f
<br />DIVISION 1 GENERAL NOTES
<br />DIVISION 2 SITE WORK
<br />i THERMAL AND MOISTURE
<br />DIVISION -1 THERMAL MOISTURE
<br />DIVISION S DOORS AND WINDOWS
<br />ION
<br />TIOAND
<br />SECTION 01340 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
<br />SEE STRUCTURAL
<br />FFART2
<br />SECTION 01320 ONE PIECE MISSION "S" CLAY ROOFING TILE
<br />SECTION 0S111 STANDARD STEEL DOORS AND FRAMES
<br />S
<br />PART 1 GENERAL
<br />PART I GENERAL
<br />PART I GENERAL
<br />1.01 REQUIREMENTS INCLUDED
<br />B. PROVIDE EIFS COMPONENTS FROM SINGLE SOURCE MANUFACTURER OR APPROVED SUPPLIER
<br />1.01 SECTION INCLUDES
<br />1.01 GENERAL
<br />A. SUBMIT SHOP DRAWINGS, PRODUCT DATA AND SAMPLES REQUIRED BY CONTRACT DOCUMENTS, OR AS
<br />C. ALTERNATES TO THE APPROVED MANUFACTURER WILL BE CONSIDERED ONLY IF SUBMITTED TO ARCHITECT
<br />A. FORMED CLAY ROOFING TILES, COMPLETE WITH COMPONENTS AND OTHER REQUIRED ACCESSORIES AS NEEDED FOR A
<br />A. PROVIDE DOORS AND FRAMES COMPLYING WITH STEEL DOOR INSTITUTE "RECOMMENDED SPECIFICATIONS
<br />NECESSARY WHERE NOT INDICATED, SO ARCHITECT CAN REVIEW, SELECT, CHECK FOR CONFORMANCE,
<br />DIVISION 3 CONCRETE
<br />10 DAYS PRIOR TO BID IN WRITING. SUBMITTED SYSTEM MUST INCLUDE SUBSTANTIATION OF SPECIFIED SYSTEM
<br />COMPLETE AND PROPER INSTALLATION.
<br />STANDARD STEEL DOORS AND FRAMES" AN5I/5DI-100.
<br />ETC., AS REQUIRED.
<br />PERFORMANCE, PRODUCT COMPONENT PERFORMANCE AND PRODUCT COMPONENT DESCRIPTIONS.
<br />B. UNDERLAYMENT, EAVE, VALLEY, RAKE, AND RIDGE PROTECTIONt NAILERS, SHEET METAL FLASHINGS AND TILE FASTENING.
<br />B. MANUFACTURER TO BE A MEMBER OF THE STEEL DOOR INSTITUTE. IE: CECO BUILDING PRODUCTS, REPUBLIC
<br />BUILDERS PRODUCTS OR STEEL CRAFT.
<br />102 RELATED REQUIREMENTS
<br />SEE STRUCTURAL
<br />.
<br />202 ADHESIVE
<br />REFERENCES
<br />N0.
<br />C. SUPPLIER TO BE A STOCKING DISTRIBUTOR FOR ONE OF THE LISTED MANUFACTURERS WITH NO LESS THAN
<br />A. DESIGNATED IN THE CONSTRUCTION SCHEDULE, OR IN A SEPARATE COORDINATE SCHEDULE, THE DATES
<br />A. BTS PLUS, AONE-COMPONENT, FACTORY-PROPRTIONED, POLYMER -MODIFIED, CEMENT -BASED ADHESIVE WITH
<br />A. A. ICBM REPORT 3523 -CLAY ROOFING TILES.
<br />FIVE YEARS OF DISTRIBUTION FOR SAME MANUFACTURER SUPPLIER TO HAVE A "UL" OR "WARNOCK
<br />FOR SUBMISSION AND THE DATES THAT REVIEWED SHOP DRAWINGS, PRODUCT DATA AND SAMPLES WILL
<br />FIBER REINFORCEMENT (FOR USE OVER EXTERIOR GYPSUM SHEATHING, DENS GLASS GOLD SHEATHING,
<br />B. A57M STANDARD SPECIFICATIONS
<br />1. C144 - AGGREGATE FOR MASONRY MORTAR
<br />HERSEY" CERTIFIED FABRICATION SHOP.
<br />BE NEEDED. ALLOW SUFFICIENT TIME IN THE SCHEDULE FOR ARCHITECT REVIEW AND POSSIBLE
<br />EXTERIOR CEMENTATION SHEATHING, CONCRETE, MASONRY OR PLASTER SURFACES. NOT RECOMMENDED OVER
<br />2. C150 - PORTLANDCEMENT.
<br />RESUBMITTAL5 IF REQUIRED.
<br />WOOD SURFACE5).
<br />3. D226 - ASPHALLTT-SATURATED ORGANIC FELT USED IN ROOFING AND WATERPROOFING.
<br />1.02 DOORS
<br />4. 01002 - SILICONE SEALANT.
<br />A. EXTERIOR DOORS TO BE GRADE II, MINIMUM 18 GA. A60 GALVANNEALED FACE SHEET WITH 16 GA STEEL
<br />1.03 SHOP DRAWINGS
<br />/y� /� /��p�/
<br />DIVISION 4 MASONRY
<br />2.03 INSULATION BOARD
<br />5. D2626 - ASPHALT -SATURATED AND COATED ORGANIC FELT BASE USED IN ROOFING.
<br />HINGE CHANNEL, FLUSH TOP CHANNEL AND INVERTED BOTTOM CHANNEL. CORE TO BE HONEYCOMB OR
<br />A. DRAWINGS SHALL BE PRESENTED IN A CLEAR AND THOROUGH MANNER
<br />1
<br />A NOMINAL 1.0 Ib/CuFt. (16 Kg/M EXPANDED POLYSTYRENE (EPS) INSULATION BOARD IN COMPLIANCE WITH
<br />6. 02822 - ASPHALT ROOF CEMENT.
<br />POLYSTYRENE. DOOR TO HAVE FACTORY APPLIED PRIMED INVERTED TOP, CHANNEL WITH SHOP APPLIED
<br />1. DETAILS SHALL BE IDENTIFIED BY REFERENCE TO SHEET AND DETAIL, SCHEDULE OR ROOM NUMBERS
<br />A$TM C 518 TYPE I REQUIREMENTS AND EIMA GUIDELINE SPECIFICATION FOR EXPANDED POLYSTYRENE (EPS)
<br />CAP IS NOT ACCEPTABLE.
