Laserfiche WebLink
o�0 <br />1TJ <br />O N <br />\ <br />oD 7 <br />v <br />N <br />ao <br />N <br />917.1 <br />r <br />A PITA P y I <br />' t <br />P y A <br />r <br />0 <br />Florida flospital Ze h rhillsp Y <br />7050 Gall Boulevard <br />ze h rhills FL 335411 <br />l� Y <br />Client Code/ ]File Number: 23/100046 Project 11D Submission Number 107-002 <br />PROJECT TEAM DIRECTORY MEP ENGINEER SYMBOLS AND MATERIALS INDEX OF DRAWINGS <br />Smith Seickman Reid, Inc. NOTE: The symbols here are specific to the Architectural Drawings as a whole. <br />OWNER The Life Safety, Reflected Ceiling Plan and Roof Plan respectively Include supplementary legends AO.O Cover Sheet <br />6948 Professional Parkway East and drawing notes specific to those sheets. Refer to other disciplines for additional symbols. <br />Florida Hospital Ze h rhills Sarasota, Florida 34240 WINDOW TYPE - - EARTH <br />p p Y Phone: (941) 907-7750 ® ARCHITECTURAL ELECTRICAL <br />7050 Gall Boulevard Fax: (941) 907-7751 � ELEVATION BENCHMARK � GRANULAR FILL <br />Zephyrhills, Florida 33541 LS.1 Life Safety Plan E0.1 Electrical Schedules, Legends and Drawing Index <br />1 METAL <br />REVISION AND NUMBER ® A1,0 Life Safety Plan - Partial First Floor E0.2 Electrical Ground Floor Locations Reference Plan <br />Phone. (813) 788 0411 <br />® FINISH WOOD Al.I First Floor ICRA Plan E0.3 Electrical First Floor Locations Reference Plan <br />C.J.D CONTROL JOINT <br />STUCCO OR GYPSUM BOARD A1.2 Ground Floor ICRA Plan ELL First Floor Plan - Demolition - Electrical <br />ARCHITECT STRUCTURALENGINEER 124 A2.0 Demolition Plan E2.1 First Floor Plan - New Construction - Lighting <br />DOOR AND FRAME CONCRETE OR GRAVEL <br />TKW Consulting Engineers WITH DOOR NUMBER A2.1 Floor Plan E3.1 First Floor Plan - New Construction - Power <br />Burt Hill /Pollock Krieg Architects, Inc. ® CONCRETE MASONRY UNIT (CMU) A2,2 Reflected CeilingPlan E3.2 Third Floor/Roof Plan -New Construction -Power <br />7680 Universal Boulevard, Suite 580 EXISTING DOOR ® <br />8250 College Parkway Suite 203 PLYWOOD A2.3 Framing Plan E4.1 First Floor Plan - New Construction - Systems <br />. Orlando, Florida 32819 METAL STUD WALL ACOUSTIC CEILING TILE A2 4 Roof Plan E5.1 Electrical One Line Diagram <br />Fort Myers, Florida 33919 Phone: 407 -12 1 ® �' <br />Phone: 239 482-4761 e ( ) 363 O MASONRY WALL BATT OR SEMI -RIGID INSULATION A4.0 Schedules, Wall Types, Sections and Details E6.1 Electrical Schedules <br />( ) Fax: (407) 363-1204 � <br />Fax: (239) 482-0265 EVALUATION RIGID INSULATION A5.0 UL Details E6.2 Electrical Studies <br />208 ROOM NAME AND NUMBER A6.0 Specifications E7.1 Electrical Details <br />�- WALL TYPE ® ROUGH WOOD FRAMING OR BLOCKING E8.1 Electrical Specifications <br />2x2 LAY -IN FLUORESCENT FIXTURE <br />BUILDING SECTION <br />GENERAL NOTES (� ® 2x4 LAY -1N FLUORESCENT FIXTURE STRUCTURAL <br />SECTION OR DETAIL FLUORESCENT UTILITY FIXTURE FIRE PROTECTION <br />O RECESSED DOWNLIGHT S 1.0 A/C Structural Framing Plan, Sections and Details <br />ELEVATION Z SUPPLY AiR DIFFUSER FPO.1 Fire Protection Schedules, Legends, Notes <br />g <br />Industry standards (i.e. ASTM, ANSI, etc.) SHALL HAVE THE SAME FORCE AND EFFECT Z RETURN AIR REGISTER FP0.2 Fire Protection Specifications <br />on performance of work as If copies were directly Inserted Into the Contract Documents or bound and INTERIOR ELEVATION <br />published therewith. Comply with standards In effect as of the dote of the Contract Documents, -,�G -' FINISH CEILING ELEVATIONPLUMBING <br />T ��T(; <br />unless otherwise note or required by authorities having jurisdiction. kcMaCAS NORTH (All elevations are A.F.F.) PLUM BI G FP0.3 Fire Protection Specifications <br />p5Z G � l < �� d sys 1�" NORTH ARROW ® EXIT LIGHT FP1.1 First Floor Plan - Demolition - Fire Protection <br />� l 4 2x2 ACOUSTICAL CEILING TILE P0.1 Plumbing Schedule, Legend and Notes <br />s� � - � FP2.1 First Floor Plan -New Construction -Fire Protection <br />V ` k�o� t �o � P0.2 Plumbing Specifications <br />CODES -All work shall conform to the following codes and ordinances: ��, � � FP2.2 Second Floor Plan -New Construction -Fire Protection <br />'L4 2x4 ACOUSTICAL CEILING TILE <br />I � D�( ,2nn P0.3 Plumbing Specifications <br />- 2007 Florida Building Code, with 2009 amendments ©� rr• 1 FP5.1 Fire Protection Details <br />- 2007 Florida Plumbing Code, with 2009 amendments r3 g <br />- 2007 Florida Fuel Gas Code, with 2009 amendments+� GYPSUM BOARD P0.4 Plumbing Specifications <br />- 2007 Florida Mechanical Code, with 2009 amendments P0.5 PlumbingSpecifications <br />- 2007 Florida Fire Prevention Code MAGNETIC DOOR HOLDER MEDICAL EQUIPMENT <br />Local Codes and Ordinances where applicable and flood damage prevention ordinances P1.1 First Floor Plan - Demolition - Plumbing <br />2006 NFPA /01 - Llfe Safety Code <br />2006 NFPA 99 - Health Care Facilities P1.2 First Floor Plan - Demolition - Medical Gas A-101 Equipment Layout - Details, Legend and Notes <br />- 2006 Guidelines for Design and Construction of Health Care Facilities . <br />BUILDING CODE INFORMATION : P1.3 Partial Roof Plan -Demolition -Plumbing A-102 Reflected Ceiling and Safety/Service Clearance Plans <br />OCCUPANCY GROUP :GROUP I-2 P2.1 First Floor Plan- New Construction - Plumbing S-101 Structural Floor Plan - Details and Notes <br />TYPE OF CONSTRUCTION : TYPE IB-FBC P2.3 Partial Roof Plan - New Construction - Plumbing S-102 Structural Ceiling Plan - Details and Notes <br />TYPE I (3,3,2) FULLY SPRINKLERED <br />P3.1 First Floor Plan- New Construction - Medical Gas S-103 Structural Details <br />SQUARE FOOTAGE OF REMODELING: 1,247 S.F. E 101 <br />VICINITY _ :.. P5.1 Plumbing Details <br />Electrical Raceway Plan -Legend and Notes <br />....... <br />'n D - <br />rr Dimension and Notes <br />h-102 Electrical Dimen • n Plan - Legend <br />1. Contractor to oversee cleaning and Insure that the premises are maintained free of rubbish during construction. Final cleanup Is the aae vigil <br />responsibility of the Contractor. Contractor to provide Permitting Authority with Debris Affidavit at time of submittal. E-501 Electrical Details and Notes <br />2. At the termination of work, submit to Building Agent/Tenant maintenance manuals presenting full details for care and maintenance of all MECHANICAL M-101 Mechanical Plan - Details and Notes <br />surfaces and equipment of every nature. Contents shall Include manufacturer's and Installer's names, addresses, and phone numbers, and r <br />.:. <br />Instructions for Installation, start-up, operation, maintenance parts list, and data sheets. <br />M0.1 Mechanical Legends, Notes and Drawing Index <br />J. Contractor Is responsible for compliance with all Codes, Ordinances and Regulations applicable at project location. Contractor is responsible t <br />for fllin and securing all necessary permits. approvals. etc. for all trades. Like <br />9 9 y PP M0.2 Mechanical Schedules <br />. t <br />• • • nt n / r Architect.M0.3 Mechanical Specifications <br />4. When or equal'. 'alternate', or other qualifying terms ore used, those Items shall be approved by Building Agent/Tenn o d o <br />£ rs <br />io <br />nVentilation Pl Please be advised this review of plans submitted is a <br />5. Existing materials or items scheduled to remain that are damaged by construction shall be repaired, patched, and refinished to the nearest MI.0 Construction Zone an <br />r t0 <br />Intersection, restoring surface to It's original condition. <br />cursory assist the contractor in compliance with <br />M 1.1 First Floor Plan - Demolition - Mechanical fine safety codes. This review is not intended <br />to be a %al of #a submitted <br />nl m during an construction. Existing - > . tied tt is the <br />6. Contractor shall protect all existing walls, doors, frames. surfaces, fixtures, fi sties, etc. from damage du g d g plans <br />- - <br />M21 Fir Second Floor Plans New Construction Mechanical <br />materials to be removed shall be coordinated with Owner to verify if Owner wishes to salvage some. Relocation of salvaged materials, once GontfaCbiS sole teS b ensure that removed, to be b the Building A ent/Tenant's forces "`"`" �ty the plans <br />Y 9 9 <br />'andm <br />- 4� ' �. . � Partial Roof Plan -New Construction -Mechanical � «� <br />local <br />M2 2 <br />7. Contractor shall verify and be responsible for all dimensions and job site conditions related to this work. Any discrepancy in dimensions or Otdi<1arIC@S• In 