1
<br />EXISTING V. 0. AND MA
<br />PIPING TO REMAIN (VIF)
<br />REMOVE EXISTING OUTLETS
<br />AND VERTICAL DROPS
<br />3
<br />A2
<br />2
<br />Z
<br />0-
<br />ABV. CLG.
<br />EXISTING TOILET
<br />SHALL REMAIN
<br />1/2" m_,i H@
<br />-3/4"
<br />t
<br />\A
<br />t
<br />R�\
<br />1
<br />ABV. CLG. _
<br />-3/4-
<br />_ i
<br />{
<br />-----
<br />-1/2
<br />i1 -
<br />PkAF
<br />V
<br />i
<br />EXISTING TOILET vy-
<br />?
<br />SHALL REMAIN
<br />I
<br />E E
<br />i
<br />3/4V
<br />DROPS TO BUILDING
<br />1/2N 0
<br />STANDARD MED. GAS
<br />I
<br />1 /' 2 A
<br />OUTLETS
<br />.
<br />..._....
<br />F
<br />I
<br />i
<br />_T
<br />PLUMBING 1st FLOOR PLAN - NEW CONSTRUCTION
<br />MEDICAL GAS GENERAL NOTES
<br />1.
<br />CONTRACTOR SHALL PROVIDE COMPLETE MEDICAL GAS SYSTEMS AS DETAILED ON THESE
<br />13.
<br />VERIFY THE EXACT LOCATION OF EXISTING OXYGEN, MEDICAL AIR, NITROUS OXIDE,
<br />DRAWINGS. WORK CONSISTS OF FURNISHING ALL MATERIALS, EQUIPMENT, AND SERVICES
<br />MEDICAL VACUUM, AND NITROGEN PIPING MAINS FROM THE EXISTING MEDICAL OFFICE
<br />REQUIRED FOR COMPLETE SYSTEMS. INCLUDE ANY INCIDENTAL APPARATUS,
<br />BUILDING. ALL NEW LINES ARE TO BE ROUTED TO AND/OR FROM VERIFIED
<br />APPLIANCES, MATERIAL LABOR AND SERVICES NECESSARY TO MAKE NEW WORK
<br />LOCATIONS. TAPS, WHEN NOT PROVIDED BY PREVIOUS INSTALLER, ARE TO BE PROVIDED
<br />COMPLETE IN ALL RESPECTS AND FULLY READY FOR OPERATION.
<br />BY THIS INSTALLER.
<br />2.
<br />ALL MEDICAL GAS WORK SHALL BE DESIGNED, INSTALLED, TESTED, LABELED, AND
<br />14.
<br />THE INSTALLER SHALL VISIT THE JOB SITE AND INSPECT ALL EXISTING CONDITIONS
<br />CLEANED IN ACCORDANCE WITH NFPA 99-12 CODE REQUIREMENTS.
<br />AFFECTING THE WORK. SUBMISSION OF HIS PROPOSAL SHALL BE CONSTRUED AS
<br />INDICATING SUCH KNOWLEDGE. NO ADDITIONAL PAYMENT WILL BE MADE ON CLAIMS
<br />3.
<br />MAKE SUCH OFFSETS AND DEVIATIONS FROM WORK SHOWN ON THE DRAWINGS, AS MAY
<br />THAT ARISE FROM THE CONTRACTOR'S FAILURE TO COMPLY WITH THIS REQUIREMENT.
<br />BE NECESSARY TO FIT THE ACTUAL SPACE CONDITIONS.
<br />15.
<br />PROVIDE AND MAINTAIN TEMPORARY CONNECTIONS TO KEEP EXISTING UTILITIES IN
<br />4.
<br />WHERE VALVES OCCUR ABOVE DRYWALL OR PLASTER OR ARE CONCEALED BEHIND
<br />SERVICE. ANY SHUT DOWNS ARE TO BE APPROVED BY OWNER'S REPRESENTATIVE.
<br />WALLS, THIS CONTRACTOR SHALL FURNISH AND INSTALL ACCESS PANELS. PANELS
<br />SHALL MATCH EXISTING.
<br />16.
<br />FIELD VERIFY ALL EXISTING PIPE SIZES PRIOR TO INSTALLATION.
