MECHANICAL SPECIFICATIONS
<br />MEC44ANICAL STET INDEX
<br />MI MECHANICAL LEGEND 4 SPECIFICATIONS
<br />M2 MECHANICAL RENOVATION PLAN
<br />MECHANICAL SPECIFICATIONS
<br />I. GENERAL RESPONSIBILITIES OF THE CONTRACTOR
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE THE LABOR,
<br />MATERIALS, AND EQUIPMENT REQUIRED FOR THE HEATING,
<br />VENTILATION, AND AIR CONDITIONING SYSTEM(S) AS DESCRIBED
<br />IN THE COMPLETE SET OF CONSTRUCTION DOCUMENTS. ALL
<br />WORK SHALL CONFORM TO THE REQUIREMENTS OF THE 2010
<br />FLORIDA BUILDING CODE AND 2010 FLORIDA ENERGY CODE
<br />(INCLUDING THE 2010 SUPPLEMENTS), 2011 NATIONAL ELECTRIC
<br />FIRE CODES, AND ALL OTHER STATE
<br />ACODE, NFPA ND LOCAL CODES.
<br />SUFFICIENT CLEARANCES ARE PROVIDED FOR MAINTENANCE.
<br />ALL MECHANICAL EQUIPMENT AT A HEIGHT GREATER THAN
<br />SIXTEEN (16) FEET SHALL HAVE A PERMANENT MEANS OF
<br />ACCESS. ALL COMPRESSORS SHALL HAVE A MINIMUM OF
<br />THIRTY (30) INCHES OF CLEAR SPACE ON THE SERVICE SIDE(S).
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE VIBRATION
<br />ISOLATION AS RECOMMENDED BY THE MANUFACTURER(S)
<br />AND/OR REQUIRED BY THE MECHANICAL ENGINEER TO ENSURE
<br />QUIET OPERATION OF THE MECHANICAL EQUIPMENT. NO UNDUE
<br />VIBRATION OR SOUND SHALL BE TRANSMITTED TO THE
<br />STRUCTURE OR ANY OCCUPIED SPACES WITHIN THE STRUCTURE.APPROVED
<br />THAN ONE AND ONE-HALF (15) DUCT DIAMETERS. SAGS SHALL
<br />NOT EXCEED ONE-HALF (05) INCH PER LINEAR FOOT OF
<br />FLEXIBLE DUCT. HANGERS, SADDLES, AND OTHER SUPPORTS
<br />SHALL HAVE A MINIMUM WIDTH OF ONE AND ONE-HALF (15)
<br />INCHES. THE MECHANICAL CONTRACTOR SHALL PROVIDE
<br />SUPPORT FOR NEW AND EXISTING FLEXIBLE DUCTWORK IN THE
<br />SCOPE OF WORK WITH A MAXIMUM SPACING OF 5'-0", UNLESS
<br />OTHERWISE NOTED ON THE CONSTRUCTION DOCUMENTS OR
<br />AUTHORIZED BY THE MECHANICAL ENGINEER FOR ACHA
<br />RELATED PROJECTS SUCH AS HOSPITALS, ASC'S AND NURSING
<br />HOMES, THE FLEX DUCT SHALL BE THERMAFIN, METALFLEX OR
<br />APROVED EQUAL PER FBCB 41S3.11%o.
<br />PENETRATION OF A SMOKE ASSEMBLY OR CHASE. EACH
<br />FIRE/SMOKE DAMPER SHALL CLOSE AND THE ASSOCIATED AIR
<br />HANDLER SHALL SHUT DOWN IF EITHER OF THE AIR HANDLER'S
<br />OR THE SPACE'S SMOKE DETECTORS ARE ACTIVATED.
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE ADDITIONAL
<br />DUCTWORK AND PIPING SUPPORTS WITHIN EIGHTEEN (18) INCHES
<br />OF BOTH SIDES OF ALL FIRE -RATED ASSEMBLIES. DUCTWORK
<br />AND PIPING SHALL NOT BE SUPPORTED BY FIRE -RATED WALLS,
<br />BUT INSTEAD SHALL BE SUPPORTED BY THE BUILDING
<br />STRUCTURE.
<br />1. SMOKE DETECTORS
<br />THE TEST AND BALANCE CONTRACTOR SHALL ENSURE THAT THE
<br />BUILDING IS UNDER POSITIVE PRESSURE AT THE CONCLUSION OF
<br />THE TEST AND BALANCE PROCESS. IF THE BUILDING IS NOT
<br />UNDER POSITIVE PRESSURE AT THE CONCLUSION OF THE TEST
<br />AND BALANCE PROCESS, THEN THE TEST AND BALANCE AND
<br />MECHANICAL CONTRACTORS SHALL IMMEDIATELY AND WITHOUT
<br />DELAY NOTIFY THE ARCHITECT AND MECHANICAL ENGINEER
<br />THE TEST AND BALANCE CONTRACTOR SHALL, UPON
<br />COMPLETION OF ALL NECESSARY TESTING AND BALANCING AND
<br />At LEAST ONE (1) WEEK PRIOR TO SUBSTANTIAL COMPLETION,
<br />SUBMITTHREE (3) BOUNDREPORT t0 THE MECHANICAL ENGIOPIES NEER, F THE TEST AND BALANCE
<br />M3 MECHANICAL ROOF PLAN
<br />M4 MECHANICAL SCHEDULES
<br />M5 MECHANICAL DETAILS
<br />M6 MECHANICAL DETAILS (CONT.)
<br />/�
<br />C,1�lIC,4l.. LEGEND
<br />50 NEW CEILING DIFFUSER/GRILLE CLAY -IN)
<br />THE
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE 2" FILTER
<br />THE OWNER SHALL NOT BE RESPONSIBLE FOR ANY PORTION OF
<br />THE SCOPE OF WORK UNLESS SPECIFICALLY NOTED IN THE
<br />CONSTRUCTION DOCUMENTS.
<br />THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE
<br />INSTALLATION SCHEDULES OF ALL TRADES. FIXED WORK SUCH
<br />AS DUCTWORK AND SANITARY AND STORM PIPING SHALL BE
<br />RACKS FOR THE MECHANICAL EQUIPMENT AS REQUIRED. THE
<br />FILTER RACKS SHALL BE INSTALLED SUCH THAT SUFFICIENT
<br />CLEARANCES ARE PROVIDED FOR MAINTENANCE AND SHALL
<br />BE SEALED AIRTIGHT. THE FILTERS SHALL BE REMOVABLE
<br />FROM EITHER (OR BOTH) SIDE (6) OF THE FILTER SECTION(S).
