MECHANICAL SPECIFICATIONS <br />MEC44ANICAL STET INDEX <br />MI MECHANICAL LEGEND 4 SPECIFICATIONS <br />M2 MECHANICAL RENOVATION PLAN <br />MECHANICAL SPECIFICATIONS <br />I. GENERAL RESPONSIBILITIES OF THE CONTRACTOR <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE THE LABOR, <br />MATERIALS, AND EQUIPMENT REQUIRED FOR THE HEATING, <br />VENTILATION, AND AIR CONDITIONING SYSTEM(S) AS DESCRIBED <br />IN THE COMPLETE SET OF CONSTRUCTION DOCUMENTS. ALL <br />WORK SHALL CONFORM TO THE REQUIREMENTS OF THE 2010 <br />FLORIDA BUILDING CODE AND 2010 FLORIDA ENERGY CODE <br />(INCLUDING THE 2010 SUPPLEMENTS), 2011 NATIONAL ELECTRIC <br />FIRE CODES, AND ALL OTHER STATE <br />ACODE, NFPA ND LOCAL CODES. <br />SUFFICIENT CLEARANCES ARE PROVIDED FOR MAINTENANCE. <br />ALL MECHANICAL EQUIPMENT AT A HEIGHT GREATER THAN <br />SIXTEEN (16) FEET SHALL HAVE A PERMANENT MEANS OF <br />ACCESS. ALL COMPRESSORS SHALL HAVE A MINIMUM OF <br />THIRTY (30) INCHES OF CLEAR SPACE ON THE SERVICE SIDE(S). <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE VIBRATION <br />ISOLATION AS RECOMMENDED BY THE MANUFACTURER(S) <br />AND/OR REQUIRED BY THE MECHANICAL ENGINEER TO ENSURE <br />QUIET OPERATION OF THE MECHANICAL EQUIPMENT. NO UNDUE <br />VIBRATION OR SOUND SHALL BE TRANSMITTED TO THE <br />STRUCTURE OR ANY OCCUPIED SPACES WITHIN THE STRUCTURE.APPROVED <br />THAN ONE AND ONE-HALF (15) DUCT DIAMETERS. SAGS SHALL <br />NOT EXCEED ONE-HALF (05) INCH PER LINEAR FOOT OF <br />FLEXIBLE DUCT. HANGERS, SADDLES, AND OTHER SUPPORTS <br />SHALL HAVE A MINIMUM WIDTH OF ONE AND ONE-HALF (15) <br />INCHES. THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />SUPPORT FOR NEW AND EXISTING FLEXIBLE DUCTWORK IN THE <br />SCOPE OF WORK WITH A MAXIMUM SPACING OF 5'-0", UNLESS <br />OTHERWISE NOTED ON THE CONSTRUCTION DOCUMENTS OR <br />AUTHORIZED BY THE MECHANICAL ENGINEER FOR ACHA <br />RELATED PROJECTS SUCH AS HOSPITALS, ASC'S AND NURSING <br />HOMES, THE FLEX DUCT SHALL BE THERMAFIN, METALFLEX OR <br />APROVED EQUAL PER FBCB 41S3.11%o. <br />PENETRATION OF A SMOKE ASSEMBLY OR CHASE. EACH <br />FIRE/SMOKE DAMPER SHALL CLOSE AND THE ASSOCIATED AIR <br />HANDLER SHALL SHUT DOWN IF EITHER OF THE AIR HANDLER'S <br />OR THE SPACE'S SMOKE DETECTORS ARE ACTIVATED. <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE ADDITIONAL <br />DUCTWORK AND PIPING SUPPORTS WITHIN EIGHTEEN (18) INCHES <br />OF BOTH SIDES OF ALL FIRE -RATED ASSEMBLIES. DUCTWORK <br />AND PIPING SHALL NOT BE SUPPORTED BY FIRE -RATED WALLS, <br />BUT INSTEAD SHALL BE SUPPORTED BY THE BUILDING <br />STRUCTURE. <br />1. SMOKE DETECTORS <br />THE TEST AND BALANCE CONTRACTOR SHALL ENSURE THAT THE <br />BUILDING IS UNDER POSITIVE PRESSURE AT THE CONCLUSION OF <br />THE TEST AND BALANCE PROCESS. IF THE BUILDING IS NOT <br />UNDER POSITIVE PRESSURE AT THE CONCLUSION OF THE TEST <br />AND BALANCE PROCESS, THEN THE TEST AND BALANCE AND <br />MECHANICAL CONTRACTORS SHALL IMMEDIATELY AND WITHOUT <br />DELAY NOTIFY THE ARCHITECT AND MECHANICAL ENGINEER <br />THE TEST AND BALANCE CONTRACTOR SHALL, UPON <br />COMPLETION OF ALL NECESSARY TESTING AND BALANCING AND <br />At LEAST ONE (1) WEEK PRIOR TO SUBSTANTIAL COMPLETION, <br />SUBMITTHREE (3) BOUNDREPORT t0 THE MECHANICAL ENGIOPIES NEER, F THE TEST AND BALANCE <br />M3 MECHANICAL ROOF PLAN <br />M4 MECHANICAL SCHEDULES <br />M5 MECHANICAL DETAILS <br />M6 MECHANICAL DETAILS (CONT.) <br />/� <br />C,1�lIC,4l.. LEGEND <br />50 NEW CEILING DIFFUSER/GRILLE CLAY -IN) <br />THE <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE 2" FILTER <br />THE OWNER SHALL NOT BE RESPONSIBLE FOR ANY PORTION OF <br />THE SCOPE OF WORK UNLESS SPECIFICALLY NOTED IN THE <br />CONSTRUCTION DOCUMENTS. <br />THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE <br />INSTALLATION SCHEDULES OF ALL TRADES. FIXED WORK SUCH <br />AS DUCTWORK AND SANITARY AND STORM PIPING SHALL BE <br />RACKS FOR THE MECHANICAL EQUIPMENT AS REQUIRED. THE <br />FILTER RACKS SHALL BE INSTALLED SUCH THAT SUFFICIENT <br />CLEARANCES ARE PROVIDED FOR MAINTENANCE AND SHALL <br />BE SEALED AIRTIGHT. THE FILTERS SHALL BE REMOVABLE <br />FROM EITHER (OR BOTH) SIDE (6) OF THE FILTER SECTION(S). <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A TOTAL OF <br />THREE (3) COMPLETE SETS OF FILTERS FOR ALL MECHANICAL <br />SURFACES UPON WHICH CLOSURE OR SEALING PRODUCTS ARE <br />TO BE APPLIED SHALL BE CLEAN AND DRY IN ACCORDANCE <br />WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. ALL <br />DUCTWORK SHALL BE SEALED WITH A NON -HARDENING, <br />NON -MIGRATING MASTIC OR LIQUID ELASTIC SEALANT AS <br />REQUIRED TO MEET THE 2010 FLORIDA ENERGY CODE. THE <br />MECHANICAL CONTRACTOR SHALL PROVIDE HOT -DIPPED <br />INDIVIDUAL AIR HANDLING SYSTEMS WITH A DESIGN CAPACITY <br />OF MORE THAN 2000 CFM SHALL AUTOMATICALLY SHUT DOWN <br />BY MEANS OF AN APPROVED SMOKE DETECTOR PLACED IN <br />THE SUPPLY AIRFLOW AFTER ANY AIR FILTERS AND BEFORE <br />ANY BRANCH CONNECTIONS IN THE SUPPLY DUCTWORK <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE SYSTEM <br />11, SUBSTANTIAL AND FINAL COMPLETION <br />THE MECHANICAL CONTRACTOR SHALL MAINTAIN A SET OF <br />CONTINUOUSLY UPDATED, REPRODUCIBLE AS -BUILT DRAWINGS <br />DURING CONSTRUCTION AND PROVIDE A COMPLETE SET OF <br />THOSE DRAWINGS IN BOTH ELECTRONIC AND HAROCOPY <br />FORMATS TO THE OWNER UPON FINAL COMPLETION <br />® SUPPLY DIFFUSER BLANKING <br />NEW HIGH PRESSURE DUCTWORK <br />SUPPLY DUCTWORK TRANSITION UP OR DOWN <br />INSTALLED PRIOR TO ANY TRADE WORK THAT CAN BE EASILY <br />RELOCATED OR OFFSET SUCH AS ELECTRICAL CONDUIT AND <br />FIRE PROTECTION AND WATER PIPING. ALL ELECTRICAL <br />CONDUIT AND WATER PIPING SHALL BE INSTALLED AS CLOSE <br />TO WALLS AND AS CLOSE TOGETHER AS POSSIBLE TO ALLOW <br />FOR MAXIMUM DUCT ACCESSIBILITY. <br />ALL CONTRACTORS SHALL COORDINATE THE SCOPE OF THEIR <br />WORK AND THEIR CONSTRUCTION SCHEDULES WITH THE OWNER <br />EQUIPMENT IN THE SIZE AND ARRANGEMENT RECOMMENDED BY <br />THE MANUFACTURER THE 2" FILTERS SHALL PROVIDE ASHRAE <br />52.2 FILTRATION EFFICIENCY AS SHOWN ON THE CONSTRUCTION <br />DOCUMENTS OR MINIMUM MERV 6 FILTRATION EFFICIENCY IF NO <br />HIGHER VALUE IS SPECIFIED. <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A ASHRAE <br />62.1-2010 SECTION 5.11 COMPLIANT DRAIN PAN. THE <br />MECHANICAL CONTRACTOR SHALL PROVIDE A SECONDARY <br />GALVANIZED STEEL FASTENERS, ANCHORS, RODS, STRAPS, TRIM, <br />AND ANGLES FOR INTERIOR DUCTWORK SUPPORTS. INTERIOR <br />DUCTWORK SUPPORT SPACING SHALL NOT EXCEED 5'-0". <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE INSULATION <br />WITH A MINIMUM R-VALUE OF SIX (6) ON ALL DUCTWORK <br />CONCEALED DUCTWORK MAY BE INSULATED WITH FLEXIBLE <br />FIBERGLASS INSULATION, BUT ALL EXPOSED DUCTWORK <br />(INCLUDING DUCTWORK LOCATED IN MECHANICAL ROOMS) MUST <br />SENSOR MODEL DH100ACDCP 4-WIRE PHOTOELECTRIC SMOKE <br />DETECTORS AS REQUIRED WITH MODEL SSK 451 <br />MULTI -SIGNALING ACCESSORIES LOCATED IN HIGHLY VISIBLE <br />AREAS. IF ANY ONE SMOKE DETECTOR IS ACTIVATED, THEN ALL <br />OF THE ASSOCIATED AIR HANDLING SYSTEMS (UP TO TEN) <br />SHALL SHUT DOWN. THE MECHANICAL CONTRACTOR SHALL <br />PROVIDE A COMPLETE SYSTEM OF THIS TYPE FOR EACH <br />INCREMENT OF TEN (10) AIR HANDLING SYSTEMS. THE <br />MECHANICAL CONTRACTOR SHALL PROVIDE SAMPLING TUBES <br />THE MECHANICAL CONTRACTOR SHALL CLEAN ALL COOLING <br />AND HEATING COILS, CONDENSATE PANS, AND CONDENSATE <br />DRAIN LINES PRIOR TO SUBSTANTIAL COMPLETION. THE <br />MECHANICAL CONTRACTOR SHALL ALSO REPLACE ALL FILTERS <br />AND BELTS PRIOR TO SUBSTANTIAL COMPLETION AND PROVIDE <br />TWO (3) COMPLETE REPLACEMENT SETS OF FILTERS AND (2) <br />SETS OF BELTS FOR ALL MECHANICAL EQUIPMENT TO THE <br />OWNER UPON FINAL COMPLETION. <br />�j-�� <br />1 A RETURN DUCTWORK TRANSITION UP OR DOWN <br />LA W EXHAUST DUCTWORK TRANSITION UP OR DOWN <br />DUCTWORK CROSSOVER OR CROSSUNDER AT <br />TO PREVENT ANY INTERRUPTIONS UNACCEPTABLE TO THE <br />OWNER THIS MAY REQUIRE WORK AFTER NORMAL OPERATING <br />HOURS AND/OR ON WEEKENDS. <br />2. BIDS, SHOP DRAWINGS, EQUIPMENT SUBMITTALS, AND <br />CHANGE ORDERS <br />EACH PROSPECTIVE CONTRACTOR SHALL EVALUATE THE <br />SCOPE OF WORK THOROUGHLY PRIOR TO SUBMITTING A BID. <br />DRAIN PAN AND A FLOAT SWITCH UNDER EACH AIR HANDLER <br />THE FLOAT SWITCH SHALL SHUT ITS ASSOCIATED AIR HANDLER <br />DOWN IF OVERFLOW IS DETECTED. <br />ALL REFRIGERANT LINES AND ACCESSORIES SHALL BE SIZED <br />AND INSTALLED PER THE EQUIPMENT MANUFACTURER'S' <br />RECOMMENDATIONS. THE MECHANICAL CONTRACTOR AND <br />MANUFACTURER(S) SHALL STUDY THE