Laserfiche WebLink
PLUMBING LEGEND <br />sma 05ar oN <br />Sym 013aw ON <br />--- <br />COD WATER <br />i <br />BALL VALVE <br />--- <br />HOT WATER 010'F) <br />OW VALVE <br />---- <br />HOT WATER RELATION <br />P-1;ETc <br />917M IOENiFICATiON <br />_SS- <br />SANITARY SEWER IIOEROROIMI <br />CdNWM TO EIm= <br />-W- <br />WASTE LME <br />CAP ON LINE <br />--Y-- <br />V131T PIPE 1ABOVE OR BELOW GROIMI <br />PPE TOWED LP <br />-RWL- <br />RAN WATER LEADER <br />a <br />PPE TIRED DOWN <br />- SW- <br />STORY WATER OROERGRMM1 <br />,5 <br />ter- <br />BALANCING VALVE CRCUi SETTER W/t.TEOI <br />VALVE SET AT OJ56PY <br />� 1 <br />CLEANOUT (ABOVE CELMM <br />- B - <br />DRP TAOIIOH MAN LIE <br />--CD- <br />CONDMTE DRAM LINE <br />PRESM REDUCNO VALVE <br />-•- <br />UNDSOM M COLD WATER <br />-PCD- <br />PLIPED CONDENSATE <br />PLUMBING ABBREVIATIONS <br />C.W <br />COLD WATER <br />PRY. <br />M13M REDLM VALVE <br />H.N. <br />HOT WATER <br />RPB.P. <br />REDUCED PRESSIAE BA XRM PREVDTTER <br />ILIA. <br />HOT WATER RECRC <br />A.F.F. <br />ABOVE FNSIED FLOOR <br />V.TR <br />VENT THRU ROOF <br />A.M. <br />ABOVE FINISHED lIRAOE <br />W. <br />WASTE NiTERORI <br />A.P. <br />ACCESS PANEL <br />RWL <br />RAN WATER LEADER <br />W.CA. <br />WALL CLEANMJT <br />S.W. <br />STM WATER <br />S.S. <br />SANITARY SEWER <br />L L <br />NVM ELEVATION <br />VIV. <br />VALVE N VERTICAL <br />CA. <br />CLEAMIT <br />C.D. <br />CONDESATE <br />OFCI <br />OWNER FIR ISHM CONTRACTOR NSTALLLD <br />LE <br />INVERT ELEVATION <br />R.D. <br />ROOF DRAM <br />F.C.U. <br />FAN COL 1114T <br />FD. <br />FLOOR WAN <br />N1.C. <br />NOT N CONTRACT <br />FF. L <br />FNSIm FLOOR ELEVATION <br />E.W.C. <br />ELECTING WATER COOLER <br />MEDICAL <br />GAS LEGEND <br />SYMBOL <br />DESCRIPTION <br />A <br />MEDICAL COMPRESSED AIR <br />V <br />VACUUM <br />02 <br />OXYGEN <br />N 2 0 <br />NITROUS OXIDE <br />N 2 <br />NITROGEN <br />Q <br />MEDICAL GAS EQUIPMENT (SEE MED. GAS SCHEDULE) <br />SL <br />SLIDE <br />WAGD <br />WASTE ANESTHESIA GAS DISPOSAL <br />PLUMBING DEMOLITION NOTES <br />1. EXISTING SERVICES INDICATED ON THESE DRAWINGS <br />WERE DERIVED FROM EXISTING DRAWINGS AND <br />LIMITED FIELD OBSERVATIONS. THESE DRAWINGS <br />MAY NOT BE ALL INCLUSIVE OF SERVICES THAT <br />EXIST IN THE PROJECT AREA. CONTRACTOR SHALL <br />VERIFY SERVICES, LOCATION, TYPE, AND SIZE <br />PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS <br />IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL <br />BE REPORTED TO THE ARCHITECT FOR COORDINATION <br />PRIOR TO CONSTRUCTION. <br />2. EXISTING SERVICES, EQUIPMENT, AND FIXTURES, TO <br />REMAIN OR TO BE RELOCATED, SHALL BE REPAIRED <br />TO ORIGINAL OPERATION OR REPLACED, SHOULD THEY <br />BE DAMAGED DURING CONSTRUCTION. <br />3. ALL EXISTING WORK NOT SHOWN ON THESE DRAWINGS <br />(UNLESS NOTED OTHERWISE) SHALL REMAIN AS IS. <br />4. ALL PENETRATIONS OR OPENINGS FROM REMOVED <br />PIPES THROUGH EXISTING BUILDING <br />WALLS AND FLOORS SHALL BE SLEEVED AND/OR <br />PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL <br />DRAWINGS FOR FINAL FINISHES. <br />5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE <br />TO EXISTING PIPING , FIXTURES, MED GAS OUTLETS OR EQUIPMENT <br />DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING <br />WORK TO ITS ORIGINAL CONDITION AT NO COST TO THE <br />OWNER. <br />6. CONTINUITY OF SERVICES: EXISTING BUILDING WILL REMAIN IN <br />USE DURING CONSTRUCTION OPERATIONS. WHEN AN INTERRUPTION <br />OF AN EXISTING SERVICE IS NECESSARY, CONTRACTOR SHALL <br />COORDINATE WITH AUTHORIZED HOSPITAL PERSONNEL BEFORE <br />MAKING THE NECESSARY INTERRUPTION. <br />7. CONTRACTOR TO REMOVE EXISTING STACKS AND RISERS LOCATED IN <br />EXISTING WALLS TO BE DEMOLISHED AND PROVIDE NEW OFFSETS AT <br />CEILING ABOVE AND CEILING BELOW TO NEW STACK OR RISER LOCATION <br />COORDINATED WITH FLOOR PLAN LAYOUT AND EXISTING CONDITIONS. <br />g. CONTRACTOR TO FIELD VERIFY THAT ALL EXISTING PLUMBING AND MEDICAL GAS <br />TO BE REMOVED DOES NOT AFFECT OTHER AREA'S OF THE HOSPITAL THAT <br />ARE NOT IN CONSTRUCTION AND MUST STAY OPERATIONAL. IF <br />DISCREPANCIES ARE FOUND THE CONTRACTOR IS TO NOTIFY THE <br />ENGINEER. <br />9. CONTRACTOR SHALL REMOVE EXISTING PLUMBING AND MEDICAL GAS <br />TO FIXTURES, MEDICAL GAS OUTLETS, ZONE VALVE BOXES, ALARM PANELS <br />AND EQUIPMENT TO BE REMOVED AS SHOWN ON DRAWINGS OR AS REQUIRED. <br />CONTRACTOR SHALL CAP SERVICES NEXT TO SERVICE MAINS IN CEILINGS, <br />WALLS OR BELOW FLOOR. CONTRACTOR SHALL REROUTE ALL ACTIVE PLUMBING <br />SERVICES IN CHASES OR WALLS TO BE REMOVED, TO NEW <br />CHASE AREAS OR NEW WALLS AS REQUIRED. <br />10. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF PLUMBING <br />FIXTURES, MED GAS OUTLETS AND/OR EQUIPMENT THAT ARE TO BE REMOVED <br />TO THE LOCAL OWNER'S REPRESENTATIVE. ALL ITEMS THAT THE <br />LOCAL OWNER'S REPRESENTATIVE WISHES TO RETAIN SHALL BE <br />TURNED OVER TO THE OWNER AND THE REMAINDER SHALL BE REMOVED <br />FROM THE SITE AND LEGALLY DISPOSED. <br />PLUMBING FIXTURE SCHEDULE <br />SYMBOL <br />FIXTURE <br />FITTING <br />FLOOR <br />MOUNTED <br />CARRIER <br />P.W <br />C.W <br />H.W. <br />WASTE <br />REMARKS <br />MANUFACTURER <br />MODEL <br />TYPE <br />SIZE <br />MANUFACTURER <br />TYPE <br />SUPPLY <br />TRAP <br />FAUCET <br />P-26 <br />STERNS <br />SCRUB SINK <br />OWNER FURNISHED <br />AMSCO FLEXMATIC <br />TWO STATION <br />FRONT SENSOR <br />WITH DECK MTD. <br />MIXING VALVE. <br />64'x27%Jx511/J <br />STERIS <br />SENSOR <br />WITH MANUAL <br />DECK MIXING VALVE <br />H-2165 <br />(2)*8912 <br />1 <br />1 /¢ P-TRAPS <br />SENSOR <br />ZURN <br />Z1224-75 <br />SERIES <br />-- <br />1/¢ <br />I/¢ <br />11/� <br />PROVIDE HANGER <br />AND BRACKETS <br />NOTES: <br />1. CONTRACTOR SHALL PROVIDE ALL LOW VOLTAGE WIRING AND CONDUITS FROM TRANSFORMERS ABOVE CEILING TO PLUMBING FIXTURES FOR A COMPLETE AND OPERATIVE SYSTEM. COORDINATE WITH DIVISION 16. <br />2. CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIAL FOR A COMPLETE INSTALLATION OF PLUMBING FIXTURES. