�9
<br />H
<br />5
<br />SEE FLOOR PLAN
<br />J(DIL O L O OPENINCx IN EXISTINCs CM UJ�41..L
<br />SCALE: 3/8" I'-0" RM 106 SCALE: 3/8" I'-0" RM "906 SCALE: NONE
<br />EXISTING BI
<br />TO REMAIN
<br />INTERIOR
<br />NEW 4" x 3'
<br />STEEL ANGI
<br />EXPANSION
<br />AT I6" OTC.
<br />EXISTTNG BLOCK WALL
<br />TO BE REMOVED
<br />EXTERIOR
<br />EXISTING CONCRETE
<br />SLAB --\
<br />PROVIDE A MIN. /\ a
<br />VAPOR BARRIER \j
<br />EQUIVALENT TO
<br />STEGOWRAP BELOW
<br />NEW CONCRETE - TAPE \\
<br />NEW VAPOR BARRIER
<br />TO EXISTING.
<br />PROVIDE CLEAN COMPACTED
<br />TERMITE TREATED FILL AS REQUIRED
<br />NEW (2) 4" X 3 1/2" X 1/4"
<br />STEEL ANGLE WITH 3/8"
<br />THRU BOLTS AT 16" O.G.
<br />EXISTING BLOCK
<br />WALL TO REMAIN
<br />REMOVE EXISTING CONC.
<br />BLOCK SEE FLOOR PLAN
<br />AND WINDOW SCHEDULE.
<br />SAWCUT CONCRETE SLAB MIN.
<br />1 1/2" DEEP AND BREAK OUT
<br />EXISTING CONCRETE
<br />3000 PSI CONCRETE INFILL
<br />CEMENT
<br />STABILIZED SAND
<br />NEW PLUMBING
<br />PIPING OR
<br />CONDUIT AS
<br />REQUIRED
<br />DECK
<br />EXTEND WALL TO UNDERSIDE OF
<br />ROOF DECK PER U.L. DESIGN U.465
<br />STEEL CHANNEL
<br />"I HOUR FIRE WALL - DO NOT PENETRATE"
<br />SIGNS WITH FOUR (4) INCH LETTERING, SHALL
<br />BE PLACED EVERY TEN (10) FEET MAXIMUM
<br />ABOVE CEILING LEVEL ON BOTH SIDES OF
<br />WALL. SIGNS MAY BE STICK ON SIGNS IN
<br />CONTRASTING COLORS OR STENCILED PAINT
<br />ON WALLS.
<br />FIRE BLOCKING AS PER IBC 111
<br />LAY -IN ACOUSTICAL
<br />OR GYPSUM BOARD
<br />CEILING.
<br />5/8" x 48" WIDE TYPE "X" GYPSUM WALLBOARD
<br />APPLIED HORIZONTALLY OR VERTICALLY, CORNER
<br />JOINTS OVER STUDS, STAGGER 16" O.G. OPPOSITE SIDES.
<br />ATTACH TO STUDS AND RUNNERS WITH I" LONG TYPE "S"
<br />SCREWS AT THE JOINTS 4 RUNNER CHANNELS 1/2" TO 3/4"
<br />FROM EDGES OF GNU$. SCREWS SHALL BE SPACED 8"
<br />O.G. ALONG EDGES OF BOARD AND 12" O.G. IN THE FIELD,
<br />COVER JOINTS WITH TAPE AND JOINT COMPOUND PER
<br />GA - WP - 1200. INCREASE METAL STUD THICKNESS AS
<br />REQUIRED FOR PLUMBING AND ELECTRICAL.
<br />FIRE BLOCKING AS PER IBC 111
<br />I SEE UL DESIGN NO. U465 I
<br />R-11 BLANKET INSULATION AT
<br />SOUND PROOF PARTITIONS ONLY.
<br />8" GALVANIZED METAL STUDS
<br />(SEE FLOOR PLAN) AT 16" O.C, 20 GA.