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A TOTAL OF
<br />THREE (3) COMPLETE SETS OF FILTERS FOR ALL MECHANICAL
<br />SURFACES UPON WHICH CLOSURE OR SEALING PRODUCTS ARE
<br />TO BE APPLIED SHALL BE CLEAN AND DRY IN ACCORDANCE
<br />WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. ALL
<br />DUCTWORK SHALL BE SEALED WITH A NON -HARDENING,
<br />NON -MIGRATING MASTIC OR LIQUID ELASTIC SEALANT AS
<br />REQUIRED TO MEET THE 2010 FLORIDA ENERGY CODE. THE
<br />MECHANICAL CONTRACTOR SHALL PROVIDE HOT -DIPPED
<br />INDIVIDUAL AIR HANDLING SYSTEMS WITH A DESIGN CAPACITY
<br />OF MORE THAN 2000 CFM SHALL AUTOMATICALLY SHUT DOWN
<br />BY MEANS OF AN APPROVED SMOKE DETECTOR PLACED IN
<br />THE SUPPLY AIRFLOW AFTER ANY AIR FILTERS AND BEFORE
<br />ANY BRANCH CONNECTIONS IN THE SUPPLY DUCTWORK
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE SYSTEM
<br />11, SUBSTANTIAL AND FINAL COMPLETION
<br />THE MECHANICAL CONTRACTOR SHALL MAINTAIN A SET OF
<br />CONTINUOUSLY UPDATED, REPRODUCIBLE AS -BUILT DRAWINGS
<br />DURING CONSTRUCTION AND PROVIDE A COMPLETE SET OF
<br />THOSE DRAWINGS IN BOTH ELECTRONIC AND HAROCOPY
<br />FORMATS TO THE OWNER UPON FINAL COMPLETION
<br />® SUPPLY DIFFUSER BLANKING
<br />NEW HIGH PRESSURE DUCTWORK
<br />SUPPLY DUCTWORK TRANSITION UP OR DOWN
<br />INSTALLED PRIOR TO ANY TRADE WORK THAT CAN BE EASILY
<br />RELOCATED OR OFFSET SUCH AS ELECTRICAL CONDUIT AND
<br />FIRE PROTECTION AND WATER PIPING. ALL ELECTRICAL
<br />CONDUIT AND WATER PIPING SHALL BE INSTALLED AS CLOSE
<br />TO WALLS AND AS CLOSE TOGETHER AS POSSIBLE TO ALLOW
<br />FOR MAXIMUM DUCT ACCESSIBILITY.
<br />ALL CONTRACTORS SHALL COORDINATE THE SCOPE OF THEIR
<br />WORK AND THEIR CONSTRUCTION SCHEDULES WITH THE OWNER
<br />EQUIPMENT IN THE SIZE AND ARRANGEMENT RECOMMENDED BY
<br />THE MANUFACTURER THE 2" FILTERS SHALL PROVIDE ASHRAE
<br />52.2 FILTRATION EFFICIENCY AS SHOWN ON THE CONSTRUCTION
<br />DOCUMENTS OR MINIMUM MERV 6 FILTRATION EFFICIENCY IF NO
<br />HIGHER VALUE IS SPECIFIED.
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A ASHRAE
<br />62.1-2010 SECTION 5.11 COMPLIANT DRAIN PAN. THE
<br />MECHANICAL CONTRACTOR SHALL PROVIDE A SECONDARY
<br />GALVANIZED STEEL FASTENERS, ANCHORS, RODS, STRAPS, TRIM,
<br />AND ANGLES FOR INTERIOR DUCTWORK SUPPORTS. INTERIOR
<br />DUCTWORK SUPPORT SPACING SHALL NOT EXCEED 5'-0".
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE INSULATION
<br />WITH A MINIMUM R-VALUE OF SIX (6) ON ALL DUCTWORK
<br />CONCEALED DUCTWORK MAY BE INSULATED WITH FLEXIBLE
<br />FIBERGLASS INSULATION, BUT ALL EXPOSED DUCTWORK
<br />(INCLUDING DUCTWORK LOCATED IN MECHANICAL ROOMS) MUST
<br />SENSOR MODEL DH100ACDCP 4-WIRE PHOTOELECTRIC SMOKE
<br />DETECTORS AS REQUIRED WITH MODEL SSK 451
<br />MULTI -SIGNALING ACCESSORIES LOCATED IN HIGHLY VISIBLE
<br />AREAS. IF ANY ONE SMOKE DETECTOR IS ACTIVATED, THEN ALL
<br />OF THE ASSOCIATED AIR HANDLING SYSTEMS (UP TO TEN)
<br />SHALL SHUT DOWN. THE MECHANICAL CONTRACTOR SHALL
<br />PROVIDE A COMPLETE SYSTEM OF THIS TYPE FOR EACH
<br />INCREMENT OF TEN (10) AIR HANDLING SYSTEMS. THE
<br />MECHANICAL CONTRACTOR SHALL PROVIDE SAMPLING TUBES
<br />THE MECHANICAL CONTRACTOR SHALL CLEAN ALL COOLING
<br />AND HEATING COILS, CONDENSATE PANS, AND CONDENSATE
<br />DRAIN LINES PRIOR TO SUBSTANTIAL COMPLETION. THE
<br />MECHANICAL CONTRACTOR SHALL ALSO REPLACE ALL FILTERS
<br />AND BELTS PRIOR TO SUBSTANTIAL COMPLETION AND PROVIDE
<br />TWO (3) COMPLETE REPLACEMENT SETS OF FILTERS AND (2)
<br />SETS OF BELTS FOR ALL MECHANICAL EQUIPMENT TO THE
<br />OWNER UPON FINAL COMPLETION.
<br />�j-��
<br />1 A RETURN DUCTWORK TRANSITION UP OR DOWN
<br />LA W EXHAUST DUCTWORK TRANSITION UP OR DOWN
<br />DUCTWORK CROSSOVER OR CROSSUNDER AT
<br />TO PREVENT ANY INTERRUPTIONS UNACCEPTABLE TO THE
<br />OWNER THIS MAY REQUIRE WORK AFTER NORMAL OPERATING
<br />HOURS AND/OR ON WEEKENDS.
<br />2. BIDS, SHOP DRAWINGS, EQUIPMENT SUBMITTALS, AND
<br />CHANGE ORDERS
<br />EACH PROSPECTIVE CONTRACTOR SHALL EVALUATE THE
<br />SCOPE OF WORK THOROUGHLY PRIOR TO SUBMITTING A BID.
<br />DRAIN PAN AND A FLOAT SWITCH UNDER EACH AIR HANDLER
<br />THE FLOAT SWITCH SHALL SHUT ITS ASSOCIATED AIR HANDLER
<br />DOWN IF OVERFLOW IS DETECTED.
