TEXTURE <br />A. UNDERLAYMENT: <br />DEVICES AND TECHNIQUES. f <br />C ��I <br />AND COLOR AS SELECTED BY ARCHITECT. (NOTE: SPECIFY FINISH COLOR WITH A LIGHTNESS VALUE <br />1. UNDERLAYMENT SHALL CONFORM TO ONE OF THE FOLLOWING: <br />2. FULL RANGE OF COLOR, TEXTURE AND PATTERN FOR ARCHITECT SELECTION AT NO ADDITIONAL <br />OF 20% OR > OVER THE SYSTEM). <br />a. ROLL UNDERLAYMENT: ASTM D226 NON -PERFORATED. <br />SECTION OS4113 ALUMINUM -FRAMED ENTRANCES 4 STOREFRONT SYSTEM <br />COST. SUBMIT ONLY SPECIFIED COLOR RANGE IF DIFFERENT FROM MANUFACTURER'S STANDARD <br />SECTION 01210 1:31JILDING INSULATION <br />b. ROLL UNDERLAYMENT FOR AREAS OF FREQUENT ICE BUILD UP OR HIGH WIND AREAS: ASTM D2626. <br />RANGE. <br />2.08 JOB MIXED INGREDIENTS <br />B. NAILERS: <br />I. WHERE INDICATED ON THE DRAWINGS OR WHERE REQUIRED FOR PROPER FASTENING, PROVIDE: <br />YKK AP 35H SUJING DOOR <br />B. ALL SAMPLES OF A PARTICULAR PRODUCT, ASSEMBLY, UNIT, ETC., SHALL BE SUBMITTED AT THE SAME <br />PART I GENERAL <br />A. PORTLAND CEMENT: ASTM C 150, TYPE I (FOR WATERPROOF BASE COAT ONLY). <br />a. 2 INCH BY 6 INCH WOOD NAILING STRIPS AT ALL HIPS AND RIDGES. <br />TIME TO ALLOW PROPER REVIEW AND COMPARISON BETWEEN SAMPLES. <br />B. WATER: CLEAN AND POTABLE. <br />b. 2 INCH BY 4 INCH WOOD NAILING STRIPS UNDER FIRST ROW OF COVER TILE AFTER GABLE ROLL, WITH ADJACENT 2 INCH <br />PART I GENERAL <br />101 GENERAL <br />BY 2 INCH WOOD NAILING STRIP ALONG RAKE SIDES. <br />1.06 SUBMITTALS <br />A COAT INSULATION EXPOSED TO VIEW IN FINISH WORK WITH CEMENTITIOUS COATING. INSTALL COATING STRICTLY <br />2i9 MIXING <br />C. FLASHING: <br />1.01 SUMMARY <br />A. PERMITS, LICENSES, AND CERTIFICATES: FOR THE OWNER'S RECORDS, SUBMIT COPIES OF PERMITS, <br />IN ACCORDANCE WITH COATING MANUFACTURER'S INSTRUCTION. APPLY COATING APPROXIMATELY 3/16" <br />A. MIX MATERIALS IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED INSTRUCTIONS. <br />1. VALLEY FLASHING: MINIMUM 26 GAUGE CORROSION -RESISTANT METAL. <br />ASECTION INCLUDES: ALUMINUM SWING DOORS, INCLUDING: <br />LICENSES, CERTIFICATIONS, INSPECTION REPORTS, RELEASES, JURISDICTIONAL SETTLEMENTS, NOTICES, <br />THICK TEXTURE SURFACE WITH A PAINT ROLLER <br />2. OTHER: LEAD, COPPER OR OTHER APPROVED MATERIAL. <br />1. YKK AP SERIES 20D NARROW STILE SWING ENTRANCES. <br />RECEIPTS FOR FEE PAYMENTS, JUDGMENTS, AND SIMILAR DOCUMENTS, CORRESPONDENCE AND RECORDS <br />PART' 3 EXECUTION <br />FAST <br />D FASTENERS: <br />2. YKK AP SERIES 35D MEDIUM STILE SWING ENTRANCES. <br />ESTABLISHED IN CONJUNCTION WITH COMPLIANCE WITH STANDARDS AND REGULATIONS BEARING UPON <br />ID2 GENERAL BUILDING INSULATION <br />3DI INSTALLATION <br />I. NAILS: CORROSION -RESISTANT BOX NAILS, MINIMUM 11 GAUGE, <br />3. YKK AP SERIES 50D WIDE STILE SWING ENTRANCES. <br />PERFORMANCE OF THE WORK f <br />A BLANKET INSULATION TO BE UNFACED, MINERAL FIBER