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS. <br />3. PROVIDE SYMMONS THERMOSTATIC MIXING VALVE *5-210-CK 1/2 GPM MIN, 2 GPM MAX ON ALL FAUCETS. SET AT 110°F. SEE DETAILS. INSTALL PER MANUFACTURERS WRITTEN INSTRUCTIONS. <br />PLUMBING NEW CONSTRUCTION NOTES I <br />1. PLUMBING INSTALLATION OF ALL FIXTURES, EQUIPMENT. AND PIPING <br />SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE <br />WITH ALL APPLICABLE STATE, LOCAL AND HEALTH CODES <br />REQUIREMENTS. <br />2. CONTRACTOR SHALL FIELD VERIFY EXISTING ELEVATIONS, SIZES AND <br />LOCATIONS OF EXISTING PLUMBING PRIOR TO BIDDING. IF DISCREPANCIES ARE <br />FOUND, THEY ARE TO NOTIFY ENGINEER. <br />3, ALL PLUMBING FIXTURES TO COMPLY WITH TABLE 604.3 OF THE FLORIDA <br />BUILDING CODE - 2007 <br />4. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING <br />HEIGHTS WITH KITCHEN EQUIPMENT EQUIPMENT AND ARCHITECTURAL DRAWINGS <br />AND SUPPLIER. INSTALL EQUIPMEW AND MAKE FINAL <br />CONNECTIONS FURNISHING CUTOFF VALVES, P-TRAPS, FITTINGS, <br />P.R.V.'S, AND PIPING AS REQUIRED. CONTRACTOR SHALL OBTAIN <br />A SET OF THE EQUIPMENT DRAWINGS PRIOR TO BIDDING IN ORDER <br />TO DETERMINE ALL REQUIRED CONNECTIONS. <br />5. PROVIDE 12'X12' ACCESS PANELS FOR ALL VALVES LOCATED <br />ABOVE HARD CEILINGS. INSTALL VALVES SO AS TO BE WITHIN <br />REACH OF ACCESS DOOR. <br />6. CONTRACTOR SHALL PROVIDE ROUGH -INS AND MAKE FINAL CONNECTIONS <br />FOR EACH PIECE OF EQUIPMENT REQUIRING PLUMBING CONNECTION, <br />INCLUDING TAILPIECES, TRAPS, LINE STRAINERS, STOP VALVES, GAUGES. <br />VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS, THERMOMETERS, <br />GLOBE SOLENOID VALVES, INSULATION, AND ALL NECESSARY DEVICES <br />FOR A COMPLETE AND OPERATIVE SYSTEM. COORDINATE EXACT REQUIRED <br />PLUMBING ROUGH -INS WITH VENDOR SUPPLIER DRAWINGS. <br />7. THE CONTRACTOR SHALL INSTALL PLUMBING PIPING IN LOCATIONS INDICATED <br />ON THE CONTRACT DOCUMENTS. THE ONLY DEVIATION FROM THIS WOULD BE <br />IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES. <br />IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR <br />ANY OTHER REASON, HE SHALL COMPENSATE THE ENGINEER AT A RATE OF <br />DPE x 2.75 TO REVISE THE PLUMBING DRAWINGS, RISER DIAGRAMS AND FOR <br />THE TIME INVOLVED IN REISSUING DRAWINGS TO THE AUTHORITY HAVING <br />JURISDICTION. CONTRACTOR SHALL CONTACT ENGINEER FOR ESTIMATED TIME <br />REQUIRED AND SCHEDULE FOR PERFORMING WORK. <br />8. EXISTING UTILITIES, WHICH ARE NOT SHOWN, THAT ARE DISCOVERED <br />DURING DEMOLITION SHALL BE BROUGHT TO THE ATTENTION OF THE <br />OWNER'S REPRESENTATIVE BY THE CONTRACTOR FOR PROPER CO- <br />ORDINATION. CONTRACTOR SHALL REMOVE, REWORK AND/OR REROUTE <br />THE EXISTING UTILITIES AS DIRECTED BY THE OWNER'S REPRESENTATIVE. <br />9. ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT <br />CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS. <br />10. SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE <br />WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION FIRE STOP <br />SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND <br />SPECIFICATIONS. <br />11. CONTRACTOR SHALL FURNISH AND INSTALL SHOCK ABSORBERS ON FLUSH <br />VALVE FIXTURES AND ALL LINES SERVING QUICK CLOSING VALVES AND AS <br />INDICATED ON PLUMBING PLANS AND RECOMMENDED BY THE MANUFACTURER. <br />12. CLEANOUT COVERS SHALL NOT BE INSTALLED ON THE CORRIDOR SIDE OF <br />ANY WALL OR IN ANY CORRIDOR FLOORS. IF DISCREPANCIES ARE FOUND ON <br />PLANS CONTRACTOR SHALL NOTIFY PLUMBING ENGINEER PRIOR TO INSTALLATION. <br />13. PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT, PANELS AND PHONE <br />PANELS. <br />14. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE LOCATIONS <br />AND MOUNTING HEIGHTS. <br />15. ALL EXPOSED PIPE AND FITTINGS IN FINISHED AREAS SHALL BE <br />CHROME PLATED. <br />16. THE PLUMBING CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS__ <br />17. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING <br />AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING <br />WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER. <br />I8. CONTRACTOR SHALL COORDINATE WITH ALL <br />DISCIPLINES INVOLVED SO AS TO AVOID ANY PIPE <br />ROUTING PROBLEMS. <br />19. PROVIDE OFFSETS AND FITTINGS AS REQUIRED. <br />20. ALL VENTS SHALL BE A MINIMUM OF 25'-0' AWAY FROM <br />A/C INTAKES. AND OPERABLE WINDOWS. <br />21. CONTRACTOR SHALL PROVIDE ALL LOW VOLTAGE WIRING AND CONDUIT FOR <br />SENSOR OPERATED FIXTURES AND MEDICAL GAS ALARM PANELS AND SHALL <br />COORDINATE WITH DIVISION 16. CONTRACTOR SHALL HOLD A LOW VOLTAGE <br />WIRING LICENSE. <br />22. WHEN BEAM SLEEVE PENETRATIONS ARE NECESSARY, NOTIFY AND COORDINATE <br />PENETRATIONS WITH ALL TRADES, THE ARCHITECT AND STRUCTURAL ENGINEER <br />PRIOR TO PENETRATING ANY BEAMS. <br />23. COORDINATE INSTALLATION OF PLUMBING SYSTEMS WITH ALL CASEWORK. <br />CONTRACTOR SHALL OBTAIN ARCHITECTURAL DRAWINGS AND REVIEW <br />PRIOR TO INSTALLATION. <br />24. CHANGES IN THE DIRECTION OF SANITARY PIPING SHALL NOT BE MADE WITH <br />FITTINGS WHICH WILL CAUSE EXCESSIVE REDUCTION IN THE VELOCITY OF FLOW <br />' A DOUBLE <br />-RADIUS <br />25. THIS CONTRACTOR SHALL BASE HIS <br />THE DRAWINGS. IF MORE THAN ONE MANUFACTURER OF EQUIPMENT IS <br />SPECIFIED ANY ONE OF THE MANUFACTURERS OF EQUIPMENT MAY BE USED IN <br />THIS CONTRACTOR'S PROPOSAL. IF THIS CONTRACTOR <br />WISHES TO USE EQUIPMENT NOT SPECIFIED HE MUST, AT THE TIME OF BIDDING, <br />SUBMIT SEPARATELY ON LETTERHEAD STATIONARY OF THE BIDDER, THE <br />EQUIPMENT HE WOULD SUBSTITUTE AND THE COST TO BE ADDED OR TO BE <br />DEDUCTED FROM HIS PROPOSAL. <br />26. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME <br />TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES <br />WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF <br />SUBSTITUTE MATERIALS. <br />27. WARRANTY/GUARANTEE <br />A. THE CONTRACTOR SHALL WARRANTY/GUARANTEE AND MAINTAIN THE STABILITY <br />OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION <br />FOR THE PERIOD OF ONE YEAR. <br />B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING <br />DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY <br />THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE <br />OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE <br />DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE <br />ORIGINAL DEFECT OR REPAIR THERETO. <br />28. <br />29. <br />30. <br />31. <br />32. <br />33. <br />34. <br />35. <br />36. <br />3T. <br />38. <br />39. <br />40. <br />41. <br />42. <br />2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME <br />CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND <br />WEEKEND OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE <br />OF THE CONTRACT. <br />ALL STORM PIPING AND CONDENSATE PIPING SHALL BE INSULATED <br />THROUGHOUT ENTIM SYSTEM. <br />PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE <br />TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES <br />SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO <br />OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />THE MAXIMUM VERTICAL DISTANCE FROM THE FIXTURE OUTLET TO THE TRAP <br />WEIR SHALL NOT EXCEED 24-INCHES AND THE HORIZONTAL DISTANCE SHALL <br />NOT EXCEED 30-INCHES MEASURED FROM THE CENTER LINE OF FIXTURE OUTLET <br />TO THE CENTERLINE OF THE INLET OF THE TRAP AS PER SECTION 1002 OF THE <br />FLORIDA PLUMBING CODE 2007. <br />PROVIDE THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING FIXTURES. <br />PLUMBING CONTRACTOR SHALL VERIFY AND COORDINATE PRIOR TO THE START OF <br />CONSTRUCTION. <br />ALL FIXTURE STOPS, VALVES, AND ALL PIPING SHALL BE RIGIDLY <br />SECURED (NO MOVEMENT WHEN OPERATED). INSTALL PERMANENT STAMPED BRASS <br />VALVE TAG ON EACH VALVE, COORDINATE WITH OWNER'S IDENTIFICATION SYSTEM. <br />INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A <br />MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING <br />OF 50. <br />DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO <br />ACTUAL CONDITION AND SPACE REQUIREMENTS. <br />ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS <br />WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY <br />OPERATIVE, AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING <br />AUTHORITIES AND SUBJECT TO ACCEPTANCE BY OWNER/ENGINEER. <br />CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES. INSPECTIONS <br />AND TESTS. <br />ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE <br />CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY <br />DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF <br />THE WORK. <br />GENERAL NOTEs TEMPERATURE OF HOT WATER TO PUBLIC REST ROOMS SHALL NOT <br />EXCEED 110' F, PER FLORIDA ENERGY CODE 412.1.ABCD.2.3.2. CONTRACTOR <br />SHALL VERIFY TEMPERATURE OF HOT WATER SYSTEM WITH OWNER. INSTALL <br />TEMPERING VALVES AS REQUIRED, FOR A MAXIMUM TEMPERATURE OF 110' F <br />SUBJECT TO REVIEW BY ENGINEER. <br />CONTRACTOR SHALL TEST WATER FROM DOMESTIC COLD AND HOT WATER SYSTEMS <br />WHICH HAVE BEEN MODIFIED BY THE RENOVATION AFTER MODIFICATIONS ARE <br />COMPLETE FOR CONTAMINANTS. PROVIDE COPY OF TEST REPORT ONE WEEK PRIOR <br />TO FINAL AHCA INSPECTION. <br />ALL NEW VALVES INSTALLED IN DOMESTIC WATER SYSTEMS SHALL BE NSF-61 <br />CERTIFIED. <br />CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL <br />RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW <br />THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH <br />THOSE REQUIREMENTS. SEE MECHANICAL DRAWINGS FOR COORDINATION OF <br />VENTILATION REQUIREMENTS REQUIRED BY ICRA. <br />MEDICAL GAS SCHEDULE <br />SYMBOL <br />DESCRIPTION EQUIPPED WITH REMARKS <br />0 <br />EXISTING ZONE VALVE BOX <br />1/1 02, I/¢A, I/JN20, 3/4V <br />ANGIO (RELABEL) <br />© <br />PEDESTAL <br />(D-02, (D-A, (0-V, (D-SL, (1)-N20, (1)-WAGD <br />ANGIO <br />LINE PRESSURE ALARM PANEL <br />(2)-02, (2)-V, (2)-A, (D-N20, (1) SPARE <br />ANGIO AND STRESS ROOM <br />0 <br />ZONE VALVE BOX <br />1/102, I/JA, 3/4V <br />STRESS ROOM <br />EE <br />EXISTING WALL OUTLET <br />(D-02, (D-A, (2)-V, (D-SL <br />STRESS ROOM <br />F <br />WALL OUTLET <br />1 (D-02, (D-A, (D-V, (D-SL, (D-N20, (D-WAGD <br />ANGIO <br />NOTES: <br />1. CONTRACTOR SHALL PROVIDE PERMANENTLY ENGRAVED LABELS AT ALL ZONE VALVE BOXES AND ALARM PANELS, <br />IDENTIFIED ABOVE IN SCHEDULE TO INDICATE SPECIFIC ROOMS SERVED. COORDINATE LABELING WITH FINAL ROOM NAMES <br />AND NUMBERS, AND AREA SERVED WITH HOSPITAL. <br />2. PROVIDE PERMANENT ENGRAVED LABELS AT ALL NEW ALARM PANELS, IDENTIFIED ABOVE IN SCHEDULE, INDICATING <br />ELECTRICAL LIFE SAFETY CIRCUIT FEEDING ALARM PANEL. <br />3. NOTE: ALARM PANEL IN SCHEDULE ABOVE HAS MULTIPLE POINTS OF THE SAME SERVICE. LABELS SHALL CLEARLY <br />IDENTIFY WHICH ALARM POINT SERVES WHICH ROOM. <br />DRAWING INDEX <br />SHEET <br />NUMBER <br />SHEET TITLE <br />PO.1 <br />PLUMBING SCHEDULES, LEGENDS AND NOTES <br />PO.2 <br />PLUMBING SPECIFICATIONS <br />PO.3 <br />PLUMBING SPECIFICATIONS <br />PO.4 <br />PLUMBING SPECIFICATIONS <br />PO.5 <br />PLUMBING SPECIFICATIONS <br />131.1 <br />FIRST FLOOR PLAN - DEMOLITION - PLUMBING <br />P1.2 <br />FIRST FLOOR PLAN - DEMOLITION - MEDICAL GAS <br />P1.3 <br />PARTIAL ROOF PLAN - DEMOLITION - PLUMBING <br />P2.1 <br />FIRST FLOOR PLAN - NEW CONSTRUCTION - PLUMBING <br />P2.2 <br />PARTIAL ROOF PLAN - NEW CONSTRUCTION - PLUMBING <br />P3.1 <br />FIRST FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS <br />P5.1 <br />PLUMBING DETAILS <br />ci <br />C� <br />N <br />0 <br />•� <br />a� <br />t�cc� <br />Ot3 <br />�cco <br />GNU <br />O 00 <br />to to � o <br />obi Z � <br />Izq <br />C&O, <br />Smith <br />SS11 Reid, <br />Reid, Inc. <br />600 West Hillsboro, Suite 300 <br />Deerfield Beach, FL 33441 <br />(954) 421-1260 <br />FAX:(954) 421-1466 <br />www.ssr-inc.com <br />Firm Certifieation - EB4)000857 <br />Dennis Davie PE - 58588 <br />John E. Moulder PE - 33200 <br />SSR JOB # 1137003.0 <br />`,��f,111111/ <br />QO <br />P4 <br />•/ <br />INd0s <br />(1 r <br />TATE OF <br />ONAL <br />H <br />O <br />Z <br />0 <br />Z <br />Q <br />07 <br />0 <br />Z <br />W <br />0 <br />W <br />J <br />0 <br />W <br />J <br />Z) <br />0 <br />W <br />0 <br />U) <br />0 <br />Z_ <br />Im <br />J <br />T <br />Project No. 00000.00 <br />Pomi <br />cD 2011 BHI PK Architects, Inc. <br />