My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (129)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (129)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 3:36:20 PM
Creation date
2/25/2025 9:48:41 AM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Rodda Construction
Building Plans - Permit #
12953
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES <br />AT THEIR EXPENSE, THE CUSTOMER AND/OR THE CONTRACTOR WILL BE EXPECTED TO <br />PROVIDE THE FOLLOWING (IF REQUIRED) PRIOR TO X-RAY EQUIPMENT DELIVERY AND <br />INSTALLATION: <br />1. ANY ROOM REMODELING AND CONSTRUCTION - FLOOR CEILING AND WALLS MUST BE <br />FINISHED BEFORE EQUIPMENT INSTALLATION CAN BEGIN. <br />2. INSTALLATION OF PROPER SPECIFIED POWER. <br />3. INSTALLATION OF LOAD CENTERS, BRANCH PANELS, CIRCUIT BREAKERS, JUNCTION BOXES, <br />CONDUIT AND CABLE TRAYS AS SPECIFIED. <br />4. INTERCONNECTING WIRE AND CABLE AS SPECIFIED. <br />5. INSTALLATION OF WALL AND CEILING SUPPORT AND SUSPENSION FRAME WORK AS <br />SPECIFIED. <br />6. FOR THE MOST PART CONVENIENCE OUTLETS ARE TO BE SPECIFIED BY OTHERS. <br />OUTLETS REQUIRED BY EQUIPMENT WILL BE SPECIFIED. FOR EASE IN EQUIPMENT <br />SERVICE, A MINIMUM NUMBER OF OUTLETS WILL BE DEPICTED. <br />7. ANY CEILING MOUNTED LIGHT FIXTURES, DIFFUSERS, VENTS, SMOKE/FIRE DETECTORS, <br />SPRINKLER HEADS, HALON NOZZLES, ETC. SHALL NOT EXTEND MORE THAN 1/2" BELOW <br />THE FINISHED CEILING. <br />8. ANY PLUMBING REQUIREMENTS. <br />9. INSTALLATION OF OPTIONAL WARNING LIGHT AND/OR DOOR INTERLOCK SWITCH AT <br />ENTRANCE DOORS OF X-RAY ROOM TO BE COORDINATED WITH FACILITY, EQUIPMENT <br />INSTALLERS, AND DESIGN TEAM. <br />10. ANY AIR CONDITIONING REQUIREMENTS. (HVAC - HEATING, VENTILATION, AIR CONDITIONING <br />AND HUMIDIFICATION) <br />11. ALL ANCILLARY AND ACCESSORY ITEMS. <br />12. RADIATION PROTECTION REQUIREMENTS: <br />THESE MUST BE SPECIFIED BY A QUALIFIED RADIATION PHYSICIST. <br />13. SHIELDING TESTING (LEAD OR EQUIVALENT): <br />AFTER X-RAY EQUIPMENT HAS BEEN INSTALLED AND PLACED IN OPERATING CONDITION, <br />THE SHIELDING SHALL, BE TESTED, AT THE OWNER'S EXPENSE, BY A CERTIFIED HEALTH <br />PHYSICIST. <br />14. THE DECISION OF ACCEPTABILITY BY A HEALTH PHYSICIST SHALL BE THE RESPONSIBILITY <br />OF THE CONTRACTOR. THEREFORE, THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR <br />REPLACEMENT OF ALL DEFECTIVE WORK (INCLUDING WORK SUBSEQUENTLY AFFECTED) <br />AND ADDITIONAL TESTS REQUIRED TO MEET THE SATISFACTION OF THE HEALTH <br />PHYSICIST. <br />15. LIABILITY: <br />THE EQUIPMENT REPRESENTATIVES OR THEIR