Laserfiche WebLink
REVISIONS BY <br />CONNECT TO �TOP-BEAM �TOP-OF <br />TEES AS C-CLAMP TRUSSES <br />REQUIRED C-CLAMP <br />GALVANIZED BRACKET PLUMBING PIPING <br />1-1/2" NPt INSIDE MAY EXTEND AS WITH FIRE RETARDANT <br />A WASTE INSERT, ATTACHED TO <br />THREADS VAT OR I -BEAM STEEL TRUSSES STRUT <br />TAILPIECE <br />-- <br />CHROME WALL /2" A.T R t0 STRUCTURE <br />SLDIP JOINT ,,,-WALL <br />COVER < SCREW A.T.R. �A.t.R. <br />��WALL LOCKING NUT <br />PLUGGED TEE-L- ----- ---�- CHANNEL TO ' <br />WITH CLEANOUT SWIVEL RING ---------- ------------ ------------- - SUPPORT <br />SERVICES <br />SLIDE JOINT <br />SWIVEL RING <br />BALANCE OF CO <br />DOUBLE SUPPORT u m <br />PIPING SAME + <br />+ NUT WITH WASHER <br />SPECAS ( CATION R 0 <br />N «i I` U <br />N <br />G.O. Cq <br />. 00 F" <br />L4� c0 <br />U <br />NOTES: tl Q E <br />1. ALL HANGERS TO COMPLY WITH 2O10 FLORIDA PLUMBING CODE. °' 00 ti 3 <br />2. DISTANCE BETWEEN HANGERS SHALL 5E AS PER 2010 FPC TABLE 305B <br />3. PIPE SCHEDULE AS PER SPECIFICATION. C' 3 <br />C <br />a <br />0 <br />�m <br />O P-T10 RoP DETAIL � WALL CLEANOUT DETAIL PIPE HA R DETAIL <br />O NOT TO SCALE O NOT TO SCALE NI�� DETAIL <br />NOT TO SCALE O NOT TO SCALE � <br />1 <br />� 1 <br />WASTE OR VENT RISER r i — — — — — — i} s <br />PIPING TO LAVATORY OR SINK <br />METAL OR WOOD STUD------,1/2" C.W. FROM WATER - - - - - - - - - - - SET SCREWS�'d' w a <br />SUPPLY z o` <br />FIRE -RETARDANT INSERT I i <br />EXTEND FOR I/2" COPPER PIPE �� �L.�, z W <br />AS A c( <br />SHUT-OFF A <br />• , „,L ACCESS 7E OR ATTACH TO STUDS ® VALVE LOCKING O 0 ,� -= <br />COVER AND TRAP PRIMER DEVICE _ <br />TEST TEE i FRAME / TP STE£LAPIPE VARIES <br />GALVANIZED BRACKET 2 r w <br />UPRIGHTS SEE CAPPED O <br />CHROME ® AND UJ/OPSNCENTERS" ARCH. LEVELING I <br />WALL WALL <br />COVER �- UNION i D S. SCREWS <br />THREADED PLUGGED STAINLESS STEEL BAND <br />ATTACHED 14 WASTE RISER ®®'®�®� S, �-'®® <br />CLEANOUT • � � � � � � � � � FINISHED TEE WITH (EQUAL TO HOLDRITE +MIO) 9 <br />PLUG WALL I FINISHED WALL <br />CLEANOUT <br />• SURFACE FLOOR PENETRATION i i i SET SCREWS °°�09°N <br />FLUSH VALVE AT WATER <br />TIE RODS <br />Na 31'�7 1 ® � <br />CLOSETS <br />BALANCE SOLDER PIPE TO BRACKET „ FINISHED FLOOR <br />OF 1/2 C11J. PIPINGS B� <br />ELOW °°4 <br />PIPING COPPER -PLATED BRACKET SLAB t0 FLOOR DRAIN. 