<br />ALL REFRIGERANT LINES AND ACCESSORIES SHALL BE SIZED
<br />AND INSTALLED PER THE EQUIPMENT MANUFACTURER'S'
<br />RECOMMENDATIONS. THE MECHANICAL CONTRACTOR AND
<br />MANUFACTURER(S) SHALL STUDY THE COMPLETE SET OF
<br />CONSTRUCTION DOCUMENTS AND EXISTING AND PROPOSED
<br />CONDITIONS TO ENSURE THAT THE MECHANICAL EQUIPMENT HAS
<br />BE INSULATED WITH FIBROUS DUCTBOARD. ALL DUCTWORK
<br />INSULATION, FITTINGS, COVERS, AND FINISHES SHALL HAVE A
<br />MAXIMUM FLAME SPREAD RATING OF 25, A MAXIMUM SMOKE
<br />DEVELOPMENT RATING OF 50, AND SHALL BE IN COMPLIANCE
<br />WITH NFPA SOA. PROVIDE MINIMUM OF 1/2" FIBERGLASS WITH
<br />FOIL/SCRIM VAPOR BARRIER ON THE BACK PAN OF ALL NEW
<br />AIR DEVICES.
<br />ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM OF 10-0"
<br />FROM ANY EXHAUST OUTLET OR VENT PIPE (UNLESS THE VENT
<br />AS REQUIRED,
<br />THE CONTRACTOR -PROVIDED INSTRUCTIONS TO THE OWNER FOR
<br />OPERATING AND MAINTAINING ALL MECHANICAL EQUIPMENT
<br />SHALL INCLUDE TESTING ALL AUTOMATIC SHUTDOWN DEVICES AT
<br />LEAST ONCE PER YEAR SPECIAL INSTRUCTIONS SHALL BE
<br />GIVEN WITH REGARD TO ENSURING THAT SMOKE SENSING
<br />DEVICES ARE PROPERLY CLEANED AND CALIBRATED IN
<br />ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS. MORE
<br />INFORMATION IS AVAILABLE IN CHAPTER 4 OF NFPA WA.
<br />THE MECHANICAL AND ELECTRICAL CONTRACTORS SHALL
<br />PROVIDE FIVE (5) BOUND COPIES OF ALL MECHANICAL AND
<br />ELECTRICAL CONTRACTOR WARRANTIES, MANUFACTURER'S'
<br />WARRANTIES, PARTS LISTS, AND INSTALLATION AND
<br />MAINTENANCE MANUALS FOR ALL MECHANICAL EQUIPMENT, AS
<br />WELL AS INSTRUCTIONS FOR OPERATING AND MAINTAINING ALL
<br />MECHANICAL EQUIPMENT TO THE OWNER UPON FINAL
<br />COMPLETION.
<br />THE MECHANICAL CONTRACTOR'S DISCRETION
<br />W* ELBOW WITH TURNING VANES
<br />45' ELBOW WITH TUNING VANES
<br />R SPIN -IN FITTING
<br />PRIOR TO STARTING THE PROJECT, THE MECHANICAL
<br />CONTRACTOR SHALL STUDY THE COMPLETE SET OF
<br />CONSTRUCTION DOCUMENTS AND COORDINATE WITH THE OTHER
<br />TRADES AS REQUIRED TO PROVIDE SHOP DRAWINGS TO SUBMIT
<br />TO THE MECHANICAL ENGINEER FOR APPROVAL. THE SHOP
<br />THE CAPACITY TO PROPERLY RETURN OIL TO THE
<br />COMPRESSOR(S). THE MECHANICAL CONTRACTOR SHALL
<br />ENSURE THAT THE MANUFACTURER(S) IS/ARE AWARE OF THE
<br />HORIZONTAL DISTANCE AND VERTICAL RISE BETWEEN EACH AIR
<br />HANDLER AND ITS ASSOCIATED CONDENSING UNIT. THE
<br />MECHANICAL CONTRACTOR SHALL PROVIDE A REFRIGERANT
<br />PIPE IS At LEAST TWO (2) FEET ABOVE THE OUTSIDE AIR
<br />INTAKE). THE MECHANICAL CONTRACTOR SHALL PROVIDE
<br />SCREENS ON ALL OUTSIDE AIR INTAKES AND EXHAUST OUTLETS
<br />AT NO LESS THAN 1/4" BY 1/4 AND NO GREATER THAN 1/2" BY 1/2"
<br />. THE MECHANICAL CONTRACTOR SHALL PROVIDE MOTORIZED
<br />DAMPERS IN ALL OUTSIDE AIR DUCTS.
<br />THE MECHANICAL AND ELECTRICAL CONTRACTORS SHALL
<br />PROVIDE EACH AIR HANDLING SYSTEM WITH A MINIMUM OF ONE
<br />(1) MANUALLY -OPERABLE MEANS TO SHUT DOWN ALL SUPPLY,
<br />RETURN, EXHAUST, AND OUTSIDE AIR FANS IN AN EMERGENCY.
<br />MORE INFORMATION IS AVAILABLE IN CHAPTER 4 OF NFPA SOA.
<br />y� SPIN -IN FITTING WITH DAMPER
<br />FLEXIBLE DUCT CONNECTION
<br />DRAWINGS MAY BE SUBMITTED AS HAND -DRAWN NOTES UPON A
<br />COPY OF THE CONSTRUCTION DOCUMENTS IF PERMISSION IS
<br />RISER DIAGRAM SHOWING ALL REFRIGERANT LINE SIZES AND
<br />ACCESSORIES WITH THE EQUIPMENT SUBMITTALS. REFRIGERANT
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE AN
<br />S. CONDENSATE DRAIN LINES
<br />VOLUME DAMPER
<br />OBTAINED FROM THE MECHANICAL ENGINEER THE
<br />LINES SHALL BE FILLED WITH DRY NITROGEN DURING
<br />OPPOSED -BLADE VOLUME DAMPER FOR EVERY RECTANGULAR
<br />CONSTRUCTION DOCUMENTS ARE DIAGRAMMATIC IN NATURE AND
<br />INTENDED SOLELY TO CLARIFY THE SCOPE OF WORK AND
<br />SOLDERING. THE MECHANICAL CONTRACTOR SHALL TEST,
<br />CLEAN, AND DEHYDRATE ALL REFRIGERANT LINES AND
<br />BRANCH AND OUTLET AND AT EVERY RECTANGULAR TAKE -OFF
<br />FOR A DIFFUSER OR GRILLE. (ROUND OR OVAL BRANCHES,
<br />CONDENSATE DRAIN LINES SHALL BE CONSTRUCTED OF
<br />COPPER (TYPE 'L' OR HEAVIER), OR GALVANIZED STEEL
<br />ACCESS PANEL
<br />INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. THE
<br />PROVIDE THE CRITICAL CHARGE(S) OF REFRIGERANT PER THE
<br />OUTLETS, AND TAKE -OFFS FOR DIFFUSERS AND GRILLES SHALL
<br />(MINIMUM SCHEDULE 40). THE MECHANICAL CONTRACTOR
<br />CONSTRUCTION DOCUMENTS ARE NOT INTENDED TO ALERT THE
<br />CONTRACTOR(S) OF ALL OBSTACLES. THE SHOP DRAWINGS
<br />MECHANICAL EQUIPMENT MANUFACTURER'S' RECOMMENDATIONS.
