Laserfiche WebLink
REFLECTED CEILING LEGEND <br />REVISIONS BY <br />EXISTING G.I. <br />PATCH AND <br />REQUIRED. <br />EXISTING <br />GE IL ING <br />PATCH AND RE <br />EXISTING WALL <br />AS REQUIRED. <br />HEADER <br />3/4" PLYWOOD <br />V-0" +/- OIL <br />CEILING <br />-SUSPENDED <br />ACOUSTICAL <br />CEILING SYSTEM <br />3 5/8" METAL STUD <br />FRAMING AT 16" <br />O.C. SECURE TO <br />STRUCTURE ABOVE. <br />1/2" G.W.B. <br />RECESS TRACK. <br />LEADING EDGE OF <br />TRACK TO ALL IGN <br />WITH LEADING <br />EDGE OF G.W.B. <br />ALUMINUM SLIDING <br />WINDOW - SEE <br />INTERIOR ELEVATIONS. <br />EXISTING G.W.B. CEILING. <br />PATCH AND REPAIR AS <br />REQUIRED. <br />(4) 010 TEK SCREWS <br />AT EACH CONNECTION ------ - <br />8'-O" <br />CE IL ING <br />1/2" G.W.B. <br />LIGHT FIXTURE. SEE <br />ELECTRICAL <br />3 5/8" 25 GA. <br />(MIN.) METAL <br />STUD FRAMING <br />AT Iro" O.C. <br />SECURE TO <br />STRUCTURE <br />ABOVE. <br />3 5/S" 25 GA. <br />(MIN.) METAL <br />STUD FRAMING <br />AT 16" O.C. <br />SECURE TO <br />STRUCTURE <br />ABOVE. <br />MATCH <br />EXISTING <br />CEILING <br />1/2" G.W.B. <br />2x WOOD BLOCKING <br />DOOR FRAME <br />I I <br />DOOR <br />3 5/S" METAL STUD <br />FRAMING AT 16" O.C. <br />SECURE TO STRUCTURE <br />ABOVE. <br />• • <br />MATCH <br />EXISTING <br />CE I LING <br />SUSPENDED <br />ACOUSTICAL <br />CEILING SYSTEM <br />1/2" G.W.B. <br />HEADER <br />(4) 010 TEK 1'-0" +/- <br />SCREWS AT EACH <br />CONNECTION <br />3 5/8" 25 GA. (MIN) <br />METAL STUD FRAt°11NG <br />AT 16" O.C. SECUO TO <br />STRUCTURE A50A <br />v <br />MATCH <br />EXISTING <br />CEILING <br />SUSPENDED <br />ACOUSTICAL <br />CEILING SYSTEM <br />1/2" G.W.B. <br />LAY -IN <br />ACOUSTICAL <br />TILE CEILING <br />MATCH <br />EXISTING <br />CEILING <br />1/2" GYPSUM <br />WALLBOARD <br />CEILING DETAIL CEILING DETAILO CEILING DETAIL IGI CEILING DETAIL <br />lei SCALE: 1-1/2" = 1'-0" lel <br />SCALE: 1-1/2" = 1'-0" SCALE: 1-1/2" = V-0" SCALE: 1-1/2" = 1'-0" <br />QREPLECTED CEILING PLAN <br />SCALE: 3/1rc" = 1'-0" <br />3 5/B" 25 GA. (MIN.) <br />METAL STUD <br />FRAMING AT IV' <br />O.C. SECURE TO <br />STRUCTURE ABOVE. <br />LAY -IN <br />ACOUSTICAL <br />TILE CEILING <br />T' <br />EXISTING 2' x 4' SUSPENDED CEILING GRID SYSTEM WITH <br />2' x 4' LAY -IN ACOUSTICAL CEILING TILES <br />EXISTING 2' x 4' FLUORESCENT LIGHT FIXTURE, LAY IN AT <br />SUSPENDED CEILING GRID SYSTEM - SEE ELECTRICAL <br />FOR MORE INFORMATION <br />(� EXISTING RECESSED CAN DOWN LIGHT FIXTURE <br />- SEE ELECTRICAL FOR MORE INFORMATION <br />EXISTING EXIT LIGHT FIXTURE - SEE ELECTRICAL FOR <br />MORE INFORMATION <br />EXISTING EMERGENCY LIGHT FIXTURE <br />- SEE ELECTRICAL FOR MORE INFORMATION <br />EXISTING SMOKE DETECTOR - SEE.MECHANICAL FOR <br />MORE INFORMATION <br />® EXISTING EXHAUST FAN - SEE MECHANICAL FOR MORE <br />INFORMATION <br />EXISTING MECHANICAL SUPPLY REGISTER <br />- SEE MECHANICAL FOR MORE INFORMATION <br />EXISTING MECHANICAL RETURN REGISTER <br />- SEE MECHANICAL FOR MORE INFORMATION <br />2' x 4' SUSPENDED CEILING GRID SYSTEM WITH 2' x 4' <br />LAY -IN ACOUSTICAL CEILING TILES <br />G.W.B CEILING (SMOOTH FINISH) <br />2' x 4' FLUORESCENT LIGHT FIXTURE, LAY IN AT <br />SUSPENDED CEILING GRID SYSTEM -SEE ELECTRICAL <br />FOR MORE INFORMATION <br />2' x 4' FLUORESCENT EMERGENCY LIGHT FIXTURE, LAY