COMPLETE SET OF <br />CONSTRUCTION DOCUMENTS AND EXISTING AND PROPOSED <br />CONDITIONS TO ENSURE THAT THE MECHANICAL EQUIPMENT HAS <br />BE INSULATED WITH FIBROUS DUCTBOARD. ALL DUCTWORK <br />INSULATION, FITTINGS, COVERS, AND FINISHES SHALL HAVE A <br />MAXIMUM FLAME SPREAD RATING OF 25, A MAXIMUM SMOKE <br />DEVELOPMENT RATING OF 50, AND SHALL BE IN COMPLIANCE <br />WITH NFPA SOA. PROVIDE MINIMUM OF 1/2" FIBERGLASS WITH <br />FOIL/SCRIM VAPOR BARRIER ON THE BACK PAN OF ALL NEW <br />AIR DEVICES. <br />ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM OF 10-0" <br />FROM ANY EXHAUST OUTLET OR VENT PIPE (UNLESS THE VENT <br />AS REQUIRED, <br />THE CONTRACTOR -PROVIDED INSTRUCTIONS TO THE OWNER FOR <br />OPERATING AND MAINTAINING ALL MECHANICAL EQUIPMENT <br />SHALL INCLUDE TESTING ALL AUTOMATIC SHUTDOWN DEVICES AT <br />LEAST ONCE PER YEAR SPECIAL INSTRUCTIONS SHALL BE <br />GIVEN WITH REGARD TO ENSURING THAT SMOKE SENSING <br />DEVICES ARE PROPERLY CLEANED AND CALIBRATED IN <br />ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS. MORE <br />INFORMATION IS AVAILABLE IN CHAPTER 4 OF NFPA WA. <br />THE MECHANICAL AND ELECTRICAL CONTRACTORS SHALL <br />PROVIDE FIVE (5) BOUND COPIES OF ALL MECHANICAL AND <br />ELECTRICAL CONTRACTOR WARRANTIES, MANUFACTURER'S' <br />WARRANTIES, PARTS LISTS, AND INSTALLATION AND <br />MAINTENANCE MANUALS FOR ALL MECHANICAL EQUIPMENT, AS <br />WELL AS INSTRUCTIONS FOR OPERATING AND MAINTAINING ALL <br />MECHANICAL EQUIPMENT TO THE OWNER UPON FINAL <br />COMPLETION. <br />THE MECHANICAL CONTRACTOR'S DISCRETION <br />W* ELBOW WITH TURNING VANES <br />45' ELBOW WITH TUNING VANES <br />R SPIN -IN FITTING <br />PRIOR TO STARTING THE PROJECT, THE MECHANICAL <br />CONTRACTOR SHALL STUDY THE COMPLETE SET OF <br />CONSTRUCTION DOCUMENTS AND COORDINATE WITH THE OTHER <br />TRADES AS REQUIRED TO PROVIDE SHOP DRAWINGS TO SUBMIT <br />TO THE MECHANICAL ENGINEER FOR APPROVAL. THE SHOP <br />THE CAPACITY TO PROPERLY RETURN OIL TO THE <br />COMPRESSOR(S). THE MECHANICAL CONTRACTOR SHALL <br />ENSURE THAT THE MANUFACTURER(S) IS/ARE AWARE OF THE <br />HORIZONTAL DISTANCE AND VERTICAL RISE BETWEEN EACH AIR <br />HANDLER AND ITS ASSOCIATED CONDENSING UNIT. THE <br />MECHANICAL CONTRACTOR SHALL PROVIDE A REFRIGERANT <br />PIPE IS At LEAST TWO (2) FEET ABOVE THE OUTSIDE AIR <br />INTAKE). THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />SCREENS ON ALL OUTSIDE AIR INTAKES AND EXHAUST OUTLETS <br />AT NO LESS THAN 1/4" BY 1/4 AND NO GREATER THAN 1/2" BY 1/2" <br />. THE MECHANICAL CONTRACTOR SHALL PROVIDE MOTORIZED <br />DAMPERS IN ALL OUTSIDE AIR DUCTS. <br />THE MECHANICAL AND ELECTRICAL CONTRACTORS SHALL <br />PROVIDE EACH AIR HANDLING SYSTEM WITH A MINIMUM OF ONE <br />(1) MANUALLY -OPERABLE MEANS TO SHUT DOWN ALL SUPPLY, <br />RETURN, EXHAUST, AND OUTSIDE AIR FANS IN AN EMERGENCY. <br />MORE INFORMATION IS AVAILABLE IN CHAPTER 4 OF NFPA SOA. <br />y� SPIN -IN FITTING WITH DAMPER <br />FLEXIBLE DUCT CONNECTION <br />DRAWINGS MAY BE SUBMITTED AS HAND -DRAWN NOTES UPON A <br />COPY OF THE CONSTRUCTION DOCUMENTS IF PERMISSION IS <br />RISER DIAGRAM SHOWING ALL REFRIGERANT LINE SIZES AND <br />ACCESSORIES WITH THE EQUIPMENT SUBMITTALS. REFRIGERANT <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE AN <br />S. CONDENSATE DRAIN LINES <br />VOLUME DAMPER <br />OBTAINED FROM THE MECHANICAL ENGINEER THE <br />LINES SHALL BE FILLED WITH DRY NITROGEN DURING <br />OPPOSED -BLADE VOLUME DAMPER FOR EVERY RECTANGULAR <br />CONSTRUCTION DOCUMENTS ARE DIAGRAMMATIC IN NATURE AND <br />INTENDED SOLELY TO CLARIFY THE SCOPE OF WORK AND <br />SOLDERING. THE MECHANICAL CONTRACTOR SHALL TEST, <br />CLEAN, AND DEHYDRATE ALL REFRIGERANT LINES AND <br />BRANCH AND OUTLET AND AT EVERY RECTANGULAR TAKE -OFF <br />FOR A DIFFUSER OR GRILLE. (ROUND OR OVAL BRANCHES, <br />CONDENSATE DRAIN LINES SHALL BE CONSTRUCTED OF <br />COPPER (TYPE 'L' OR HEAVIER), OR GALVANIZED STEEL <br />ACCESS PANEL <br />INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. THE <br />PROVIDE THE CRITICAL CHARGE(S) OF REFRIGERANT PER THE <br />OUTLETS, AND TAKE -OFFS FOR DIFFUSERS AND GRILLES SHALL <br />(MINIMUM SCHEDULE 40). THE MECHANICAL CONTRACTOR <br />CONSTRUCTION DOCUMENTS ARE NOT INTENDED TO ALERT THE <br />CONTRACTOR(S) OF ALL OBSTACLES. THE SHOP DRAWINGS <br />MECHANICAL EQUIPMENT MANUFACTURER'S' RECOMMENDATIONS. <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL <br />BE PROVIDED WITH STANDARD VOLUME DAMPERS.) NOT ALL <br />DAMPERS ARE SHOWN ON THE CONSTRUCTION DOCUMENTS. <br />SHALL PROVIDE A P-TRAP AT EACH AIR HANDLER'S <br />CONDENSATE DRAIN LINE CONNECTION. EACH CONDENSATE <br />CD NEW CONDENSATE LINE <br />SHALL SHOW THE COORDINATION OF DUCTWORK AND <br />MECHANICAL EQUIPMENT INSTALLATION WITH EXISTING AND NEW <br />NECESSARY VALVES, TRAPS, SIGHT GLASSES, AND OTHER <br />ACCESSORIES AS RECOMMENDED BY THE MECHANICAL <br />HOWEVER, DAMPERS ARE REQUIRED FOR EVERY BRANCH, <br />OUTLET, AND TAKE -OFF. SOME DAMPERS MAY BE REQUIRED <br />DRAIN LINE SHALL BE SLOPED DOWN A MINIMUM OF ONE -EIGHTH <br />(1/8) INCH PER LINEAR FOOT TOWARD THE ASSOCIATED POINT <br />DIRECTION OF AIR FLOW <br />OBSTACLES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL <br />EQUIPMENT MANUFACTURER(S). SERVICE FITTINGS SHALL BE <br />AFTER TRANSITIONS. <br />OF DISCHARGE. <br />CONDUITS, FIRE PROTECTION PIPING, RAIN LEADERS, SANITARY <br />DRAINS, STRUCTURAL MEMBERS, AND WATER PIPING, AS WELL <br />ACCESSIBLE. THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />'PATE" PIPE CURB ASSEMBLIES FOR ALL REFRIGERANT LINES <br />THE MECHANICAL CONTRACTOR SHALL ATTACH A <br />THE DIAMETER OF THE CONDENSATE DRAIN LINE SHALL BE <br />U� DOOR UNDERCUT <br />AS THE MECHANICAL EQUIPMENT MANUFACTURER'S' <br />RECOMMENDED CLEARANCES AND THE STRUCTURAL <br />ENGINEER'S RECOMMENDATIONS REGARDING THE INSTALLATION <br />PENETRATING ANY ROOF. <br />EACH OX SPLIT SYSTEMS AIR HANDLER AND CONDENSING UNIT <br />BRIGHTLY -COLORED STRIP OF PLASTIC TAPE TO EVERY <br />VOLUME DAMPER EXCEPT THOSE AT THE HEAD OF A DIFFUSER <br />OR GRILLE. THE STRIP SHALL BE OF SUFFICIENT LENGTH TO <br />EQUAL TO OR GREATER THAN THE CONDENSATE DRAIN LINE <br />CONNECTION. TO AVOID EXCESSIVE DIPS IN AND TO PREVENT <br />ANY SHIFTING OF THE CONDENSATE DRAIN LINES, THE <br />O REMOTE TEMPERATURE SENSOR <br />AND ATTACHMENT OF ROOF -MOUNTED AND EXTERIOR <br />GROUND -MOUNTED EQUIPMENT. THE MECHANICAL CONTRACTOR <br />SHALL BE BY ONE MANUFACTURER AND SHALL HAVE OR <br />EXCEED THE CAPACITIES LISTED IN THE EQUIPMENT <br />HANG A MINIMUM OF 12" BELOW THE BOTTOM OF THE ASSOCIATED <br />DUCT. <br />MECHANICAL CONTRACTOR SHALL PROVIDE SUPPORTS AT THE <br />FOLLOWING INTERVALS: THREE (3) FEET FOR CONDENSATE <br />SD SMOKE DETECTOR <br />SHALL ALSO SHOW THE EXISTING CONDITIONS ON THE SHOP <br />SCHEDULE(S) ON THE CONSTRUCTION DOCUMENTS. EACH <br />DRAIN LINES CONSTRUCTED OF PVC, SIX (6) FEET FOR <br />DRAWINGS WHERE THE EXISTING CONDITIONS ARE DIFFERENT <br />FROM THOSE SHOWN ON THE CONSTRUCTION DOCUMENTS. <br />ELECTRIC HEATER SHALL HAVE OR EXCEED THE CAPACITIES <br />AND ELECTRICAL REQUIREMENTS LISTED IN THE EQUIPMENT <br />THE MECHANICAL CONTRACTOR SHALL CLEARLY AND <br />PERMANENTLY MARK EACH VOLUME DAMPER'S OPEN AND <br />CONDENSATE DRAIN LINES CONSTRUCTED OF COPPER AND TEN <br />(10) FEET FOR CONDENSATE LINES CONSTRUCTED OF STEEL. <br />O TEMPERATURE SENSOR / THERMOSTAT <br />SCHEDULE(S) ON THE CONSTRUCTION DOCUMENTS. THE <br />CLOSED POSITIONS. THE MECHANICAL CONTRACTOR SHALL <br />CONDENSATE DRAIN LINE SUPPORTS SHALL BE FIXED SOLIDLY <br />PRIOR TO STARTING THE PROJECT, THE MECHANICAL <br />CONTRACTOR SHALL STUDY THE COMPLETE SET OF <br />MANUFACTURER(S) AND THE MECHANICAL CONTRACTOR SHALL <br />PROVIDE PROTECTION FOR ALL DX MECHANICAL EQUIPMENT <br />PROVIDE A VOLUME DAMPER WITH A 2" STANDOFF WITH A <br />LOCKING QUADRANT THAT IS 24 GAUGES OR 2 GAUGES HEAVIER <br />IN PLACE. <br />W x D RECTANGULAR DUCT WIDTH x DEPTH (INCHES) <br />CONSTRUCTION DOCUMENTS AND COORDINATE WITH THE <br />MANUFACTURER(S) AS REQUIRED TO PROVIDE EQUIPMENT <br />INCLUDING, BUT NOT LIMITED TO, AN ANTI -SHORT -CYCLE TIMER <br />FOR EACH COMPRESSOR, HEAD PRESSURE CONTROL, HIGH <br />PROVIDE AND INSTALL 'RISKIN PRD-18" POSITIVE PRESSURE <br />THE MECHANICAL CONTRACTOR SHALL ROUTE CONDENSATE <br />DRAIN LINES TO THE NEW DOWNSPOUT OR GUTTER SYSTEM. <br />ROUND DUCT DIAMETER (INCHES) <br />SUBMITTALS TO SUBMIT TO THE MECHANICAL ENGINEER FOR <br />APPROVAL. THE EQUIPMENT SUBMITTALS SHALL INCLUDE <br />DIMENSIONS, WEIGHTS, SPECIFIED ACCESSORIES AND REQUIRED <br />PRESSURE CONTROL (MANUAL