<br />SHOWN ON CONTRACT DRAWINGS. f
<br />SEE STRUCTURAL
<br />INSULATION BOARD, 1-1/2" THICK
<br />123 SUBMITTALS
<br />B. INTERIOR DOORS TO BE GRADE 11, MINIMUM 20 GAGE COLD ROLLED STEEL FACE SHEET WITH 16 GAGE
<br />2. SHEET SHALL BE LABELED WITH CORRECT JOB NAME, LOCATION, ARCHITECT'S PROJECT NUMBER, AND
<br />A. SUBMIT UNDER PROVISIONS OF SECTION 01300.
<br />STEEL HINGE CHANNEL. CORE TO BE HONEYCOMB OR POLYSTYRENE.
<br />SUBCONTRACTOR'S COMPANY NAME, ADDRESS, PHONE NUMBER AND NAME OF RESPONSIBLE
<br />2.04 BASE COAT
<br />B. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS SHOWING DETAILS ON HIP, RIDGE, VALLEY AND RAKE CONFIGURATIONS,
<br />REPRESENTATIVE OF COMPANY,
<br />A. BTS PLUS, AONE-COMPONENT, FACTORY -PROPORTIONED, POLYMER MODIFIED GEMENTITOUS BASE COAT WITH
<br />AND COLLABORATED DETAILS OF RELATED WORK
<br />METHODS OF FASTENING, C. PRODUCT DATA: SUBMIT MANUFACTURER'S DATA ON TILE PROPERTIES, CONFIGURATIONS AND COLORS.
<br />1.03 FRAMES
<br />3. DRAWINGS, DETAILS, ETC. SHALL CLEARLY ILLUSTRATE ALL COMPONENTS AND ADJACENT COMPONENTS
<br />FIBER REINFORCEMENT AND LESS THAN 33 PERCENT PORTLAND CEMENT CONTENT BY WEIGHT t0 BE
<br />D. SAMPLES: SUBMIT TWO TILE SAMPLES ILLUSTRATING COLOR, SURFACE FINISH AND TEXTURE, AND TILE CONFIGURATION
<br />A EXTERIOR DOOR FRAME TO CONFORM TO SDI/ANSI A250B-1998. FABRICATED OF 16 GA. A60 GALVANNEALED
<br />OF THE WORK
<br />APPLIED AT 1/16" DRY THICKNESS.
<br />FOR ARCHITECT'S APPROVAL.
<br />STEEL. COMERS TO BE FACE WELDED AN[) GROUND SMOOTH. PAINT AREA WITH A RUST INHIBITING PRIMER.
<br />DIVISION 5 METAL6
<br />B. STO FLEXYL-FIBER REINFORCED ACRYLIC BASE COAT MIXED WITH PORTLAND CEMENT (FOR USE AS A
<br />ANCHORS TO BE CONCEALED.
<br />1.04 PRODUCT DATA
<br />WATERPROOF BASE COAT TO WATERPROOF FOUNDATIONS, SLOPED EIFS SHAPES AND PARAPETS. STO
<br />ID4 QUALITY ASSURANCE
<br />B. INTERIOR DOOR FRAME TO CONFORM TO SDI/ANSI A2503-1998. FABRICATED OF 16 GA. GOLD ROLLED
<br />A PREPARATION:
<br />PRIMER IS REQUIRED OVER STO FLEXYL PRIOR TO APPLYING FINISH COAT.
<br />A. USE ADEQUATE NUMBER OF SKILLED WORKMEN WHO ARE THOROUGHLY SKILLED AND EXPERIENCED IN THE NECE55ARY
<br />STEEL. CORNERS TO BE FACE WELDED AND GROUND SMOOTH. PAINT AREA WITH A RUST INHIBITING PRIMER
<br />1. CLEARLY MARK EACH COPY TO IDENTIFY PERTINENT PRODUCTS OR MODELS WHICH ARE SPECIFICALLY
<br />NONE SPECIFIED
<br />CRAFTS AND WHO ARE COMPLETELY FAMILIAR WITH THE SPECIFIED REQUIREMENTS AND METHODS NEEDED FOR
<br />ANCHORS TO BE CONCEALED. PREP FRAME FOR THREE SILENCERS.
<br />COVERED BY THE SUBMITTAL. REFERENCE ALL NUMBERS 70 CORRESPOND 70 THOSE IN CONTRACT
<br />105 REINFORCING MESHES
<br />PROPER PERFORMANCE OF THE WORK OF THE SECTION.
<br />DOCUMENTS.
<br />A STANDARD MESH -NOMINAL 45 oz/Sq.Yd., SYMMETRICAL, INTERLACED OPEN -WEAVE GLASS FIBER FABRIC
<br />124 HARDWARE
<br />2. SHOW PERFORMANCE CHARACTERISTICS AND CAPACITIES.
<br />MADE WITH ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH EIF5 MATERIALS. FOR USE AT WALL AREAS
<br />1D5 DELIVERY, STORAGE, AND HANDLING
<br />A. ALL MATERIAL SHALL BE HANDLED AND STORED IT A MANNER WHICH WILL PREVENT ITS DAMAGE.
<br />A PREPARE DOOR AND FRAME TO RECEIVE HARDWARE IN ACCORDANCE WITH THE DOOR SCHEDULE AND
<br />3. SHOW DIMENSIONS AND CLEARANCES REQUIRED.
<br />ABOVE FIRST FLOOR NOT SUBJECT TO PEDESTRIAN TRAFFIC.
<br />B. MATERIALS SHALL BE STORED IN ORIGINAL PALLETS AND SHALL BE CLEARLY MARKED WITH THE MANUFACTURER'S
<br />TEMPLATES PROVIDED BY THE HARDWARE MANUFACTURER
<br />4. SHOW WIRING OR PIPING DIAGRAMS AND CONTROLS.
<br />B. ARMOR MAT - ULTRA HIGH IMPACT MESH - NOMINAL 15 oz/Sq.Yd., ULTRA -HIGH IMPACT, DOUBLE STRAND,
<br />5. DELETE MODEL NUMBERS, DIAGRAMS, DETAILS, ETC., NOT APPLICABLE TO THE SUBMITTAL.
<br />�y� r Q, Q
<br />DIVISION II& WOOD and PLASTICS
<br />INTERWOVEN, OPEN -WEAVE GLASS FIBER FABRIC WITH ALKLINE RESISTANT COATING FOR COMPATIBILITY WITH
<br />1.05 FIRE RATING
<br />B. MANUFACTURER'S STANDARD SCHEMATIC DRAWINGS AND DIAGRAMS:
<br />EIF5 MATERIALS. FOR USE ON ALL AREAS AS NOTED ON PLANS. STANDARD STO MESH 15 REQUIRED OVER
<br />PART 2 PRODUCTS
<br />A ALL DOOR AND FRAMES TO BE FIRE LABELED SHALL HAVE APPROPRIATE LABELS TO MEET NFPA AND
<br />1. MODIFY DRAWINGS AND DIAGRAMS TO DELETE INFORMATION WHICH IS NOT APPLICABLE TO THE WORK
<br />ARMOR MAT AS THE SECOND LAYER
<br />LOCAL BUILDING CODES. IT SHALL BE THE RESPONSIBILITY OF THE DISTRIBUTOR 70 VERIFY ALL
<br />2. SUPPLEMENT STANDARD INFORMATION TO PROVIDE INFORMATION SPECIFICALLY APPLICABLE
<br />NONE SPECIFIED
<br />2.01 CLAY ROOFING TILE
<br />MODIFICATIONS WILL MEET THE NFPA AND LOCAL BUILDING CODES.