IN <br />011 AT SUSPENDED CEILING GRID SYSTEM - SEE <br />ELECTRICAL FOR MORE INFORMATION <br />01 RECESSED CAN DOWN LIGHT FIXTURE - SEE <br />ELECTRICAL FOR MORE INFORMATION <br />EMERGENCY LIGHT FIXTURE - SEE ELECTRICAL FOR <br />MORE INFORMATION <br />® EXIT LIGHT FIXTURE - SEE ELECTRICAL FOR MORE <br />INFORMATION <br />® EXHAUST FAN - SEE MECHANICAL FOR MORE <br />INFORMATION <br />MECHANICAL SUPPLY REGISTER - SEE MECHANICAL <br />FOR MORE INFORMATION <br />MECHANICAL RETURN REGISTER - SEE MECHANICAL <br />FOR MORE INFORMATION <br />KEYED NOTES <br />Ol HATCH INDICATES AREA OF NO WORK <br />O2 EXISTING G.W.B. HEADER <br />OEXISTING CEILING <br />OOUTLINE OF WALL MOUNTED UPPER CABINETS - SEE INTERIOR <br />ELEVATIONS <br />OPATCH AND REPAIR EXISTING CEILING AS REQUIRED. <br />ONEW CEILING GRID SYSTEM AND NEW TILES. <br />NEiz" NOTES <br />1. ALL CEILING HEIGHTS SHALL BE V-0" +/- TO MATCH EXISTING. <br />COORDINATE WITH HVAC AND EXISTING STRUCTURAL TO MAXIMIZE <br />CEILING HEIGHTS. <br />2. REFER TO EXISTING / DEMOLITION FLOOR PLAN FOR EXISTING AND <br />DEMOLISHED WALL LOCATIONS <br />3. PROVIDE DUST PARTITION BEFORE ANY DEMOLITION WORK. <br />4. TAKE ADEQUATE PROTECTION TO INHIBIT DUST INFILTRATION TO <br />EXISTING MECHANICAL SYSTEM (I.E. FILTERS OVER GRILLES. ETC.). <br />5. GENERAL CONTRACTOR TO NOTIFY ARCHITECT OF ANY <br />DISCREPANCIES PRIOR TO COMMENCING WITH ANY WORK. <br />6. GENERAL CONTRACTOR SHALL PROVIDE ALL GYP. BD. FURRDOWNS / <br />BULKHEADS AS REQUIRED. <br />"I. SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION ON <br />ELECTRICAL DEMOLITION. <br />5. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION ON <br />MECHANICAL DEMOLITION. <br />METAL STUD FASTENING NOTES <br />1. ALL METAL FRAMING FOR GYPSUM WALLBOARD CEILING SHALL BE 25 <br />GAUGE TYPICAL (U.N.O.) <br />2. 1MTL STUDS SHALL BE CONNECTED TO STRUCTURAL STL. w/ (3) 0.145110 <br />RAMSET POWDER DRIVEN FASTENERS <br />3. MTL. STUDS/CLIP ANGLE SHALL BE CONNECTED TO MTL. STUDS w/ MIN <br />(4) 012-14 TEK SCREWS. <br />4. CONTINUOUS TRACK SHALL BE CONNECTED TO STRUCTURAL STL. w/ (2) <br />0,145"0 RAMSET POWDER DRIVEN FASTENERS AT 16" O.C. <br />5. CONTINUOUS TRACK/STUDS/CLIP ANGLES SHALL BE CONNECTED TO <br />CONC./CMU w/ (2) 1/4"0 x 1 1/4" TAPCON FASTENERS AT 24" O.C. <br />6. CONNECT MTL. STUDS/CLIP ANGLES TO WOOD TRUSSES w/ (4) 1/4"m <br />WOOD SCREWS, <br />1. CONNECT SHEATHING TO MTL. STUDS w/ 012-14 TEK SCREWS AT (o" O.G. <br />8. CONTINUOUS TRACK SHALL BE CONNECTED TO ROOF DECK w/ (2) 010 <br />TEK SCREWS AT 24" O.C. <br />Q L`0-0 <br />0 <br />o -m <br />o <br />Q� rJ tl- U <br />Y = � ri <br />x <br />N <br />N caL r <br />O C u <br />o <br />O 10 <br />u . CN <br />N > <br />C .3 <br />3 � 3 <br />o � <br />o <br />El -a <br />7 N <br />m <br />Q <br />Q� <br />N <br />� O <br />" <br />> <br />0 0 <br />s <br />� <br />O <br />i <br />L. <br />0 <br />U <br />N <br />c <br />—IW <br />L <br />Z <br />V <br />M <br />U <br />0 <br />Q <br />0 <br />mN <br />C <br />W <br />•L <br />C <br />W <br />J <br />- v <br />.0 <br />Z <br />N <br />m <br />C <br />a <br />'o <br />M <br />-C <br />LLJ <br />— <br />v <br />Z <br />00 <br />M <br />-C <br />O <br />IE <br />J <br />N <br />�i <br />Date: 08. 13. 13 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: DC <br />Job: 13-46 <br />Sheet <br />A 2 <br />