4" " ®®®®®®° <br />NO -HUB WITH ACCESS COVER <br />14 <br />SAME AS W/3/4" 4 P OPENINGS (TYPICAL) �� °0 v ®° <br />PER (EQUAL TO HOLDRITE 'M02) A <br />SPECIFICATION �NOTE: CARRIER WITH CONGEALED ARM5 TO 5E <br />RATED FOR 2r2O L55. OF LOAD APPLIED TO o s <br />N <br />THE FRONT EDGE OF THE FIXTURE. ` m <br />E <br />C Z c O $ <br />— m Q o <br />U m3 <br />C voo �+ <br />L N <br />CC <br />WALL CLEANOUT DETAIL � E <br />O NOT TO SCALE b U1,�TR PI'INC SUPPORTS DETAIL , tiff' PRIMER i�T,41L a LAVATORY CARRIER DETAIL W m E <br />O NOT TO SCALE E a 9 <br />LL NOT TO SCALE O NOT t0 SCALE <br />j 5 <br />cn g <br />U <br />CS <br />U Md <br />C m 2 <br />> d <br />� <br />� c 0 Si t <br />SEE PLAN'HEAT TRAP Q w 0 ,2 '0o <br />FOR SIXES (TYPICAL) NOTES: e 0 o 2 a s <br />I. EWH-1 - ELECTRIC WATER HEATER I-1/4" (120') .2 a <br />Yg (SEE SCHEDULE) <br />Hut - - - - 2. EXt-1 -EXPANSION tAhYdG DOMESTIC WATER BALANCING VALVE <br />(SEE SCHEDULE) SUPPLY AND CHECK ON EACH <br />GRADE HEAVY DUTY V <br />N --- ELE. 3. RCP-1 - RECIRC PUMP 0 RETURN LINE O <br />TURN FLASHING _i H� 3/4 E� -1 I (SEE SCHEDULE) THERMOSTATIC MIXING Z <br />VALVE ASSEMBLY (SEE �I5ALL VALVE I •� _ W <br />DOWN INTO PIPE OR COVER 4. VIR - VACUUM RELIEF SCHEDULE) FOR SETUP Y--3/4 <br />z -- <br />VENT STACK PAVING REQUIRED CLOCK TIMER (SEE SCHEDULE) i a U Z <br />w W v <br />6 MIN. (VTR) � . TACO No.4PC95 J � � <br />4 LB. LEAD O <br />" <br />FLASHING CLEANOUt 6THICK TEMP. AUQASTAT HOT WATER T Q Q N - <br />ROOFINGS SYSTEM. CONCRETE TACO No. 4PC96 SUPPLY i ' TIAQUASTAt V W m REFER TO ASSEMBLYTSAME SIZE AS `_: <br />`: • •.. •.•, .: :. : • •4 : • R UP TO 8 VARIES 140 _ ... .: •; "� ARCHITECTURAL SEWER <br />TYPE <br />02 DRAWINGS FOR r--- --� 3/4" I �C1�IIRC-ULATOR a V <br />. • : :: .:, AND SPECIFIC DIA. I TAP RELIEF <br />EWH-1 i 140T <br />.; •'' ` INSTALLATION DETAILS SEWER I VALVE) WATER �� f <br />C <br />O O BAR JOIST - SEE MATERIAL AND i �- FULL SIZE T4P RELIEF iSTORAGE 1 HEAT 3/4 � Q �- O � <br />STRUCTURAL SIZE AS 3/q DISCHARCsE (SEE PLAN) i TANK i 1/2" i � Z 0 IV <br />DWG'S. SPECIFIED L- _ _ _ b TRAP i W 00 <br />1 DRAIN VALVE-- ---� 1/2" BY-PASS LINE i — M <br />NOTES: WITH CHECK - � <br />CHECK � <br />ATTACH TOP WATTS • AS-22 3" DRAIN PAN 3/4" VALVE 3/4" =p ow <br />i. ALL VENTS THROUGH ROOF SHALL BE A BUILDING SUPPORT STAND —j 1-1/4"F �i----120° — - - 120' m <br />MIN. OF 10'-0" FROM OUTSIDE AIR INTAKES. STRUCTURE <br />LJ- <br />2. ALL VENTS THROUGH ROOF FLASHING DOMESTIC HOT <br />r 1-I/4" L5ALANCIWs WATER RETURN Date: 06. 12. 12 <br />SHALL 5E 5Y METAL ROOF MANUFACTURER <br />COLD VALVE <br />PPLY - - Scale: AS NOTED <br />FINISHED FLOOR <br />MS5-1 3/4" Project Mgr: AAY <br />Drawn: <br />Job: 10-61 <br />9 VENT THRU ROOD DETAIL ,I® 2-WAY GRADE CLEANOUT DETAIL(D[5ECTRIC WATER I -EATER DETAIL THERMOSTATIC MIX( Y Sheet <br />NOT TO SCALE 1Z PIPING �ET�►ILO NOT TO SCALETO SCALE <br />O NOT TO SCALE <br />oPLUMBING DETAILS P 5 <br />NOT TO SCALE <br />