PLANNER ASSUME NO RESPONSIBILITY <br />FOR ANY CONSTRUCTION COSTS, WHETHER OR NOT RELATED TO THE INSTALLATION OF <br />X-RAY EQUIPMENT OR SITE PLANNING DOCUMENTS. NO WORK MAY BE PERFORMED OR <br />MATERIALS FURNISHED AT THEIR EXPENSE UNLESS AUTHORIZED BY A SIGNED, FORMAL <br />PURCHASE ORDER. ADDITIONALLY, A SITE INSPECTION SHALL BE CONDUCTED BY THE <br />EQUIPMENT REPRESENTATIVES TO CONFIRM THE SITE'S READINESS PRIOR TO X-RAY <br />EQUIPMENT DELIVERY. THIS INSPECTION SHALL BE PERFORMED WHEN NOTIFIED OF THE <br />CONSTRUCTION'S COMPLETION. <br />ARCHITECTURAL NOTES <br />1. GAMMA TECH'S SET OF DRAWINGS ARE FOR THE PURPOSE OF A LAYOUT PLAN ONLY - NOT <br />FOR CONSTRUCTION. THE EQUIPMENT REPRESENTATIVES OR THEIR DESIGNER ARE NOT <br />RESPONSIBLE OR LIABLE FOR ANY ERRORS OR OMISSIONS. <br />GAMMA TECH'S DRAWINGS ARE FOR THE BENEFIT OF PURCHASER'S ARCHITECT OF CHOICE <br />OR PROJECT MANAGER WHO SHALL ENSURE THAT ALL CONSTRUCTION COMPLIES WITH <br />BUILDING CODES AND REGULATIONS THAT HAVE JURISDICTION. THOSE MAKING USE OF OR <br />RELYING ON THIS MATERIAL ASSUMES ALL RISKS AND LIABILITY ARISING FROM SUCH USE OR <br />RELIANCE. <br />GAMMA TECH'S DRAWINGS ARE INTENDED TO PROVIDE THE CONSTRUCTION PARTICIPANTS <br />WITH SPECIFICATION AND CONCEPTUAL INFORMATION ONLY. EVERY EFFORT HAS BEEN MADE <br />TO CONFORM DETAILS TO THE ACTUAL EQUIPMENT EXPECTED TO BE INSTALLED. THE DESIGN <br />TEAM SHALL EXTRAPOLATE PERTINENT -INFORMATION FROM THIS LAYOUT AND INCORPORATE <br />INTO A WORKING SET OF CONSTRUCTION DRAWINGS OBSERVING ALL PREVAILING CODES. <br />GAMMA TECH'S FLOOR PLAN WAS SCALED FROM PRINTS DRAWN BY OTHERS. ALL <br />CONSTRUCTION PARTICIPANTS SHALL VERIFY AND ADJUST DIMENSIONS. CRITICAL <br />DIMENSIONAL RELATIONSHIPS HAVE BEEN SUPPLIED. IT IS THE RESPONSIBILITY OF ALL <br />CONSTRUCTION PARTICIPANTS TO ADHERE TO THESE DISTANCES. ALL DIMENSIONS ARE FROM <br />FINISHED SURFACES UNLESS OTHERWISE NOTED. ARCHITECT SHALL VERIFY THAT ALL DOOR <br />AND PASSAGEWAY SIZES ARE ADEQUATE FOR TRANSPORTING EQUIPMENT FROM EXTERIOR OF <br />BUILDING INTO RESPECTIVE ROOMS. RECOMMEND COVERING OR REMOVING THRESHOLDS. <br />2. ALL SUPPLY DIFFUSERS SHALL NOT CAUSE DIRECT AIR CURRENTS ON PATIENTS OR <br />OPERATORS. RECOMMEND 2' x 4' LAY -IN CEILING PANELS OF MATERIAL ACCEPTABLE TO <br />CUSTOMER AND APPROVED BY PREVAILING CODES. LIGHTING FIXTURES, VENTS, ETC. TO BE <br />FLUSH WITH FINISHED CEILING. <br />3. ARCHITECT AND ENGINEERS SHALL USE EXISTING ELECTRICAL AND STRUCTURAL ITEMS <br />WHEN FEASIBLE. <br />4. ALL WORK, EXCEPT INSTALLATION OF DIAGNOSTIC IMAGING