My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38021 Market Square (2)
Zephyrhills
>
Building Department
>
Building Plans
>
38021 Market Square (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 10:57:10 AM
Creation date
2/25/2025 9:42:44 AM
Metadata
Fields
Template:
Building Plans
Street #
38021
Location
Market Square
Contractor
Wallace and Associates
Building Plans - Permit #
14023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES <br />1. THIS PLAN 16 FOR DIMENSIONAL PURPOSES ONLY. <br />2. GENERAL CONTRACTOR TO NOTIFY ARCHITECT WITH ANY <br />DISCREPANCIES IN WRITING UPON DISCOVERY 5EFORE <br />COMMENCING WITHANY WORK. <br />3. REFER TO ARCHITECTURAL SITE PLANS AND CIvIL 61TE PLANS FOR <br />ALL SITE DIMEN51ONS <br />4. GENERAL CONTRACTOR TO NOTIFY ARCHITECT AFTER LAYOUT 18 <br />DONE AND WALL TRACK 18 IN PLACE PRIOR TO FRAMING ANY <br />WALLS. <br />5, FOR DIMENSIONING PURPOSES, METAL STUDS ARE DRAWNAT 4" OR <br />6" U.O,N. AND 5LOCK WALLS ARE DRALLNAT 8" U.N.O. <br />(o. 6" 5LOCK WALLSAND ro" METAL STUD WALLS ARE DIMENSIONED <br />AT FACE OF WALL AND 4" METAL STUD WALLSARE DIMENSIONED <br />AT CENTER OF WALL U.N.O. <br />1. ALL INTERIOR DOOR6 ARE TO HAVE A 4" JAM5 AT HINGE SIDE OF <br />DOOR (TYPICAL U.N.O.) <br />5. CONTRACTOR SHALL REFER TO WINDOW / DOOR SHOP DRAWINGS <br />FORALL REQUIRED MASONRY / ROUGH OPENINGS PRIOR TO <br />CONSTRUCTION. <br />DIMENSIONED FLOOR PLAN <br />ECCALE: 3116" - V-01- <br />REVISIONS <br />BY <br />GO <br />C',J <br />,L) m L? <br />Ei <br />CIA <br />CD <br />C5 <br />Cc <br />C", <br />00 <br />C13 <br />cf) <br />0 <br />0 <br />Ld <br />:3 �— <br />Q-0Z (D <br />x <br />LLJ Ld <br />—i C) <br />< V) -0 <br />0 Lu -I.- LL- <br />0 <br />0 <br />LLJ <br />0 JE- <br />> <br />:m >1 <br />0 <br />-C <br />C-4 <br />< z om <br />LLJ 00 <br />C <br />:6 OW <br />*3 -1 D <br />m LL- <br />Date: 06. 12. 12 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: AZP <br />Job: 10-61 <br />Sheet <br />A 1 b <br />
The URL can be used to link to this page
Your browser does not support the video tag.