WITH THERMOSETTING RESINS, TYPE 1. MINERAL FIBER <br />A. INSTALL CLASS PB EIFS IN ACCORDANCE WITH MANUFACTURER'S CURRENT PUBLISHED WRITTEN INSTRUCTIONS. <br />2. OTHER: OTHER APPROVED FASTENING SYSTEMS. <br />4.YKK AP SERIES 201DH NARROW STILE HURRICANE (SHUTTERED APPLICATIONS) SWING ENTRANCES: <br />SHALL BE MANUFACTURED FROM GLASS. <br />E. MORTAR MATERIALS, PLASTIC CEMENT AND SEALANT: <br />B.RELATED SECTIONS: <br />1.01 CONTRACTOR RESPONSIBILITIES <br />B. APPLY INSULATION UNITS COMPLYING WITH MANUFACTURER'S RECOMMENDATIONS. INSTALL BLANKET <br />3D2 PROTECTION <br />I. SAND: ASTM CI44 <br />p <br />CEMENT: ASTM TYPE I. <br />2. PLASTIC <br />I. GLASS AND GLAZING: REFER TO DIVISION 8 GLASS AND GLAZING SECTION FOR GLASS AND GLAZING REQUIREMENTS. <br />2, SINGLE SOURCE REQUIREMENT: ALL PRODUCTS LISTED BELOW SHALL BE BY THE SAME MANUFACTURER <br />A. REVIEW SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PRIOR TO SUBMISSION. <br />INSULATION IN STUD WALLS. BOND UNITS TO SUBSTRATE WITH ADHESIVE OR USE MECHANICAL ANCHORAGE <br />A PROVIDE PROTECTION OF INSTALLED EIFS MATERIALS FROM WATER INFILTRATION INTO OR BEHIND THE SYSTEM. <br />C 822.C15 <br />3. PLASTIC CEMENT: ASTM D2822. <br />a.SECTION 08 32 SLIDING ALUMINUM -FRAMED GLASS DOORS. <br />B. DETERMINE AND VERIFY: <br />70 PROVIDE PERMANENT PLACEMENT. <br />B. PROVIDE PROTECTION OF INSTALLED EIFS FROM DUST, DIRT, PRECIPITATION FREEZING AND CONTINUOUS <br />4. SILICONE SEALANT: A$TM 0I002. <br />3 <br />b.SECTION 08 5113 ALUMINUM WINDOWS. <br />1. FIELD MEASUREMENTS. <br />HIGH HUMIDITY UNTIL EIFS COATINGS ARE FULLY DRY. <br />c.SECTION 08 44 13 GLAZED ALUMINUM CURTAIN WALLS. <br />2. FIELD CONSTRUCTION CRITERIA. <br />1.03 LOOSE INSULATION <br />PART 3 EXECUTION <br />d.SECTION 08 44 33 SLOPED GLAZING ASSEMBLIES. <br />3. CATALOG NUMBERS AND SIMILAR DATA. <br />A. SAME AS GENERAL BUILDING INSULATION. FILL CRACKS AND VOIDS AROUND FRAMES AND BLOCKING AND <br />END OF SEEGTION 0-1240 <br />4. CONFORMANCE WITH SPECIFICATIONS AND DRAWINGS. <br />OTHER VOIDS IN EXTERIOR WALL AND VOIDS AROUND CANTS, CURBS, AND BLOCKING IN AND ABOUT THE <br />3.01 EXAMINATION AND PREPARATION <br />ID2 SYSTEM PERFORMANCE DESCRIPTION <br />C. COORDINATE EACH SUBMITTAL WITH REQUIREMENTS OF THE WORK AND THE CONTRACT DOCUMENTS. <br />ROOF WITH LOOSE INSULATION. WEDGE IN PLACE CORNERS AND INTERSECTIONS BEFORE SHEETING <br />A. VERIFY THAT DECK SURFACES ARE CLEAN, DRY, FREE OF RIDGES, WARP OR VOIDS. <br />APERFORMANGE REQUIREMENTS: PROVIDE ALUMINUM SWING DOORS THAT COMPLY WITH PERFORMANCE REQUIREMENTS <br />DO NOT SUBMIT NON -CONFORMING PRODUCTS. <br />OF EXTERIOR, COMPLETELY FILLING VOIDS. <br />B. VERIFY ROOF OPENING$ ARE CORRECTLY FRAMED PRIOR TO INSTALLING WORK OF THIS SECTION. DO NOT PROCEED <br />INDICATED, AS DEMONSTRATED BY TESTING MANUFACTURERS ASSEMBLIES IN ACCORDANCE <br />D NOTIFY THE ARCHITECT IN