RESET), AND LOW PRESSURE <br />CONTROL (AUTO RESET). <br />RELIEF DOORS IN SUPPLY DUCTWORK FOR ALL AIR HANDLER <br />SYSTEMS WITH SMOKE DAMPERS. PROVIDE AND INSTALL "RUSKIN <br />NRD-18 NEGATIVE PRESSURE RELIEF DOOR IN RETURN <br />THE MECHANICAL CONTRACTOR SHALL INSULATE EACH <br />CONDENSATE DRAIN LINE WITH ONE-HALF (1/2) INCH ARMAFLEX <br />EQ EQUIPMENT TAG <br />INO <br />CLEARANCES, AS WELL AS FAN CURVES, SOUND LEVELS, <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL <br />DUCTWORK FOR ALL AIR HANDLER SYSTEMS THAT HAVE <br />WHEREVER THAT CONDENSATE DRAIN LINE IS ROUTED WITHIN <br />CONSTRUCTION DETAILS, WARRANTY INFORMATION, AND ALL <br />STARTERS, CONTACTORS, RELAYS, CONTROLS, AND <br />MOTORIZED RETURN AIR DAMPERS OR SMOKE DAMPERS. <br />THE STRUCTURE OR THE CONDENSATE MAY OTHERWISE CAUSE <br />OTHER RELEVANT DATA PRESENTED IN THE SAME FORMAT AS <br />ACCESSORIES NECESSARY TO PROVIDE A COMPLETE AND <br />DAMAGE. <br />THE EQUIPMENT SCHEDULES ON THE CONSTRUCTION DOCUMENTS. <br />EQUIPMENTWITHINWATT N THE SCOPE OF WOW.- E ELECTRICAL OWER AND CONTROL SYSTEM FOR THE (CAL <br />THE MECHANICAL CONTRACTOR SHALL CLEARLY LABEL ALL <br />�.1 ' /� t Q <br />/� Q Q /� CALCULATIONS <br />15ASIS � LOAD C� LCULA i IONS <br />THE MECHANICAL ENGINEER'S APPROVAL OF THE SHOP <br />CONTRACTOR WILL PROVIDE ALL DISCONNECT SWITCHES, <br />5. DUCT LEAKAGE PERFORMANCE <br />CONDENSATE DRAIN LINES TO INDICATE CONTENT AND <br />ROOM NUMBER <br />AND NAME <br />NUMBER OF <br />PEOPLE <br />MISC. HEAT <br />LOAD(S) <br />DESCRIPTION OF <br />HEAT LOAD(S) <br />DRAWINGS AND EQUIPMENT SUBMITTALS DOES NOT IN ANY WAY <br />RELIEVE THE MECHANICAL CONTRACTOR FROM HIS/HER <br />RESPONSIBILITY TO FURNISH EQUIPMENT AND MATERIALS <br />CONDUIT, AND WIRING FOR THE MECHANICAL EQUIPMENT WITHIN <br />THE SCOPE OF WORK ALL ELECTRICAL WORK SHALL COMPLY <br />WITH THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE. <br />DUCT CONSTRUCTION AND SEALING SYSTEMS SHALL MEET THE <br />REQUIREMENTS OF THE 2010 FLORIDA ENERGY CODE AND <br />DIRECTION OF FLOW. <br />AND/OR PERFORM WORK AS REQUIRED BY THE CONSTRUCTION <br />DOCUMENTS. THE MECHANICAL ENGINEER MAY REQUIRE THE <br />THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />THE PROPER OPERATION OF THE COMPLETE SYSTEM AND <br />SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS". IF THERE <br />IS A CONFLICT AMONG THE STANDARDS, THEN THE MORE <br />S. CONTROLS <br />102 - WAITING <br />25 <br />950W <br />1 VEND, i HI-LO <br />104 - KIDS WAITING <br />S <br />20OW <br />1 TV <br />MECHANICAL CONTRACTOR TO REDO ANY WORK THAT DOES <br />NOT MEET THE DESIGN INTENT OF THE MECHANICAL ENGINEER <br />SHALL ENSURE THAT WIRING DIAGRAMS ARE PROVIDED TO THE <br />OWNER NO WIRING OF ANY KIND SHALL BE EXPOSED IN <br />STRINGENT STANDARD SHALL BE ENFORCED. <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL <br />CONTROLS AND SUB -CONTRACT TO THE ELECTRICAL <br />106 - OFFICE <br />1 <br />350W <br />I PC + 2 GUESTS <br />OR THE MECHANICAL ENGINEER MAY REQUIRE A CREDIT TO THE <br />FINISHED AREAS. <br />THE MECHANICAL CONTRACTOR SHALL SEAL ALL TRANSVERSE <br />CONTRACTOR ALL CONTROLS POWER AND TRANSFORMERS NOT <br />OWNER <br />THE MECHANICAL CONTRACTOR SHALL ENSURE THAT ALL <br />JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS <br />TO A MAXIMUM ALLOWABLE DUCT LEAKAGE CLASS OF THREE <br />IDENTIFIED IN THE ELECTRICAL PORTION OF THE CONSTRUCTION <br />DOCUMENTS. <br />109 - BREAKROOM <br />12 <br />140OW <br />i REF, COFFEEMAKER <br />ALTERNATIVES TO THE SCHEDULED EQUIPMENT AND MATERIALS <br />MUST BE EQUAL t0 OR EXCEED THOSE SCHEDULED. IF <br />MECHANICAL EQUIPMENT IS STARTED, TESTED, ADJUSTED, AND <br />PLACED IN SATISFACTORY OPERATING CONDITION PRIOR TO <br />(3) CFM PER 100 SQUARE FEET OF DUCT AREA (15%) FOR <br />ROUND DUCT AND SIX (6) CFM PER 100 SQUARE FEET OF DUCT <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A <br />113 -OFFICE <br />1 <br />350W <br />I PC + 2 GUESTS <br />SUBSTITUTIONS FOR SCHEDULED EQUIPMENT AND MATERIALS <br />ARE TO BE MADE, THEN THE MECHANICAL CONTRACTOR SHALL <br />SUBSTANTIAL COMPLETION. THE MECHANICAL CONTRACTOR <br />SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, AND <br />AREA (3%) FOR ALL OTHER DUCT TYPES, UNLESS OTHERWISE <br />NOTED ON THE CONSTRUCTION DOCUMENTS