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL
<br />BE PROVIDED WITH STANDARD VOLUME DAMPERS.) NOT ALL
<br />DAMPERS ARE SHOWN ON THE CONSTRUCTION DOCUMENTS.
<br />SHALL PROVIDE A P-TRAP AT EACH AIR HANDLER'S
<br />CONDENSATE DRAIN LINE CONNECTION. EACH CONDENSATE
<br />CD NEW CONDENSATE LINE
<br />SHALL SHOW THE COORDINATION OF DUCTWORK AND
<br />MECHANICAL EQUIPMENT INSTALLATION WITH EXISTING AND NEW
<br />NECESSARY VALVES, TRAPS, SIGHT GLASSES, AND OTHER
<br />ACCESSORIES AS RECOMMENDED BY THE MECHANICAL
<br />HOWEVER, DAMPERS ARE REQUIRED FOR EVERY BRANCH,
<br />OUTLET, AND TAKE -OFF. SOME DAMPERS MAY BE REQUIRED
<br />DRAIN LINE SHALL BE SLOPED DOWN A MINIMUM OF ONE -EIGHTH
<br />(1/8) INCH PER LINEAR FOOT TOWARD THE ASSOCIATED POINT
<br />DIRECTION OF AIR FLOW
<br />OBSTACLES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL
<br />EQUIPMENT MANUFACTURER(S). SERVICE FITTINGS SHALL BE
<br />AFTER TRANSITIONS.
<br />OF DISCHARGE.
<br />CONDUITS, FIRE PROTECTION PIPING, RAIN LEADERS, SANITARY
<br />DRAINS, STRUCTURAL MEMBERS, AND WATER PIPING, AS WELL
<br />ACCESSIBLE. THE MECHANICAL CONTRACTOR SHALL PROVIDE
<br />'PATE" PIPE CURB ASSEMBLIES FOR ALL REFRIGERANT LINES
<br />THE MECHANICAL CONTRACTOR SHALL ATTACH A
<br />THE DIAMETER OF THE CONDENSATE DRAIN LINE SHALL BE
<br />U� DOOR UNDERCUT
<br />AS THE MECHANICAL EQUIPMENT MANUFACTURER'S'
<br />RECOMMENDED CLEARANCES AND THE STRUCTURAL
<br />ENGINEER'S RECOMMENDATIONS REGARDING THE INSTALLATION
<br />PENETRATING ANY ROOF.
<br />EACH OX SPLIT SYSTEMS AIR HANDLER AND CONDENSING UNIT
<br />BRIGHTLY -COLORED STRIP OF PLASTIC TAPE TO EVERY
<br />VOLUME DAMPER EXCEPT THOSE AT THE HEAD OF A DIFFUSER
<br />OR GRILLE. THE STRIP SHALL BE OF SUFFICIENT LENGTH TO
<br />EQUAL TO OR GREATER THAN THE CONDENSATE DRAIN LINE
<br />CONNECTION. TO AVOID EXCESSIVE DIPS IN AND TO PREVENT
<br />ANY SHIFTING OF THE CONDENSATE DRAIN LINES, THE
<br />O REMOTE TEMPERATURE SENSOR
<br />AND ATTACHMENT OF ROOF -MOUNTED AND EXTERIOR
<br />GROUND -MOUNTED EQUIPMENT. THE MECHANICAL CONTRACTOR
<br />SHALL BE BY ONE MANUFACTURER AND SHALL HAVE OR
<br />EXCEED THE CAPACITIES LISTED IN THE EQUIPMENT
<br />HANG A MINIMUM OF 12" BELOW THE BOTTOM OF THE ASSOCIATED
<br />DUCT.
<br />MECHANICAL CONTRACTOR SHALL PROVIDE SUPPORTS AT THE
<br />FOLLOWING INTERVALS: THREE (3) FEET FOR CONDENSATE
<br />SD SMOKE DETECTOR
<br />SHALL ALSO SHOW THE EXISTING CONDITIONS ON THE SHOP
<br />SCHEDULE(S) ON THE CONSTRUCTION DOCUMENTS. EACH
<br />DRAIN LINES CONSTRUCTED OF PVC, SIX (6) FEET FOR
<br />DRAWINGS WHERE THE EXISTING CONDITIONS ARE DIFFERENT
<br />FROM THOSE SHOWN ON THE CONSTRUCTION DOCUMENTS.
<br />ELECTRIC HEATER SHALL HAVE OR EXCEED THE CAPACITIES
<br />AND ELECTRICAL REQUIREMENTS LISTED IN THE EQUIPMENT
<br />THE MECHANICAL CONTRACTOR SHALL CLEARLY AND
<br />PERMANENTLY MARK EACH VOLUME DAMPER'S OPEN AND
<br />CONDENSATE DRAIN LINES CONSTRUCTED OF COPPER AND TEN
<br />(10) FEET FOR CONDENSATE LINES CONSTRUCTED OF STEEL.
<br />O TEMPERATURE SENSOR / THERMOSTAT
<br />SCHEDULE(S) ON THE CONSTRUCTION DOCUMENTS. THE
<br />CLOSED POSITIONS. THE MECHANICAL CONTRACTOR SHALL
<br />CONDENSATE DRAIN LINE SUPPORTS SHALL BE FIXED SOLIDLY
<br />PRIOR TO STARTING THE PROJECT, THE MECHANICAL
<br />CONTRACTOR SHALL STUDY THE COMPLETE SET OF
<br />MANUFACTURER(S) AND THE MECHANICAL CONTRACTOR SHALL
<br />PROVIDE PROTECTION FOR ALL DX MECHANICAL EQUIPMENT
<br />PROVIDE A VOLUME DAMPER WITH A 2" STANDOFF WITH A
<br />LOCKING QUADRANT THAT IS 24 GAUGES OR 2 GAUGES HEAVIER
<br />IN PLACE.
<br />W x D RECTANGULAR DUCT WIDTH x DEPTH (INCHES)
<br />CONSTRUCTION DOCUMENTS AND COORDINATE WITH THE
<br />MANUFACTURER(S) AS REQUIRED TO PROVIDE EQUIPMENT
<br />INCLUDING, BUT NOT LIMITED TO, AN ANTI -SHORT -CYCLE TIMER
<br />FOR EACH COMPRESSOR, HEAD PRESSURE CONTROL, HIGH
<br />PROVIDE AND INSTALL 'RISKIN PRD-18" POSITIVE PRESSURE
<br />THE MECHANICAL CONTRACTOR SHALL ROUTE CONDENSATE
<br />DRAIN LINES TO THE NEW DOWNSPOUT OR GUTTER SYSTEM.
<br />ROUND DUCT DIAMETER (INCHES)
<br />SUBMITTALS TO SUBMIT TO THE MECHANICAL ENGINEER FOR
<br />APPROVAL. THE EQUIPMENT SUBMITTALS SHALL INCLUDE
<br />DIMENSIONS, WEIGHTS, SPECIFIED ACCESSORIES AND REQUIRED
<br />PRESSURE CONTROL (MANUAL RESET), AND LOW PRESSURE
<br />CONTROL (AUTO RESET).