<br />TO THE WORK
<br />2D6 PRIMER (OPTIONAL COMPONENT)
<br />A. WHERE INDICATED ON THE DRAWINGS, PROVIDE ONE-PIECE M1551ON 'S" CLAY ROOFING TILE AS MANUFACTURED BY US
<br />A. STO SILCOPRIME, A SILICONE ENHANCED, PRIMER (FOR SILICONE ENHANCED FINISHES). TINTED TO SAME
<br />TILE CO., 9W9 RAILROAD ST, CORONA, CA 92882 (800) 252-9548, IN COLOR "CHOCOLATE" WITH MATCHING HIP, RIDGE,
<br />END OF SEEGTION 08111
<br />105 SAMPLES
<br />COLOR AS FINISH COAT.
<br />RAKES, BOOSTERS AND BIRDSTOPS.
<br />A. OFFICE SAMPLES SHALL BE OF SIZE INDICATED, OR OF SUFFICIENT SIZE AND QUANTITY TO CLEARLY
<br />ILLUSTRATE :
<br />2D 1 FINISH COAT
<br />2.02 OTHER MATERIALS
<br />/�' /�,'
<br />THERMAL AND MOISTURE
<br />DIVISION 1
<br />1. FUNCTIONAL CHARACTERISTICS OF THE PRODUCT, WITH INTEGRALLY RELATED PARTS AND ATTACHMENT
<br />/'�TI�i
<br />A STO SILILIT, A SILICONE ENHANCED TEXTURED WALL COATING WITH GRADED MARBLE AGGREGATE. TEXTURE
<br />A. UNDERLAYMENT:
<br />DEVICES AND TECHNIQUES. f
<br />C ��I
<br />AND COLOR AS SELECTED BY ARCHITECT. (NOTE: SPECIFY FINISH COLOR WITH A LIGHTNESS VALUE
<br />1. UNDERLAYMENT SHALL CONFORM TO ONE OF THE FOLLOWING:
<br />2. FULL RANGE OF COLOR, TEXTURE AND PATTERN FOR ARCHITECT SELECTION AT NO ADDITIONAL
<br />OF 20% OR > OVER THE SYSTEM).
<br />a. ROLL UNDERLAYMENT: ASTM D226 NON -PERFORATED.
<br />SECTION OS4113 ALUMINUM -FRAMED ENTRANCES 4 STOREFRONT SYSTEM
<br />COST. SUBMIT ONLY SPECIFIED COLOR RANGE IF DIFFERENT FROM MANUFACTURER'S STANDARD
<br />SECTION 01210 1:31JILDING INSULATION
<br />b. ROLL UNDERLAYMENT FOR AREAS OF FREQUENT ICE BUILD UP OR HIGH WIND AREAS: ASTM D2626.
<br />RANGE.
<br />2.08 JOB MIXED INGREDIENTS
<br />B. NAILERS:
<br />I. WHERE INDICATED ON THE DRAWINGS OR WHERE REQUIRED FOR PROPER FASTENING, PROVIDE:
<br />YKK AP 35H SUJING DOOR
<br />B. ALL SAMPLES OF A PARTICULAR PRODUCT, ASSEMBLY, UNIT, ETC., SHALL BE SUBMITTED AT THE SAME
<br />PART I GENERAL
<br />A. PORTLAND CEMENT: ASTM C 150, TYPE I (FOR WATERPROOF BASE COAT ONLY).
<br />a. 2 INCH BY 6 INCH WOOD NAILING STRIPS AT ALL HIPS AND RIDGES.
<br />TIME TO ALLOW PROPER REVIEW AND COMPARISON BETWEEN SAMPLES.
<br />B. WATER: CLEAN AND POTABLE.
<br />b. 2 INCH BY 4 INCH WOOD NAILING STRIPS UNDER FIRST ROW OF COVER TILE AFTER GABLE ROLL, WITH ADJACENT 2 INCH
<br />PART I GENERAL
<br />101 GENERAL
<br />BY 2 INCH WOOD NAILING STRIP ALONG RAKE SIDES.
<br />1.06 SUBMITTALS
<br />A COAT INSULATION EXPOSED TO VIEW IN FINISH WORK WITH CEMENTITIOUS COATING. INSTALL COATING STRICTLY
<br />2i9 MIXING
<br />C. FLASHING:
<br />1.01 SUMMARY
<br />A. PERMITS, LICENSES, AND CERTIFICATES: FOR THE OWNER'S RECORDS, SUBMIT COPIES OF PERMITS,
<br />IN ACCORDANCE WITH COATING MANUFACTURER'S INSTRUCTION. APPLY COATING APPROXIMATELY 3/16"
<br />A. MIX MATERIALS IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED INSTRUCTIONS.
<br />1. VALLEY FLASHING: MINIMUM 26 GAUGE CORROSION -RESISTANT METAL.
<br />ASECTION INCLUDES: ALUMINUM SWING DOORS, INCLUDING:
<br />LICENSES, CERTIFICATIONS, INSPECTION REPORTS, RELEASES, JURISDICTIONAL SETTLEMENTS, NOTICES,
<br />THICK TEXTURE SURFACE WITH A PAINT ROLLER
<br />2. OTHER: LEAD, COPPER OR OTHER APPROVED MATERIAL.
<br />1. YKK AP SERIES 20D NARROW STILE SWING ENTRANCES.
<br />RECEIPTS FOR FEE PAYMENTS, JUDGMENTS, AND SIMILAR DOCUMENTS, CORRESPONDENCE AND RECORDS
<br />PART' 3 EXECUTION
<br />FAST
<br />D FASTENERS:
<br />2. YKK AP SERIES 35D MEDIUM STILE SWING ENTRANCES.
<br />ESTABLISHED IN CONJUNCTION WITH COMPLIANCE WITH STANDARDS AND REGULATIONS BEARING UPON
<br />ID2 GENERAL BUILDING INSULATION
<br />3DI INSTALLATION
<br />I. NAILS: CORROSION -RESISTANT BOX NAILS, MINIMUM 11 GAUGE,
<br />3. YKK AP SERIES 50D WIDE STILE SWING ENTRANCES.