EQUIPMENT, IS TO BE DONE BY <br />THOSE OTHER THAN THE EQUIPMENT REPRESENTATIVES. <br />5. SOME CONVENIENCES MAY BE REQUIRED BY CODE OR DESIRED BY CUSTOMER IN EACH <br />RESPECTIVE ROOM (i.e., STORAGE, CABINETS, SINKS AND COUNTERS, ETC.) PROJECT <br />MANAGER SHALL CONSULT WITH FACILITY REGARDING DESIRED CONVENIENCES. <br />6. THE SUPPLY VOLTAGE M'..'ST REMAIN RELATIVELY STABLE. ELECTRICAL POWER FOR X-RAY <br />EQUIPMENT REQUIRES VERY LARGE CURRENTS FOR EXTREMELY SHORT TIMES. REFER TO <br />ELECTRICAL NOTES. GROUNDING MUST CONFORM TO THE CURRENT CODE REQUIREMENTS. <br />7. VIEWING WINDOW TO BE 1/16" LEAD EQUIVALENT. RECOMMEND LARGE VIEWING WINDOWS TO <br />BE TILTED 70 TO HELP ELIMINATE GLARE. IF TILTED 70 VIEWING WINDOW IS ACRYLIC, PROVIDE A <br />SINGLE SHEET OF PLATE GLASS ON BOTH SIDES TO HELP PREVENT SCRATCHING. <br />8. NO ATTENTION HAS BEEN GIVEN TO SPECIFIC PLUMBING OR HVAC CONSIDERATIONS <br />AFFECTED BY THE SCOPE OF THIS WORK. MECHANICAL ENGINEERING DRAWINGS TO BE DONE <br />BY OTHERS. <br />ELECTRICAL AND MECHANICAL DESIGNERS SHALL BE REQUIRED TO REVIEW THESE <br />DRAWINGS TO HELP THEM GAIN AN UNDERSTANDING OF THE CONCEPT OF THIS WORK AND TO <br />HELP MINIMIZE CONFLICTING CONSTRUCTION EFFORTS. ELECTRICAL ENGINEERING DRAWINGS <br />TO BE DONE BY OTHERS. <br />NO ATTENTION HAS BEEN GIVEN TO SPECIFIC BUILDING STRUCTURAL INTEGRITY. A <br />PROFESSIONAL STRUCTURAL ENGINEER SHALL INSPECT FIELD CONDITIONS TO ENSURE THAT <br />THE FACILITY SUPPORT STRUCTURE (e.g. WALLS, FLOORS, CEILINGS) CAN PROVIDE ADEQUATE <br />SUPPORT FOR THE DIAGNOSTIC IMAGING EQUIPMENT DESCRIBED IN THE 'EQUIPMENT <br />SCHEDULE'. STRUCTURAL ENGINEERING DRAWINGS TO BE DONE BY OTHERS. <br />NO ATTENTION HAS BEEN GIVEN TO SPECIFIC SEISMIC ANCHORAGE CONSIDERATIONS <br />AFFECTED BY THE SCOPE OF THIS WORK. ALL EXPENSES ASSOCIATED WITH SEISMIC TESTING <br />AND COMPLIANCE SHALL BE THE RESPONSIBILITY OF THE FACILITY (END USER) OR THEIR <br />RESPECTIVE CONTRACTORS OF CHOICE. IT IS STRONGLY RECOMMENDED THAT THE <br />CUSTOMER CONSULTS WITH A PROFESSIONAL STRUCTURAL ENGINEER FAMILIAR WITH ALL <br />PREVAILING SEISMIC REQUIREMENTS. SEISMIC ENGINEERING DRAWINGS TO BE DONE BY <br />OTHERS. <br />9. THE EQUIPMENT REPRESENTATIVES MUST APPROVE DEVIATION FROM THESE PLANS IN <br />WRITING PRIOR TO ANY CHANGES. <br />SUPPORT NOTES <br />( CONTRACTOR FURNISHED -CONTRACTOR INSTALLED) <br />THE EQUIPMENT REPRESENTATIVE OR THEIR DESIGNER IS IN NO WAY RESPONSIBLE FOR THE <br />SUPPORT STRUCTURE FOR ANY OVERHEAD CEILING MOUNTED EQUIPMENT / DEVICES OR WALL <br />MOUNTED EQUIPMENT / DEVICES. THIS IS