<br />RELIEF DOORS IN SUPPLY DUCTWORK FOR ALL AIR HANDLER
<br />SYSTEMS WITH SMOKE DAMPERS. PROVIDE AND INSTALL "RUSKIN
<br />NRD-18 NEGATIVE PRESSURE RELIEF DOOR IN RETURN
<br />THE MECHANICAL CONTRACTOR SHALL INSULATE EACH
<br />CONDENSATE DRAIN LINE WITH ONE-HALF (1/2) INCH ARMAFLEX
<br />EQ EQUIPMENT TAG
<br />INO
<br />CLEARANCES, AS WELL AS FAN CURVES, SOUND LEVELS,
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL
<br />DUCTWORK FOR ALL AIR HANDLER SYSTEMS THAT HAVE
<br />WHEREVER THAT CONDENSATE DRAIN LINE IS ROUTED WITHIN
<br />CONSTRUCTION DETAILS, WARRANTY INFORMATION, AND ALL
<br />STARTERS, CONTACTORS, RELAYS, CONTROLS, AND
<br />MOTORIZED RETURN AIR DAMPERS OR SMOKE DAMPERS.
<br />THE STRUCTURE OR THE CONDENSATE MAY OTHERWISE CAUSE
<br />OTHER RELEVANT DATA PRESENTED IN THE SAME FORMAT AS
<br />ACCESSORIES NECESSARY TO PROVIDE A COMPLETE AND
<br />DAMAGE.
<br />THE EQUIPMENT SCHEDULES ON THE CONSTRUCTION DOCUMENTS.
<br />EQUIPMENTWITHINWATT N THE SCOPE OF WOW.- E ELECTRICAL OWER AND CONTROL SYSTEM FOR THE (CAL
<br />THE MECHANICAL CONTRACTOR SHALL CLEARLY LABEL ALL
<br />�.1 ' /� t Q
<br />/� Q Q /� CALCULATIONS
<br />15ASIS � LOAD C� LCULA i IONS
<br />THE MECHANICAL ENGINEER'S APPROVAL OF THE SHOP
<br />CONTRACTOR WILL PROVIDE ALL DISCONNECT SWITCHES,
<br />5. DUCT LEAKAGE PERFORMANCE
<br />CONDENSATE DRAIN LINES TO INDICATE CONTENT AND
<br />ROOM NUMBER
<br />AND NAME
<br />NUMBER OF
<br />PEOPLE
<br />MISC. HEAT
<br />LOAD(S)
<br />DESCRIPTION OF
<br />HEAT LOAD(S)
<br />DRAWINGS AND EQUIPMENT SUBMITTALS DOES NOT IN ANY WAY
<br />RELIEVE THE MECHANICAL CONTRACTOR FROM HIS/HER
<br />RESPONSIBILITY TO FURNISH EQUIPMENT AND MATERIALS
<br />CONDUIT, AND WIRING FOR THE MECHANICAL EQUIPMENT WITHIN
<br />THE SCOPE OF WORK ALL ELECTRICAL WORK SHALL COMPLY
<br />WITH THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE.
<br />DUCT CONSTRUCTION AND SEALING SYSTEMS SHALL MEET THE
<br />REQUIREMENTS OF THE 2010 FLORIDA ENERGY CODE AND
<br />DIRECTION OF FLOW.
<br />AND/OR PERFORM WORK AS REQUIRED BY THE CONSTRUCTION
<br />DOCUMENTS. THE MECHANICAL ENGINEER MAY REQUIRE THE
<br />THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />THE PROPER OPERATION OF THE COMPLETE SYSTEM AND
<br />SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS". IF THERE
<br />IS A CONFLICT AMONG THE STANDARDS, THEN THE MORE
<br />S. CONTROLS
<br />102 - WAITING
<br />25
<br />950W
<br />1 VEND, i HI-LO
<br />104 - KIDS WAITING
<br />S
<br />20OW
<br />1 TV
<br />MECHANICAL CONTRACTOR TO REDO ANY WORK THAT DOES
<br />NOT MEET THE DESIGN INTENT OF THE MECHANICAL ENGINEER
<br />SHALL ENSURE THAT WIRING DIAGRAMS ARE PROVIDED TO THE
<br />OWNER NO WIRING OF ANY KIND SHALL BE EXPOSED IN
<br />STRINGENT STANDARD SHALL BE ENFORCED.
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL
<br />CONTROLS AND SUB -CONTRACT TO THE ELECTRICAL
<br />106 - OFFICE
<br />1
<br />350W
<br />I PC + 2 GUESTS
<br />OR THE MECHANICAL ENGINEER MAY REQUIRE A CREDIT TO THE
<br />FINISHED AREAS.
<br />THE MECHANICAL CONTRACTOR SHALL SEAL ALL TRANSVERSE
<br />CONTRACTOR ALL CONTROLS POWER AND TRANSFORMERS NOT
<br />OWNER
<br />THE MECHANICAL CONTRACTOR SHALL ENSURE THAT ALL
<br />JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS
<br />TO A MAXIMUM ALLOWABLE DUCT LEAKAGE CLASS OF THREE
<br />IDENTIFIED IN THE ELECTRICAL PORTION OF THE CONSTRUCTION
<br />DOCUMENTS.
<br />109 - BREAKROOM
<br />12
<br />140OW
<br />i REF, COFFEEMAKER
<br />ALTERNATIVES TO THE SCHEDULED EQUIPMENT AND MATERIALS
<br />MUST BE EQUAL t0 OR EXCEED THOSE SCHEDULED. IF
<br />MECHANICAL EQUIPMENT IS STARTED, TESTED, ADJUSTED, AND
<br />PLACED IN SATISFACTORY OPERATING CONDITION PRIOR TO
<br />(3) CFM PER 100 SQUARE FEET OF DUCT AREA (15%) FOR
<br />ROUND DUCT AND SIX (6) CFM PER 100 SQUARE FEET OF DUCT
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A
<br />113 -OFFICE
<br />1
<br />350W
<br />I PC + 2 GUESTS
<br />SUBSTITUTIONS FOR SCHEDULED EQUIPMENT AND MATERIALS
<br />ARE TO BE MADE, THEN THE MECHANICAL CONTRACTOR SHALL
<br />SUBSTANTIAL COMPLETION. THE MECHANICAL CONTRACTOR
<br />SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, AND
<br />AREA (3%) FOR ALL OTHER DUCT TYPES, UNLESS OTHERWISE
<br />NOTED ON THE CONSTRUCTION DOCUMENTS OR AUTHORIZED BY
<br />PROGRAMMABLE THERMOSTAT FOR EACH NEW AIR
<br />CONDITIONING SYSTEM. THE MECHANICAL CONTRACTOR SHALL
<br />115 - RECEPTION
<br />5
<br />150OW
<br />5 WS, I COPIER
<br />115 - LAB
<br />4
<br />80OW
<br />2 REF
<br />FIRST SUBMIT TO THE MECHANICAL ENGINEER COMPARATIVE
<br />LITERATURE CLEARLY SHOWING THE EQUIVALENT OPERATING
<br />MECHANICAL EQUIPMENT TO BE FREE OF DEFECTS FOR A
<br />PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE
<br />THE MECHANICAL ENGINEER TRANSVERSE JOINTS ARE
<br />CONNECTIONS OF TWO DUCT OR FITTING ELEMENTS ORIENTED
<br />COORDINATE THE INITIAL OCCUPANCY SCHEDULES) AND
<br />PROGRAMMING WITH THE OWNER AND PROVIDE TRAINING AS
<br />CAPABILITIES AND OTHER PROPERTIES OF THE SUBSTITUTIONS.
