Laserfiche WebLink
It <br />• <br />AB or A.B. <br />Anchor Bolt <br />ABV or Abv. <br />Above <br />AC or A/C <br />Air -Conditioner <br />ADJ orADJ. <br />Adjustable <br />AFF or A.F.F. <br />Above Finished Floor <br />AHU or A.H.U. <br />Air Handier Unit <br />ALT or ALT. <br />Alternate <br />BC <br />Base Cabinet <br />BF <br />Bifold Door <br />BK SH or Bit Sh <br />BookShelf <br />BLK or BLK. <br />Block <br />BLW or BLW. <br />Below <br />BM or Bm. <br />Beam <br />BOT or Bot. <br />Bottom <br />BP or B.P. <br />Bypass (door) <br />BRG or BRG. <br />Bearing <br />C <br />Carpet <br />CAB <br />Cabinet <br />CIR or Cir. <br />Circle <br />CJ or C/J <br />Control Joint <br />CLG or Clg. <br />Ceiling <br />CMU <br />Concrete Maw" Unit <br />COFF or Coff. <br />Coffered or Tray Ceiling <br />COL or Col. <br />Column <br />COMM or Comm. <br />Community <br />COMP or Comp. <br />Compressor <br />CONNorCONN. <br />Connection <br />CONT or Cont. <br />Continuous <br />CSMT <br />Casement <br />CT or C.T. <br />Ceramic Tile <br />D or D. <br />Dryer <br />DB <br />Door Bell <br />DBL or Dbl. <br />Double <br />DCF <br />Decorative Cementitious Finish <br />DEC or Dec. <br />Decorative <br />DED or Ded. <br />Dedicated (outlet) <br />DIA or Dia. <br />Diameter <br />DISP or Disp. <br />Disposal <br />DIST or Dist. <br />Distance <br />DMF <br />Decorative Masonry Finish <br />DS or D.S. <br />Drawer Stack <br />DTL <br />Detail <br />DV or D.V. <br />Dryer Vent <br />DVP or D.V.P. <br />Diverter Valve (plumbing) <br />DW or D.W. <br />Dishwasher <br />EA or Ea. <br />Each <br />ELEC or Elec. <br />Electrical <br />ELEV or Elev. <br />Elevation <br />EQ <br />Equal <br />EW or E.W. <br />Each Way <br />EXP or Exp. <br />Expansion <br />EXT or Ext. <br />Exterior <br />FBC <br />Florida Building Code <br />FDN or Fdn. <br />Foundation <br />FFB <br />Finsh Floor Break <br />FG <br />Fiberglass (Shower Pan) <br />FIN <br />Finished <br />FIN FLR orFF or Fin. Fir. Finished Floor <br />ABBREVIATIONS <br />FIX or FXD <br />Fixed <br />FLR or Fir. <br />Floor <br />FLR SYS or Fir Sys <br />Floor System <br />FOM or F.O.M. <br />Face Of Masonry <br />FP or F.P. <br />Fireplace <br />FR DR <br />French Door <br />FRT <br />Front <br />FT or Ft. <br />Foot/ Feet <br />FTG or Ftg. <br />Footing <br />FXD GL <br />Fixed Glass <br />GALV or Galy. <br />Galvanized <br />GC or G.C. <br />General Contractor <br />GFI or G.F.I. <br />Ground Fault Interrupter <br />GT or G.T. <br />Girder Truss <br />GYP BD or Gyp. Bd. <br />Gypsum Board <br />HB <br />Hose Bibb <br />HC <br />Hollow Core <br />HDR or Hdr. <br />Header <br />HGT or Hgt. <br />Height <br />HH or H.H. <br />Hand Held (plumbing faucet) <br />HORIZ <br />Horizontal <br />HS <br />Hard Surface (flooring) <br />ILO <br />In Lieu Of <br />INSUL or Insul. <br />Insulation <br />INT or Int. <br />Interior <br />KIWALL or K/Wall <br />Kneewall <br />KS or K.S. <br />Knee Space <br />LAUN or Laun. <br />Laundry <br />LAV or Lay. <br />Lavatory <br />LF or L.F. <br />Linear Ft. <br />LL <br />Lintel Length <br />LT <br />Laundry Tub <br />MAS or Mas. <br />Masonry <br />MAX or Max <br />Maximum <br />MC <br />Medicine Cabinet <br />MFR or Mfr. <br />Manufacturer <br />MGT <br />Management (room) <br />MIN or Min <br />Minimum <br />MIR or Mir. <br />Mirror <br />ML or M.L. <br />Microlam <br />MONO or Mono <br />Monolithic <br />MW or MICRO or Micro. <br />Microwave <br />NTS or N.T.S. <br />Not to Scale <br />OE or O.E. <br />Owner's Entry <br />OPNG or Opn'g. <br />Opening <br />OPT or Opt. <br />Optional <br />PC <br />Pull Chain <br />PED or Ped. <br />Pedestal <br />PH <br />Phone <br />PKT or Pkt. <br />Pocket (Door) <br />PL or P.L. <br />Parallam <br />PLF <br />Pounds per linear foot <br />PLNT SHLF or Pit. Sh. <br />Plant Shelf <br />PLT HT or Pit. Ht. <br />Plate Height <br />PSF <br />Pounds per square foot <br />PT or P.T. <br />Pressure Treated <br />PW or P.W. <br />Pre -wire <br />PWDR or Pwd. <br />Powder Room <br />RA or R/A or R.A. <br />Return Air <br />RAD or Red. <br />Radius <br />RAG or Rag. <br />Return Air Grill <br />REC or Rec. <br />Recessed <br />RECEPT <br />Receptacle <br />REF or Ref. <br />Refrigerator <br />REINF <br />Reinforcing <br />READ or Req'd. <br />Required <br />RM or Rm. <br />Room <br />RND or Rnd. <br />Round <br />RO or R.O. <br />Rough Opening <br />RS, R/S, R/SH or R&S <br />Rod and Shelf <br />SC <br />Solid Core <br />SD or SD. <br />Smoke Detector <br />SGD <br />Sliding Glass Door <br />SH or Sh. <br />Shelves <br />SHT <br />Sheet <br />SHWR or Shwr. <br />Shower <br />SL or S.L. <br />Side Lights <br />SPECS or SPECS. <br />Specifications <br />SPF or S.P.F. <br />Spruce Pine Fir <br />SQ FT or SF or S.F. <br />Square Foot (feet) <br />SQ or Sq. <br />Square <br />STO <br />Storage <br />SW or S.W. <br />Shear Wall <br />SYP or S.Y.P. <br />Southern Yellow Pine <br />TB <br />Towel Bar <br />TEMP or Temp. <br />Tempered <br />THIKN or Thik'n. <br />Thicken <br />TOB or T.O.B. <br />Top of Block <br />TOM or T.O.M. <br />Top of Masonry <br />TOP or T.O. P. <br />Top of Plate <br />TP <br />Toilet Paper Holder <br />TR <br />Towel Ring <br />TRANS WDW or Trans. <br />Transom Window <br />TYP or Typ. <br />Typical <br />UC or u.c. <br />Under Counter <br />UCL <br />Under Cabinet Lighting <br />LINO or U.N.O. <br />Unless Noted Otherwise <br />V or v. <br />Valve (shower or tub/shower) <br />VB <br />Vanity Base <br />VERT or Vert <br />Vertical <br />VL or V.L. <br />Versalam <br />VTR or VTE <br />Vent through Roof / Exterior <br />W or w <br />Washer <br />W/ or w/ <br />With <br />WA or WA. <br />Wedge Anchor <br />WC or W/C or W.C. <br />Water Closet (toilet) <br />WD or Wd <br />Wood <br />WOW HDR orWDW.HDR. <br />Window Header <br />WH or W.H. <br />Water Heater <br />WIC or W.I.C. <br />Walk-in Closet <br />WM or W.M. <br />Wall Mounted (plumbing fixture) <br />WP <br />Water Proof(ing) <br />WS <br />Water Softener <br />WWF <br />Welded Wire Fabric (Mesh) <br />PLAN REVISIONS <br />DATE VERSION DESCRIPTION <br />04/25/12 1.0 NEW BASE PLAN <br />06/25/12 2.0 GRADE BEAM FOUNDATION <br />08/11/15 3.0 2015 NEW CODE UPDATE <br />03/06/18 4.0 ' `" `" `� -I <br />`" `" `" <br />UPDATES <br />REVISED SGD, <br />06/01 / 18 4.1 A T r % a— A r % <br />REV. 06.23.22 <br />06/07/18 4.2 REVISED DINING WINDOW TO 35-SH <br />12/19/20 5.0 FBC 2020 CODE UPDATE <br />INDEX OF DRAWINGS <br />SHEET DESCRIPTION <br />SHEET <br />No. <br />CS <br />COVER SHEET <br />1.1 <br />FIRST FLOOR PLAN <br />1.2 <br />SECOND FLOOR PLAN <br />2.1 <br />EXTERIOR ELEVATIONS <br />2.2 <br />EXTERIOR ELEVATIONS <br />3 <br />ELECTRICAL PLAN <br />4 <br />ROOF PLAN <br />5 <br />FOUNDATION PLAN <br />6.1 <br />FIRST FRAMING PLAN <br />6.2 <br />SECOND ROOF FRAMING PLAN <br />7 <br />LINTEL PLAN AND DETAILS <br />SN <br />STRUCTURAL NOTES <br />SN1 <br />DETAILS <br />S3 <br />DETAILS <br />S4 <br />DETAILS <br />S5 <br />DETAILS <br />S6 <br />DETAILS <br />ST STAIR DETAILS <br />SS RETROFIT DETAILS <br />D1 SECTIONS & DETAILS <br />D2 SECTIONS & DETAILS <br />WP WATERPROOFING DETAILS <br />PA1.0 PRODUCT APPROVAL NUMBERS <br />PA1.1 PRODUCT APPROVAL NUMBERS <br />---------------------- <br />- - - - - - - - - - - PA1.2 PRODUCT APPROVAL NUMBERS <br />PA1.3 PRODUCT APPROVAL NUMBERS <br />SH1.0 HURRICANE SHUTTER PRODUCT APPROVAL <br />SH1.1 HURRICANE SHUTTER PRODUCT APPROVAL <br />SH1.2 HURRICANE SHUTTER PRODUCT APPROVAL <br />ins ins SH1.3 HURRICANE SHUTTER PRODUCT APPROVAL <br />1U/ SH1.4 HURRICANE SHUTTER PRODUCT APPROVAL <br />E:1E]E]F-11:J::1E] 0 SH1.5 HURRICANE SHUTTER PRODUCT APPROVAL <br />E:1E:1F-1E:1E:1E:1E:1E� <br />El El El E] El El El El �i <br />I = IF= INI 14 *Itk 118M <br />1763 <br />MEAN ROOF 15 FT. HIGH TYPICAL <br />FOR SINGLE STORY HOMES <br />MEAN ROOF 30 FT. HIGH TYPICAL <br />FOR 2 STORY HOMES <br />THIS DRAWING AND DESIGN IS VALID <br />FOR 12 MONTHS AFTER THE DATE IT <br />IS SIGNED AND SEALED OR WHILE <br />CURRENT CODE IS VALID <br />CODE REFERENCES ARE SUMMARIES <br />OF CODE SECTIONS. <br />SEE FBCR (CURRENT VERSION) FOR <br />COMPLETE CODE INFORMATION. <br />Notice to Builder & All Subcontractors <br />It is the intent of Designer/Engineer listed in the titleblock of these <br />documents that these documents be accurate, providing Licensed <br />Professionals clear information. Every attempt has been made to <br />prevent error. The Builder and all subcontractors are required to <br />review all the information contained in these documents, prior to <br />the commencement of any work. The Designer/Engineer are not <br />responsible for any plan errors, omissions,or misinterpretations <br />undetected and not reported to the Designer / Engineer prior to <br />construction. All construction MUST be in accordance to the <br />information found in these documents. Any questions regarding <br />the information found in these plans should be directed to our <br />Office at (407) 880-2333 immediately. No backcharges will be <br />considered for reimbursement by the Designer/Engineer without <br />advanced notification and approval by the Designer/Engineer. <br />Payments will be made in accordance to the terms of the <br />agreement. <br />Control of Construction Site <br />The Designer/Architect and engineer of record (EOR) have no <br />control over the construction site and shall not be responsible in <br />any manner for control of the construction site including, but not <br />limited to, scheduling and