Laserfiche WebLink
CROSS BRACING DETAIL (TYP.)_ <br />SCALE:NTS <br />TRUSS NOTES: <br />CONV. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. Cg <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. Dg <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT SEE TYP TRUSS BLOCKING DETAILS <br />- L- 1wu `W ­1 1 111- 1•L✓ <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />TB <br />PRE-ENG. TRUSS <br />2X4 BLOCKING <br />2X4 DIAGONAL AT 8'-0" O.C. BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />MAX & EACH END ALTERNATE CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. ---\ A I <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />law <br />�7A TRUSS <br />21 <br />HIP <br />G.T <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE:NTS <br />(2) 2x8 #2 SYP w <br />O.S.B. FLITCH PI <br />TOP @ TRUSS E <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM a@ RAISED ENTRY <br />MASONRY WALL 4 <br />SCALE:NTS <br />SIMPSON LSTA18 <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ 4 <br />() <br />w/ (12) 1Od NAILS <br />CENTERED AT <br />SIMPSON HUC410 w/ <br />SEE PLAN I. <br />FOR CANT. <br />16d INTO HEADER & <br />(6) 6) <br />10d TOP & BOTTOM <br />SPLIT TO TIE <br />10d INTO BEAM - SEE <br />OR SIMPSON H2.5A w/ <br />BEAMS TOGETHER <br />ROOF PLAN FOR MORE <br />(10) 8d NAILS <br />INFO <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE —7/16" OSB FLITCH PLATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A INDICATED ON <br />SC EDULE/PLANM OPTION B CONNECTION INFO OPTION C <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />COMMON BM. TO POST ATTACHMENT <br />A � A <br />SEE PLAN FOR <br />SCALE: 3/4"=V-0" <br />BM. SPLICE OVER <br />CENTER OF POST <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE 2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL aC� ENTRY FRONT WALL <br />SCALE:NTS <br />2x4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD - TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />w/ (3) 10d PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />I < FOR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />w/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />L5 <br />DIAGONAL 2x8 #2 SPF RIDGE BEAM <br />AT 8'-0" WOOD SIMPSON LUS26 w/ (8) 10d NAILS <br />MAX TRUSS 2x6 #2 SYP RAFTERS FOR SPANS 4FT SIMPSON MTS18 w/ (14) OR IF 2 PLY TRUSS SIMPSON <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS 10d NAILS TYP. U.N.O. SEE PLAN FOR SIMPSON LUS26-2 w/ (8) 16d NAILS TO SEE FLOOR FRAMING PLAN <br />THAN 4FT @ 2'-0"0.C. MAX. w/ (3) 10d CANTILEVER IF MTS18 w/ (14) LEDGER AND J/S6 FOR MORE INFO. <br />COMMON TOENAILS TO TIE BEAM SEE FLOOR PLAN FOR INDICATED 10d NAILS VERIFY WITH PLAN FOR <br />COLUMN SIZE & TYP. U.N.O. 2X10 #2 SYP CONT. LEDGER w/ (3) LOCATION AND DIRECTION <br />2X4 CONT. AT CONC. MASONRY ADDITIONAL INFO. 1/2" X 4 1/2" LAG SCREWS ATTACH <br />T & B CHORD STEEL OR WOOD (WOOD COLUMN SHOWN) LAG SCREWS INTO END OF EACH BILOCKING INFO) <br />E 2/D2 FOR <br />BEARING SUPPORT MIDDLE FLOOR TRUSS, 24" O.C. MAX. (AT <br />F. EACH SIDE OF G.T. INSTALL (4) LAG MASONRY WALL <br />° SCREWS EACH SIDE) (TYPICAL) <br />A -A ALTERNATE BLOCKING CORNER SEE FOUNDATION SECTION AT LOW ROOF g <br />PLAN FOR MORE INFO SCALE:NTS <br />DETAIL @ INTERIOR BEARING 3 , ' <br />WOOD TRUSS J <br />SCALE:NTS COMMON B M . ATTACHMENT 18 <br />p' PROVIDE BLOCKING AT ALL TRUSS BEARING SCALE: NTS <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />TYP. WOOD TRUSS BLOCKING DETAIL STANDARD HEEL HEIGHT <br />SCALE:NTS <br />OIL VARIES 2x STUDS @ 16" O.C. <br />ROOF SHEATHING SEE 1/S5 FOR w/ SIMPSON SP1 w/ (10) 10d <br />ATTACHED PER ADDITIONAL SEE PLAN FOR <br />8d NAILS AT VALLEY TRUSS NAILS AT BASE & SIMPSON <br />2x4 #2 SPF BRACING @ NAILING SCHEDULE OUTLOOKER 4" O.C. INFO. SP2 w/ (12) 10d NAILS AT TOP <br />16" O.C. W/ (4) 12d COMMON TRUSSES. EXTERIOR SHEATHING INFO.ATTACHED PER 2x BLOCKING BETWEEN STUDS <br />TOENAILS TO TOP SEE TRUSS PLAN 2x4 STUDS w/ SIMPSON NAILING SCHEDULE TO TRUSS W/ (2) 12d TOENAILS <br />PLATE & (2) 12d END MIN. (2) 2x4 FOR CONNECTION SP1 w/ (10) 10d