Laserfiche WebLink
INFECTION CONTROL MEASURES: <br />v <br />0 <br />H' I H' 1 H 1 <br />TRAUMA CARDIAC 2 <br />IS LATI N <br />OFFICE <br />a <br />OFFICE E—EXAM 22 <br />i <br />EMT LOUNGE <br />-- - - - - - - - <br />- <br />i <br />OFFICE o <br />� a <br />E—EXAM 21 <br />E—DECON. SHOWER ❑ <br />0 <br />0 0 <br />E—EXAM 20 <br />STORAGE <br />0 0 E—EXAM 19 <br />HO H <br />0 0 <br />o <br />E—EXAM 18 <br />E—CORRIDOR <br />'H <br />c <br />E—EXAM 3 <br />J Ll� <br />E—CORRIDOR <br />E—NURSE STATION <br />H <br />ITS E—MEDS <br />x <br />221 <br />_ <br />� <br />L� �_J <br />4 new 6'dla bollards <br />6'-0' o.c. <br />° <br />�servatio <br />7 <br />x <br />: <br />1 <br />1 <br />e10 <br />1 0A;ervat <br />Existing concrete <br />0 curb <br />O <br />� <br />x <br />� <br />Existing concrete <br />0 <br />Observation <br />x x <br />=6 <br />v <br />H' <br />E—EXAM 4 <br />v <br />o <br />i <br />E— YN X 5 <br />O <br />E—TLT <br />E—BLOOD <br />GAS <br />FT- <br />E—SECLUSION EX 6 <br />�1 <br />E—SOILED <br />HOLD <br />O E—DIRECTOR <br />F <br />E—MENSO: U U CORRIDOR <br />E—EXAM 7 E— WOMENS E— WOMENS <br />° 0 LOCK <br />IMF---- <br />0 <br />of —MEN <br />LOCK <br />E—EXAM 8 <br />LET <br />E—STAFF LOUNGE <br />E—EXAM 9 <br />H <br />U01 <br />0 <br />E—OFFICE —TOILET <br />E—CAST <br />SUPPLY <br />E—TOILET <br />� 0 <br />�E—TOILET <br />E—ELEV <br />WAITING <br />o <br />ry <br />E—ON CALL <br />OFFICE <br />HOUSEKEEPING i <br />H H <br />O <br />2 CART WASHER <br />PROCESSED <br />STORES <br />® FEC DECONTAMINATION <br />50 <br />a 000 <br />>O 000 <br />ELEV ®JAN <br />H <br />ELEVATOR <br />EQUIPMENT <br />0 <br />H <br />H <br />E—ELEV <br />MECH <br />H <br />E—STI <br />0 <br />H] <br />H <br />H <br />H <br />TRANSITION <br />H <br />H <br />a <br />❑H <br />H <br />[©lam <br />1. The Contractor shall obtain from the owner a copy of the Infection control risk assessment i1CRA) prepared for <br />this proJect.The contractor shall review the requirements Tn this report and preform all work Tn <br />accordance with those requirements.The contractor shall strictly adhere to the limits of the construction area, <br />and where phosln applies shall adhere to the phasing pion.Arn work outside the construction are shall be <br />coordinated with he hospital and preformed In accordance wlth the ICRA report, under the supervision <br />of the hospital's representative or other designated ICRA committee officer. <br />2. To the extent that it Is required by the ICRA the contractor shall endeavor to maintain existing levels of <br />Indoor air quality In areas surrounding and adjacent to the construction work zone and elsewhere in the <br />facility. It should be anticlpafed that the ICRA report will require measures to this e7fect Including erection <br />of construction zone barriers and provisions for negative air pressure in the construction zone relative <br />to other areas of the new foclllty Failure to comply with construction and maintenance of construction barriers <br />will result in the cessation of work until the barriers are brought Into compliance. <br />3.See Mechanical plans for additional comments on negative pressure and monitoring requirements. <br />4. Any requirement for interruption or shut down of utilities made necessary by this construction shall be <br />coordinated with the hospital at least one week prior to Interruption. <br />5. Contractor shall endeavor to minimize any disruption of surrounding areas of the hospital. <br />6. If fire olorm and / or sprinkler systems are shut down for four (4) hours or more. <br />contractor to provide 'Fire Watch'. <br />7. If the structural steel fireproofing is damaged due to construction, then It shall be repaired <br />to Its original fire rating. <br />B. For short term above ceiling work outside of the phased construction barriers Contractor <br />to provide a portable construction containment system as approved by the hospital. <br />Fire retardant wood noller <br />Close open ducts with 6 mil poly <br />Seal with duct tape <br />Close celling space with 6 mil fire retor <br />Poly Seal oil Joint penetrations with duct <br />Seal around all pipe and duct <br />penetrations In the partition and <br />poly barrier with duct tape <br />11col ceiling file <br />psum wall board <br />h occupied side with <br />paint <br />'0 Go 3%' Metal studs <br />1' O.C. <br />oLi <br />o 011 J, Patient s anon Ion Observatlor, COPY/ WORK <br />Toilet '3 2 '1 1 DRS WORK Plaster tope all Joints <br />------ --- -- --- -- -- ------------ -- Secure oil tape with ram -tack <br />ja OFFICE high tack spray or equal <br />n <br />Corridor <br />Nourish E <br />CNurse <br />on <br />Drs. Sleep <br />CONFERENCE <br />OFFICE <br />FEX <br />W <br />ELEC. <br />• U <br />J <br />RECEPTION II <br />UPS <br />FEC <br />TRUE PLARRR'nnR <br />NORTH NORTH <br />i STAGE ONE ICRA PLAN <br />A1.1 1/8 ' • 1'-0' <br />Stair "B" <br />2 TEMPORARY ICRA WALL S <br />1 <br />Project No. 12036.00 <br />A I. I <br />02012 BH/PK Architects, Inc. <br />1111312012 3:00:59 PM ...\ER New\cd\AI.I ICRA Plan.dgn <br />