<br />PERFORMANCE OF THE WORK f
<br />A BLANKET INSULATION TO BE UNFACED, MINERAL FIBER WITH THERMOSETTING RESINS, TYPE 1. MINERAL FIBER
<br />A. INSTALL CLASS PB EIFS IN ACCORDANCE WITH MANUFACTURER'S CURRENT PUBLISHED WRITTEN INSTRUCTIONS.
<br />2. OTHER: OTHER APPROVED FASTENING SYSTEMS.
<br />4.YKK AP SERIES 201DH NARROW STILE HURRICANE (SHUTTERED APPLICATIONS) SWING ENTRANCES:
<br />SHALL BE MANUFACTURED FROM GLASS.
<br />E. MORTAR MATERIALS, PLASTIC CEMENT AND SEALANT:
<br />B.RELATED SECTIONS:
<br />1.01 CONTRACTOR RESPONSIBILITIES
<br />B. APPLY INSULATION UNITS COMPLYING WITH MANUFACTURER'S RECOMMENDATIONS. INSTALL BLANKET
<br />3D2 PROTECTION
<br />I. SAND: ASTM CI44
<br />p
<br />CEMENT: ASTM TYPE I.
<br />2. PLASTIC
<br />I. GLASS AND GLAZING: REFER TO DIVISION 8 GLASS AND GLAZING SECTION FOR GLASS AND GLAZING REQUIREMENTS.
<br />2, SINGLE SOURCE REQUIREMENT: ALL PRODUCTS LISTED BELOW SHALL BE BY THE SAME MANUFACTURER
<br />A. REVIEW SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PRIOR TO SUBMISSION.
<br />INSULATION IN STUD WALLS. BOND UNITS TO SUBSTRATE WITH ADHESIVE OR USE MECHANICAL ANCHORAGE
<br />A PROVIDE PROTECTION OF INSTALLED EIFS MATERIALS FROM WATER INFILTRATION INTO OR BEHIND THE SYSTEM.
<br />C 822.C15
<br />3. PLASTIC CEMENT: ASTM D2822.
<br />a.SECTION 08 32 SLIDING ALUMINUM -FRAMED GLASS DOORS.
<br />B. DETERMINE AND VERIFY:
<br />70 PROVIDE PERMANENT PLACEMENT.
<br />B. PROVIDE PROTECTION OF INSTALLED EIFS FROM DUST, DIRT, PRECIPITATION FREEZING AND CONTINUOUS
<br />4. SILICONE SEALANT: A$TM 0I002.
<br />3
<br />b.SECTION 08 5113 ALUMINUM WINDOWS.
<br />1. FIELD MEASUREMENTS.
<br />HIGH HUMIDITY UNTIL EIFS COATINGS ARE FULLY DRY.
<br />c.SECTION 08 44 13 GLAZED ALUMINUM CURTAIN WALLS.
<br />2. FIELD CONSTRUCTION CRITERIA.
<br />1.03 LOOSE INSULATION
<br />PART 3 EXECUTION
<br />d.SECTION 08 44 33 SLOPED GLAZING ASSEMBLIES.
<br />3. CATALOG NUMBERS AND SIMILAR DATA.
<br />A. SAME AS GENERAL BUILDING INSULATION. FILL CRACKS AND VOIDS AROUND FRAMES AND BLOCKING AND
<br />END OF SEEGTION 0-1240
<br />4. CONFORMANCE WITH SPECIFICATIONS AND DRAWINGS.
<br />OTHER VOIDS IN EXTERIOR WALL AND VOIDS AROUND CANTS, CURBS, AND BLOCKING IN AND ABOUT THE
<br />3.01 EXAMINATION AND PREPARATION
<br />ID2 SYSTEM PERFORMANCE DESCRIPTION
<br />C. COORDINATE EACH SUBMITTAL WITH REQUIREMENTS OF THE WORK AND THE CONTRACT DOCUMENTS.
<br />ROOF WITH LOOSE INSULATION. WEDGE IN PLACE CORNERS AND INTERSECTIONS BEFORE SHEETING
<br />A. VERIFY THAT DECK SURFACES ARE CLEAN, DRY, FREE OF RIDGES, WARP OR VOIDS.
<br />APERFORMANGE REQUIREMENTS: PROVIDE ALUMINUM SWING DOORS THAT COMPLY WITH PERFORMANCE REQUIREMENTS
<br />DO NOT SUBMIT NON -CONFORMING PRODUCTS.
<br />OF EXTERIOR, COMPLETELY FILLING VOIDS.
<br />B. VERIFY ROOF OPENING$ ARE CORRECTLY FRAMED PRIOR TO INSTALLING WORK OF THIS SECTION. DO NOT PROCEED
<br />INDICATED, AS DEMONSTRATED BY TESTING MANUFACTURERS ASSEMBLIES IN ACCORDANCE
<br />D NOTIFY THE ARCHITECT IN WRITING, AT THE TIME OF SUBMISSION, OF ANY DEVIATIONS IN THE SUBMITTALS
<br />UNTIL ALL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED,
<br />WITH TEST METHODS INDICATED.
<br />I. AIR INFILTRATION (SINGLE ACTING BUTT HINGES OR OFFSET PIVOTS} AIR INFILTRATION SHALL BE TESTED IN
<br />FROM REQUIREMENTS OF THE CONTRACT DOCUMENTS, OR OF ANY DISCREPANCIES WITHIN THE CONTRACT
<br />1.04 SOUND ATTENUATING INSULATION
<br />DOCUMENTS.
<br />A SOUND INSULATION SHALL BE INSTALLED IN STUD WALLS AND CEILINGS WHERE INDICATED ON
<br />3.02 INSTALLATION
<br />E WITH ASTM E 283-91 AT STATIC PRESSURE OF 151 PSF (15 PA). INFILTRATION SHALL
<br />ACCORDANCE
<br />RK
<br />E. BEGIN NO FABRICATION OR WOWHICH REQUIRES SUBMITTALS UNTIL RETURN OF SUBMITTALS WITH
<br />THE DRAWINGS. FIT INSULATION TIGHTLY BETWEEN STUD MEMBERS.
<br />A UNDERLAYMENT:
<br />NOT EXCEED THE FOLLOWING:
<br />j z
<br />a.FOR 20D/20DH SINGLE DOORS: 0.15 CFM/FT (1.02 M /HM) OF CRACK LENGTH.
<br />ARCHITECT'S CONFORMANCE REVIEW.
<br />I. FOR ROOF SLOPES OF 3:12 TO �4:12, TWO (2) LAYERS OF ASTM D226 TYPE II (NM30 FELT) ARE REQUIRED PER IBC AND
<br />b.FOR 200/200H PAIR OF DOORS: 050 CFM/FT (153 M /HM) OF CRACK LENGTH.