THE RESPONSIBILITY OF THE CONSTRUCTION <br />PARTICIPANTS. <br />UNISTRUT: <br />1. ALL UNISTRUT, ALL STEEL WORK AND ALL OTHER PARTS NECESSARY TO SUPPORT CEILING <br />MOUNTED TUBE HANGER OR OTHER CEILING SUSPENDED EQUIPMENT SHALL BE PROVIDED BY <br />AND INSTALLED BY CONTRACTOR. CONSIDER INSTALLING UNISTRUT CHANNELS WALL TO WALL <br />TO FACILITATE FUTURE EQUIPMENT. UNISTRUT CHANNEL SHALL BE PARALLEL, SQUARE AND IN <br />SAME HORIZONTAL PLANE. THE SYSTEM IS TO BE CROSS BRACED VERTICALLY, HORIZONTALLY, <br />AND DIAGONALLY TO ALLOW NO MOVEMENT AND A MAXIMUM OF 1/16" DEFLECTION. THE <br />RECOMMENDED HEIGHT ABOVE THE FINISHED FLOOR TO THE BOTTOM TO THE UNISTRUT IS <br />SPECIFIED ON THIS PLAN. <br />2. INTENTIONALLY LEFT BLANK. <br />3. CONTRACTOR SHALL SUPPLY CLOSURE STRIPS (P3184) FOR AREAS OF UNISTRUT EXPOSED <br />AND WITHOUT MOUNTING UNITS. THE CLOSURE STRIPS SHALL BE INSTALLED AFTER THE <br />OVERHEAD RAILS HAVE BEEN SECURED IN PLACE BY THE EQUIPMENT INSTALLERS. <br />4. METHODS OF SUPPORT FOR THE STEELWORK THAT WILL PERMIT ATTACHMENT TO <br />STRUCTURAL STEEL OR THROUGH BOLTS IN CONCRETE CONSTRUCTION SHOULD BE FAVORED. <br />DO NOT USE SCREW ANCHORS IN DIRECT TENSION. <br />5. DO NOT USE SCREWS TO FASTEN CEILING GRID TO UNISTRUT. AN ALTERNATE METHOD SUCH <br />AS TACK, SPOT WELDING, ETC. SHOULD BE CONSIDERED. <br />6. ALL UNISTRUT MEMBERS HAVE BEEN COORDINATED WITH THE X-RAY EQUIPMENT. ANY <br />DEVIATION FROM THIS PLAN MUST BE APPROVED BY SIGNATURE THROUGH THE EQUIPMENT <br />REPRESENTATIVE. <br />7. IT IS STRONGLY RECOMMENDED THAT A STRUCTURAL ENGINEER, IN CONJUNCTION WITH <br />UNISTRUT REPRESENTATIVES, COORDINATE ANY UNISTRUT SUPPORT STRUCTURE. <br />SUPPORTS: <br />1. ALL UNITS THAT ARE WALL MOUNTED OR CEILING SUSPENDED ARE TO BE PROVIDED WITH <br />SUPPORTS STRUCTURES WHERE NECESSARY. <br />2. ALL SUPPORTS STRUCTURES ARE TO BE PROVIDED BY THE FACILITY OR THEIR <br />CONTRACTOR. <br />3. WALL SUPPORTS ARE TO BE HIDDEN WITHIN WALLS WHENEVER POSSIBLE. <br />4. WALL SUPPORTS MAY NOT BE REQUIRED IF WALL MATERIAL IS ADEQUATE FOR THE LOADS <br />GIVEN (i.e.,BLOCK). CONSULTATION WITH A STRUCTURAL ENGINEER IS STRONGLY <br />RECOMMENDED. <br />5. ALL SURFACE MOUNTED SUPPORTS ARE TO BE PAINTED THE SAME COLOR AS THE <br />ADJACENT SURFACE OR CONSULT WITH FACILITY REGARDING ACCENT COLORS. <br />FACILITY: <br />Florida Hospital <br />Zephyrhills, FL <br />DRAWN BY: <br />Dave Moser <br />DATE: <br />01.30.2012 <br />FILE NAME: <br />FHZ122011 <br />SCALE: <br />NONE <br />SHEET: <br />A <br />-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.