<br />STUDS AT WALL MOUNTED EQUIPMENT
<br />25 GA. GALV. STEEL CHANNEL
<br />FASTEN TO SLAB AT 24" O.G.
<br />FLOOR SLAB
<br />104 1 TYP�C,4L FIRE RATED 10AWITION
<br />101 LINTEL■ 1DETAIL J(DI 11 gAALE:1 ICUT ,/ SLA5 PATC 4 DETAIL I
<br />It
<br />REVEAL DETAIL
<br />SCALE: 3" ■ I'-0"
<br />WOOD VENEER
<br />PANEL OVER
<br />3/4" PLYWOOD
<br />BLACK LAMINATE
<br />AT REVEAL
<br />LOCATIONS TYP.
<br />3/4" PLYWOOD
<br />Design No. U465
<br />September 27, 2005
<br />Nonbearing Wall Rating - 1 HR
<br />n }
<br />1. Floor and Ceiling Runners - (not shown) - Channel shaped runners, 3-5/8 in. wide (min), 1-1/4 in. legs, formed from min No. 25 MSG galv
<br />steel, attached to floor and ceiling with fasteners spaced 24 in. OC max.
<br />2. Steel Studs - Channel shaped, 3-5/8 in. wide (min), 1-1/4 in. legs, 3/8 in. folded back returns, formed from min No. 25 MSG galv steel spaced
<br />24 in. OC max.
<br />3. Batts and Blankets* - (Optional) - Mineral wool or glass fiber batts partially or completely filling stud cavity.
<br />See Batts and Blankets (BZJZ) category for names of Classified companies.
<br />3A. Fiber, Sprayed* - As an alternate to Batts and Blankets (Item 3) - Spray applied cellulose material. The fiber is applied with water to
<br />completely fill the enclosed cavity in accordance with the application instructions supplied with the product. Nominal dry density of 3.0 lb/ft3.
<br />Alternate application method: The fiber is applied with U.S. Greenfiber LLC Type AD100 hot melt adhesive at a nominal ratio of one part
<br />adhesive to 6.6 parts fiber to completely fill the enclosed cavity in accordance with the application instructions supplied with the product.
<br />Nominal dry density of 2.5 IWO.
<br />U S GREENFIBER L L C - Cocoon2 Stabilized or Cocoon-FRM (Fire Rated Material)
<br />3B. Fiber, Sprayed* - As an alternate to Batts and Blankets (Item 3) and Item 3A - Spray applied cellulose insulation material. The fiber is
<br />applied with water to interior surfaces in accordance with the application instructions supplied with the product. Applied to completely fill the
<br />enclosed cavity. Minimum dry density of 4.3 pounds per cubic ft.
<br />NU -WOOL CO INC - Cellulose Insulation
<br />4. Gypsum Board* - 5/8 in. thick, 4 ft wide, attached to steel studs and floor and ceiling track with 1 in. long, Type S steel screws spaced 8 in.
<br />OC. along edges of board and 12 in. OC in the field of the board. Joints oriented vertically and staggered on opposite sides of the assembly.
<br />When attached to item 6 (resilient channels) or 6A (furring channels), wallboard is screw attached to furring channels with 1 in. long, Type S
<br />steel screws spaced 12 in. OC.
<br />AMERICAN GYPSUM CO - Types AG-C, AGX-I
<br />BEIJING NEW BUILDING MATERIALS PUBLIC
<br />LTD CO - Type DBX-1.
<br />BPB AMERICA INC - Types 1, EGRG, ProRoc Type X, ProRoc Type C.
<br />BPB CANADA INC - ProRoc Type C, ProRoc Type X or ProRoc Type Abuse -Resistant.
<br />CANADIAN GYPSUM COMPANY - Types AR, C, IP-AR, IP-X1, IP-X2, IPC-AR SCX, SHX, WRC or WRX.
<br />G-P GYPSUM CORP, SUB OF
<br />GEORGIA-PACIFIC CORP - Types 5, 9, C, DAP, DD, DA, DGG, DS, GPFS6.
