<br />NOTE:
<br />A. THIS LIST IS NOT INCLUSIVE OF ALL CODES AND STANDARDS THAT MAY
<br />OR MAY NOT APPLY TO THIS PROJECT.
<br />B. PERFORM WORK SPECIFIED IN SPECIFICATIONS IN ACCORDANCE WITH
<br />STANDARDS LISTED BELOW INCLUDING AMENDMENTS OR REVISIONS. WHEN
<br />THESE SPECIFICATIONS ARE MORE STRINGENT, THEY TAKE PRECEDENCE. IN
<br />CASE OF CONFLICT, OBTAIN A DECISION FROM THE DESIGNER.
<br />NFPA-70 (2011)
<br />NATIONAL ELECTRICAL CODE
<br />NFPA-72 (2010)
<br />NATIONAL FIRE ALARM CODE
<br />NFPA-90A (2012)
<br />INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS
<br />NFPA-90B (2012)
<br />INSTALLATION OF WARM AIR HEATING AND AIR CONDITIONING SYSTEMS
<br />NFPA-91 (2010)
<br />EXHAUST SYSTEMS FOR AIR CONVEYING OF VAPORS, GASES, MISTS, AND
<br />NON-COMBUSTIBLE PARTICULATE SOLIDS
<br />NFPA-96 (2011)
<br />VENTILATION CONTROL AND FIRE PREVENTION OF COMMERCIAL COOKING
<br />OPERATIONS.
<br />NFPA-101 (2012)
<br />LIFE SAFETY CODE
<br />FLORIDA BUILDING CODE, BUILDING 5TH EDITION (2014)
<br />FLORIDA BUILDING CODE, MECHANICAL 5TH EDITION (2014)
<br />FLORIDA BUILDING CODE, PLUMBING 5TH EDITION (2014)
<br />FLORIDA BUILDING CODE, TEST PROTOCOLS FOR HIGH WIND HURRIZANE
<br />ZONES 5TH EDITION (2014)
<br />FLORIDA BUILDING CQDE, FUEL GAS 5TH EDITION (004) _
<br />FLORIDA FIRE PREVENTION CODE 5TH EDITION (2014)
<br />FLORIDA ACCESSIBILITY CODE (2014)
<br />APPLICABLE STATE ENERGY CODE (2014)
<br />STATE OF FLORIDA ADMINISTRATIVE CODE NO. 69A-3.012 AND 69A-60.
<br />NOTE: WHERE THERE ARE DIFFERENCES BETWEEN SECTIONS OF THE
<br />"BUILDING" AND "MECHANICAL" OR "PLUMBING" CODES, IT WILL BE ASSUMED
<br />THAT THE BUILDING CODE TAKES PRECEDENCE.
<br />PLUMBING ABBREVIATIONS
<br />ABBREVIATION
<br />DESCRIPTION
<br />ABBREVIATION
<br />DESCRIPTION
<br />A
<br />MEDICAL AIR LINE
<br />MGA
<br />MASTER ALARM PANEL
<br />ADA
<br />AMERICANS WITH DISABILITIES ACT
<br />MECH
<br />MECHANICAL
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />MTD
<br />MOUNTED
<br />AVTR
<br />ACID VENT THROUGH ROOF
<br />02
<br />OXYGEN LINE
<br />BPW
<br />BED PAN WASHER
<br />OFE
<br />OWNER FURNISHED EQUIPMENT
<br />CLG
<br />CEILING
<br />PAT
<br />PATIENT
<br />CONT
<br />CONTINUATION
<br />PUB
<br />PUBLIC
<br />COORD
<br />COORDINATION
<br />RPBP
<br />REDUCED PRESSURE
<br />BACKFLOW PREVENTER
<br />CO
<br />CLEAN OUT
<br />RWL
<br />RAINWATER PIPING
<br />CW
<br />COLD WATER LINE
<br />SAN
<br />SANITARY SEWER PIPING
<br />DN
<br />DOWN
<br />SD
<br />UNDERGROUND STORM PIPING
<br />DWG
<br />DRAWING
<br />SF
<br />SQUARE FOOT
<br />EA
<br />EACH
<br />SS
<br />SOLID SURFACE
<br />ECO
<br />EXTERIOR CLEAN OUT
<br />TMP
<br />TEMPERATURE
<br />FM
<br />FLOOR MOUNTED
<br />TMV
<br />THERMOSTATIC MIXING VALVE
<br />FPD
<br />FIRE PROTECTION DRY PIPE
<br />TYP
<br />TYPICAL
<br />FPW
<br />FIRE PROTECTION WET PIPE
<br />V
