Laserfiche WebLink
N <br />N <br />LEN <br />\ <br />r') O <br />SM <br />C\- <br />N <br />Eel <br />o � <br />03 <br />0 <br />, - I <br />ijbl j <br />i Flpl�'1 rl y <br />it <br />,.I <br />s <br />r i <br />r,'- : <br />7 <br />O O <br />�)711 <br />--- - - _ _ <br />I <br />FD I <br />I ' lij <br />xo" <br />I.? <br />ail <br />I <br />N <br />HVAC DEMOLITION PLAN <br />SCALE: %" = 1'- 0" <br />700 <br />O <br />300 <br />� --------- --707------- <br />♦� <br />OI <br />250(2) I 1 <br />300 <br />O <br />SCOPE OF WORK 100 <br />20500 <br />I v <br />100 <br />I - U P U (�) P t 0 4 0 ! <br />i <br />n <br />t <br />*'-"4 <br />r- <br />HVAC PLAN - NEW WORK <br />SCALE: %" = 1' - C" <br />T <br />UTILIZE EXISTING ROOFTOP <br />ABANDONED EXHAUST FAN <br />CURB FOR NEGATIVE <br />PRESSURE FAN RELIEF. <br />O AHU-20 OUTSIDE AIR <br />�o AHU-20 TOTAL SUPPLY AIR <br />i i t_I <br />- - IL— - <br />I <br />IL <br />O FE <br />T <br />FD <br />GENERAL DEMOLITION NOTES: <br />1. PRIOR TO DEMOLITION, MEASURE AND RECORD AIR & WATER QUANTITIES IN <br />UTILITIES REQUIRED TO MAINTAIN OPERATION WITH -IN AND BEYOND 1=ACH <br />DEMOLITION PHASE UNTIL AFFECTED AREAS ARE DEMOLISHED. MAINTAIN <br />THESE QUANTITIES THROUGHOUT EACH DEMOLITION PHASE. <br />2. MAINTAIN EXISTING AIR HANDLING UNIT (AHU-20) IN OPERATION UNTIL. ITS <br />RESPECTIVE DEMOLITION PHASE IS COMPLETE. BLANK OFF AND SEAL <br />RETURN AIR INTAKES SERVING EACH DEMOLISHED AREA IN ORDER T3 <br />PREVENT GENERATED CONSTRUCTION DEBRIS FROM BEING RECIRCULATED <br />TO OCCUPIED SPACES DURING DEMOLITION --CONSTRUCTION PHASE. BLANK <br />OFF AND SEAL ANY SA, RA AND/OR EA DUCTS BEING DEMOLISHED AND <br />REMAINING WITHIN THE CONSTRUCTION AREA. <br />3. MAINTAIN NEGATIVE RELATIVE AIR PRESSURE IN DEMOLITION PHASE AREA. <br />MINIMUM HEPA-FILTERED EXHAUST AIR QUANTITY SHALL BE 0.5 TO 0.75 CFM/SQ.FT. <br />UTILIZE MULTIPLE NEGATIVE AIR UNITS, AS NECESSARY, TO MAINTAIN NEGATIVE <br />PRESSURE. PROVIDE REQUIRED MAKE-UP AIR FROM A SEPARATE SOURCE. <br />FANS IDENTIFIED TO BE DEMOLISHED, IN DEMOLITION AREA, AND/OR=XISTING <br />ROOF EXHAUST FANS AND THEIR ROOF OPENINGS MAY BE UTILIZED FOR AIR <br />DISCHARGE UNTIL DEMOLITION PHASE IS COMPLETE. DO NOT UTILIZE EXISTING <br />EXHAUST RISERS THAT SERVE OTHER SPACES OR OTHER LEVELS IN BUILDING. <br />4. VERIFY NEGATIVE RELATIVE AIR PRESSURE IN THE CONSTRUCTION SPACE <br />BY PROVIDING A MAGNAHELIC GAUGE AND MAINTAINING A WRITTEN LOG, <br />TAKEN AT REGULAR INTERVALS, POSTED FOR REVIEW AT SITE OF CONSTRUCTION. <br />5. DEMOLISH ALL DUCTWORK, PIPING AND ANCILLARY DEVICES WITHIN AREA OF <br />PHASING PLAN UNLESS OTHERWISE NOTED. ALL BRANCH DUCTS BEING <br />OPENINGS PATCHED, SEALED AND INSULATED TO MATCH EXISTING DUCTWORK. <br />DEMOLISHED FROM MAIN TRUNK DUCTS SHALL HAVE BRANCH CONNECTION <br />6. DEMOLISH ALL ABANDONED DUCTWORK, DAMPERS, PIPING AND ANCILLARY <br />WALLS TO MATCH EXISTING OR NEW CONSTRUCTION, AS PROJECT DICTATES. <br />DEVICES IN DEMOLITION AREA UNLESS OTHERWISE NOTED. PATCH AFFECTED <br />7. PRIOR TO DEMOLITION, MEASURE AND RECORD AIRFLOW AT POINTS LISTED <br />O THRU �o <br />SUBMIT REPORT TO ARCHITECT FOR EVALUATION PRIOR TO NEW CONSTRUCTION. <br />KEYED NOTES: <br />OPROVIDE SIX (6) TYPE KA 24x24 PERFORATED SUPPLY AIR GRILLES MOUNTED IN CEILING. <br />BALANCE TO 250 CFM EACH. SEE SCHEDULE FOR DETAILS. <br />02 BALANCE TO NEW VALUE SHOWN ON PLAN. <br />03 VERIFY AHU-20 IS BALANCED TO A MINIMUM OF 20% OA. <br />04 EXISTING, AVERAGING TEMPERATURE SENSORS TO CONTROL SPACE TEMPERATURE(S). <br />_ __ _____ <br />L ----ij ;x ,_ <br />ROOM AIR CHANGE CALCULATION <br />CATH LAB # 1 - REQ ACH = 15 (TOTAL AIR) / 3 (OUTSIDE AIR) <br />ROOM AREA = 500 SO FT <br />CEILING HEIGHT = 9'-3" <br />VOLUME = 500 SO FT x 9.25 FT CLG = 4625 CU FT <br />(CALCULATION IS BASED ON ENTIRE ROOM AT THE HIGHEST CEILING LEVEL) <br />AIR CHANGE _ (1500 CFM x 60) / 4625 CU FT= 19.4 ACH <br />CORRIDOR- REQ ACH = 2 (TOTAL AIR) / NONE (OUTSIDE AIR <br />(AREA OUTSIDE OF CATH LAB) <br />ROOM AREA = 520 SO FT <br />CEILING HEIGHT = 8'-0" <br />VOLUME = 520 SO FT x 8 FT = 4160 CU FT <br />AIR CHANGE _ (600 CFM x 60) / 4160 CU FT= 8.7 ACH <br />design <br />Heery International Inc. <br />4700 Millenia Boulevard, <br />Suite 550, <br />Orlando, Florida 32839 <br />407.992.6300 <br />EB 0005176 <br />Seal: <br />ti N 3443 <br />0 . F 1 <br />' & <br />.dam, OW •,�.� <br />°!1l dl i <br />GARY D. STARRETT - PE #33443 <br />Project No. 12010.00 <br />m I I <br />010I1 IM/M Architects, Inc. <br />FDA, L$ $TIME$ $FILEA$ <br />