<br />F. SUBMITTALS NOT PROPERLY REVIEWED BY CONTRACTOR FOR CONFORMANCE WITH CONTRACT DOCUMENTS
<br />105 RELATED WORK
<br />Imo'
<br />c.FOR 35D/50D SINGLE DOORS: 0.43 CFM/FT (2.44 M'/HM') OF CRACK LENGTH.
<br />$HALL BE RETURNED WITHOUT ARCHITECT'S REVIEW OR ACCEPTANCE.
<br />A. SPECIFIED ELSEWHERE, INCLUDES, BUT NOT LIMITED TO, FUR41SHING AND INSTALLING SUCH ITEMS AS ROOF
<br />2. FOR PITCHES OF 4/12 AND GREATER: MINIMUM ONE LAYER ASTM D226 TYPE II (N030 FELT) (ASTM D4869 TYPE IV) HEAD
<br />d.FOR 35D/50D PAIR OF DOORS: 0.50 CFM/FT (2B3 M'/HM') OF CRACK LENGTH.
<br />MEMBRANE SYSTEM, NAILERS, MECHANICAL FASTENERS, FLASHING, ETC-
<br />LAPPED 2 INCHES AND END LAPPED 6 INCHES, OR APPROVED EQUAL PER UBG.
<br />2. STRUCTURAL: DOOR CORNER STRUCTURAL STRENGTH SHALL BE TESTED PER YKK AP'5 DUAL MOMENT TEST
<br />IDS SUBMISSION REQUIREMENTS
<br />B. FLASHING:
<br />PROCEDURE AND CERTIFIED
<br />A. MAKE SUBMITTALS PROMPTLY IN ACCORDANCE WITH APPROVED SCHEDULE, AND IN SUCH SEQUENCE
<br />I. FLASH AT VALLEYS IN STRICT ACCORDANCE WITH CHAPTER 15 OF THE U BUILDING CODE:
<br />BY AN INDEPENDENT TESTING LABORATORY TO ENSURE CORNER INTEGRITY AND WELD COMPLIANCE. CERTIFIED
<br />AS TO CAUSE NO DELAY IN THE WORK OR IN THE WORK OF ANY OTHER CONTRACTOR
<br />PART 2 PRODUCTS
<br />VALL
<br />VALLEY
<br />a. PROVIDE NO LIGHTER THAN 26 GAUGE CORROSION RESISTANT METAL EY FLASHING THAT EXTENDS AT LEAST it
<br />TEST PROCEDURES AND
<br />RESULTS
<br />RESULTS ARE AVAILABLE UPON REQUEST.
<br />B. NUMBER OF SUBMITTALS REQUIRED:
<br />INCHES EACH WAY FROM THE CENTER POINT.
<br />3.UNIFORM LOAD TEST:
<br />1. SHOP DRAWINGS: SUBMIT THE NUMBER OF OPAQUE REPRODUCTIONS WHICH THE CONTRACTOR REQUIRES,
<br />2DI MATERIAL DESCRIPTION
<br />b. PROVIDE A SPLASH DIVERTER RIB NOT LESS THAN I INCH HIGH AT FLOW LINE FORMED AS A PART OF FLASHING.
<br />a.SINGLE DOORS: 60 PSF.
<br />&SING
<br />PLUS THREE (3) COPIES WHICH WILL BE RETAINED BY THE ARCHITECT. MAXIMUM ACCEPTABLE
<br />A. AT CMU WALLS
<br />c. PROVIDE END LAPS OF NOT LESS THAN 6 INCHES.
<br />OF DOORS: 60 SF.
<br />b.PAIR4.FORCED
<br />SIZE IS 24" x 36" FOR ANY ONE SHEET.
<br />I. INSTALL OWENS CORNING PINK FOAMULAR RIDGED FOAM INSULATION 1" THICK - R-5
<br />d. LONGITUDINAL EDGES SHALL BE TURNED IN NOT LESS THAN 30 DEGREES, AND SHALL BE NOT LESS THAN I/1 INCH IN
<br />ENTRY RESISTANCE: 300 LBS. SATISFACTORY.
<br />2. PRODUCT DATA: SUBMIT THE NUMBER OF COPIES WHICH THE CONTRACTOR REQUIRES, PLUS THREE (3)
<br />B. AT WALL CAVITIES
<br />HEIGHT TO PREVENT WATER OVERFLOW.
<br />WHICH WILL BE RETAINED BY THE ARCHITECT.
<br />I. 4" WALLS: INSTALL OWENS CORNING KRAFT FACED R-11 INSULATION
<br />e. FOR ROOF SLOPES OF 3/11 AND OVER, THE METAL VALLEY FLASHING SHALL HAVE A 36 INCH WIDE UNDERLAYMENT
<br />DIRECTLY UNDER IT CONSISTING OF A MINIMUM OF ONE LAYER OF TYPE 15 FELT RUNNING THE FULL LENGTH OF THE
<br />123PROJECT CONDITIONS / SITE CONDITIONS
<br />3. SAMPLES: SUBMIT THE NUMBER STATED IN EACH SPECIFICATION SECTION. IF NO NUMBER IS GIVEN,
<br />2. b" WALLS: INSTALL OWENS CORNING KRAFT FACED R-19 INSULATION
<br />VALLEY, IN ADDITION TO OTHER SPECIFIED UNDERLAYMENT.
<br />AFIELD MEASUREMENTS: VERIFY ACTUAL MEASUREMENTS/OPENINGS BY FIELD MEASUREMENTS BEFORE FABRIGATIONt
<br />VERIFY CORRECT NUMBER WITH ARCHITECT PRIOR TO SUBMITTAL. MINIMUM OF TWO (2) SAMPLES.
<br />C. AT CEILINGS
<br />2. AT SIDES OF DORMERS, CHIMNEYS AND OTHER WALLS, EXTEND FLASHING AT LEAST 6 INCHES UP VERTICAL SURFACE.
<br />SHOW RECORDED
<br />4. PROVIDE SUBMITTALS AS REQUIRED BY THE INDIVIDUAL SECTION, BUT NO LESS THAN THAT
<br />I. INSTALL OWENS CORNING KRAFT FACED R-19 OR R-30 INSULATION AS SPECIFIED IN DRAWINGS
<br />a. THOROUGHLY COUNTER FLASH.
<br />MEASUREMENTS ON SHOP DRAWINGS. COORDINATE FIELD MEASUREMENTS, FABRICATION SCHEDULE WITH CONSTRUCTION
<br />STATED ABOVE.
<br />D. AT SOUND PARTITIONS
<br />b. EXTEND FLASHING UNDER TILE AT LEAST 4 INCHES AND TURN EDGE UP 1-1/2" INCHES,
<br />PROGRESS TO AVOID CONSTRUCTION DELAYS.
