My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38135 Market Square (4)
Zephyrhills
>
Building Department
>
Building Plans
>
38135 Market Square (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 11:35:05 AM
Creation date
2/25/2025 9:43:44 AM
Metadata
Fields
Template:
Building Plans
Street #
38135
Location
Market Square
Contractor
Wallace Associates
Building Plans - Permit #
11964
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL GENERAL NOTES <br />1. WHERE HVAC SYSTEM COMPONENTS ARE REMOVED FROM AN <br />EASTING ROOF PENETRATION NOT TO BE RENOVATED, THE <br />MECHANICAL CONTRACTOR SHALL ENSURE THAT THE ROOF <br />PENETRATION IS COVERED WITH A WEATHERPROOF CAP AND <br />SEALED. <br />2. WHERE HVAC SYSTEM COMPONENTS ARE REMOVED FROM AN <br />EASTING SURFACE NOT TO BE RENOVATED, THE MECHANICAL <br />CONTRACTOR SHALL ENSURE THAT THE SURFACE IS REPAIRED <br />/ REFINISHED TO MATCH EASTING. <br />3. WHERE BRANCH DUCTS ARE REMOVED FROM AN ExIST1NG MAIN <br />DUCT NOT TO BE DEMOLISHED, THE MECHANICAL CONTRACTOR <br />SHALL PATCH AND SEAL THE MAIN DUCT PER THE <br />SPECIFICATIONS. <br />4. WHERE EASTING DUCT INSULATION IS DAMAGED OR MISSING, <br />THE MECHANICAL CONTRACTOR SHALL REPAIR THE DUCT <br />INSULATION PER THE SPECIFICATIONS. <br />5. WHERE EASTING FLEABLE DUCT SUPPORTS ARE DAMAGED OR <br />MISSING, THE MECHANICAL CONTRACTOR SHALL PROVIDE OR <br />REPAIR THE FLEABLE DUCT SUPPORTS PER THE <br />SPECIFICATIONS. <br />6. ROUTE ExHAUST AND OUTSIDE AIR DUCTWORK ABOVE ALL <br />OTHER HVAC SYSTEM COMPONENTS WHERE POSSIBLE. <br />7. THE MECHANICAL CONTRACTOR SHALL ENSURE THAT ALL <br />VOLUME DAMPERS ARE ACCESSIBLE. <br />MECHANICAL KEY NOTES <br />MECHANICAL LEGEND <br />® Z ® EASTING CEILING DIFFUSER/GRILLE (LAY -IN) <br />SD <br />EASTING RIGID DUCTWORK <br />TO BE REMOVED <br />NEW POINT OF CONNECTION <br />SUPPLY DUCTWORK TRANSITION UP OR DOWN <br />RETURN DUCTWORK TRANSITION UP OR DOWN <br />L ExHAUST DUCTWORK TRANSITION UP OR DOWN <br />DUCTWORK CROSSOVER OR CROSSUNDER AT <br />THE MECHANICAL CONTRACTOR'S DISCRETION <br />90' ELBOW WITH TURNING VANES <br />45' ELBOW WITH TURNING VANES <br />Jul SPIN -IN FITTING <br />SPIN -IN FITTING WITH DAMPER <br />FLEABLE DUCT CONNECTION <br />O1 CONNECT 12"0 EXHAUST DUCT TO 6' LABCONCO CANOPY —� FIRE DAMPER <br />HOOD MODEL #7099000. BALANCE HOOD TO 425 CFM. <br />POSITION HOOD OVER SCOPE MACHINES. —� FIRE/SMOKE DAMPER <br />2 CORRDINATE T F' F T V E I VOLUME DAMPER <br />3 PROVIDE ACCESS PANEL IN DUCT TO FACILITATE CLEANING �- DIRECTION OF AIR FLOW <br />OF AIRFLOW MEASURING DEVICE IN RETURN VAV BOX. REFER <br />TO DETAIL #8 ON M5.1. TYPICAL OF ALL RETURN VAV BOXE TEMPERATURE SENSOR / THERMOSTAT <br />4 (SEE SCHEDULE ON M4.0) O <br />O4 TYPICAL RETURN FILTER GRILLE. REFER TO AIR DEVICE W x D RECTANGULAR DUCT WIDTH x DEPTH (INCHES) <br />SCHEDULE ON M4.0. <br />r"i ROUND DUCT DIAMETER (INCHES) <br />_EQ__1 EQUIPMENT TAG <br />h— I JU—L r �� <br />K <br />EXISTING EXIT CORRIDOR NO <br />75 CFM 340 CFM)';1'dPASSAGE <br />t 172 <br />118 t <br />RG-1 <br />EXISTING EXISTING <br />PROCEDURE <br />EXISTING <br />°; 3 M I I PUMP ROOM j ELEC. ROOM <br />PROCEDURE { 175 (174 I ! <br />4 4 1. SWS-1 173 SWS-1 & <br />176 _._ CLEAN I & SWR-1 1-I SWR-1 600 L <br />SD-2 LINEN 150 CIFI CFM <br />i� SD-2 1� <br />500 CFM i i 0 188 - L 310 CFM <br />- - - ----- <br />j z SD-2 Rwr1 STOR. 1, <br />450 CFM CORR187 <br />35 FM 187 N <br />X C <br />+ I - <br />RG-1 T 186 SD-2 a _04 <br />l --- VAV J _ - -1 _ - _ _ x <br />425 CFM - _F -- - _ - — -- - -- - --- 35-_CFM <br />0 4 8R 75 CF <br />I _J / I <br />i VAV VAV I 1 {, 14"x14" <br />4-7 <br />= 4-7R ----- -- — I IL40 <br />EXP NDED X <br />4 EXISTING CORR. - 4-8 1 SD-2 SID 2 $ SD-2 <br />O - - - ----HOOD--SCOPE__50 ( F <br />310 F REC VERY � 10 CF <br />3 177 SD- Q 5 CF ROOM-- - 1 189 <br />�.( <br />130 CFM i V4 1 I <br />r 185 B" li <br />RG-1 <br />X I 4 -9 I <br />475 CFM <br />RTU-4 <br />EXISTING ,'� 12"x10" II SD—L <br />- j I RM # ROOM AIR AREA CEILG ACH CA ACH TOT CFM CA CFM TOT CFM CA CFM TOT RET EXHAUST TRANSF. NET REMARKS <br />— PROCEDURE178 \ C? I 320 CFM I OLD NAME FLOW SF HT REQ REQ REQ REQ DESIGN DESIGN DESIGN DESIGN DESIGN CFM 0 <br />SD-2 �\\ —� SD-2 173 EXISTING ELECTRIC ROOM 0 50 10 0 0 0 0 94 600 600 0 0 0 0 <br />SC ��,, i STAFF <br />310 CFM <br />RG- 425 CFM I 00 I I 174 EXISTING PUMP ROOM 0 50 10 0 0 0 0 24 150 150 0 0 0 0 <br />350 I <br />1, TOILET /� VAV I x I 175 PROCEDURE #4 180 10 3 15 90 450 71 450 375 0 -75 0 75 CFM TO #177 <br />_ <br />- - <br />CFM � I SD-2184 \ �f� 4_2 -- -- 176 EXISTING PROCEDURE #3 + 195 10 3 15 98 488 79 500 425 0 -75 0 75 CFM TO #177 <br />/1 .• i _ <br />j C)T I 425 CFM D_2 75 FM FROM #175, 176, 178, 180; T #179, 183, <br />18"x 6" 310 I : 177/181 CORRIDOR 0 365 10 0 2 0 122 63 400 475 0 75 0 185. <br />n " <br />y y F <br />o N CFM \- SD-2 <br />VAV SOILED W 2 II 178 EXISTING PROCEDURE #2 + 170 10 3 15 85 425 67 425 350 0 -75 0 75 CFM TO #177 <br />_ _ EXISTING I 179 SOILED WORK ROOM - 80 10 0 10 0 133 33 210 0 285 75 0 75 CFM FROM #177 <br />AV G-1 I 310 CFM I <br />VAV <br />4-1R ROOM 4-g 5 CFM I 24"z20" \ N�L, x R4 STOR. 180 EXISTING PROCEDURE #1 + 165 10 3 15 83 413 67 425 350 0 -75 0 75 CFM TO #177 <br />_ N I 1 190 )6I 183 JANITOR - 35 10 0 10 0 58 0 0 0 75 75 0 75 CFM FROM #177 <br />— - — — <br />t - SD- 184 STAFF TOILET - 44 10 0 10 0 73 0 0 0 75 75 0 75 CFM FROM #189 <br />_ 6 n n n RG 185 SCOPE ROOM - 165 10 0 10 0 275 67 425 0 500 75 0 75 CFM TO #177 <br />x' 120I \14x14 12x12 <br />*' y \ I I l 5 CFM 186/191 CORRIDOR #4 & EXIST CORR 0 200 10 0 2 0 67 16 10- 0 0 -100 0 100 CFM TO #189 <br />5D- ,\.J�_-_= - EXISTING l <br />�'`-- VAV 2 - 187 GENERAL STORAGE 0 25 10 0 0 0 0 6 35 35 0 0 0 0 <br />FM �1`` -- EXISTING e I- TOILET/ <br />EG-1 {� VAV -' CORR. K_ 4-3 PATIEN 188 CLEAN LINEN + 25 10 0 4 0 17 12 75 0 0 -75 0 75 CFM TO #189 <br />4-5 191 1 s 75 FM FROM #188; T #184, 193, 194, 100 FI <br />E 2 5 CFM 7 T VAV r X I 189 EXPANDED RECOVERY 0 1330 10 2 6 443 1330 441 2800 2750 0 -50 0 FROM #186/191 <br />n n 194 4-4R ` o <br />SD-2 ,.