<br />MEDICAL VACUUM PIPING
<br />FV
<br />FLUSH VALVE
<br />VTR
<br />VENT THROUGH ROOF
<br />GN
<br />GOOSENECK
<br />W/
<br />WITH
<br />GPM
<br />GALLONS PER MINUTE
<br />WB
<br />WRIST BLADE
<br />HW
<br />HOT WATER LINE
<br />WC
<br />WATER CLOSET
<br />HWR
<br />HOT WATER RETURN
<br />WCO
<br />WALL CLEAN OUT
<br />LAV
<br />LAVATORY
<br />WH
<br />WALL HUNG
<br />PLUMBING FIXTURE
<br />CONNECTION SCHEDULE
<br />COLD
<br />HOT
<br />TYPE
<br />DESCRIPTION
<br />WASTE
<br />VENT
<br />WATER
<br />WATER
<br />P-1
<br />SINK (DROP -IN, GN, WB, ADA/BF)
<br />1-1/2"
<br />1-1/4"
<br />1/2"
<br />1/2"
<br />P-2
<br />SINK (DROP -IN, GN, WB, ADA/BF)
<br />1-1/2"
<br />1-1/4"
<br />1/2"
<br />1/2"
<br />P-3
<br />WALL BOX (CW)
<br />---
<br />---
<br />1 /2"
<br />---
<br />NOTES:
<br />1. ALL EXPOSED P-TRAPS SHALL BE PROVIDED W/LAV SHIELDS.
<br />2. PROVIDE BACKFLOW PREVENTER AT CONNECTION TO OWNER FURNISHED EQUIPMENT PER FPC.
<br />3. IN ADDITION TO SERVICE VALVES SHOWN ON PLANS, PROVIDE AND INSTALL ISOLATION VALVES ON HOT AND COLD WATER
<br />SUPPLY PIPING TO EACH PLUMBING FIXTURE, INCLUDING TRAP PRIMERS.
<br />4. PROVIDE OFFSET GRID DRAINS AT BARRIER FREE LOCATIONS.
<br />5. COORDINATE EXACT LOCATIONS W/ MECHANICAL EQUIPMENT.
<br />PLUMBING LEGEND:
<br />SYMBOL
<br />DESCRIPTION
<br />REDUCED PRESSURE BACKFLOW PREVENTER
<br />®
<br />P TRAP
<br />BALL VALVE
<br />CONNECTION TO EXISTING
<br />@'L7 O�.i3�7
<br />FLOOR DRAIN
<br />P- No.
<br />PLUMBING FIXTURE DESIGNATION
<br />C
<br />END CAP
<br />�E�CWMMMEMEBM
<br />COLD WATER SUPPLY
<br />H!^,
<br />HOT WATER SUPPLY
<br />0--HWIRSEESEEM
<br />HOT WATER RETURN
<br />140 H!^.SEEEES
<br />140° HOT WATER SUPPLY
<br />140 HWREMEa
<br />1400 HOT WATER RETURN
<br />SANITARY VENT
<br />SS
<br />SANITARY WASTE
<br />'�^•��
<br />ACID WASTE
<br />��-
<br />ACID VENT
<br />RAIN WATER LEADER
<br />,RD
<br />OVERFLOW ROOF DRAIN
<br />Sn
<br />STORM DRAIN
<br />G
<br />NATURAL GAS LINE
<br />PROJECT COORDINATION NOTES:
<br />THE CONSTRUCTION PHASING OF THIS PROJECT IS OF THE UTMOST
<br />IMPORTANCE. ALL CONTRACTORS FOR ALL DIVISIONS OF THE WORK SHALL
<br />GUARANTEE THAT THEIR WORK IS IN ACCORD WITH THE PHASING PLANS
<br />SHOWN IN THE ARCHITECTURAL CONTRACT DOCUMENTS. SHOULD IT BE
<br />NECESSARY TO ACCOMPLISH WORK IN AREAS WHICH ARE NOT INCLUDED
<br />IN THE PHASING PLANS, SUCH WORK SHALL BE DONE WITH THE MINIMUM
<br />OF DISTURBANCES THAT IS POSSIBLE AND WITHOUT CAUSING THE
<br />INTERRUPTION OF EXISTING SERVICES. ALL SERVICE INTERRUPTIONS THAT
<br />ARE ESSENTIAL TO THE WORK SHALL BE SCHEDULED WITH THE ARCHITECT
<br />AND, THEREBY, WITH THE OWNER. ALL CONTRACTORS FOR ALL TRADES
<br />SHALL COOPERATE AND COORDINATE THEIR WORK TO ALLOW THE
<br />COMPLETION OF ALL WORK WITH THE LEAST POSSIBLE NUMBER ON
<br />INTERFERENCE'S WITH THE SERVICES OF THE EXISTING BUILDING.