OR AUTHORIZED BY <br />PROGRAMMABLE THERMOSTAT FOR EACH NEW AIR <br />CONDITIONING SYSTEM. THE MECHANICAL CONTRACTOR SHALL <br />115 - RECEPTION <br />5 <br />150OW <br />5 WS, I COPIER <br />115 - LAB <br />4 <br />80OW <br />2 REF <br />FIRST SUBMIT TO THE MECHANICAL ENGINEER COMPARATIVE <br />LITERATURE CLEARLY SHOWING THE EQUIVALENT OPERATING <br />MECHANICAL EQUIPMENT TO BE FREE OF DEFECTS FOR A <br />PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE <br />THE MECHANICAL ENGINEER TRANSVERSE JOINTS ARE <br />CONNECTIONS OF TWO DUCT OR FITTING ELEMENTS ORIENTED <br />COORDINATE THE INITIAL OCCUPANCY SCHEDULES) AND <br />PROGRAMMING WITH THE OWNER AND PROVIDE TRAINING AS <br />CAPABILITIES AND OTHER PROPERTIES OF THE SUBSTITUTIONS. <br />BY THE OWNER AND SHALL REPAIR ANY DEFECTS OCCURRING <br />PERPENDICULAR TO THE DIRECTION OF THE AIRFLOW. <br />REQUIRED. <br />121 - CHECK-OUT <br />3 <br />- <br />ALL DEVIATIONS MST BE CLEARLY IDENTIFIED AND A REQUEST <br />MUST BE MADE SPECIFIC FOR ALL DEVIATIONS. WHEN <br />WITHIN THAT TIME WITHOUT COST TO THE OWNER ALL <br />MECHANICAL EQUIPMENT IN THE SCOPE OF WORK SHALL BE <br />LONGITUDINAL SEAMS ARE JOINTS ORIENTED IN THE DIRECTION <br />OF THE AIRFLOW. DUCT WALL PENETRATIONS ARE OPENINGS <br />EACH THERMOSTAT, HUMIDISTAT, AND TEMPERATURE SENSOR <br />122 - TRIAGE <br />3 . <br />- <br />- <br />SUBSTITUTIONS ARE MADE, THE CONTRACTOR ASSUMES FULL <br />RESPONSIBILITY OF COORDINATING WITH OTHER TRADES ON <br />COVERED FOR THE DURATION OF THE MANUFACTURER'S' <br />GUARANTEE(S) OR WARRANTY(IES) AND THE CONTRACTOR <br />MADE BY SCREWS, NON -SELF-SEALING FASTENERS, PIPES, <br />TUBING, RODS, AND WIRE. ROUND AND FLAT -OVAL SPIRAL <br />SHALL BE INSTALLED AT 4'-6" ABOVE THE FINISHED FLOOR <br />UNLESS OTHERWISE NOTED ON THE CONSTRUCTION DOCUMENTS. <br />124 - TREATMENT <br />2 <br />20OW <br />MISC. <br />125 - TREATMENT <br />2 <br />20OW <br />MISC. <br />ANY CHANGES REQUIRED FOR THE SUBSTITUTION, INCLUDING <br />COSTS, ASSOCIATED WITH DUCTWORK, PIPING, ELECTRICAL AND <br />SHALL PROVIDE THE OWNER WITH ORIGINALS OF ALL <br />MANUFACTURER'S' GUARANTEES AND WARRANTIES. ALL <br />LOCK SEAMS NEED NOT BE SEALED PRIOR TO ASSEMBLY BUT <br />SHALL BE COATED AFTER ASSEMBLY TO REDUCE LEAKAGE. <br />THE MECHANICAL CONTRACTOR SHALL COORDINATE THE <br />EXACT LOCATION OF EACH THERMOSTAT, HUMIDISTAT, AND <br />126 - TREATMENT <br />2 <br />20OW <br />MISC. <br />STRUCTURAL TO IMPLEMENT THE SUBSTITUTED ITEM(S). <br />THE MECHANICAL CONTRACTOR SHALL VERIFY THE LOCATIONS <br />COMPRESSORS SHALL BE PROVIDED WITH A MINIMUM FIVE (5) <br />YEAR WARRANTY. <br />ALL OTHER CONNECTIONS ARE CONSIDERED TRANSVERSE <br />JOINTS INCLUDING, BUT NOT LIMITED TO, SPIN -INS, TAPS OR <br />OTHER BRANCH CONNECTIONS, ACCESS DOOR FRAMES, AND <br />TEMPERATURE SENSOR WITH THE ARCHITECT AND OWNER AND <br />SUBMIT THE PROPOSED LOCATION TO THE MECHANICAL <br />ENGINEER FOR APPROVAL. THE MECHANICAL CONTRACTOR <br />121 - TREATMENT <br />2 <br />20OW <br />MISC. <br />OF THE DIFFUSERS AND GRILLES AND SUBMIT A <br />REQUEST -FOR -INFORMATION IF THERE IS A CONFLICT BETWEEN <br />THE MECHANICAL CONTRACTOR SHALL COORDINATE ALL <br />MECHANICAL EQUIPMENT VOLTAGE REQUIREMENTS WITH THE <br />DUCT CONNECTIONS TO EQUIPMENT. MORE INFORMATION IS <br />AVAILABLE IN CHAPTER 35 OF ASHRAE'S 'FUNDAMENTALS <br />SHALL PROVIDE COORDINATION OF ALL THERMOSTAT, <br />HUMIDISTAT, AND TEMPERATURE SENSOR FINISHES WITH ROOM <br />129 -SAMPLE ROOM <br />0 <br />400W <br />1 REF <br />THE ARCHITECTURAL AND MECHANICAL PORTIONS OF THE <br />CONSTRUCTION DOCUMENTS. THE MECHANICAL CONTRACTOR <br />VOLTAGE AVAILABLE AT THE PROJECT SITE PRIOR TO <br />ORDERING ANY MECHANICAL EQUIPMENT. <br />HANDBOOK': <br />FINISHES AT NO ADDITIONAL COST TO THE OWNER <br />132 - TREATMENT <br />2 <br />20OW <br />MISC. <br />133 - RECOVERY <br />8 _ <br />10OW <br />I REF, MISC. <br />SHALL ALSO VERIFY THE TYPES OF CEILINGS IN THE SCOPE OF <br />WORK PRIOR TO ORDERING DIFFUSERS AND GRILLES. FOR <br />ALL DUCTWORK SHALL BE INSPECTED BY THE MECHANICAL <br />ENGINEER PRIOR TO BEING COVERED OR INSULATED. THE <br />ALL 120-VOLT RESTROOM EXHAUST FANS WITH ELECTRICAL <br />REQUIREMENTS OF UP TO 800 WATTS SHALL BE CONTROLLED <br />134 - TREATMENT <br />2 <br />20OW <br />MISC. <br />DIFFUSERS