WRITING, AT THE TIME OF SUBMISSION, OF ANY DEVIATIONS IN THE SUBMITTALS <br />UNTIL ALL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED, <br />WITH TEST METHODS INDICATED. <br />I. AIR INFILTRATION (SINGLE ACTING BUTT HINGES OR OFFSET PIVOTS} AIR INFILTRATION SHALL BE TESTED IN <br />FROM REQUIREMENTS OF THE CONTRACT DOCUMENTS, OR OF ANY DISCREPANCIES WITHIN THE CONTRACT <br />1.04 SOUND ATTENUATING INSULATION <br />DOCUMENTS. <br />A SOUND INSULATION SHALL BE INSTALLED IN STUD WALLS AND CEILINGS WHERE INDICATED ON <br />3.02 INSTALLATION <br />E WITH ASTM E 283-91 AT STATIC PRESSURE OF 151 PSF (15 PA). INFILTRATION SHALL <br />ACCORDANCE <br />RK <br />E. BEGIN NO FABRICATION OR WOWHICH REQUIRES SUBMITTALS UNTIL RETURN OF SUBMITTALS WITH <br />THE DRAWINGS. FIT INSULATION TIGHTLY BETWEEN STUD MEMBERS. <br />A UNDERLAYMENT: <br />NOT EXCEED THE FOLLOWING: <br />j z <br />a.FOR 20D/20DH SINGLE DOORS: 0.15 CFM/FT (1.02 M /HM) OF CRACK LENGTH. <br />ARCHITECT'S CONFORMANCE REVIEW. <br />I. FOR ROOF SLOPES OF 3:12 TO �4:12, TWO (2) LAYERS OF ASTM D226 TYPE II (NM30 FELT) ARE REQUIRED PER IBC AND <br />b.FOR 200/200H PAIR OF DOORS: 050 CFM/FT (153 M /HM) OF CRACK LENGTH. <br />F. SUBMITTALS NOT PROPERLY REVIEWED BY CONTRACTOR FOR CONFORMANCE WITH CONTRACT DOCUMENTS <br />105 RELATED WORK <br />Imo' <br />c.FOR 35D/50D SINGLE DOORS: 0.43 CFM/FT (2.44 M'/HM') OF CRACK LENGTH. <br />$HALL BE RETURNED WITHOUT ARCHITECT'S REVIEW OR ACCEPTANCE. <br />A. SPECIFIED ELSEWHERE, INCLUDES, BUT NOT LIMITED TO, FUR41SHING AND INSTALLING SUCH ITEMS AS ROOF <br />2. FOR PITCHES OF 4/12 AND GREATER: MINIMUM ONE LAYER ASTM D226 TYPE II (N030 FELT) (ASTM D4869 TYPE IV) HEAD <br />d.FOR 35D/50D PAIR OF DOORS: 0.50 CFM/FT (2B3 M'/HM') OF CRACK LENGTH. <br />MEMBRANE SYSTEM, NAILERS, MECHANICAL FASTENERS, FLASHING, ETC- <br />LAPPED 2 INCHES AND END LAPPED 6 INCHES, OR APPROVED EQUAL PER UBG. <br />2. STRUCTURAL: DOOR CORNER STRUCTURAL STRENGTH SHALL BE TESTED PER YKK AP'5 DUAL MOMENT TEST <br />IDS SUBMISSION REQUIREMENTS <br />B. FLASHING: <br />PROCEDURE AND CERTIFIED <br />A. MAKE SUBMITTALS PROMPTLY IN ACCORDANCE WITH APPROVED SCHEDULE, AND IN SUCH SEQUENCE <br />I. FLASH AT VALLEYS IN STRICT ACCORDANCE WITH CHAPTER 15 OF THE U BUILDING CODE: <br />BY AN INDEPENDENT TESTING LABORATORY TO ENSURE CORNER INTEGRITY AND WELD COMPLIANCE. CERTIFIED <br />AS TO CAUSE NO DELAY IN THE WORK OR IN THE WORK OF ANY OTHER CONTRACTOR <br />PART 2 PRODUCTS <br />VALL <br />VALLEY <br />a. PROVIDE NO LIGHTER THAN 26 GAUGE CORROSION RESISTANT METAL EY FLASHING THAT EXTENDS AT LEAST it <br />TEST PROCEDURES AND <br />RESULTS <br />RESULTS ARE AVAILABLE UPON REQUEST. <br />B. NUMBER OF SUBMITTALS REQUIRED: <br />INCHES EACH WAY FROM THE CENTER POINT. <br />3.UNIFORM LOAD TEST: <br />1. SHOP DRAWINGS: SUBMIT THE NUMBER OF OPAQUE REPRODUCTIONS WHICH THE CONTRACTOR REQUIRES, <br />2DI MATERIAL DESCRIPTION <br />b. PROVIDE A SPLASH DIVERTER RIB NOT LESS THAN I INCH HIGH AT FLOW LINE FORMED AS A PART OF FLASHING. <br />a.SINGLE DOORS: 60 PSF. <br />&SING <br />PLUS THREE (3) COPIES WHICH WILL BE RETAINED BY THE ARCHITECT. MAXIMUM ACCEPTABLE <br />A. AT CMU WALLS <br />c. PROVIDE END LAPS OF NOT LESS THAN 6 INCHES. <br />OF DOORS: 60 SF. <br />b.PAIR4.FORCED <br />SIZE IS 24" x 36" FOR ANY ONE SHEET. <br />I. INSTALL OWENS CORNING PINK FOAMULAR RIDGED FOAM INSULATION 1" THICK - R-5 <br />d. LONGITUDINAL EDGES SHALL BE TURNED IN NOT LESS THAN 30 DEGREES, AND SHALL BE NOT LESS THAN I/1 INCH IN <br />ENTRY RESISTANCE: 300 LBS. SATISFACTORY. <br />2. PRODUCT DATA: SUBMIT THE NUMBER OF COPIES WHICH THE CONTRACTOR REQUIRES, PLUS THREE (3) <br />B. AT WALL CAVITIES <br />HEIGHT TO PREVENT WATER OVERFLOW. <br />WHICH WILL BE RETAINED BY THE ARCHITECT. <br />I. 4" WALLS: INSTALL OWENS CORNING KRAFT FACED R-11 INSULATION <br />e. FOR ROOF SLOPES OF 3/11 AND OVER, THE METAL VALLEY FLASHING SHALL HAVE A 36 INCH WIDE UNDERLAYMENT <br />DIRECTLY UNDER IT CONSISTING OF A MINIMUM OF ONE LAYER OF TYPE 15 FELT RUNNING THE FULL LENGTH OF THE <br />123PROJECT CONDITIONS / SITE CONDITIONS <br />3. SAMPLES: SUBMIT THE NUMBER STATED IN EACH SPECIFICATION SECTION. IF NO NUMBER IS GIVEN, <br />2. b" WALLS: INSTALL OWENS CORNING KRAFT FACED R-19 INSULATION <br />VALLEY, IN ADDITION TO OTHER SPECIFIED UNDERLAYMENT. <br />AFIELD MEASUREMENTS: VERIFY ACTUAL MEASUREMENTS/OPENINGS BY FIELD MEASUREMENTS BEFORE FABRIGATIONt <br />VERIFY CORRECT NUMBER WITH ARCHITECT PRIOR TO SUBMITTAL. MINIMUM OF TWO (2) SAMPLES. <br />C. AT CEILINGS <br />2. AT SIDES OF DORMERS, CHIMNEYS AND OTHER WALLS, EXTEND FLASHING AT LEAST 6 INCHES UP VERTICAL SURFACE. <br />SHOW RECORDED <br />4. PROVIDE SUBMITTALS AS REQUIRED BY THE INDIVIDUAL SECTION, BUT NO LESS THAN THAT <br />I. INSTALL OWENS CORNING KRAFT FACED R-19 OR R-30 INSULATION AS SPECIFIED IN DRAWINGS <br />a. THOROUGHLY COUNTER FLASH. <br />MEASUREMENTS ON SHOP DRAWINGS. COORDINATE FIELD MEASUREMENTS, FABRICATION SCHEDULE WITH CONSTRUCTION <br />STATED ABOVE. <br />D. AT SOUND PARTITIONS <br />b. EXTEND FLASHING UNDER TILE AT LEAST 4 INCHES AND TURN EDGE UP 1-1/2" INCHES, <br />PROGRESS TO AVOID CONSTRUCTION DELAYS. <br />C. SUBMITTALS SHALL CONTAIN: <br />I. INSTALL OWENS CORNING QUIET ZONE NOISE CONTROL BATTS <br />1.0451113MITTAL$ <br />1. THE DATE OF SUBMISSION AND THE DATES OF ANY PREVIOUS SUBMISSIONS. <br />3. AT LOWER SIDES OF DORMERS, CHIMNEYS AND OTHER WALLS, EXTEND FLASHING AT LEAST 4 INCHES UP WALL AND 4 <br />AGENERAL: PREPARE, REVIEW, APPROVE, AND SUBMIT SPECIFIED SUBMITTALS IN ACCORDANCE WITH "CONDITIONS OF <br />2. THE PROJECT TITLE AND NUMBER. <br />INCHES OVER TILE, AND THEN THOROUGHLY COUNTER FLASH. <br />THE CONTRACT" <br />3. CONTRACT IDENTIFICATION, <br />4. THE NAMES OF: <br />END OF