<br />5.
<br />THE PLANS AND DIAGRAMS OF MEDICAL GAS PIPING ARE SCHEMATIC ONLY AND SHOULD
<br />17.
<br />THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ABOVE CEILING
<br />NOT BE SCALED. INSTALLER SHALL COORDINATE AT SITE WITH ALL EXISTING PLUMBING, WVAC,
<br />CONFLICTS. THE CONTRACTOR IS RESPONSIBLE TO ALSO CHECK FIELD CONDITIONS
<br />FIRE PROTECTION, MEDICAL GASES, AND ELECTRICAL WORK SO AS NOT TO CONFLICT IN
<br />PRIOR TO BIDDING AND REPORT ANY PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2
<br />LOCATION WITH OTHER WORK UNDER THIS CONTRACT OR THAT MAY BE EXISTING.
<br />DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM CONDITIONS ARISING IN THE
<br />6.
<br />EXACT LOCATION NUMBER MEDICAL GAS OUTLETS SHALL BE DETERMINED FROM
<br />FIELD WHICH WERE NOT BROUGHT TO THE ENGINEER'S ATTENTION ARE TO BE MADE BY
<br />ARCHITECTURAL DRAWINGS. VERIFY SUCH LOCATIONS BEFORE PROCEEDING ROUGH -IN.
<br />THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER.
<br />7.
<br />INSTALLER SHALL NOT CUT ANY EXISTING STRUCTURAL MEMBERS WITHOUT FIRST SECURING
<br />18.
<br />UPON COMPLETION OF THE WORK UNDER THIS CONTRACT, THE CONTRACTOR SHALL
<br />WRITTEN APPROVAL FROM THE ARCHITECT.
<br />REMOVE ALL TOOLS, APPLIANCES, SURPLUS MATERIALS, AND SCRAP. ALL IDENTIFIED
<br />EXISTING EQUIPMENT TO BE REMOVED SHALL BE TURNED OVER TO THE OWNER.
<br />8.
<br />PROVIDE DIELECTRIC UNIONS AT ALL CONNECTIONS BETWEEN DISSIMILAR PIPING METALS.
<br />19.
<br />CONDITIONS SHOWN AS EXISTING (LOCATIONS, MATERIALS, ELEVATIONS, SIZED, ETC.)
<br />9.
<br />WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER,
<br />ARE BASED ON AVAILABLE EXISTING DATA AND SHOULD BE INTERPRETED TO BE
<br />THE ITEMS OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED.
<br />APPROXIMATE. CONTRACTOR SHALL VERIFY CONDITIONS IN THE FIELD. EXISTING
<br />CONDMONS FOUND TO DEVIATE FROM THOSE SHOWN SHALL BE REPORTED TO THE
<br />10.
<br />THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID
<br />ENGINEER.
<br />CONFLICTS.
<br />20.
<br />PROVIDE DIELECTRIC UNIONS AT ALL CONNECTIONS BETWEEN DISSIMILAR METALS.
<br />11.
<br />ALL NEW MEDICAL GAS PIPING SHALL BE TYPE K COOPER. MINIMUM PIPE SIZE FOR
<br />OXYGEN AND AIR PIPING SHALL BE 1/2" MINIMUM PIPE SIZE FOR VACUUM PIPING SHALL
<br />21.
<br />CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ALL CEILING TILES AND GRIDS
<br />BE 3/4" MINIMUM. ALL NEW PIPING SHALL BE PROVIDED PRECL.EANED IN ACCORDANCE WITH
<br />AS NECESSARY TO INSTALL NEW MEDICAL GAS SYSTEM.
<br />NFPA 99 REQUIREMENTS.
<br />22.
<br />CONTRACTOR TO CONTINUOUSLY PURGE MEDICAL GAS PIPING WITH DRY NITROGEN WHILE BRAZING
<br />12.
<br />PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. PENETRATIONS FOR PIPES,
<br />ALL PIPING JOINTS.
<br />CONDUITS, OR OTHER PURPOSES THROUGH ASSEMBLIES (FLOORS„ WALLS, PARTITIONS,
<br />23.