<br />THE DESIGN DRAWINGS OF ALL CATEGORIES AND TRADES
<br />(ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE PROTECTION, MEDICAL
<br />GAS, MECHANICAL, HEATING, VENTILATING AND AIR CONDITIONING AND
<br />ELECTRICAL) AND ALL SPECIFICATIONS AND SHOP DRAWINGS MUST BE
<br />COORDINATED AND BE VIEWED IN CONNECTION AND CONJUNCTION WITH
<br />EACH OTHER TO INSURE THE PROPER LOCATION OF ALL DEVICES AND
<br />EQUIPMENT. MAKE PARTICULAR NOTE OF LOCATIONS AND DIMENSIONS
<br />SHOWN ON THE ARCHITECTURAL FLOOR PLANS AND ELEVATIONS.
<br />PLUMBING GENERAL NOTES:
<br />1. PROVIDE AND INSTALL TRAP PRIMERS FOR ALL FLOOR DRAINS. TRAP
<br />PRIMER SUPPLY LINE TO CONNECT TO 1-1/4" CW LINE MAXIMUM. PROVIDE
<br />SERVICE VALVE. TRAP GUARDS SHALL NOT BE ACCEPTED.
<br />2. PROVIDE ACCESSIBLE SERVICE VALVE(S) IN EACH WATER LINE SERVING
<br />EACH PLUMBING FIXTURE OR OWNER FURNISHED EQUIPMENT, IN ADDITION
<br />TO STOPS.
<br />3. BV4W DENOTES BALANCING VALVE AND GPM SETTING.
<br />4. CONNECT ALL NEW PLUMBING FIXTURES TO SANITARY SEWER MAINS AS
<br />INDICATED OR NOTED ON THE PLANS.
<br />5. COLLECT AND ROUTE ALL NEW SANITARY SEWER VENT PIPING FROM
<br />NEW PLUMBING FIXTURES TO SANITARY VENTS AS INDICATED OR NOTED ON
<br />THE PLANS.
<br />6. ROUTE ALL NEW CW AND HW PIPING FROM NEW PLUMBING FIXTURES TO
<br />MAINS AS INDICATED OR NOTED ON THE PLANS.
<br />7. COORDINATE ALL PLUMBING PIPING WITH NEW AND EXISTING
<br />MECHANICAL DUCTWORK. SPECIAL ATTENTION SHALL BE PAID TO PIPING
<br />UNDERGROUND OR ON OTHER FLOORS NOT WITHIN THE DIRECT SCOPE OF
<br />THE PROJECT.
<br />8. PROVIDE CLEAN -OUTS ON SANITARY SEWER AND RAIN WATER LEADER
<br />PIPING AT ALL CHANGES IN DIRECTION GREATER THAN 45 DEGREES AND AT
<br />THE BASE OF EACH STACK.
<br />9. AS MUCH AS POSSIBLE, ROUTE PLUMBING WITHIN STRUCTURAL JOIST
<br />SPACE.