<br />LAFARGE NORTH AMERICA INC - Types LGFC2, LGFC2A, LGFC6, LGFC6A, LGFC-C, LGFC-C/A.
<br />NXTTONAL GYP9W CO - Types FSK,_F$K-C, FSK-G, FSW-C, FSW-G, FSW, FSW-3 , FSW-5.
<br />PABCO BUILDING PRODUCTS L L C, DBA
<br />PABCO GYPSUM - Type PG-C or PG-9 .
<br />PANEL REY S A - Type PRX.
<br />SIAM GYPSUM INDUSTRY (SARABURI) CO LTD - Type EX-1
<br />STANDARD GYPSUM L L C - Types FRX-6, VPBX-6, FRWRX-6, SHTGX-6, FRX-6 Exterior Gypsum Soffit Board, SG-C.
<br />TEMPLE -INLAND FOREST PRODUCTS CORP - Type X, Veneer Plaster Base - Type X, Water Rated - Type X, Sheathing - Type X, Soffit -
<br />Type X, TG-C.
<br />UNITED STATES GYPSUM CO - Type AR, C, FRX-G, IP-AR, IP-XI, IP-X2, IPC-AR, SCX, SHX, WRC or WRX.
<br />USG MEXICO S A DE C V - Type AR, C, IP-AR, IP-X1, IP-X2, IPC-AR, SCX, SHX, WRC or WRX.
<br />4A. Gypsum Board* - (As alternate to Item 4) - Nom 5/8 in. thick gypsum panels with beveled, square or tapered edges, applied vertically or
<br />horizontally. Vertical joints centered over studs and staggered one stud cavity on opposite sides of studs. Horizontal edge joints and horizontal
<br />buttjoints on opposite sides of studs need not be staggered or backed. Panels attached to steel studs and floor runner with 1 in. long Type S steel
<br />screws spaced 8 in. OC when applied horizontally, or 8 in. OC along vertical and bottom edges and 12 in. OC in the field when panels are
<br />applied vertically.
<br />CANADIAN GYPSUM COMPANY - Types AR, C, IP-AR, IP-XI, IP-X2, IPC-AR, SCX, SHX, WRC or WRX.
<br />UNITED STATES GYPSUM CO - T ype AR, C, FRX-G, IP-AR, IP-Xl, IP-X2, IPC-AR, SCX, SHX, WRC or WRX.
<br />USG MEXICO S A DE C V - Type AR, C, IP-AR, IP-Xl, IP-X2, IPC-AR, SCX, SHX, WRC or WRX.
<br />4B. Gypsum Board* - (As an alternate to Items 4 or 4A) - Nom 3/4 in. thick, 4 ft wide, installed as described in Item 4A with screw length
<br />increased to 1-1/4 in.
<br />CANADIAN GYPSUM COMPANY - Types AR, IP-AR.
<br />UNITED STATES GYPSUM CO - Types AR, IP-AR.
<br />USG MEXICO S A DE C V - Types AR, IP-AR.
<br />5. Joint Tape and Compound - Vinyl, dry or premixed joint compound, applied in two coats to joints and screw heads; paper tape, 2 in. wide,
<br />embedded in first layer of compound over all joints. As an alternate, nominal 3/32 in. thick gypsum veneer plaster may be applied to the entire
<br />surface of Classified veneer baseboard. Joints reinforced.
<br />6. Resilient Channel - (Optional -Not Shown) - 25 MSG galv steel resilient channels spaced vertically max 24 in. OC, flange portion attached to
<br />each intersecting stud with 1/2 in. long type S- 12 panhead steel screws.
<br />6A. Steel Framing Members (Not Shown)* - As an alternate to Item 3, furring channels and resilient sound isolation clip as described below:
<br />a. Furring Channels - Formed of No. 25 MSG gals steel. 2-3/8 in. wide by 7/8 in. deep, spaced 24 in. OC perpendicular to studs. Channels
<br />secured to studs as described in Item b. Ends of adjoining channels are overlapped 6 in. and tied together with double strand of No. 18 SWG
<br />gals steel wire near each end of overlap. As an alternate, ends of adjoining channels may be overlapped 6 in. and secured together with two
<br />self -tapping #6 framing screws, min. 7/16 in. long at the midpoint of the overlap, with one screw on each flange of the channel.