SECTION 0-1210 <br />4. AT WOOD SADDLES AND RETURNS, LINE WITH I6 OZ. COPPER EXTENDING UP ROOF SLOPE NOT LESS THAN 14 INCHES, AND <br />AND DIVISION I SUBMITTALS SECTIONS. PRODUCT DATA, SHOP DRAWINGS, SAMPLES, AND SIMILAR SUBMITTALS ARE <br />"CONDITIONS <br />a. CONTRACTOR <br />UP VERTICAL WALLS NOT LESS THAN 6 INCHES, AND THOROUGHLY COUNTER FLASH. <br />DEFINED IN OF THE CONTRACT." <br />B.PRODUCT DATA: SUBMIT PRODUCT DATA FOR EACH ENTRANCE SERIES SPECIFIED. <br />b. SUBCONTRACTOR <br />SECTION 01240 EXTERIOR INSULATION AND FINISW SYSTEM (EIFS) <br />5. MAKE ALL COUNTER FLASHING PLUGGED, POINTED AND SECURE. <br />G.SU56TITUTION5: WHENEVER SUBSTITUTE PRODUCTS ARE TO BE CONSIDERED, SUPPORTING TECHNICAL DATA, SAMPLES, <br />c. SUPPLIER <br />C. 15IRD5TOP5, BOOSTERS AND STARTERS: <br />AND TEST REPORTS MUST BE SUBMITTED TEN (10) WORKING DAYS PRIOR TO BID DATE IN ORDER TO <br />d. MANUFACTURER <br />PART I GENERAL <br />I. INSTALL CLAY BIRDSTOPS ALONG ENTIRE LENGTH OF ALL EAVES. <br />MAKE A VALID COMPARISON. <br />5. IDENTIFICATION OF THE PRODUCT, WITH THE SPECIFICATION SECTION NUMBER <br />1.01 SUMMARY <br />2. INSTALL FIRST COURSE OF PAN TILE LEAVING A 2 TO 3 INCH OVERHANG AT SAVE. <br />D. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS SHOWING LAYOUT, PROFILES, AND PRODUCT COMPONENTS, INCLUDING <br />6, FIELD DIMENSIONS, CLEARLY IDENTIFIED AS SUCH. <br />A. MATERIALS AND INSTALLATION OF CLASS PB EIFS SYSTEM. <br />3. INSTALL 3 INCH BOOSTER TILES ON TOP OF 5IRDSTOP5. <br />ANCHORAGE, <br />ACCESSORIES, AND FINISH COLORS. <br />1. RELATION TO ADJACENT OR CRITICAL FEATURES OF THE WORK OR MATERIALS. <br />4. INSTALL 15 INCH STARTER TILES ON TOP OF BOOSTER TILES ALONG PERIMETER OF ALL EAVES. <br />E.SAMPLES: SUBMIT VERIFICATION SAMPLES FOR COLORS. MINIMUM 2-1/2 INCH BY 3 INCH (61 MM BY 13 MM) SAMPLES ON <br />8. APPLICABLE STANDARDS SUCH AS, BUT NOT LIMITED TO ASTM OR FEDERAL SPECIFICATION NUMBERS. <br />1.02 DELIVERY, STORAGE AND HANDLING <br />D. FASTENERS: (EDIT TO AVOID CONFLICTING REQUIREMENTS) <br />ACTUAL ALUMINUM SUBSTRATES INDICATING FULL COLOR RANGE EXPECTED IN INSTALLED SYSTEM. <br />9. IDENTIFICATION OF DEVIATIONS FROM CONTRACT DOCUMENTS. <br />A. DELIVER ALL EIFS MATERIALS IN THEIR ORIGINAL SEALED CONTAINERS BEARING MANUFACTURER'S NAME <br />I. AT PLYWOOD DECKS, PROVIDE MINIMUM OF II GAUGE, LARGE HEADED, CORROSION RESISTANT NAILS OF SUFFICIENT <br />F. QUALITY ASSURANCE /CONTROL SUBMITTALS: <br />10. IDENTIFICATION OF OPTIONS AVAILABLE, BUT NOT INDICATED IN THE SPECIFICATIONS, SUCH AS <br />AND IDENTIFICATION OF PRODUCT. <br />LENGTH TO PENETRATE 3/4 INCHES INTO OR THROUGH THE SHEATHING, WHICHEVER IS LESS. <br />I. TEST REPORTS: SUBMIT CERTIFIED TEST REPORTS SHOWING COMPLIANCE WITH SPECIFIED PERFORMANCE <br />COLOR, FINISH, TEXTURE, ETC. WITH COMPLETE SAMPLES OR LISTING INCLUDED IN THE SUBMITTAL FOR <br />B. PROTECT COATINGS (PAIL PRODUCTS) FROM FREEZING AND TEMPERATURES IN EXCESS OF 50, F (32' C). <br />2. A7 CONCRETE DECKS, USE STAINLESS STEEL OR SILICON BRONZE SCREW SHANK NAILS OF SUFFICIENT <br />CHARACTERISTICS AND <br />ARCHITECT'S SELECTION. ' <br />STORE AWAY FROM DIRECT SUNLIGHT. <br />LENGTH TO PENETRATE 1/2TO 3/4 THEIR LENGTH INTO, BUT NOT THROWN THE DECK <br />LENGTH T <br />PHYSICAL PROPERTIES. <br />11. INDICATION OF TERMS TO BE INCLUDED IN THE WORK AND SHOWN ON THE SHOP DRAWINGS SHALL BE <br />C. PROTECT PORTLAND CEMENT BASED MATERIALS (BAG PRODUCTS) FROM MOISTURE AND HUMIDITY. STORE <br />3. PROVIDE TWO FASTENERS PER TILE IN SNOW AREAS. <br />4. IN AREAS DESIGNATED BY THE BUILDING OFFICIALS AS BEING SUBJECT TO REPEATED WIND VELOCITIES IN EXCESS OF <br />2. INSTALLER QUALIFICATION DATA: SUBMIT INSTALLER QUALIFICATION DATA <br />DIMENSIONED AND COORDINATED FOR PROPER FIT AND TIMELY INCLUSION. <br />UNDER COVER OFF GROUND IN A DRY LOCATION. <br />80 MPH, OR WHERE ROOF HEIGHT EXCEEDS 40 FEET ABOVE GRADE, ALL TILES SHALL BE ATTACHED AS FOLLOWS: <br />G.CL05EOUT SUBMITTALS: <br />12. IDENTIFICATION OF REVISIONS ON SUBMITTALS.. <br />a. THE HEADS OF ALL TILES SHALL BE NAILED. <br />I. WARRANTY: SUBMIT EXECUTED WARRANTY DOCUMENTS SPECIFIED HEREIN, ENDORSED BY YKK AP AUTHORIZED <br />13. AN 8" x 3" BLANK SPACE FOR CONTRACTOR AND ARCHITECT STAMPS. <br />I.D3 SUBMITTALS <br />b. THE NOSES OF ALL EAVE TILES SHALL BE FASTENED WITH APPROVED CLIPS. <br />OFFICIAL AND INSTALLER <br />14. CONTRACTOR'S STAMPS, INITIALED OR SIGN, CERTIFYING THE REVIEW OF SUBMITTAL, VERIFICATION OF <br />A. MANUFACTURER'S SPECIFICATIONS, DETAILS, INSTALLATION INSTRUCTIONS AND PRODUCT DATA <br />c. ALL RAKE TILES SHALL BE NAILED WITH TWO NAILS. <br />2. PROJECT RECORD DOCUMENTS: SUBMIT PROJECT RECORD DOCUMENTS, INCLUDING OPERATION AND MAINTENANCE <br />DATA FOR INSTALLED MATERIALS IN ACCORDANCE WITH DIVISION I PROJECT CLOSEOUT (PROJECT RECORD <br />PRODUCTS, FIELD MEASUREMENTS AND FIELD CONSTRUCTION CRITERIA, AND COORDINATION OF <br />B. APPLICATOR'S CERTIFICATE OF INSTRUCTION. <br />d. THE NOSES OF ALL HIP, RIDGE AND RAKE TILES SHALL BE SET IN A BEAD OF APPROVED ROOFER'S MASTIC. <br />DOCUMENTS) SECTION. <br />THE INFORMATION WITHIN THE SUBMITTAL WITH REQUIREMENTS OF THE WORK AND OF CONTRACT <br />G. SAMPLES ALL PROFILES AND TEXTURES FOR APPROVAL BY ARCHITECT. <br />5. ON SLOPES OVER 1/12, THE NOSE END OF ALL TILES SHALL BE SECURELY FASTENED WITH "STORM LOCKS" OR "WIND <br />&MAINTENANCE DATA: MAINTENANCE PROCEDURES FOR CARE AND CLEANING OF ENTRANCE SYSTEMS. <br />DOCUMENTS. <br />U <br />D. MANUFACTURRER'S CODE REPORT. <br />LOCKS", AS MANUFACTURED BY THE WIRE WORKS, INC (800541-8828, OR WITH OTHER APPROVED FASTENING <br />E. MANUFACTURER'S STANDARD WARRANTY. <br />SYSTEM. <br />TILE -TIE 6Y <br />6. PROVIDE TWISTED WIRE TILE TYf, OR RINfSS TILE -TIE SYSTEM OF BRASS, COPPER OR