<br />10. CONTRACTOR TO PROVIDE A SHOCKTROL AT ALL WATER CLOSETS,
<br />URINALS, CLINICAL SINKS, OR WHERE ANY QUICK -CLOSING VALVES ARE
<br />UTILIZED. SHOCKTROL TO BE ZURN SERIES Z-1700 OR EQUAL. SHOCKTROL
<br />SIZE TO BE A #100 FOR SINGLE FIXTURES AND A #200 FOR BACK TO BACK
<br />FIXTURES. INSTALL SHOCK ARRESTORS IN ACCORDANCE WITH
<br />MANUFACTURER'S SPECIFICATIONS. PROVIDE ACCESS TO ALL
<br />SHOCKTROLS THRU ACCESS PANELS, LAY -IN CEILINGS, WALL IN CHASE.
<br />11. THESE DOCUMENTS SHALL FOLLOW THE ADA GUIDELINES FOR
<br />ACCESSIBILITY TO PLACES OF PUBLIC ACCOMMODATION AND COMMERCIAL
<br />FACILITIES BY INDIVIDUALS WITH DISABILITIES. THESE GUIDELINES ARE TO BE
<br />APPLIED DURING DESIGN, CONSTRUCTION AND ALTERATION OF SUCH
<br />BUILDING AND FACILITIES TO THE EXTENT REQUIRED BY REGULATIONS
<br />ISSUED BY FEDERAL AGENCIES, INCLUDING THE DEPARTMENT OF JUSTICE,
<br />UNDER THE AMERICANS WITH DISABILITIES ACT (ADA) AND THE
<br />REQUIREMENTS OF ANSI A117.1
<br />12. THE SIZE AND LOCATION OF EXISTING PIPING IS SHOWN ACCORDING TO
<br />RECORDED INFORMATION. THE PLUMBING CONTRACTOR SHALL MAKE AN
<br />APPROPRIATE PRE -BID SITE INSPECTION IN ORDER TO ASCERTAIN EXISTING
<br />CONDITIONS AND SHALL INCLUDE IN HIS BID THE COST OF ALL WORK
<br />RESULTING FROM EXISTING CONDITIONS, WHETHER THIS WORK IS SHOWN
<br />OR NOT ON THESE DRAWINGS.
<br />13. PRIOR TO ANY EXCAVATION OR DEMOLITION THIS CONTRACTOR SHALL
<br />COORDINATE WORK WITH OTHER TRADES, THE FACILITY MAINTENANCE
<br />DEPARTMENT AND ANY OTHER AVAILABLE SOURCE OF INFORMATION AS TO
<br />ABOVE OR BELOW GROUND SERVICES THAT SHALL BE AVOIDED.
<br />CONTRACTOR SHALL INFORM THE OWNER ONE WEEK IN ADVANCE OF ANY
<br />DISRUPTION OF SERVICES TO THE FACILITY AND SHALL NOT PROCEED
<br />WORK WITHOUT WRITTEN APPROVAL FROM THE OWNER. CONTRACTOR
<br />SHALL REPAIR ANY SERVICES (ABOVE OR BELOW GROUND) DAMAGED BY
<br />WORK THE CONTRACTOR PERFORMED. REPAIRS SHALL BE MADE AT NO
<br />ADDITIONAL COST TO THE OWNER.
<br />14. CEILING TILES, FIXTURES AND GRID THAT ARE REQUIRED TO BE
<br />REMOVED IN EXISTING AREAS IN ORDER TO FACILITATE NEW WORK SHALL
<br />BE PERFORMED BY THE GENERAL CONTRACTOR.
<br />15. CUT AND PATCH AS REQUIRED FOR INSTALLATION.
<br />16. ALL PIPING SHALL BE INSTALLED AS CLOSE TO PLANS AS POSSIBLE.
<br />REVISIONS TO PIPING SHALL BE MADE ONLY WHEN A CONFLICT WITH OTHER
<br />TRADES OCCURS AND SHALL BE APPROVED BY THE ARCHITECT/ENGINEER.
<br />17. THE LOCATION OF ALL CLEANOUTS, VALVES, GAUGES, ETC. SHALL BE
<br />LOCATED FOR ACCESS OR SERVICE IN REFERENCE TO THE FINISHED
<br />BUILDING. REFER TO THE DRAWINGS FOR APPLICABLE DETAILS. WALL
<br />CLEANOUTS SHALL BE 18" A.F.F. AND FLOOR CLEANOUTS SHALL BE
<br />LOCATED WITHIN 12" OF AN ADJACENT WALL.
