Laserfiche WebLink
I 111 11.1 1 1 - - u - — -- <br />N <br />d <br />p <br />tV <br />CD <br />• <br />O 40 <br />te <br />1 <br />i <br />i <br />k <br />f <br />t <br />SE E <br />HVAC 3rd FLOOR PLAN - <br />SCALE: 1 /4"=1'-0" <br />DEMOLITION NOTES <br />1O MECHANICAL/DEMOLITION CONTRACTOR REMOVE EXISTING MEDICAL CHILLER CONDENSER AND COPPER <br />PIPING. CONTRACTOR SHALL RECOVER ALL REFRIGERANT FROM MEDICAL CHILLERS PRIOR TO DISPOSAL. <br />RETURN REFRIGERANT TO APPROVED RECLAIM FACILITY. <br />MECHAl*lk0l"w*f'AL DOTES <br />O NEW MEDICAL CHILLER PROVIDED BY SIEMENS. LABEL UNIT AS CH-1. INSTALL CHILLER ON STRUCTURAL <br />STEEL STAND. SEE MOUNTING DETAIL ON STRUCTURAL SHEETS <br />O3 PROVIDE INSULATED CHILLED �ATER, SCHEDULE 40, SIPING FROM CHILLER TO MRI EQUIPMENT <br />ROOM. SIZE ACCORDING TO DIMENSIONS SHOWN. REFER TO SHEET M5.0 SUPPORT DETAILS. USE EXISTING <br />PIPE CURB AND CHASE. <br />® EXISTING MRI EXHAUST FAN (EF-4) TO REMAIN. FAN IS RATED FOR 2,000 CFM AT 0.75 INCHES WATER. <br />Q EXISTING 8"0 STAINLESS STEEL QUENCH VENT TO REMAIN. <br />NEW SCREEN <br />WALL <br />NEW CON6TRUCTION <br />CH-1 <br />EXISTING CAPPED <br />PIPE CURB <br />Project No. 15017.00 <br />M402 <br />®2015 BH/PK Architects, Inc. <br />$DATE$ $TIME$ $FILEA$ <br />