� 190 EXIST. STORAGE 0 20 10 0 0 0 0 4 25 25 0 0 0 0 <br />EXISTING RG-1 50 CFM - 192 DOCTOR'S DICTATION 0 75 10 0 0 0 0 27 170 170 0 0 0 0 <br />-� 1EXISTING CORK. SD -2 1 QR, S-170--- - _- _ - N <br />CONSUCT�I SD-2 �I 193 EXIST. TOILET PATIENT CHANGE - 60 10 0 10 0 100 4 25 0 100 75 0 75 CFM FROM #189 <br />¢ I PROCEDURE 181 x 135 CF DICTATION ! x, 195 10 CFM ' 194 EXIST. TOILET PATIENT CHANGE - 60 10 0 10 0 100 4 25 0 100 75 0 75 CFM FROM #189 <br />x -- CFM ,: <br />D 180 SD-2 1�EG-1 x 11g2 SD- S�-2 SD-2 & :> VAV 195 CONSULT #1 0 55 10 0 0 0 0 29 185 185 0 0 0 0 <br />v 425 CFM �\5 CFty( ao SD-2 25 C 25 CFM ? RG-1 4-4 196 CONSULT #2 0 50 10 0 0 0 0 29 185 185 0 0 0 0 <br />170 CFM TOTALS: 1135 7210 6075 1135 <br />185 CFM 0 0 <br />RG-,16"x16" 16"x16" 26"x26" I RTU-4 AHCA AIR BALANCE <br />350 CFM <br />JAN. —_ O SCALE: 3/16" = 1'-0„ <br />VAV =- - - <br />4-5R `�183; '! 12"x10" <br />EG-1 VAV VAV <br />4 4 -- - ----� '=--�--=-� 1,-_. EG-1 W6 x�_-100 CFM ,a Gr`CAA 4-3R 4-2 <br />RI <br />I I RY CHANGE -- ----- <br />`_.I `.I: 310 CFM _ <br />,Ic ,Ic 193 0 RG-1 <br />1375 CFM <br />SD-1 (TYP. OF 2) 1 �� I �� I 20"x2O" <br />550 CFM <br />(TYP OF 5) <br />O 0 0 <br />RTU-4. MECHANICAL - PARTIAL FLOOR PLAN <br />SCALE: 3/16" = 1'-0" <br />s <br />E N Vry <br />No 51871 <br />� � e <br />P <br />REVISIONS <br />BY <br />CUENT CONTRACTOR <br />Z�LREV. & PERMIT <br />03. 18. 11 <br />VTK <br />FLOW MEASURING <br />DUCE MAIN,ENANcE <br />DSB <br />f, <br />> <br />� CO <br />~ U F <br />O Lc] <br />o <br />a ti <br />ti <br />3 Ln <br />o�Lr) <br />Fti00 <br />Cn Cry <br />E � <br />0 <br />L <br />U U F 5 � <br />a <br />U <br />o <br />03o <br />cu <br />mw <br />�a <br />m �0 � <br />o " <br />.. <br />E n <br />O p� <br />U c� <br />C <br />C co E <br />w <br />E <br />Y <br />D U Z <br />� m <br />U m9 <br />f0 `? <br />7 N N o u <br />'D d� <br />Q a Cu <br />C o= <br />uJ ui <br />m a E. <br />2 `r <br />MU <br />0 <br />_Z N <br />v J <br />O U-) <br />•� V <br />m M <br />O 7 M <br />v v' <br />°x" Q N ° <br />w U v <br />0 LLL IL)� <br />Q La ° <br />y M s <br />Q <br />a 00 <br />O M <br />IL <br />N <br />4 <br />0 <br />J <br />L L_ <br />Date: 12. 15. 10 <br />Scale: AS NOTED <br />Project Mgr: MWW <br />Drawn: MWW <br />Job: 09-45 <br />Sheet <br />M 2. 3 <br />s<_ <br />-`I <br />
The URL can be used to link to this page
Your browser does not support the video tag.