<br />18. WHERE PLUMBING SERVICES ARE REQUIRED FOR EQUIPMENT
<br />FURNISHED UNDER OTHER SECTIONS OR PROVIDED BY THE OWNER (OFCI),
<br />THE CONTRACTOR SHALL DETERMINE ACCURATE ROUGHING
<br />REQUIREMENTS IN ADVANCE OF WORK, SET EQUIPMENT IN PLACE, MAKE
<br />NECESSARY SERVICE CONNECTIONS AND PROVIDE ACCESSORIES AS
<br />REQUIRED. REFER TO "EQUIPMENT SCHEDULE (OFCI)" AND KITCHEN
<br />EQUIPMENT DRAWINGS WHERE APPLICABLE.
<br />19. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION AND
<br />ROUGHING DIMENSIONS OF ALL PLUMBING FIXTURES, DRAINS, ETC...
<br />20. ALL FLOOR DRAINS SHALL BE SERVED BY AN APPROVED TRAP PRIMER.
<br />EXCEPTION: SHOWER AND KITCHEN DRAINS.
<br />21. ALL HOSE BIBBS, WALL HYDRANTS AND HOSE END CONNECTIONS BE
<br />EQUIPPED WITH AN APPROVED INTEGRAL VACUUM BREAKER.
<br />22. DIELECTRIC UNIONS SHALL BE INSTALLED AT ALL CONNECTIONS OF
<br />DISSIMILAR METALS (SUCH AS COPPER TO GALVANIZED STEEL).
<br />23. ALL VENT PENETRATIONS THRU THE ROOF SHALL BE LOCATED A
<br />MINIMUM OF 25'-0" FROM ALL FRESH AIR INTAKES. 10'-0" CLEARANCE IS
<br />ACCEPTABLE FOR NON -HEALTHCARE PROJECTS.
<br />24. UNLESS OTHERWISE NOTED, ALL WALL HYDRANTS AND HOSE BIBBS
<br />SHALL BE INSTALLED 24" ABOVE FINISHED FLOORS OR GRADE.
<br />25. FOR UNDERGROUND SANITARY WASTE PIPING, CAST IRON SHALL BE
<br />INSTALLED FOR THE FIRST TEN FEET ON THE DRAIN SERVING ANY
<br />STERILIZER OR OTHER EQUIPMENT THAT MAY DISCHARGE WASTE WATER
<br />ABOVE 140TF. - -- - -- - - --- - -
<br />PLUMBING SHEET LIST
<br />SHEET
<br />NUMBER SHEET NAME
<br />P0.1
<br />PLUMBING - LEGEND, NOTES, DETAILS
<br />P5.1
<br />PLUMBING - PARTIAL FIRST FLOOR PLANS
<br />P10.1
<br />PLUMBING ISOMETRIC DIAGRAMS
<br />REVISIONS
<br />N 00
<br />00
<br />N
<br />I
<br />Q�
<br />o °°� o
<br />08
<br />��ti
<br />5
<br />NSa�'-
<br />c
<br />►--�
<br />o
<br />o ro
<br />U , N
<br />ro
<br />'�
<br />it
<br />¢ E ~'
<br />Q
<br />o
<br />�-"
<br />o=ti
<br />o
<br />E oa.
<br />N
<br />co
<br />1
<br />Z
<br />OV/
<br />Z
<br />U
<br />W
<br />D
<br />LL
<br />0
<br />U
<br />ZO
<br />00
<br />U
<br />V
<br />c Z
<br />O
<br />.�
<br />U
<br />04
<br />Q.
<br />-X
<br />M
<br />--
<br />NNNNJILIJ
<br /><
<br />H O
<br />�
<br />V
<br />o
<br />`s
<br />_
<br />O 0
<br />O
<br />U W
<br />c
<br />vi
<br />�
<br />O
<br />L0
<br />CO r
<br />O
<br />M
<br />ImNNNNNI
<br />O
<br />N
<br />CL CL O
<br />Date: 06. 03. 16
<br />Scale: AS NOTED
<br />Project Mgr: DAN
<br />Drawn: DEG
<br />Job: 16-062
<br />Sheet
<br />Poe I
<br />
|