1hs t1i1t #tat further examination or <br />a _ M3.1 Mechanical Details ttte <br />special modifications required due to field conditions shall be reported to the Architect for cloriflcatlon �' M1gOn18v88�i tarrce, itshal be <br />Details weir sole expense to <br />M3 2 Mechanical De ' s the cordmcloes sole <br />8. The Architect does not have control or charge of, and shall not be held responsible for construction means, methods, techniques, sequence or for ,� ;, HALL COMPLYWITHALL <br />nprogramsInconnection with work, for the acts or omissions of the contractor, subcontractors or an other persons "` BUILDING Y assumes <br />safety precautions and o o y p <br />.. a. _ : DES, FLORIDA <br />ALLWORK S brinQ chose areas in oont _ umes no <br />performing any of the work, or for the fallure of any of them to carry out the work in accordance with the Documents. M4.1 Mechanical Controls <br />B>st.� <trli PREVAILING CO rseponsibt <br />NFPA and t CODE,NATIONAI,ELECTRICCODEAND o oomph <br />..N: �e oorrtractor's be to � <br />HygFIII,LS wry all A local <br />t t the fI resistive n str structural Integrity a... CITY OF ZEP %Od@S <br />ORDINANCES � ardinanoes <br />9. All plpes, ducts, conduit, etc., which penetrate the final slab or walls shall be Installed so as o maintain a re and uc g y <br />of the building construction. <br />zz� <br />ice.::: .. <br />10. Demolition of existing construction necessary to install new construction and equipment is to be performed by the contractor who is to <br />supply and Install the new construction and equipment. Install lintels where required with prior written approval.'` tic Y , <br />� ��. <br />Il. Contractor to repair floor slabs, fill gaps, cracks and voids. Grind smooth any high spots or ridges. Floors to be prepared as required to ` <br />4 <br />REVIEW DATE j� I <br />receive floor finishes so that previous substrate defects cannot be detected. _ :.. H <br />LL SUBMITTED PLAN(S) HAVE BEEN REVIEWES <br />CI 4F ZEP YRHI S <br />:.;.... PLANS EXAMINER BY ZEPHYRHILLS FIR M SHAL'S OFFICE <br />12. GENERAL CONDITIONS OF THE CONTRACT, AIA Document A201, latest edition, shall apply. , r, <br />Date: <br />-�� <br />Reviewer: <br />13. All gypsum board In partitions around 'wet use areas' (Le.: Toilet Room(s), Laundry Room(s), Shower Room(s), etc.) shall be of moisture -resistant Project Location rya' f ��" «� { ... <br />type, and these F ^ titlons are to be sound noted.r ai <br />14. All studs, furring and miscellaneous metal accessories in walls having moisture- resistant gypsum board are to be of galvanized metal. <br />g. <br />15. All fire -rated partitions are to extend to deck above, and have all volds packed between the deck and top of wall with fire sofeing Insulation. <br />Floor track Is to be set In a bed of sealant. Joints In gypsum board partitions are to be taped over the full height of the partition. <br />r <br />16. Fire extinguisher cabinets mounting height to be 2'-6' from floor to bottom of receptacle. Top of extinguisher to be 4' 0' AFF, max. <br />:: <br />�7. All non -fire -rated partitions are to extend 4' above suspended celling grid. All such partitions are to be braced back to the structural" <br />decking or joists with suitable sub-froming at 48' o.c., max. Provide additional framing, bracing and blocking for all required cabinetry f <br />and equipment. M <br />F1 OR D Hos H RH S <br />ANGIOGRA H ROOM UPGR Di S <br />18. Not all listed GENERAL NOTES may apply, nor are they all-inclusive for every work situation. Excellence, through out the job, does apply. <br />19. Each FIRE WALL, FIRE BARRIER, FiRE PARTITION, SMOKE BARRIER, SMOKE PARTITION, or any other new wall <br />tl with signs rstencilingabove on <br />h llpermanentlyTden fled w s s o required to have protected openings s a be <br />q P gy <br />decorative celling and In concealed spaces with the wds,'FIRE AND SMOKE BARRIER PRO orTECTED ALL OPENINGS'. <br />1 �`i1L3 . <br />or similar language. Such or stenciling shall be in 4-Inch high letters, /2-Inch stroke, and not more than 15-feet on center. ����a <br />i <br />Project No. 11007.00 <br />AO,00 <br />G 2011 BH! PK Architects, lac. <br />121812011 3:41:57 PM ...\CD\AO-0 Cover Sheet.dgn <br />