AND GRILLES LOCATED IN PLASTER OR GYPSUM <br />4. DUCTWORK CONSTRUCTION <br />OWNER AND MECHANICAL ENGINEER SHALL BE PRESENT <br />BY AN OCCUPANCY SENSOR WITH A TIME DELAY. THE. INITIAL <br />CEILINGS, THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />TITUS MODEL TRM PLASTER FRAMES. THE FRAMES MAY BE <br />THE SHEET METAL AND AIR CONDITIONING CONTRACTORS' <br />DURING ALL DUCT LEAKAGE TESTING AND THE DUCTWORK <br />SHALL BE TESTED AS INSTRUCTED BY THE MECHANICAL <br />TIME DELAY SHALL BE SET AT TWENTY (20) MINUTES. <br />136 - DICTATION <br />1 <br />20OW <br />MISC. <br />ALUMINUM IN NON -FIRE -RATED CEILINGS BUT MUST BE STEEL IN <br />FIRE -RATED CEILINGS. THE MECHANICAL CONTRACTOR SHALL <br />NATIONAL ASSOCIATION'S "HVAC DUCT CONSTRUCTION <br />STANDARDS" SHALL BE CONSIDERED PART OF THE <br />ENGINEER AND RETESTED IF REQUIRED BY THE MECHANICAL <br />ENGINEER IF ANY DISCREPANCIES ARE IDENTIFIED, THE <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A <br />HONEYWELL AT145-1214 TRANSPOIRMER, BELIMO LF24-SR-E-US <br />135 - CONTROL ROOM <br />1 <br />50OW <br />MISC. <br />13S - XRAY <br />4 <br />500W <br />MISC. <br />COORDINATE THE FINISH OF ALL DIFFUSERS AND GRILLES, <br />EXPOSED DUCTWORK, GRAVITY VENTILATORS, LOUVERS, AND <br />SPECIFICATIONS FOR THIS PROJECT. ANY WORK THAT DOES <br />NOT COMPLY WITH THESE STANDARDS MAY BE REJECTED AT <br />DUCTWORK SHALL BE UNCOVERED AND REPAIRS SHALL BE <br />MADE AT THE MECHANICAL CONTRACTOR'S EXPENSE. THE <br />ACTUATOR FOR AN OUTSIDE AIR DAMPER WITH;A MINIMUM <br />POSITIONER AND CONNECT TO OUTSIDE AIR DAMPER AND A <br />NOTE: ROOM NUMBERS OMITTED FROM THIS LIST INCLUDE STAIRWELLS <br />AND SMALL SPACES INCORPORATED INTO LARGER SPACES <br />FOR SIMPLICITY. THE MECHANICAL CONTRACTOR SHALL <br />WALL CAPS WITH THE ARCHITECT. ALL VISIBLE EXTERIOR <br />COMPONENTS (SUCH AS EXPOSED DUCTWORK AND LOUVERS) <br />SHALL BE PROVIDED WITH A PAINT -GRIP FINISH. <br />ANY TIME DURING THE PROJECT. <br />ALL EXHAUST AND OUTSIDE AIR DUCTWORK SHALL BE SHEET <br />METAL, <br />MECHANICAL CONTRACTOR SHALL GIVE THE MECHANICAL <br />ENGINEER TWO (2) WEEKS NOTICE BEFORE TESTING THE <br />DUCTWORK IF THE DUCTWORK FAILS THE DUCT LEAKAGE TEST, <br />THEN THE MECHANICAL CONTRACTOR SHALL COMPENSATE THE <br />HONEYWELL C1232A/5 SPACE CO2 SENSOR WITH DISPLAY. <br />10. TESTING AND BALANCING THE HEATING, VENTILATION, AND <br />AIR CONDITIONING SYSTEM <br />ANY CHANGE ORDER SUBMITTED BY THE GENERAL, <br />MECHANICAL ENGINEER FOR AN ADDITIONAL SITE VISIT. <br />COORDINATE THE LOCATIONS OF ALL THERMOSTATS, <br />MECHANICAL, OR ELECTRICAL CONTRACTORS FOR WORK WITHIN <br />ALL DUCT DIMENSIONS SHOWN ON THE CONSTRUCTION <br />THE /MECHANICAL CONTRACTOR SHALL PROVIDE THE <br />TEMPERATURE SENSORS, HUMIDISTATS, AND OTHER CONTROLS <br />THE SCOPE OF THIS PROJECT SHALL NOT EXCEED THE VALUES <br />DOCUMENTS ARE INSIDE CLEAR DIMENSIONS. THE MECHANICAL <br />SERVICES OF AN INDEPENDENT TEST AND BALANCE AGENCY TO <br />WITH THE ARCHITECT AND OWNER AND SUBMIT THOSE <br />LISTED IN THE MOST CURRENT VERSIONS OF THE MEANS COST <br />DATA BOOKS FOR THE APPLICABLE TRADES. EVERY CHANGE <br />CONTRACTOR SHALL PROVIDE FLEXIBLE CONNECTIONS <br />BETWEEN EACH ITEM OF MECHANICAL EQUIPMENT AND ITS <br />6. ACCESS PANELS, FIRE DAMPERS, AND FIRE/SMOKE <br />DAMPERS <br />TEST, BALANCE, AND CERTIFY THE PERFORMANCE OF THE <br />COMPLETE HEATING, VENTILATION, AND AIR CONDITIONING <br />LOCATIONS TO THE MECHANICAL ENGINEER FOR REVIEW. <br />ORDER SHALL BE ACCOMPANIED BY A DETAILED COST <br />ASSOCIATED DUCT(S). ALL ITEMS OF THE HEATING, VENTILATION, <br />SYSTEM, t0 INCLUDE SUPPLY, RETURN, OUTSIDE / MAKE-UP, AND <br />BREAKDOWN FOR EACH TASK, INCLUDING EQUIPMENT, <br />AND AIR CONDITIONING SYSTEM INCLUDING, BUT NOT LIMITED TO, <br />THE GENERAL AND MECHANICAL CONTRACTORS SHALL <br />EXHAUST AIR SYSTEMS. THE TEST AND BALANCE CONTRACTOR <br />MATERIALS, AND LABOR THE MECHANICAL ENGINEER MAY, At <br />AIR HANDLERS, FANS, DUCTWORK, DIFFUSERS, AND GRILLES <br />PROVIDE ACCESS PANELS TO ALLOW ACCESS TO VOLUME <br />SHALL PERFORM ALL TESTING, ADJUSTING, BALANCING, AND <br />HIS DISCRETION, REQUIRE THE CONTRACTOR(S) t0 PROVIDE A <br />SHALL NOT BE SUPPORTED BY THE CEILING OR CEILING <br />DAMPERS ABOVE PLASTER OR GYPSUM CEILINGS, TURNING <br />DATA RECORDING