<br />CONTRACTOR SHALL ARRANGE FOR, OBTAIN AND BEAR THE COST OF
<br />ETC.) WITH A REQUIRED FIRE STOP MATERIAL FIRE STOP MATERIAL SHALL BE U.L.
<br />NECESSARY PERMITS, BONDS AND FEES.
<br />LISTED AND INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
<br />REQUIREMENTS TO MEET OR EXCEED THE FIRE RATING OF THE PENETRATED ASSEMBLY.
<br />ABBREVIATIONS
<br />2
<br />A
<br />M DI AL AI
<br />AFF
<br />ABOVE FI IHED FLOOR
<br />CP
<br />CHROME PLATED
<br />CLG
<br />CEILING
<br />CW
<br />COLD WATER
<br />DN
<br />DOWN
<br />FL
<br />FLOOR
<br />2N
<br />0
<br />OXYGEN
<br />LION
<br />UNLESS OTHERWISE NOTED
<br />V
<br />VENT
<br />I I L
<br />2 VF
<br />VACUUM
<br />PIPING
<br />EXISTING PIPING SHALL REMAIN (VIF)
<br />EXISTING PIPING SHALL BE REMOVED
<br />NEW COLD WATER PIPING
<br />NEW HOT WATER PIPING
<br />NEW WASTE PIPING
<br />EXISTING MEDICAL AIR PIPING TO REMAIN
<br />EXISTING OXYGEN PIPING TO REMAIN
<br />EXISTING VACUUM PIPING TO REMAIN
<br />NEW MEDICAL AIR PIPING TO REMAIN
<br />NEW OXYGEN PIPING TO REMAIN
<br />NEW VACUUM PIPING TO REMAIN
<br />PLUMBING FIXTURE SCHEDULE
<br />MARK
<br />ITEM
<br />COLD
<br />WATER
<br />HOT
<br />WATER
<br />WASTE
<br />VENT
<br />ITV
<br />LAVATORY: AMERICAN STANDARD 10355.012 LUCERNE WALL MOUNTED 20-1/2- X 18-1/4" VITREOUS CHINA, THREE HOLES, 4"
<br />CENTERS, FRONT OVERFLOW, FOR CONCEALED ARMS FAUCET: T & S B-0892 CP RIGID GOOSENECK WITH 4" WRIST BLADE
<br />HANDLES AND LAMINAR FLOW DEVICE
<br />DRAIN: BRASSCRAFT 1-1/4" X 1 1/4" CHROME PLATED GRID DRAIN WITH 17 GAUGE TAILPIECE 1-1/4" X 1
<br />1/2-
<br />1/2"
<br />1-1/2"
<br />EXISTING
<br />"TRAP: "BRASSCRAFT
<br />1/2 CHROME PLATED 17 GAUGE P TRAP WITH CLEANOUT SUPPLIES: BRASSCRAFT 1/2 X 3/8 X 12 CHROME PLATED FLEXIBLE
<br />SUPPLIES WITH LEAD FREE LOOSE KEY STOPS CARRIER: ZURN WALL CARRIER FOR CONCEALED ARMS INSULATE WASTE AND WATER
<br />PLIES BELOW LAVATORY WITH TRUEBRO PIPE INSULATION COLOR/ FlNI
<br />HOSE BIBB: 1. ROUGH CHROME FACE, WITH 34HF INTEGRAL VACUUM BREAKER - HOSE CONNECTION, 1/2- CONNECTION - W00
<br />1/2
<br />-
<br />-
<br />-
<br />MODELJ24, MOUNT 0 18" ABOVE GRADE AND/OR FLOOR
<br />1
<br />I10
<br />1
<br />- EXISTING WALL TO REMAIN
<br />EXISTING VERTICAL HOT AND WATER
<br />COLD WATER SUPPLIES TO REMAIN
<br />0
<br />NEW PLUMBING FIXTURE WITH
<br />CONCEALED WALL CARRIER
<br />NEW 1-1/4' X 1-1/2"
<br />CHROME PLATED TAILPIECE
<br />NEW 3 8" CHROME PLATED HOT AND COLD
<br />CHROME PLATED FLEXIBLE SUPPLIES
<br />NEW 3/8" X 1/2" CHROME PLATED LEAD
<br />FREE LOOSE KEY STOPS
<br />NEW 1-1/4" X 1-1/2- CHROME PLATED
<br />P TRAP WITH CLEANOUT
<br />NEW CHROME PLATED
<br />ESCUTCHEONS
<br />EXISTING FLOOR
<br />DIAGRAMMATIC NEW PIPING
<br />FIXTURE DETAIL NOT TO SCALE
<br />SPECIFICATIONS
<br />1.0
<br />BASIC MATERIAL AND METHODS
<br />1.1
<br />SCOPE OF WORK
<br />PROVIDE LABOR AND MATERIALS AS REQUIRED TO PROVIDE A FULLY FUNCTIONING AND COMPLETE SYSTEM AS INDICATED 2.1
<br />EQUIPM�Q
<br />ON DRAWINGS. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATE THE GENERAL ARRANGEMENT OF
<br />A. Acceptable Manufacturers: Provide products by the following: Chemetron by Allied.