<br />BY THE OWNER AND SHALL REPAIR ANY DEFECTS OCCURRING
<br />PERPENDICULAR TO THE DIRECTION OF THE AIRFLOW.
<br />REQUIRED.
<br />121 - CHECK-OUT
<br />3
<br />-
<br />ALL DEVIATIONS MST BE CLEARLY IDENTIFIED AND A REQUEST
<br />MUST BE MADE SPECIFIC FOR ALL DEVIATIONS. WHEN
<br />WITHIN THAT TIME WITHOUT COST TO THE OWNER ALL
<br />MECHANICAL EQUIPMENT IN THE SCOPE OF WORK SHALL BE
<br />LONGITUDINAL SEAMS ARE JOINTS ORIENTED IN THE DIRECTION
<br />OF THE AIRFLOW. DUCT WALL PENETRATIONS ARE OPENINGS
<br />EACH THERMOSTAT, HUMIDISTAT, AND TEMPERATURE SENSOR
<br />122 - TRIAGE
<br />3 .
<br />-
<br />-
<br />SUBSTITUTIONS ARE MADE, THE CONTRACTOR ASSUMES FULL
<br />RESPONSIBILITY OF COORDINATING WITH OTHER TRADES ON
<br />COVERED FOR THE DURATION OF THE MANUFACTURER'S'
<br />GUARANTEE(S) OR WARRANTY(IES) AND THE CONTRACTOR
<br />MADE BY SCREWS, NON -SELF-SEALING FASTENERS, PIPES,
<br />TUBING, RODS, AND WIRE. ROUND AND FLAT -OVAL SPIRAL
<br />SHALL BE INSTALLED AT 4'-6" ABOVE THE FINISHED FLOOR
<br />UNLESS OTHERWISE NOTED ON THE CONSTRUCTION DOCUMENTS.
<br />124 - TREATMENT
<br />2
<br />20OW
<br />MISC.
<br />125 - TREATMENT
<br />2
<br />20OW
<br />MISC.
<br />ANY CHANGES REQUIRED FOR THE SUBSTITUTION, INCLUDING
<br />COSTS, ASSOCIATED WITH DUCTWORK, PIPING, ELECTRICAL AND
<br />SHALL PROVIDE THE OWNER WITH ORIGINALS OF ALL
<br />MANUFACTURER'S' GUARANTEES AND WARRANTIES. ALL
<br />LOCK SEAMS NEED NOT BE SEALED PRIOR TO ASSEMBLY BUT
<br />SHALL BE COATED AFTER ASSEMBLY TO REDUCE LEAKAGE.
<br />THE MECHANICAL CONTRACTOR SHALL COORDINATE THE
<br />EXACT LOCATION OF EACH THERMOSTAT, HUMIDISTAT, AND
<br />126 - TREATMENT
<br />2
<br />20OW
<br />MISC.
<br />STRUCTURAL TO IMPLEMENT THE SUBSTITUTED ITEM(S).
<br />THE MECHANICAL CONTRACTOR SHALL VERIFY THE LOCATIONS
<br />COMPRESSORS SHALL BE PROVIDED WITH A MINIMUM FIVE (5)
<br />YEAR WARRANTY.
<br />ALL OTHER CONNECTIONS ARE CONSIDERED TRANSVERSE
<br />JOINTS INCLUDING, BUT NOT LIMITED TO, SPIN -INS, TAPS OR
<br />OTHER BRANCH CONNECTIONS, ACCESS DOOR FRAMES, AND
<br />TEMPERATURE SENSOR WITH THE ARCHITECT AND OWNER AND
<br />SUBMIT THE PROPOSED LOCATION TO THE MECHANICAL
<br />ENGINEER FOR APPROVAL. THE MECHANICAL CONTRACTOR
<br />121 - TREATMENT
<br />2
<br />20OW
<br />MISC.
<br />OF THE DIFFUSERS AND GRILLES AND SUBMIT A
<br />REQUEST -FOR -INFORMATION IF THERE IS A CONFLICT BETWEEN
<br />THE MECHANICAL CONTRACTOR SHALL COORDINATE ALL
<br />MECHANICAL EQUIPMENT VOLTAGE REQUIREMENTS WITH THE
<br />DUCT CONNECTIONS TO EQUIPMENT. MORE INFORMATION IS
<br />AVAILABLE IN CHAPTER 35 OF ASHRAE'S 'FUNDAMENTALS
<br />SHALL PROVIDE COORDINATION OF ALL THERMOSTAT,
<br />HUMIDISTAT, AND TEMPERATURE SENSOR FINISHES WITH ROOM
<br />129 -SAMPLE ROOM
<br />0
<br />400W
<br />1 REF
<br />THE ARCHITECTURAL AND MECHANICAL PORTIONS OF THE
<br />CONSTRUCTION DOCUMENTS. THE MECHANICAL CONTRACTOR
<br />VOLTAGE AVAILABLE AT THE PROJECT SITE PRIOR TO
<br />ORDERING ANY MECHANICAL EQUIPMENT.
<br />HANDBOOK':
<br />FINISHES AT NO ADDITIONAL COST TO THE OWNER
<br />132 - TREATMENT
<br />2
<br />20OW
<br />MISC.
<br />133 - RECOVERY
<br />8 _
<br />10OW
<br />I REF, MISC.
<br />SHALL ALSO VERIFY THE TYPES OF CEILINGS IN THE SCOPE OF
<br />WORK PRIOR TO ORDERING DIFFUSERS AND GRILLES. FOR
<br />ALL DUCTWORK SHALL BE INSPECTED BY THE MECHANICAL
<br />ENGINEER PRIOR TO BEING COVERED OR INSULATED. THE
<br />ALL 120-VOLT RESTROOM EXHAUST FANS WITH ELECTRICAL
<br />REQUIREMENTS OF UP TO 800 WATTS SHALL BE CONTROLLED
<br />134 - TREATMENT
<br />2
<br />20OW
<br />MISC.