GALVANIZED WIRE AS <br />ID5QUALITY ASSURANCE <br />IDS RESUBMISSION REQUIREMENTS <br />F. A LIST OF MINIMUM THREE(3) JOB REFERENCES. <br />8, OR OTHER APPROVED FASTENING SYSTEM. <br />MANUFACTURED BY THE WIRE WORKS, INC.N O <br />A.QUALIRCATIONS: <br />A. MAKE ANY CORRECTIONS OR CHANGES IN THE SUBMITTALS REQUIRED BY THE ARCHITECT AND RESUBMIT <br />G. MANUFACTURER'S CERTIFICATION OF COMPLIANCE WITH EIMA STANDARDS. <br />E. INSTALL FIELD TILE IN COURSES BEGINNING RAVE WORKING INCLINE OF ROOF DECK <br />L <br />I. INSTALLER QUALIFICATIONS: INSTALLER EXPERIENCED (AS DETERMINED BY CONTRACTOR) TO PERFORM WORK OF THIS <br />UNTIL ACCEPTED. <br />H. EPS BOARD MANUFACTURER'S CERTIFICATE WITH THE CURRENT EDITION OF EIMA GUIDELINE SPECIFICATIONS <br />TILES IN VERTICAL ROWS AT A MAXIMUM OF II INCH CENTERS, WITH EACH TILE FASTENED WITH ONE NAIL, <br />I. INSTALL T <br />SECTION WHO <br />B. SHOP DRAWINGS AND PRODUCT DATA: <br />FOR EXPANDED POLYSTYRENE (EPS) INSULATION BOARD. <br />PROVIDING A MAXIMUM EXPOSURE 15 INCHES FOR EACH TILE. <br />HAS SPECIALIZED IN THE INSTALLATION OF WORK SIMILAR TO THAT REQUIRED FOR THIS PROJECT. IF REQUESTED BY <br />1. REVISE INITIAL DRAWINGS OR DATA, AND RESUBMIT AS SPECIFIED FOR THE INITIAL SUBMITTAL. <br />I. SEALANT MANUFACTURER'S CERTIFICATE OF COMPLIANCE WITH EIMA STANDARD 300.01. <br />2. AS AN ALTERNATE, END CAPS CAN BE EMBEDDED IN CEMENT MORTAR FOR A MORE RUSTIC APPEARANCE. <br />OWNER, SUBMIT <br />2. INDICATE ANY CHANGES WHICH HAVE BEEN MADE OTHER THAN THOSE REQUESTED BY THE ARCHITECT. <br />J. PREPARE AND SUBMIT PROJECT -SPECIFIC DETAILS (WHEN REQUIRED BY CONTRACT DOCUMENTS). <br />3. AS AN ALTERNATE, COVER TILES CAN BE ADDED USING 5005TER TILES LAID DRY OR LAID IN CEMENT MORTAR <br />REFERENCE LIST of COMPLETED PROJECTS. <br />2. MANUFACTURER QUALIFICATIONS: MANUFACTURER CAPABLE OF PROVIDING FIELD SERVICE REPRESENTATION <br />C. SAMPLES: SUBMIT NEW SAMPLES AS REQUIRED FOR INITIAL SUBMITTAL. <br />4. INSTALL HIP AND RIDGE TILES: <br />NG <br />DURING <br />1.04 WARRANTY <br />a. PROVIDE CEMENT MORTAR OR OTHER APPROVED MATERIALS AT ALL HIPS AND RIDGES TO COMPLETELY FILL VOIDS <br />CONSTRUCTION PROCESS. <br />1.10 DISTRIBUTION <br />A. PROVIDE MANUFACTURER'S STANDARD SEVEN YEAR LABOR AND MATERIAL WARRANTY. <br />AND TO WEATHERPROOF THE ROOF. <br />BALL HIP, RIDGE AND FIRST ROW OF COVER TILES AFTER GABLE ROLL SHALL BE SET IN CEMENT MORTAR AND <br />SMOCK -UPS (FIELD CONSTRUCTEDh INSTALL AT PROJECT SITE A JOB MOCK-UP USING ACCEPTABLE PRODUCTS AND <br />A. DISTRIBUTE REPRODUCTION OF SHOP DRAWINGS AND COPIES OF PRODUCT DATA WHICH CARRY THE <br />. <br />FASTENED BY NONCORROSIVE NAILS. <br />MANUFACTURER APPROVED INSTALLATION METHODS. OBTAIN OWNER'S AND ARCHITECT'S <br />ARCHITECT'S STAMP OF CONFORMANCE TO: <br />ACCEPTANCE OF FINISH COLOR, AND WORKMANSHIP STANDARD. <br />1. JOB SITE FILE. <br />2. RECORD DOCUMENTS