<br />C. SUBMITTALS SHALL CONTAIN:
<br />I. INSTALL OWENS CORNING QUIET ZONE NOISE CONTROL BATTS
<br />1.0451113MITTAL$
<br />1. THE DATE OF SUBMISSION AND THE DATES OF ANY PREVIOUS SUBMISSIONS.
<br />3. AT LOWER SIDES OF DORMERS, CHIMNEYS AND OTHER WALLS, EXTEND FLASHING AT LEAST 4 INCHES UP WALL AND 4
<br />AGENERAL: PREPARE, REVIEW, APPROVE, AND SUBMIT SPECIFIED SUBMITTALS IN ACCORDANCE WITH "CONDITIONS OF
<br />2. THE PROJECT TITLE AND NUMBER.
<br />INCHES OVER TILE, AND THEN THOROUGHLY COUNTER FLASH.
<br />THE CONTRACT"
<br />3. CONTRACT IDENTIFICATION,
<br />4. THE NAMES OF:
<br />END OF SECTION 0-1210
<br />4. AT WOOD SADDLES AND RETURNS, LINE WITH I6 OZ. COPPER EXTENDING UP ROOF SLOPE NOT LESS THAN 14 INCHES, AND
<br />AND DIVISION I SUBMITTALS SECTIONS. PRODUCT DATA, SHOP DRAWINGS, SAMPLES, AND SIMILAR SUBMITTALS ARE
<br />"CONDITIONS
<br />a. CONTRACTOR
<br />UP VERTICAL WALLS NOT LESS THAN 6 INCHES, AND THOROUGHLY COUNTER FLASH.
<br />DEFINED IN OF THE CONTRACT."
<br />B.PRODUCT DATA: SUBMIT PRODUCT DATA FOR EACH ENTRANCE SERIES SPECIFIED.
<br />b. SUBCONTRACTOR
<br />SECTION 01240 EXTERIOR INSULATION AND FINISW SYSTEM (EIFS)
<br />5. MAKE ALL COUNTER FLASHING PLUGGED, POINTED AND SECURE.
<br />G.SU56TITUTION5: WHENEVER SUBSTITUTE PRODUCTS ARE TO BE CONSIDERED, SUPPORTING TECHNICAL DATA, SAMPLES,
<br />c. SUPPLIER
<br />C. 15IRD5TOP5, BOOSTERS AND STARTERS:
<br />AND TEST REPORTS MUST BE SUBMITTED TEN (10) WORKING DAYS PRIOR TO BID DATE IN ORDER TO
<br />d. MANUFACTURER
<br />PART I GENERAL
<br />I. INSTALL CLAY BIRDSTOPS ALONG ENTIRE LENGTH OF ALL EAVES.
<br />MAKE A VALID COMPARISON.
<br />5. IDENTIFICATION OF THE PRODUCT, WITH THE SPECIFICATION SECTION NUMBER
<br />1.01 SUMMARY
<br />2. INSTALL FIRST COURSE OF PAN TILE LEAVING A 2 TO 3 INCH OVERHANG AT SAVE.
<br />D. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS SHOWING LAYOUT, PROFILES, AND PRODUCT COMPONENTS, INCLUDING
<br />6, FIELD DIMENSIONS, CLEARLY IDENTIFIED AS SUCH.
<br />A. MATERIALS AND INSTALLATION OF CLASS PB EIFS SYSTEM.
<br />3. INSTALL 3 INCH BOOSTER TILES ON TOP OF 5IRDSTOP5.
<br />ANCHORAGE,
<br />ACCESSORIES, AND FINISH COLORS.
<br />1. RELATION TO ADJACENT OR CRITICAL FEATURES OF THE WORK OR MATERIALS.
<br />4. INSTALL 15 INCH STARTER TILES ON TOP OF BOOSTER TILES ALONG PERIMETER OF ALL EAVES.
<br />E.SAMPLES: SUBMIT VERIFICATION SAMPLES FOR COLORS. MINIMUM 2-1/2 INCH BY 3 INCH (61 MM BY 13 MM) SAMPLES ON
<br />8. APPLICABLE STANDARDS SUCH AS, BUT NOT LIMITED TO ASTM OR FEDERAL SPECIFICATION NUMBERS.
<br />1.02 DELIVERY, STORAGE AND HANDLING
<br />D. FASTENERS: (EDIT TO AVOID CONFLICTING REQUIREMENTS)
<br />ACTUAL ALUMINUM SUBSTRATES INDICATING FULL COLOR RANGE EXPECTED IN INSTALLED SYSTEM.
<br />9. IDENTIFICATION OF DEVIATIONS FROM CONTRACT DOCUMENTS.
<br />A. DELIVER ALL EIFS MATERIALS IN THEIR ORIGINAL SEALED CONTAINERS BEARING MANUFACTURER'S NAME
<br />I. AT PLYWOOD DECKS, PROVIDE MINIMUM OF II GAUGE, LARGE HEADED, CORROSION RESISTANT NAILS OF SUFFICIENT
<br />F. QUALITY ASSURANCE /CONTROL SUBMITTALS:
<br />10. IDENTIFICATION OF OPTIONS AVAILABLE, BUT NOT INDICATED IN THE SPECIFICATIONS, SUCH AS
<br />AND IDENTIFICATION OF PRODUCT.
<br />LENGTH TO PENETRATE 3/4 INCHES INTO OR THROUGH THE SHEATHING, WHICHEVER IS LESS.
<br />I. TEST REPORTS: SUBMIT CERTIFIED TEST REPORTS SHOWING COMPLIANCE WITH SPECIFIED PERFORMANCE
<br />COLOR, FINISH, TEXTURE, ETC. WITH COMPLETE SAMPLES OR LISTING INCLUDED IN THE SUBMITTAL FOR
<br />B. PROTECT COATINGS (PAIL PRODUCTS) FROM FREEZING AND TEMPERATURES IN EXCESS OF 50, F (32' C).
<br />2. A7 CONCRETE DECKS, USE STAINLESS STEEL OR SILICON BRONZE SCREW SHANK NAILS OF SUFFICIENT
<br />CHARACTERISTICS AND
<br />ARCHITECT'S SELECTION. '
<br />STORE AWAY FROM DIRECT SUNLIGHT.
<br />LENGTH TO PENETRATE 1/2TO 3/4 THEIR LENGTH INTO, BUT NOT THROWN THE DECK
<br />LENGTH T
<br />PHYSICAL PROPERTIES.
<br />11. INDICATION OF TERMS TO BE INCLUDED IN THE WORK AND SHOWN ON THE SHOP DRAWINGS SHALL BE
<br />C. PROTECT PORTLAND CEMENT BASED MATERIALS (BAG PRODUCTS) FROM MOISTURE AND HUMIDITY. STORE
<br />3. PROVIDE TWO FASTENERS PER TILE IN SNOW AREAS.