<br />SYSTEMS AND EQUIPMENT. FINAL LOCATIONS OF EQUIPMENT SHALL BE FIELD DETERMINED. ALL DISCREPANCIES ON
<br />DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IN WRITING PRIOR TO SUBMISSION OF BIDS.
<br />B. Shutoff Valves: Medical gas shutoff valves shall be Chemetron 7700-83-1105, bronze -bodied, double
<br />seal full flow, union ball type with neoprene seat seals and 0-ring packing. Design for working pressures up
<br />1.2
<br />QUALITY CONTROL
<br />to and including 300 psi and so quarter turn of lever -type handle is maximum travel between open and closed
<br />UNLESS OTHERWISE NOTED, PROVIDE NEW MATERIALS FREE OF DEFECTS, WHERE NO SPECIFIC WEIGHTS OR GRADES ARE
<br />positions. Provide valves with color -coded identification labels, and in -out copper tube connecting extensions.
<br />SPECIFIED PROVIDE MATERIALS OF AN ACCEPTED STANDARD WEIGHT AND GRADE ACCORDING TO CODE AND GOVERNING
<br />C. Wall Outlets:
<br />STANDARDS BY NFPA AND UL• INSTALL ALL EQUIPMENT, PIPING, IN
<br />ACCORDANCE WITH CODES, GOVERNING STANDARDS, AND MANUFACTURER'S RECOMMENDATIONS.
<br />1. Medical gas wall outlets shall be Chemetrom 64-01-5001, 64-01-5002 AND 64-01-5003
<br />air, and vacuum, or building standards.
<br />1.4
<br />COORDINATION
<br />2. Modular design with 16 ga. steel mounting plate. Brass outlet block attached to the mounting plate with
<br />COORDINATE ALL WORK FOR PROPER LOCATION, POWER, AND UTILITY REQUIREMENTS. SCHEDULE INSTALLATIONS TO
<br />swivel type 3/8" O.D. copper tube inlet. Gas service identification shall be affixed to the inlet tube and the
<br />AVOID CONFLICT AMONG TRADES. ADDITIONS TO THE CONTRACT FOR COORDINATION AMONG TRADES WILL NOT BE
<br />face of this mounting plate.
<br />ALLOWED.
<br />3. A metal trim plate with permanent, color -coded marking of service identification shall be included as part of
<br />the latch/valve assembly. A push button release mechanism, for disconnecting apparatus shall be accessible
<br />1.5
<br />PENETRATIONS. CUTTING AND PATCHING
<br />from the top, bottom and side of the outlet.
<br />SEAL ALL PIPING PENETRATIONS OF WALLS IN ACCORDANCE WITH ARCHITECTURAL DRAWINGS AND
<br />4. A die cast, chrome plated coverplate shall be provided to trim each outlet and to fill the space between
<br />SPECIFICATIONS. PIPING PENETRATIONS OF RATED FLOORS AND WALLS SHALL BE SEALED WITH FIRE STOPPING MATERIAL.
<br />adjacent outlets. Coverplate design shall allow latch valves to be individually removed for servicing.
<br />FLASH ALL ROOF AND WALL PENETRATIONS IN ACCORDANCE WITH ARCHITECTURAL DRAWINGS.