sequencing of work, jobsite safety, and <br />ventilation of the building and thereby shall not be responsible for <br />the indoor air quality, or the effects thereof, for any reason <br />whatsoever. The Designer/Architect and FOR has no duty to <br />protect, without limitation, the residence, construction site, <br />materials, or equipment, from moisture, mold, fungus, fire, theft, <br />vandalism, trespass, or any other peril or condition, at any time, <br />expressly including, but not limited to, the period of time before <br />construction, during the construction of the project, or after <br />construction and the Designer/Architect and FOR has no duty to <br />take any action or preventive measures to protect such property <br />against any such peril at any time for any reason. <br />Care and Maintenance <br />Yearly maintenance and inspections by the builder/homeowner <br />are necessary for the future life of this home. Care must be taken <br />to check windows and doors for caulking, remove leaves and <br />debris off roofs, make sure that water flow is away from the <br />house and have your home repainted every 3 - 5 years to protect <br />the coatings. The designer and engineer of record are not <br />responsible for the upkeep of the home and will not be held <br />liable for instances that may occur over the normal life of the <br />home without proper maintenance. <br />C" c <br />N <br />'= <br />O <br />N a� <br />Y O <br />a� o <br />G N V CV <br />wwJ ✓ Li- a- <br />N N G7 .- <br />_I <br />d <br />m d <br />d � <br />a� <br />G <br />+' eo 0 <br />�' ` <br />�•i.t <br />CZD <br />04 <br />co <br />N <br />Ir J <br />° ;go W`y <br />U <br />A <br />� <br />g <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineer's signature and seal Is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />E <br />F o 8. <br />go <br />LQN � Or' <br />1 <br />inr.- r'-V F # <br />M C14 O iR ti <br />C J lL W <br />LL <br />J LL o <br />m c <br />_ <br />0 0 <br />N r0 > Y <br />W j 'fkf W0. <br />g <br />t� Ocp m w <br />IL '0 — d z N NZ a J <br />O 6 00 <br />Z � <br />W ❑ ❑ <br />C9 <br />� <br />Z N � <br />z <br />Z n <br />Q ? <br />N Z <br />C2N0.1 <br />LL <br />N <br />(Z LL' <br />V � <br />O w g <br />to c C11 <br />V) <br />ON= � <br />9 <br />-00> <br />�Q <br />see <br />o <br />o <br />Z <br />Z <br />LL <br />m <br />p <br />zo <br />so <br />>N <br />aR <br />a <br />wLL <br />?0 <br />♦— <br />g V <br /><Z <br />°ir <br />70 <br />-a <br />Z <br /><o <br />Z <br />W; <br />C <br />C <br />ao <br />mo <br />ZLL <br />Z <br />M J <br />ym <br />aw <br />fz <br />oS <br />F <br />m <br />a0 <br />z <br />�a <br />13 <br />o <br />�< <br />>o <br />ch <br />a r <br />N <br />o 3 <br />0 <br />C c <br />LO <br />0 <br />rn <br />L° <br />0 <br />N <br />M <br />Co cfl <br />T <br />co <br />T >+ <br />Ca <br />T <br />(n <br />4-J °° = <br />Ln <br />M <br />-� M <br />N <br />U ) <br />T <br />0^0 <br />Q c LO <br />T <br />ECM <br />M <br />M iri to <br />o <br />Z <br />Z <br />E T <br />E a3 <br />c <br />a <br />U Q pre <br />JOB <br />NO: 23-06110 <br />SCALE : AS NOTED <br />SHEET NO. <br />C'so <br />