<br />4. IN AREAS DESIGNATED BY THE BUILDING OFFICIALS AS BEING SUBJECT TO REPEATED WIND VELOCITIES IN EXCESS OF
<br />2. INSTALLER QUALIFICATION DATA: SUBMIT INSTALLER QUALIFICATION DATA
<br />DIMENSIONED AND COORDINATED FOR PROPER FIT AND TIMELY INCLUSION.
<br />UNDER COVER OFF GROUND IN A DRY LOCATION.
<br />80 MPH, OR WHERE ROOF HEIGHT EXCEEDS 40 FEET ABOVE GRADE, ALL TILES SHALL BE ATTACHED AS FOLLOWS:
<br />G.CL05EOUT SUBMITTALS:
<br />12. IDENTIFICATION OF REVISIONS ON SUBMITTALS..
<br />a. THE HEADS OF ALL TILES SHALL BE NAILED.
<br />I. WARRANTY: SUBMIT EXECUTED WARRANTY DOCUMENTS SPECIFIED HEREIN, ENDORSED BY YKK AP AUTHORIZED
<br />13. AN 8" x 3" BLANK SPACE FOR CONTRACTOR AND ARCHITECT STAMPS.
<br />I.D3 SUBMITTALS
<br />b. THE NOSES OF ALL EAVE TILES SHALL BE FASTENED WITH APPROVED CLIPS.
<br />OFFICIAL AND INSTALLER
<br />14. CONTRACTOR'S STAMPS, INITIALED OR SIGN, CERTIFYING THE REVIEW OF SUBMITTAL, VERIFICATION OF
<br />A. MANUFACTURER'S SPECIFICATIONS, DETAILS, INSTALLATION INSTRUCTIONS AND PRODUCT DATA
<br />c. ALL RAKE TILES SHALL BE NAILED WITH TWO NAILS.
<br />2. PROJECT RECORD DOCUMENTS: SUBMIT PROJECT RECORD DOCUMENTS, INCLUDING OPERATION AND MAINTENANCE
<br />DATA FOR INSTALLED MATERIALS IN ACCORDANCE WITH DIVISION I PROJECT CLOSEOUT (PROJECT RECORD
<br />PRODUCTS, FIELD MEASUREMENTS AND FIELD CONSTRUCTION CRITERIA, AND COORDINATION OF
<br />B. APPLICATOR'S CERTIFICATE OF INSTRUCTION.
<br />d. THE NOSES OF ALL HIP, RIDGE AND RAKE TILES SHALL BE SET IN A BEAD OF APPROVED ROOFER'S MASTIC.
<br />DOCUMENTS) SECTION.
<br />THE INFORMATION WITHIN THE SUBMITTAL WITH REQUIREMENTS OF THE WORK AND OF CONTRACT
<br />G. SAMPLES ALL PROFILES AND TEXTURES FOR APPROVAL BY ARCHITECT.
<br />5. ON SLOPES OVER 1/12, THE NOSE END OF ALL TILES SHALL BE SECURELY FASTENED WITH "STORM LOCKS" OR "WIND
<br />&MAINTENANCE DATA: MAINTENANCE PROCEDURES FOR CARE AND CLEANING OF ENTRANCE SYSTEMS.
<br />DOCUMENTS.
<br />U
<br />D. MANUFACTURRER'S CODE REPORT.
<br />LOCKS", AS MANUFACTURED BY THE WIRE WORKS, INC (800541-8828, OR WITH OTHER APPROVED FASTENING
<br />E. MANUFACTURER'S STANDARD WARRANTY.
<br />SYSTEM.
<br />TILE -TIE 6Y
<br />6. PROVIDE TWISTED WIRE TILE TYf, OR RINfSS TILE -TIE SYSTEM OF BRASS, COPPER OR GALVANIZED WIRE AS
<br />ID5QUALITY ASSURANCE
<br />IDS RESUBMISSION REQUIREMENTS
<br />F. A LIST OF MINIMUM THREE(3) JOB REFERENCES.
<br />8, OR OTHER APPROVED FASTENING SYSTEM.
<br />MANUFACTURED BY THE WIRE WORKS, INC.N O
<br />A.QUALIRCATIONS:
<br />A. MAKE ANY CORRECTIONS OR CHANGES IN THE SUBMITTALS REQUIRED BY THE ARCHITECT AND RESUBMIT
<br />G. MANUFACTURER'S CERTIFICATION OF COMPLIANCE WITH EIMA STANDARDS.
<br />E. INSTALL FIELD TILE IN COURSES BEGINNING RAVE WORKING INCLINE OF ROOF DECK
<br />L
<br />I. INSTALLER QUALIFICATIONS: INSTALLER EXPERIENCED (AS DETERMINED BY CONTRACTOR) TO PERFORM WORK OF THIS
<br />UNTIL ACCEPTED.
<br />H. EPS BOARD MANUFACTURER'S CERTIFICATE WITH THE CURRENT EDITION OF EIMA GUIDELINE SPECIFICATIONS
<br />TILES IN VERTICAL ROWS AT A MAXIMUM OF II INCH CENTERS, WITH EACH TILE FASTENED WITH ONE NAIL,
<br />I. INSTALL T
<br />SECTION WHO
<br />B. SHOP DRAWINGS AND PRODUCT DATA:
<br />FOR EXPANDED POLYSTYRENE (EPS) INSULATION BOARD.
<br />PROVIDING A MAXIMUM EXPOSURE 15 INCHES FOR EACH TILE.
<br />HAS SPECIALIZED IN THE INSTALLATION OF WORK SIMILAR TO THAT REQUIRED FOR THIS PROJECT. IF REQUESTED BY
<br />1. REVISE INITIAL DRAWINGS OR DATA, AND RESUBMIT AS SPECIFIED FOR THE INITIAL SUBMITTAL.
<br />I. SEALANT MANUFACTURER'S CERTIFICATE OF COMPLIANCE WITH EIMA STANDARD 300.01.
<br />2. AS AN ALTERNATE, END CAPS CAN BE EMBEDDED IN CEMENT MORTAR FOR A MORE RUSTIC APPEARANCE.
<br />OWNER, SUBMIT
<br />2. INDICATE ANY CHANGES WHICH HAVE BEEN MADE OTHER THAN THOSE REQUESTED BY THE ARCHITECT.
<br />J. PREPARE AND SUBMIT PROJECT -SPECIFIC DETAILS (WHEN REQUIRED BY CONTRACT DOCUMENTS).