FILE. <br />6. ALL TILES IN CONTACT WITH CEMENT MORTAR SHALL BE IMMERSED IN WATER FOR TWO MINUTES BEFORE LAYING. <br />I. MOCK-UP SIZE: <br />2. MAINTENANCE: MAINTAIN MOCK-UP DURING CONSTRUCTION FOR WORKMANSHIP COMPARISONt REMOVE AND <br />3. SUBCONTRACTORS. <br />1. TO AVOID COLOR PROBLEMS ON ROOF: <br />LEGALLY DISPOSE OF MOCK-UP WHEN NO LONGER REQUIRED. <br />4. SUPPLIER OR FABRICATOR <br />a. ROOF LOAD TILES FROM DIFFERENT PALLETS. <br />3. INCORPORATION: MOCK-UP MAY BE INCORPORATED INTO FINAL CONSTRUCTION UPON OWNER'$ APPROVAL. <br />5. OWNER (TO BE DISTRIBUTED BY THE ARCHITECT). <br />b. VISUALLY INSPECT APPLICATION FROM THE GROUND LEVEL AFTER INSTALLING 100 TILES. <br />C.PRE-INSTALLATION MEETINGS: CONDUCT Pam -INSTALLATION MEETING TO VERIFY PROJECT REQUIREMENTS, SUBSTRATE <br />c. VISUALLY VERIFY THAT ROOF TILE COLOR IS UNIFORM AND EVEN, AND VERIFY THAT TILE COURSES ARE STRAIGHT AND <br />CONDITIONS, <br />INSTALLATION INSTRUCTIONS AND MANUFACTURER'S WARRANTY REQUIREMENTS. <br />L11 ARCHITECT'S DUTIES <br />TRUE.MANUFACTURER'S <br />A. REVIEW SUBMITTALS WITH REASONABLE PROMPTNESS AND IN ACCORD WITH SCHEDULE. ALLOW A MINIMUM <br />8. CORRECT ANY COLOR OR INSTALLATION PROBLEMS BEFORE PROCEEDING WITH THE INSTALLATION. <br />OF TEN (10) WOWING DAYS FOR REVIEW, UNLE56 SPECIAL HANDLING IS ARRANGED IN ADVANCE. <br />9. COMPLETE INSTALLATION TO PROVIDE WEATHER TIGHT SERVICE. <br />B. AFFIX STAMP AND INITIALS OR SIGNATURE, AND INDICATE REQUIREMENTS FOR RE5UBMITTAL OR <br />303 CLEAN UP <br />A CLEAN ROOF TO REMOVE ALL PIECES OF DEBRIS. <br />CONFORMANCE OF SUBMITTAL. ACCEPTANCE IS FOR GENERAL CONFORMANCE WITH DESIGN CONCEPT AND <br />B. REMOVE AND DISPOSE OF ALL WORK -RELATED REFUSE AND DEBRIS. <br />GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. QUANTITIES AND DIMENSIONS OF MATERIALS <br />END OF SECTION <br />WILL NOT BE REVIEWED. ACCEPTANCE OF A SUBMITTAL DOES NOT WAIVE OR ALTER THE REQUIREMENTS <br />PRODUCTS: <br />OF THE CONTRACT DOCUMENTS. <br />US TILE AUTHENTIC CLAY ROOF TILES <br />C. RETURN SUBMITTALS TO CONTRACTOR FOR DISTRIBUTION OR FOR RESUBMIS510N. <br />END OF S£:C:TION 01340 f <br />REVISIONS BY <br />00 <br />._. <br />�M <br />�CnC.0 <br />Q . <br />C) o <br />' �xti <br />N E <br />CV • U <br />CDC ` <br />U N <br />ti 3 <br />N 3 <br />o <br />C <br />/ c <br />0 <br />� :Z:tia <br />N <br />._� r' <br />U <br />JA <br />A <br />E''o ", <br />54a.� gggg <br />0 <br />00 <br />cn <br />C=) �" o <br />N . <br />> 0 0 <br />o # <br />Y v <br />� a <br />a� <br />O <br />L U <br />O <br />Z <br />� J � <br />U C <br />O <br />m J E U+- <br />� U N vi <br />O <br />> s <br />0 m a <br />N C <br />� � O <br />3 p <br />Z L.� <br />Date: 03, 25. 13 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: DC <br />Job: 13-08a <br />Sheet <br />N1 <br />�I .1 id., aAl,.. - I .11 1I 11, : 1LeJ.: I I -F_ it - TfI <br />