NECESSARY TO ESTABLISH THE CAPACITY <br />FINAL, VERIFIABLE ACCOUNTING OF EQUIPMENT, MATERIALS, AND <br />SUSPENSION SYSTEM, BUT INSTEAD SHALL BE SUPPORTED BY <br />VANES, FIRE DAMPERS, FIRE/SMOKE DAMPERS, DUCT -MOUNTED <br />AND QUALITY OF THE SYSTEMS AND CONFIRM THE <br />LABOR AFTER THE WORK IS COMPLETE AND PRIOR TO THE <br />THE BUILDING STRUCTURE. <br />SMOKE DETECTORS, AND WHERE REQUIRED FOR THE <br />SATISFACTORY COMPLETION OF ALL ASPECTS OF THE SCOPE <br />MECHANICAL ENGINEER'S APPROVAL OF THE CONTRACTOR'S' <br />MAINTENANCE OF ALL MECHANICAL EQUIPMENT. ACCESS <br />OF WORK THIS WILL INCLUDE NOT ONLY THE NEW SYSTEMS, BUT <br />FINAL PAY APPLICATION(S). <br />ALL FORTY-FIVE (45) AND NINETY (SO) DEGREE ELBOWS SHALL <br />PANELS SHALL HAVE A FIRE RATING EQUAL TO THE <br />ALSO ALL OF THE EXISTING SYSTEMS THAT HAVE BEEN <br />HAVE A ONE AND ONE-HALF (15) CENTERLINE RADIUS -TO -WIDTH <br />PENETRATED ASSEMBLY, WITH A MINIMUM FIRE RATING OF ONE <br />MODIFIED. <br />3. MECHANICAL EQUIPMENT INSTALLATION <br />OR RADIUS -TO -DEPTH RATIO OR SHALL BE CONSTRUCTED WITH <br />(1) HOUR <br />SINGLE BLADE TURNING VANES. ANGULAR TAPERS SHALL BE <br />THE TEST AND BALANCE CONTRACTOR SHALL BE AN <br />ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED AS <br />LIMITED TO THIRTY (30) DEGREES FOR CONTRACTING TAPERS <br />THE MECHANICAL CONTRACTOR SHALL ATTACH A <br />APPROVED MEMBER OF THE AABC OR NE55 AND SHALL <br />REQUIRED BY THE MANUFACTURER'S' INSTALLATION AND <br />AND TWENTY (20) DEGREES FOR EXPANDING TAPERS. <br />BRIGHTLY -COLORED STRIP OF PLASTIC TAPE TO EVERY <br />SPECIALIZE IN THE TESTING AND BALANCING OF HEATING, <br />MAINTENANCE MANUALS. THOSE MANUALS WILL TYPICALLY <br />DUCT -MOUNTED ACCESS PANEL. THE STRIP SHALL BE OF <br />VENTILATION, AND AIR CONDITIONING SYSTEMS. THE FOLLOWING <br />PROVIDE MORE DETAIL THAN THE CONSTRUCTION DOCUMENTS. <br />THE MAXIMUM LENGTH OF NEW FLEXIBLE SUPPLY DUCT SHALL <br />SUFFICIENT LENGTH TO HANG A MINIMUM OF 12" BELOW THE <br />TEST AND BALANCE CONTRACTORS ARE PRE -APPROVED: THE <br />IF THERE 15 A CONFLICT BETWEEN THE INSTALLATION AND <br />BE 8'-0"1FLEXIBLE RETURN DUCT SHALL NOT BE USED. <br />BOTTOM OF THE ASSOCIATED DUCT. <br />PHOENIX AGENCY, TEST AND BALANCE CORPORATION, AND <br />MAINTENANCE MANUALS AND THE CONSTRUCTION DOCUMENTS, <br />FLEXIBLE DUCT SHALL BE INSTALLED AND SUPPORTED SO AS <br />SPEC TECH CONSULTANTS. THE MECHANICAL CONTRACTOR <br />THEN THE MECHANICAL CONTRACTOR SHALL SUBMIT A <br />TO PREVENT THE USE OF EXCESS DUCT MATERIAL, PREVENT <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A FIRE <br />SHALL SUBMIT ANY NON -PRE -APPROVED TEST AND BALANCE <br />REQUEST -FOR -INFORMATION TO THE MECHANICAL ENGINEER <br />DISLOCATION OR DAMAGE, AND PREVENT CONSTRICTION OF <br />DAMPER AT EVERY DUCT PENETRATION OF A FIRE -RATED <br />CONTRACTOR TO THE MECHANICAL ENGINEER FOR APPROVAL <br />THE DUCT BELOW THE RATED DUCT DIAMETER FLEXIBLE DUCT <br />ASSEMBLY AND A FIRE/SMOKE DAMPER WITH A MINIMUM <br />PRIOR TO SUBMITTING A BID. <br />ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED SUCH THAT <br />BENDS SHALL MAINTAIN A CENTERLINE RADIUS OF NOT LESS <br />FIRE/SMOKE RATING OF TWO (2) HOURS At EVERY DUCT <br />Oi <br />MECHANICAL ANICAL SPECIFICATIONS t LEGEND <br />SCALE: NT5 <br />REVISIONS <br />BY <br />f, <br />�00 <br />00 <br />Cn <br />o�� o <br />Y <br />,�Sti <br />YElX Y <br />LZ. G.. u <br />• <br />.� O <br />C U • C'Q <br />Lo <br />Q E ` > <br />� 3 <br />a� ti <br />3 <br />N <br />0 <br />N <br />Cn <br />�e <br />i; <br />Z w <br />o <br />%D 8 <br />% • <br />e Lilt <br />� <br />mw <br />m� <br />o a a <br />6 U) U) o <br />o <br />�€ <br />om ya <br />Z <br />C <br />ova <br />� � U <br />c a <br />C �a <br />or <br />W 1_ <br />( �M8 <br />U <br />y <br />�t <br />d W <br />cn <br />_0 U oZ <br />CD <br />@ Nd <br />�N <br />C <br />Q mE <br />mW <br />W�L? d <br />=o <br />N '@ a E <br />2 ° am <br />�U <br />� U <br />Z <br />LLJ <br />v •J 1— <br />°- Z <br />W <br />U �•L <br />= Q N O <br />a UW <br />�LL. <br />.-o�Q�rn <br />L <br />W v •- <br />o�U� <br />� -C <br />F— cv a <br />a OWN <br />O <br />�0 <br />':3 J <br />m LL_ <br />Date: 06. 12. 12 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: <br />Job: 10-61 <br />Sheet <br />m 1 <br />