<br />3. AS AN ALTERNATE, COVER TILES CAN BE ADDED USING 5005TER TILES LAID DRY OR LAID IN CEMENT MORTAR
<br />REFERENCE LIST of COMPLETED PROJECTS.
<br />2. MANUFACTURER QUALIFICATIONS: MANUFACTURER CAPABLE OF PROVIDING FIELD SERVICE REPRESENTATION
<br />C. SAMPLES: SUBMIT NEW SAMPLES AS REQUIRED FOR INITIAL SUBMITTAL.
<br />4. INSTALL HIP AND RIDGE TILES:
<br />NG
<br />DURING
<br />1.04 WARRANTY
<br />a. PROVIDE CEMENT MORTAR OR OTHER APPROVED MATERIALS AT ALL HIPS AND RIDGES TO COMPLETELY FILL VOIDS
<br />CONSTRUCTION PROCESS.
<br />1.10 DISTRIBUTION
<br />A. PROVIDE MANUFACTURER'S STANDARD SEVEN YEAR LABOR AND MATERIAL WARRANTY.
<br />AND TO WEATHERPROOF THE ROOF.
<br />BALL HIP, RIDGE AND FIRST ROW OF COVER TILES AFTER GABLE ROLL SHALL BE SET IN CEMENT MORTAR AND
<br />SMOCK -UPS (FIELD CONSTRUCTEDh INSTALL AT PROJECT SITE A JOB MOCK-UP USING ACCEPTABLE PRODUCTS AND
<br />A. DISTRIBUTE REPRODUCTION OF SHOP DRAWINGS AND COPIES OF PRODUCT DATA WHICH CARRY THE
<br />.
<br />FASTENED BY NONCORROSIVE NAILS.
<br />MANUFACTURER APPROVED INSTALLATION METHODS. OBTAIN OWNER'S AND ARCHITECT'S
<br />ARCHITECT'S STAMP OF CONFORMANCE TO:
<br />ACCEPTANCE OF FINISH COLOR, AND WORKMANSHIP STANDARD.
<br />1. JOB SITE FILE.
<br />2. RECORD DOCUMENTS FILE.
<br />6. ALL TILES IN CONTACT WITH CEMENT MORTAR SHALL BE IMMERSED IN WATER FOR TWO MINUTES BEFORE LAYING.
<br />I. MOCK-UP SIZE:
<br />2. MAINTENANCE: MAINTAIN MOCK-UP DURING CONSTRUCTION FOR WORKMANSHIP COMPARISONt REMOVE AND
<br />3. SUBCONTRACTORS.
<br />1. TO AVOID COLOR PROBLEMS ON ROOF:
<br />LEGALLY DISPOSE OF MOCK-UP WHEN NO LONGER REQUIRED.
<br />4. SUPPLIER OR FABRICATOR
<br />a. ROOF LOAD TILES FROM DIFFERENT PALLETS.
<br />3. INCORPORATION: MOCK-UP MAY BE INCORPORATED INTO FINAL CONSTRUCTION UPON OWNER'$ APPROVAL.
<br />5. OWNER (TO BE DISTRIBUTED BY THE ARCHITECT).
<br />b. VISUALLY INSPECT APPLICATION FROM THE GROUND LEVEL AFTER INSTALLING 100 TILES.
<br />C.PRE-INSTALLATION MEETINGS: CONDUCT Pam -INSTALLATION MEETING TO VERIFY PROJECT REQUIREMENTS, SUBSTRATE
<br />c. VISUALLY VERIFY THAT ROOF TILE COLOR IS UNIFORM AND EVEN, AND VERIFY THAT TILE COURSES ARE STRAIGHT AND
<br />CONDITIONS,
<br />INSTALLATION INSTRUCTIONS AND MANUFACTURER'S WARRANTY REQUIREMENTS.
<br />L11 ARCHITECT'S DUTIES
<br />TRUE.MANUFACTURER'S
<br />A. REVIEW SUBMITTALS WITH REASONABLE PROMPTNESS AND IN ACCORD WITH SCHEDULE. ALLOW A MINIMUM
<br />8. CORRECT ANY COLOR OR INSTALLATION PROBLEMS BEFORE PROCEEDING WITH THE INSTALLATION.
<br />OF TEN (10) WOWING DAYS FOR REVIEW, UNLE56 SPECIAL HANDLING IS ARRANGED IN ADVANCE.
<br />9. COMPLETE INSTALLATION TO PROVIDE WEATHER TIGHT SERVICE.
<br />B. AFFIX STAMP AND INITIALS OR SIGNATURE, AND INDICATE REQUIREMENTS FOR RE5UBMITTAL OR
<br />303 CLEAN UP
<br />A CLEAN ROOF TO REMOVE ALL PIECES OF DEBRIS.
<br />CONFORMANCE OF SUBMITTAL. ACCEPTANCE IS FOR GENERAL CONFORMANCE WITH DESIGN CONCEPT AND
<br />B. REMOVE AND DISPOSE OF ALL WORK -RELATED REFUSE AND DEBRIS.
<br />GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. QUANTITIES AND DIMENSIONS OF MATERIALS
<br />END OF SECTION
<br />WILL NOT BE REVIEWED. ACCEPTANCE OF A SUBMITTAL DOES NOT WAIVE OR ALTER THE REQUIREMENTS
<br />PRODUCTS:
<br />OF THE CONTRACT DOCUMENTS.
<br />US TILE AUTHENTIC CLAY ROOF TILES
<br />C. RETURN SUBMITTALS TO CONTRACTOR FOR DISTRIBUTION OR FOR RESUBMIS510N.
<br />END OF S£:C:TION 01340 f
<br />REVISIONS BY
<br />00
<br />._.
<br />�M
<br />�CnC.0
<br />Q .
<br />C) o
<br />' �xti
<br />N E
<br />CV • U
<br />CDC `
<br />U N
<br />ti 3
<br />N 3
<br />o
<br />C
<br />/ c
<br />0
<br />� :Z:tia
<br />N
<br />._� r'
<br />U
<br />JA
<br />A
<br />E''o ",
<br />54a.� gggg
<br />0
<br />00
<br />cn
<br />C=) �" o
<br />N .
<br />> 0 0
<br />o #
<br />Y v
<br />� a
<br />a�
<br />O
<br />L U
<br />O
<br />Z
<br />� J �
<br />U C
<br />O
<br />m J E U+-
<br />� U N vi
<br />O
<br />> s
<br />0 m a
<br />N C
<br />� � O
<br />3 p
<br />Z L.�
<br />Date: 03, 25. 13
<br />Scale: AS NOTED
<br />Project Mgr: AAY
<br />Drawn: DC
<br />Job: 13-08a
<br />Sheet
<br />N1
<br />�I .1 id., aAl,.. - I .11 1I 11, : 1LeJ.: I I -F_ it - TfI
<br />
|