NAILS EACH END ( BETWEEN TRUSSES <br />STRUCTURAL SHEATHING NAILS TO TRUSS SPF TOP INFORMATION. AT BASE SEE J/S6 FOR (2) 12d NAILS TO EACH VERTICAL <br />ATTACHED PER NAILING BOTTOM CHORD GAB LOW ROOF/WALL <br />SCHEDULE PLATE MORE INFO. TRUSS h STUD) <br />SHEATHING ATTACHED <br />VARIES SEE PLAN PER NAILING SCHEDULE 2x BASE PLATE W/ (2) 12d <br />VARIES W/ FOR WALL LOCATION 2x4 BASE PLATE W/ 1/2" PLYWOOD NAILS @ 16 O.C. ALONG W/ <br />ROOF SLOPE >< SIMPSON LSTA30 w/ <br />SIMPSON MTS12 w/ (14) 10d x <br />(22) 10d NAILS OR (2) 16d NAILS TO <br />EACH COMMON 1 1/2" NAILS TO BLOCKING <br />WOOD WALL SIMPSON MTS12 w/ BELOW @ 16" O.C. <br />MIN. 2x4 #2 SPF STUDS @ <br />OR TRUSS. (14) 10d x 1 1/2" NAILS TRUSS/ FRAMING 2X4 CONT. W/ (2) I <br />SEE PLAN 16d COMMONS 16 O.C. W/ EXTERIOR TO FLOOR GIRDER TYP TOP &BOTTOM <br />NAILS EACH SHEATHING ATTACHED BELOW @ 16" O.C. j <br />STUD TYP. T&B PER NAILING SCHEDULE & • MASONRY WALL BELOW: SIMPSON PLYWOOD <br />(3) 12d TOENAILS TO a HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />TRUSS OR SEE PLAN FOR <br />PLATE BELOW MASONRY WALL 4'-0" O.C. TO GABLE TRUSS FLOORING <br />ROOF SYSTEM TOP OF WALL OR BEAM • BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN a " <br />MIN. 2x4 #2 SYP P.T. PLATE 16" FLOOR SYSTEM FLOOR GIRDER (24) 10d x 1 1/2 NAILS @ 4 -0 O.C. A�L W/ 1/2"X8" EPDXY ANCHOR SEE PLAN FOR SEE PLAN FOR TO GABLE TRUSS LOW ROOF TRUSS W/ (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />MASONRY WALL SEE @ 3" FROM EACH END & DIRECTION CONNECTION COMMON TRUSS RAISED BOTTOM CHORD 2nd FLOOR WALL w/ SEE PLAN <br />PLAN FOR MORE 16" O.C. MAX. �° SEE ROOF PLAN EXTENSION SEE TRUSS SIMPSON LUS24-2 w/ (16) <br />SHEAR TRANSFER INFO. � SECTION @ FLOOR FOR CONNECTION MANUF. SPEC'S FOR 16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />EXTERIOR. WALL SECTION ENTRYKTNCONNECTION 22 SECTION AT HIP GABLE 12 SECTION @ BUMP OUT 39 <br />SCALE:NTS SCALE:NTS SCALE: NTS SCALE:NTS SCALE: NTS ��j <br />DETAILS & SECTIONS <br />C� vy'( JIfs <br />•aSE••• <br />Q <br />0. <br />•i <br />� <br />F L ©4` <br />? <br />j�q�0pzss1OvP <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications <br />contained within these <br />drawings comply with the 2017 <br />Florida Building Code - <br />Residential 6th Edition. Engineers signature <br />and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />Q <br />o <br />�E <br />T8 �' <br />O <br />J <br />N LL <br />0 <br />N J it <br />N <br />lt7 W <br />� F_ —0LL J fL <br />LL <br />M co <br />W ' N <br />m�ii a a <br />2— Z O <br />��� ox� <br />ra <br />CC Q O <br />N m m J <br />q W <br />J Q <br />Z <br />IL <br />Z <br />ao <br />N <br />o 0 <br />coZ U0 � <br />O U ❑❑❑ <br />M n <br />Z <br />N M <br />O � <br />O 4 <br /><c <br />J <br />U) <br />N <br />z <br />irrml <br />0 <br />w <br />O <br />N <br />w <br />c <br />o <br />y <br />w. <br />U <br />E <br />m1 <br />= <br />U <br />c <br />L <br />o <br />u) � <br />-o <br />®o <br />Q <br />N Ol <br />o <br />w <br />Mu <br />M <br />¢ <br />29 <br />z <br />< <br />LLL <br />c <br />Q <br />E <br />E <br />0Z0 <br />UU <br />zz <br />oo <br />z <br />> N <br /><R <br />o a <br />co <br />r6 <br />m= <br />XU <br />uo <br />O <br />N¢o <br />C <br />E <br />o¢ <br />az <br />o¢ <br />aZ <br />L <br />< ❑ <br />r <br />m <br />U) <br />Eli <br />oY <br />�° <br />of <br />Z <br />co <br />m <br />¢ W <br />N <br />to <br />�� <br />Z° <br />Q U <br />a <br />rnw <br />MW <br />U <br /><� <br />ao <br />o <br />=k <br />F_ <br />O <br />o <br />¢ <br />3 <br />o <br />O <br />w <br />I <br />a F <br />,o <br />�M <br />a`) <br />'� <br />LL <br />L <br />m <br />m <br />c� <br />U <br />O� <br />� <br />T <br />< <br />C <br />' <br />O <br />O <br />nloll., <br />U <br />1 ° <br />`0 <br />0 <br />~ <br />\{/ <br />c <br />E <br />o <br />d' <br />T <br />(6 <br />Np <br />� <br />T0 <br />2 O <br />rn <br />r <br />r� <br />ui <br />w <br />M <br />o <br />Z <br />E O <br />U � <br />Q <br />p <br />JOB <br />NO: <br />20-6227 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />D1 <br />