<br />DIFFUSERS AND GRILLES LOCATED IN PLASTER OR GYPSUM
<br />4. DUCTWORK CONSTRUCTION
<br />OWNER AND MECHANICAL ENGINEER SHALL BE PRESENT
<br />BY AN OCCUPANCY SENSOR WITH A TIME DELAY. THE. INITIAL
<br />CEILINGS, THE MECHANICAL CONTRACTOR SHALL PROVIDE
<br />TITUS MODEL TRM PLASTER FRAMES. THE FRAMES MAY BE
<br />THE SHEET METAL AND AIR CONDITIONING CONTRACTORS'
<br />DURING ALL DUCT LEAKAGE TESTING AND THE DUCTWORK
<br />SHALL BE TESTED AS INSTRUCTED BY THE MECHANICAL
<br />TIME DELAY SHALL BE SET AT TWENTY (20) MINUTES.
<br />136 - DICTATION
<br />1
<br />20OW
<br />MISC.
<br />ALUMINUM IN NON -FIRE -RATED CEILINGS BUT MUST BE STEEL IN
<br />FIRE -RATED CEILINGS. THE MECHANICAL CONTRACTOR SHALL
<br />NATIONAL ASSOCIATION'S "HVAC DUCT CONSTRUCTION
<br />STANDARDS" SHALL BE CONSIDERED PART OF THE
<br />ENGINEER AND RETESTED IF REQUIRED BY THE MECHANICAL
<br />ENGINEER IF ANY DISCREPANCIES ARE IDENTIFIED, THE
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A
<br />HONEYWELL AT145-1214 TRANSPOIRMER, BELIMO LF24-SR-E-US
<br />135 - CONTROL ROOM
<br />1
<br />50OW
<br />MISC.
<br />13S - XRAY
<br />4
<br />500W
<br />MISC.
<br />COORDINATE THE FINISH OF ALL DIFFUSERS AND GRILLES,
<br />EXPOSED DUCTWORK, GRAVITY VENTILATORS, LOUVERS, AND
<br />SPECIFICATIONS FOR THIS PROJECT. ANY WORK THAT DOES
<br />NOT COMPLY WITH THESE STANDARDS MAY BE REJECTED AT
<br />DUCTWORK SHALL BE UNCOVERED AND REPAIRS SHALL BE
<br />MADE AT THE MECHANICAL CONTRACTOR'S EXPENSE. THE
<br />ACTUATOR FOR AN OUTSIDE AIR DAMPER WITH;A MINIMUM
<br />POSITIONER AND CONNECT TO OUTSIDE AIR DAMPER AND A
<br />NOTE: ROOM NUMBERS OMITTED FROM THIS LIST INCLUDE STAIRWELLS
<br />AND SMALL SPACES INCORPORATED INTO LARGER SPACES
<br />FOR SIMPLICITY. THE MECHANICAL CONTRACTOR SHALL
<br />WALL CAPS WITH THE ARCHITECT. ALL VISIBLE EXTERIOR
<br />COMPONENTS (SUCH AS EXPOSED DUCTWORK AND LOUVERS)
<br />SHALL BE PROVIDED WITH A PAINT -GRIP FINISH.
<br />ANY TIME DURING THE PROJECT.
<br />ALL EXHAUST AND OUTSIDE AIR DUCTWORK SHALL BE SHEET
<br />METAL,
<br />MECHANICAL CONTRACTOR SHALL GIVE THE MECHANICAL
<br />ENGINEER TWO (2) WEEKS NOTICE BEFORE TESTING THE
<br />DUCTWORK IF THE DUCTWORK FAILS THE DUCT LEAKAGE TEST,
<br />THEN THE MECHANICAL CONTRACTOR SHALL COMPENSATE THE
<br />HONEYWELL C1232A/5 SPACE CO2 SENSOR WITH DISPLAY.
<br />10. TESTING AND BALANCING THE HEATING, VENTILATION, AND
<br />AIR CONDITIONING SYSTEM
<br />ANY CHANGE ORDER SUBMITTED BY THE GENERAL,
<br />MECHANICAL ENGINEER FOR AN ADDITIONAL SITE VISIT.
<br />COORDINATE THE LOCATIONS OF ALL THERMOSTATS,
<br />MECHANICAL, OR ELECTRICAL CONTRACTORS FOR WORK WITHIN
<br />ALL DUCT DIMENSIONS SHOWN ON THE CONSTRUCTION
<br />THE /MECHANICAL CONTRACTOR SHALL PROVIDE THE
<br />TEMPERATURE SENSORS, HUMIDISTATS, AND OTHER CONTROLS
<br />THE SCOPE OF THIS PROJECT SHALL NOT EXCEED THE VALUES
<br />DOCUMENTS ARE INSIDE CLEAR DIMENSIONS. THE MECHANICAL
<br />SERVICES OF AN INDEPENDENT TEST AND BALANCE AGENCY TO
<br />WITH THE ARCHITECT AND OWNER AND SUBMIT THOSE
<br />LISTED IN THE MOST CURRENT VERSIONS OF THE MEANS COST
<br />DATA BOOKS FOR THE APPLICABLE TRADES. EVERY CHANGE
<br />CONTRACTOR SHALL PROVIDE FLEXIBLE CONNECTIONS
<br />BETWEEN EACH ITEM OF MECHANICAL EQUIPMENT AND ITS
<br />6. ACCESS PANELS, FIRE DAMPERS, AND FIRE/SMOKE
<br />DAMPERS
<br />TEST, BALANCE, AND CERTIFY THE PERFORMANCE OF THE
<br />COMPLETE HEATING, VENTILATION, AND AIR CONDITIONING
<br />LOCATIONS TO THE MECHANICAL ENGINEER FOR REVIEW.
<br />ORDER SHALL BE ACCOMPANIED BY A DETAILED COST
<br />ASSOCIATED DUCT(S). ALL ITEMS OF THE HEATING, VENTILATION,
<br />SYSTEM, t0 INCLUDE SUPPLY, RETURN, OUTSIDE / MAKE-UP, AND
<br />BREAKDOWN FOR EACH TASK, INCLUDING EQUIPMENT,
<br />AND AIR CONDITIONING SYSTEM INCLUDING, BUT NOT LIMITED TO,
<br />THE GENERAL AND MECHANICAL CONTRACTORS SHALL
<br />EXHAUST AIR SYSTEMS. THE TEST AND BALANCE CONTRACTOR
<br />MATERIALS, AND LABOR THE MECHANICAL ENGINEER MAY, At
<br />AIR HANDLERS, FANS, DUCTWORK, DIFFUSERS, AND GRILLES
<br />PROVIDE ACCESS PANELS TO ALLOW ACCESS TO VOLUME
<br />SHALL PERFORM ALL TESTING, ADJUSTING, BALANCING, AND
<br />HIS DISCRETION, REQUIRE THE CONTRACTOR(S) t0 PROVIDE A
<br />SHALL NOT BE SUPPORTED BY THE CEILING OR CEILING
<br />DAMPERS ABOVE PLASTER OR GYPSUM CEILINGS, TURNING
<br />DATA RECORDING NECESSARY TO ESTABLISH THE CAPACITY
<br />FINAL, VERIFIABLE ACCOUNTING OF EQUIPMENT, MATERIALS, AND
<br />SUSPENSION SYSTEM, BUT INSTEAD SHALL BE SUPPORTED BY
<br />VANES, FIRE DAMPERS, FIRE/SMOKE DAMPERS, DUCT -MOUNTED
<br />AND QUALITY OF THE SYSTEMS AND CONFIRM THE
<br />LABOR AFTER THE WORK IS COMPLETE AND PRIOR TO THE
<br />THE BUILDING STRUCTURE.
