Laserfiche WebLink
0 <br />N, <br />N <br />RO <br />V* <br />N <br />CIO <br />rn o <br />Nit- <br />N <br />r N <br />0 <br />�!JIFki'L^iT <br />I <br />7 - <br />I <br />i <br />- J -1L <br />I I r <br />-- -- — — <br />I j Hosp, <br />I i ! Hosp fah <br />I ! Elev. ,. I P Male Change Female Chan e <br />i Public Public S-1 ! j EL - - .. 1 I r - <br />r <br />- j _L l -1, 1 Jv <br />j Elev ! Elev ---- STAIR ! 1 <br />tr` <br />i 1�1 . �_i-� ._. I _ l <br />B-1 ! B 2 <br />- b w <br />7 <br />vVdrk�,i�n <br />HL <br />On El <br />Call LO <br />- -- <br />i <br />I I! C i <br />---I� ELECT <br />! <br />i <br />I I <br />I <br />I <br />TOIL <br />PAIN R IV Pi <br />OFFICE ! OFFIC <br />I. OFFICE I <br />I <br />CONFERENCEit- <br />�. <br />�hI <br />OFFICE T' <br />i,p ! <br />�i <br />--- <br />WORK <br />I ! i' I it i lip <br />WORK <br />II <br />OFFICE <br />- CORRIDOR OFFICE <br />r, <br />CONFERENCE ---- - - - I) — -- - <br />�I J TOIL <br />%! I <br />Ir,fi' It <br />OFFICE i II --- <br />PROCEDURES <br />-- -- TOIL <br />i I <br />I I, _ <br />Ij t <br />FivINR <br />! TOIL = - <br />EXAM I }.- I I t z )) <br />-- <br />- <br />I 0 <br />Tell <br />--- ! ! JANITOR I <br />CLOSET I i <br />Ir ! <br />STAIR <br />" K' <br />---- <br />'1 -H" <br />2" HS & <br />!I t <br />I, I <br />H T <br />A-0 � 14 Soil <br />GENERAL DEMOLITION NOTES: <br />1. PRIOR TO DEMOLITION, MEASURE AND RECORD AIR & WATER QUANTITIES IN <br />UTILITIES REQUIRED TO MAINTAIN OPERATION WITHIN AND BEYOND EACH <br />DEMOLITION PHASE UNTIL AFFECTED AREAS ARE DEMOLISHED. MAINTAIN <br />THESE QUANTITIES THROUGHOUT EACH DEMOLITION PHASE. <br />2. MAINTAIN EXISTING AIR HANDLING UNITS IN OPERATION UNTIL ITS <br />RESPECTIVE DEMOLITION PHASE IS COMPLETE. BLANK OFF AND SEAL <br />RETURN AIR INTAKES SERVING EACH DEMOLISHED AREA IN ORDER TO <br />PREVENT GENERATED CONSTRUCTION DEBRIS FROM BEING RECIRCULATED <br />TO OCCUPIED SPACES DURING DEMOLITION -CONSTRUCTION PHASE. BLANK <br />OFF AND SEAL ANY SA, RA AND / OR EA DUCTS BEING DEMOLISHED AND <br />REMAINING WITHIN THE CONSTRUCTION AREA. <br />3. MAINTAIN NEGATIVE RELATIVE AIR PRESSURE IN DEMOLITION PHASE AREA. <br />MINIMUM HEPA-FILTERED EXHAUST AIR QUANTITY SHALL BE 0.5 TO 0.75 CFM/SQ.FT. <br />UTILIZE MULTIPLE NEGATIVE AIR UNITS, AS NECESSARY, TO MAINTAIN NEGATIVE <br />PRESSURE. PROVIDE REQUIRED MAKE-UP AIR FROM A SEPARATE SOURCE. <br />FANS IDENTIFIED TO BE DEMOLISHED, IN DEMOLITION AREA, AND / OR EXISTING <br />ROOF EXHAUST FANS AND THEIR ROOF OPENINGS MAY BE UTILIZED FOR NEGATIVE <br />AIR DISCHARGE UNTIL DEMOLITION PHASE IS COMPLETE. DO NOT UTILIZE EXISTING <br />EXHAUST RISERS THAT SERVE OTHER SPACES OR OTHER LEVELS IN BUILDING. <br />4. VERIFY NEGATIVE RELATIVE AIR PRESSURE IN THE CONSTRUCTION SPACE <br />BY PROVIDING A MAGNAHELIC PRESSURE GAUGE AND MAINTAINING A WRITTEN LOG, <br />TAKEN AT REGULAR INTERVALS, POSTED FOR REVIEW AT SITE OF CONSTRUCTION. <br />5. DEMOLISH ALL DUCTWORK, PIPING AND ANCILLARY DEVICES WITHIN AREA OF <br />PHASING PLAN UNLESS OTHERWISE NOTED. ALL BRANCH DUCTS BEING <br />DEMOLISHED FROM MAIN TRUNK DUCTS SHALL HAVE BRANCH CONNECTION <br />OPENINGS PATCHED, SEALED AND INSULATED TO MATCH EXISTING DUCTWORK. <br />6. DEMOLISH ALL ABANDONED DUCTWORK, DAMPERS, PIPING AND ANCILLARY <br />DEVICES IN DEMOLITION AREA UNLESS OTHERWISE NOTED. PATCH AFFECTED <br />WALLS TO MATCH EXISTING OR NEW CONSTRUCTION, AS PROJECT DICTATES. <br />7. PRIOR TO DEMOLITION, MEASURE AND RECORD AIRFLOW AT POINTS LISTED <br />0 THRU 9O <br />SUBMIT REPORT TO ARCHITECT FOR EVALUATION PRIOR TO NEW CONSTRUCTION. <br />It <br />i <br />;-�, I <br />A � � -I j IT , <br />1 <br />- KEYED DEMOLITION NOTES: <br />1. UTILIZE DEMOLISHED SIDEWALL EXHAUST FAN OPENING <br />FOR NEGATIVE PRESSURE MACHINE DISCHARGE. <br />2. UTILIZE DEMOLISHED WINDOW OPENING FOR FRESH AIR <br />SOURCE OR NEGATIVE PRESSURE MACHINE DISCHARGE. <br />r <br />ry II <br />I I 'I <br />3. UTILIZE EXISTING ENTRY LOBBY DOORS FOR FOR <br />I ! <br />FRESH AIR AIR SOURCE, IF NEEDED.. <br />jl <br />I I <br />---' "! 4. UTILIZE DEMOLISHED EXHAUST FAN RISER FOR NEGATIVE <br />! PRESSURE MACHINE DISCHARGE., IF REQUIRED. <br />Ti <br />� JI <br />D <br />i <br />! Ij rl <br />r `'r <br />L I <br />Y; EXISTING PHYSICIANS OFFICES'\ <br />i <br />i <br />It <br />! t WAIT <br />! <br />BREAK OFFICE OFFICE I EXAM EXAM i EXAM <br />10 <br />!!i <br />ROOM <br />t J <br />--ra--- -T <br />I! j <br />I ! <br />Project No. 09005.00 <br />m 1 41 1 <br />$DATE$ $TIME$ $FILER$ <br />© 2012 13111 Architects, Inc. I <br />