<br />b. Steel Framing Members* - Used to attach furring channels (Item a) to studs (Item 1). Clips spaced 48 in. OC., and secured to studs with 1-5/8
<br />in. wafer or hex head Type S steel screw through the center grommet. Furring channels are friction fitted into clips.
<br />PAC INTERNATIONAL INC - Type RSIC-1.
<br />*Bearing the UL Classification Mark
<br />UL DESIGN NO. U465
<br />SCALE: N T.S.
<br />KEYED NOTES
<br />OBASEBOARD - SEE FINISH SCHEDULE
<br />OOPEN SPACE / KNEE SPACE BELOW COUNTER
<br />OOPEN BEYOND
<br />OKEYBOARD DRAWER
<br />OREFRIGERATOR BY TENANT
<br />OUNDERCOUNTER REFRIGERATOR BY TENANT
<br />OSTAINLESS STEEL SINK - SEE PLUMBING DRAWINGS
<br />OLAMINATED END PANEL
<br />OLAMINATED BACKSPLASH
<br />10 LAMINATED COUNTER TOP
<br />11 SOLID SURFACE COUNTER TOP - SEE CABINET DETAILS AND FINISH
<br />SCHEDULE.
<br />12 GYPSUM WALLBOARD WRAPPED HEADER / SOFFIT - SEE
<br />REFLECTED CEILING PLAN.
<br />13 LAMINATED SUPPORT LEG.
<br />14 FALSE LAMINATED PANEL.
<br />15 3/4" WIDE x 3/4" DEEP REVEAL - SEE DETAIL 1/A3b.
<br />I6 "LYNX" MOBILE CABINET PACKAGE BY TENANT.
<br />11 40 INCH WIDE DUCTLESS FUME HOOD BY TENANT.
<br />18 DOOR SYSTEM - SEE FLOOR PLAN AND DOOR SCHEDULE.
<br />G PEW- EFRAL NOTES
<br />I. SEE REFLECTED CEILING PLAN FOR ALL CEILING HEIGHTS AND
<br />DECORATIVE CEILING DIMENSIONS AND DETAILS.
<br />2. SUBMIT SHOP DRAWINGS TO ARCHITECT PRIOR TO FABRICATION OF
<br />CABINETRY FOR APPROVAL.
<br />3. SEE SHEET A4 FOR CABINET DETAILS.
<br />4. SEE SHEET A5 FOR FINISH SCHEDULES AND MATERIALS.
<br />REVISIONS
<br />BY
<br />i
<br />.—.. co
<br />ram.
<br />►� ¢ ;0,
<br />O ti
<br />t- 0
<br />N
<br />U
<br />' E x y
<br />N
<br />o 2
<br />0o u N ro
<br />ti >
<br />0
<br />Cn
<br />ti o
<br />ti
<br />co
<br />I
<br />W
<br />a
<br />ii
<br />oo
<br />6v I cv y
<br />0
<br />co
<br />o
<br />v�
<br />O
<br />� � Q
<br />C1.
<br />C
<br />U_
<br />� Z
<br />O (V
<br />U W Ln
<br />D L. o N)
<br />0--
<br />w Q
<br />cn v
<br />-�
<br />O O
<br />Q
<br />O L �
<br />a LLB
<br />0 y
<br />Lo
<br />Q M L
<br />°° o.
<br />0
<br />a — m
<br />O N
<br />L.
<br />J
<br />LL
<br />Date: 06. 03. 16
<br />Scale: AS NOTED
<br />Project Mgr: AAY
<br />Drawn: JDS
<br />Job: 16-062
<br />Sheet
<br />A3b
<br />
|