<br />SMOKE DETECTORS, AND WHERE REQUIRED FOR THE
<br />SATISFACTORY COMPLETION OF ALL ASPECTS OF THE SCOPE
<br />MECHANICAL ENGINEER'S APPROVAL OF THE CONTRACTOR'S'
<br />MAINTENANCE OF ALL MECHANICAL EQUIPMENT. ACCESS
<br />OF WORK THIS WILL INCLUDE NOT ONLY THE NEW SYSTEMS, BUT
<br />FINAL PAY APPLICATION(S).
<br />ALL FORTY-FIVE (45) AND NINETY (SO) DEGREE ELBOWS SHALL
<br />PANELS SHALL HAVE A FIRE RATING EQUAL TO THE
<br />ALSO ALL OF THE EXISTING SYSTEMS THAT HAVE BEEN
<br />HAVE A ONE AND ONE-HALF (15) CENTERLINE RADIUS -TO -WIDTH
<br />PENETRATED ASSEMBLY, WITH A MINIMUM FIRE RATING OF ONE
<br />MODIFIED.
<br />3. MECHANICAL EQUIPMENT INSTALLATION
<br />OR RADIUS -TO -DEPTH RATIO OR SHALL BE CONSTRUCTED WITH
<br />(1) HOUR
<br />SINGLE BLADE TURNING VANES. ANGULAR TAPERS SHALL BE
<br />THE TEST AND BALANCE CONTRACTOR SHALL BE AN
<br />ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED AS
<br />LIMITED TO THIRTY (30) DEGREES FOR CONTRACTING TAPERS
<br />THE MECHANICAL CONTRACTOR SHALL ATTACH A
<br />APPROVED MEMBER OF THE AABC OR NE55 AND SHALL
<br />REQUIRED BY THE MANUFACTURER'S' INSTALLATION AND
<br />AND TWENTY (20) DEGREES FOR EXPANDING TAPERS.
<br />BRIGHTLY -COLORED STRIP OF PLASTIC TAPE TO EVERY
<br />SPECIALIZE IN THE TESTING AND BALANCING OF HEATING,
<br />MAINTENANCE MANUALS. THOSE MANUALS WILL TYPICALLY
<br />DUCT -MOUNTED ACCESS PANEL. THE STRIP SHALL BE OF
<br />VENTILATION, AND AIR CONDITIONING SYSTEMS. THE FOLLOWING
<br />PROVIDE MORE DETAIL THAN THE CONSTRUCTION DOCUMENTS.
<br />THE MAXIMUM LENGTH OF NEW FLEXIBLE SUPPLY DUCT SHALL
<br />SUFFICIENT LENGTH TO HANG A MINIMUM OF 12" BELOW THE
<br />TEST AND BALANCE CONTRACTORS ARE PRE -APPROVED: THE
<br />IF THERE 15 A CONFLICT BETWEEN THE INSTALLATION AND
<br />BE 8'-0"1FLEXIBLE RETURN DUCT SHALL NOT BE USED.
<br />BOTTOM OF THE ASSOCIATED DUCT.
<br />PHOENIX AGENCY, TEST AND BALANCE CORPORATION, AND
<br />MAINTENANCE MANUALS AND THE CONSTRUCTION DOCUMENTS,
<br />FLEXIBLE DUCT SHALL BE INSTALLED AND SUPPORTED SO AS
<br />SPEC TECH CONSULTANTS. THE MECHANICAL CONTRACTOR
<br />THEN THE MECHANICAL CONTRACTOR SHALL SUBMIT A
<br />TO PREVENT THE USE OF EXCESS DUCT MATERIAL, PREVENT
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A FIRE
<br />SHALL SUBMIT ANY NON -PRE -APPROVED TEST AND BALANCE
<br />REQUEST -FOR -INFORMATION TO THE MECHANICAL ENGINEER
<br />DISLOCATION OR DAMAGE, AND PREVENT CONSTRICTION OF
<br />DAMPER AT EVERY DUCT PENETRATION OF A FIRE -RATED
<br />CONTRACTOR TO THE MECHANICAL ENGINEER FOR APPROVAL
<br />THE DUCT BELOW THE RATED DUCT DIAMETER FLEXIBLE DUCT
<br />ASSEMBLY AND A FIRE/SMOKE DAMPER WITH A MINIMUM
<br />PRIOR TO SUBMITTING A BID.
<br />ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED SUCH THAT
<br />BENDS SHALL MAINTAIN A CENTERLINE RADIUS OF NOT LESS
<br />FIRE/SMOKE RATING OF TWO (2) HOURS At EVERY DUCT
<br />Oi
<br />MECHANICAL ANICAL SPECIFICATIONS t LEGEND
<br />SCALE: NT5
<br />REVISIONS
<br />BY
<br />f,
<br />�00
<br />00
<br />Cn
<br />o�� o
<br />Y
<br />,�Sti
<br />YElX Y
<br />LZ. G.. u
<br />•
<br />.� O
<br />C U • C'Q
<br />Lo
<br />Q E ` >
<br />� 3
<br />a� ti
<br />3
<br />N
<br />0
<br />N
<br />Cn
<br />�e
<br />i;
<br />Z w
<br />o
<br />%D 8
<br />% •
<br />e Lilt
<br />�
<br />mw
<br />m�
<br />o a a
<br />6 U) U) o
<br />o
<br />�€
<br />om ya
<br />Z
<br />C
<br />ova
<br />� � U
<br />c a
<br />C �a
<br />or
<br />W 1_
<br />( �M8
<br />U
<br />y
<br />�t
<br />d W
<br />cn
<br />_0 U oZ
<br />CD
<br />@ Nd
<br />�N
<br />C
<br />Q mE
<br />mW
<br />W�L? d
<br />=o
<br />N '@ a E
<br />2 ° am
<br />�U
<br />� U
<br />Z
<br />LLJ
<br />v •J 1—
<br />°- Z
<br />W
<br />U �•L
<br />= Q N O
<br />a UW
<br />�LL.
<br />.-o�Q�rn
<br />L
<br />W v •-
<br />o�U�
<br />� -C
<br />F— cv a
<br />a OWN
<br />O
<br />�0
<br />':3 J
<br />m LL_
<br />Date: 06. 12. 12
<br />Scale: AS NOTED
<br />Project Mgr: AAY
<br />Drawn:
<br />Job: 10-61
<br />Sheet
<br />m 1
<br />
|