<br />3.0
<br />SUBMITTALS
<br />2.0
<br />PIPING
<br />PROVIDE 6-SETS (EACH) OF MANUFACTURERS PLUMBING FIXTURES, O&M MANUALS, ELECTRICAL DATA, DIMENSIONAL DATA AND
<br />A. Copper Tube, Fittings, Valves, and Piping Components: Factory- cleaned, -urged, and -sealed, and marked or
<br />"CLEANED "CLEAN
<br />CLEARANCES, CONNECTION DATA, COLOR SAMPLES (IF REQUIRED) AND TEST DATA FOR THE FOLLOWING:
<br />labeled FOR MEDICAL GAS SERVICE,- FOR OXYGEN SERVICE.
<br />B. Components required, but not available cleaned for medical gas use, may be provided, but must be cleaned
<br />SHOP DRAWINGS MUST BE SUBMITTED AND APPROVED PRIOR TO ORDERING EQUIPMENT. ENGINEER WILL REQUIRE
<br />10 WORKING DAYS TO REVIEW DRAWINGS.
<br />before use as specified below under -PREPARATION."
<br />C. Pipe joining materials, specialties, and basic installation requirements are specified in Division 15 Section
<br />"Basic Mechanical Materials and Methods. -
<br />MEDICAL GAS TUBE
<br />A. Hard Copper Tube: ASTM B 88, Type K or Type L, water tube, seamless, drawn temper.
<br />B. Precleaned and Sealed Copper Tube: ASTM B 88, Type K or Type L, water tube, seamless, drawn temper,
<br />cleaned for medical gas use, purged, and with ends sealed. All medical gas piping shall be furnished pre -cleaned
<br />and plugged per NFPA 99 (1993) requirements. On site cleaning is limited to recleaning of the joints in accordance
<br />with NFPA 99 requirements.
<br />TUBING JOINING MATERIAL
<br />A Brazing Filler Metals: BS EN 1044 AG351 (silver solder) Series alloys. Flux is prohibited, except when
<br />used with bronze fittings. During brazing operations, all medical gas piping is to be continuously purged with
<br />nitrogen in accordance with NFPA 99 requirements.
<br />DRAWING INDEX
<br />PLUMBING
<br />P1.0 PLUMBING LEGEND, GENERAL NOTES FIXTURE SCHEDULE AND DETAILS
<br />AND PLUMBING PARTIAL FLOOR PLAN
<br />P2.0 PLUMBING MOBILE MRI
<br />PLUMBING GENERAL NOTES
<br />1. ALL WORK SHALL BE DESIGNED, INSTALLED, TESTED, AND CLEANED IN ACCORDANCE WITH
<br />THE 2014 EDITION OF THE FLORIDA BUILDING CODE AND THE 2014 FLORIDA PLUMBING CODE.
<br />2. CONTRACTOR SHALL PROVIDE COMPLETE PLUMBING SYSTEMS AS DETAILED ON THESE DRAWINGS.
<br />WORK CONSISTS OF FURNISHING ALL MATERIALS, EQUIPMENT, AND SERVICES REQUIRED FOR
<br />COMPLETE SYSTEMS. INCLUDE ANY INCIDENTAL APPARATUS, APPLIANCES, MATERIAL LABOR AND
<br />SERVICES NECESSARY TO MAKE NEW WORK COMPLETE IN ALL RESPECTS AND FULLY READY FOR
<br />OPERATION.
<br />3. VERIFY THE EXACT LOCATION OF EXISTING WASTE AND WATER SUPPLY FROM
<br />THE ACTUAL JOB SITE PRIOR TO SUBMITTING BID. SUBMISSION OF YOUR PROPOSAL
<br />SHALL BE CONSTRUED AS INDICATING SUCH KNOWLEDGE. NO ADDITIONAL PAYMENT WILL BE
<br />MADE ON CLAIMS THAT ARISE FROM THE CONTRACTORS FAILURE TO COMPLY WITH THIS
<br />REQUIREMENT.
<br />4. MAKE SUCH OFFSETS AND DEVIATIONS FROM WORK SHOWN ON THE DRAWINGS, AS MAY BE
<br />NECESSARY TO FIT THE ACTUAL SPACE CONDITIONS.
<br />5. WHERE VALVES OCCUR ABOVE DRYWALL OR PLASTER OR ARE CONCEALED BEHIND WALLS, THIS
<br />CONTRACTOR SHALL FURNISH AND INSTALL ACCESS PANELS. COORDINATE COLOR AND STYLE
<br />WITH ENGINEER/ARCHITECT.
<br />6. INSTALLER SHALL NOT CUT ANY EXISTING STRUCTURAL MEMBERS WITHOUT FIRST SECURING
<br />WRITTEN APPROVAL FROM THE ARCHITECT.
<br />7. PROVIDE DIELECTRIC UNIONS AT ALL CONNECTIONS BETWEEN DISSIMILAR PIPING METALS.
<br />8. PROVIDE LAVATORY WITH TRAP FITTINGS FOR CLEANOUT.
<br />9. CONTRACTOR IS RESPONSIBLE TO ALSO CHECKING FIELD CONDITIONS PRIOR TO BIDDING AND
<br />REPORT ANY PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY. ANY
<br />CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE
<br />ENGINEER'S ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE
<br />OWNER.
<br />10. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE(1)
<br />YEAR FROM DATE OF FINAL ACCEPTANCE. ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED
<br />WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE
<br />OWNER AT NO ADDITIONAL COST TO THE OWNER.
<br />11. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT, THE CONTRACTOR SHALL REMOVE ALL
<br />TOOLS, APPLIANCES, SURPLUS MATERIALS, AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO
<br />BE REMOVED SHALL BE TURNED OVER TO THE OWNER.
<br />12. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS.
<br />CODES AND STANDARDS
<br />THE FLORIDA BUILDING CODES 2010
<br />(BUILDING, PLUMBING, MECHANICAL, FUEL GAS, HURRICANE ZONES)
<br />HOSPITAL LICENSURE (FAC 59A-3), LATEST PROMULGATION
<br />UNIFORM FIRE SAFETY STANDARDS FOR HOSPITALS AND NURSING HOMES (FAC 4A-53), LATEST PROMULGATION
<br />NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE, 2012
<br />NFPA 70, NATIONAL ELECTRIC CODE, 2011
<br />NFPA 72, NATIONAL FIRE ALARM CODE, 2010
<br />NFPA 99, STANDARD FOR HEALTH CARE FACILITIES, 2012
<br />NFPA 101, LIFE SAFETY CODE, 2012
<br />ASME-A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS 2007 A17.10 2008 AND A17.1b-2009 ADDENDA
<br />UNDERWRITERS'S LABORATORIES FIRE RESISTANCE DIRECTORY, LATEST EDITION
<br />UNDERWRITERS'S LABORATORIES BUILDING MATERIALS DIRECTORY LATEST EDITION
<br />STANDARD CONSTRUCTION DETAILS, PUBLISHED BY AHCA PLANS AND CONSTRUCTION
<br />FLORIDA FIRE PREVENTION CODE - 2004
<br />GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITAL AND HEALTH CARE FACILITIES, 2001 EDITION
<br />\'\\` NfkD' Mp 7'
<br />c'�y'i.
<br />o. 4 193
<br />it
<br />a ST OF
<br />LORI -
<br />C.
<br />'AWAM# PROFESSIONAL ENGINEERS
<br />3203 QUEEN PALM DRIVE
<br />TAMPA, FLORIDA 33619
<br />PHONE (813) 241-6488
<br />FAX (813) 241-6498
<br />Board of 111,11 oferrd E, 9111 - Uoorw 0 2=
<br />V "m
<br />JW�UAO
<br />U
<br />U
<br />U
<br />U
<br />S�� N
<br />N
<br />00
<br />U o,
<br />OM
<br />a
<br />M � N
<br />�, M o
<br />o 6"Z
<br />C)
<br />a�
<br />N o •�
<br />00w0-0 �_1
<br />in %10
<br />1-4 0 0
<br />0d (11
<br />I I
<br />I
<br />0 0
<br />1-4
<br />o
<br />Z W
<br />a w
<br />U 0
<br />D
<br />a ILLI
<br />as
<br />Project No. 15017.00
<br />I'm
<br />0
<br />02015 BH1PK Architects, Inc. I
<br />
|