Laserfiche WebLink
RACEWAY & WIRING SCHEDULE <br />( CONTRACTOR FURNISHED -CONTRACTOR INSTALLED) <br />RUN # <br />FROM <br />TO <br />SIZE <br />REMARKS <br />480VAC, <br />REFER TO "INCOMING WIRE SIZE WITH TEAL PCDU-ORF POWER CONDITIONER "NOTES. <br />< > <br />3-PHASE, <br />A <br />VARIES <br />EC SHALL CONNECT BOTH ENDS. <br />SOURCE <br />3-#1AWG, 1 #1AWG NEUTRAL AND 1-#6AWG GROUND. EC SHALL CONNECT AT (A) AND <br />2 <br />A <br />CEE 1 <br />11/211 <br />CONNECT TO POWER IN TEAL CONDITIONER WITH SEALTITE <br />CONDUIT <br />TION BOX (E1) ANDNAL <br />BETWEEN JUNCNPUT <br />REAR OF TEALUNIT. <br />1/211 <br />2-#14AWG PLUS GROUND. EC SHALL CONNECT TO SHUNT TRIP DEVICE IN (A) <br />3 <br />> <br />B <br />( <br />A <br />CONDUIT <br />AND CONNECT "EMERGENCY OFF" SWITCH IN BOX (B). <br />DRIVEN <br />VERTICAL <br />GROUND (WELDING BLE). EC SHALL CONNECT TO DRIVEN GROUND ROD <br />4 <br />GROUND <br />RISER <br />1 1/2" <br />AN�OAWG <br />TO COPPER BUS BAR (MG )AREFER TO BUS AR BLO K DIAGRAM. <br />ROD <br />CONDUIT <br />1/211 <br />2-#14AWG PLUS GROUND. EC SHALL CONNECT TO DOOR INTERLOCK SWITCH AND <br /><57 <br />N <br />) <br />w <br />() <br />CONDUIT <br />LEAVE TAILS AT (J) PASS THROUGH BOX (W) . <br />INSTALL ONLY IF REQUIRED BY PREVAILING CODES OR REQUESTED BY CUSTOMER. <br />VERTICAL <br />1/2" <br />2-#14AWG PLUS GROUND. EC SHALL CONNECT TO "X-RAY IN USE" WARNING SIGN <br /><6> <br />()w <br />RISER <br />CONDUIT <br />AT BOX (W) AND LEAVE TAILS AT (E). EC SHALL ENSURE NO LIVE WIRES IN (E). <br />INSTALL ONLY IF REQUIRED BY PREVAILING CODES OR REQUESTED BY CUSTOMER. <br />VERTICAL <br />THREE 2-1/2" <br />OMEGA FURNISHED CABLES TO BE INSTALLED BY X-RAY EQUIPMENT INSTALLERS. <br /><7> <br />(rm <br />RISER <br />CONDUITS <br />CONDUIT FOR MONITOR INTERCONNECT CABLES. <br />EC SHALL LEAVE PULL STRINGS. <br />WIRE <br />ONE 5" <br />MOUNT CONDUIT FLUSH WITH THE FINISHED FLOOR LOCATED WHERE SHOWN AND <br />8 <br />G <br />TROUGH <br />CHASE NIPPLE <br />CONNECTED TO WIRE TROUGH BELOW THE FLOOR. <br />CONDUIT FOR C-ARM CABLES. <br />WIRE <br />TWO 2-1/2" <br />MOUNT CONDUITS FLUSH WITH THE FINISHED FLOOR LOCATED WHERE SHOWN AND <br />9 <br />T <br />TROUGH <br />CHASE NIPPLES <br />CONNECTED TO WIRE TROUGH BELOW THE FLOOR. <br />CONDUIT FOR TABLE CABLES. <br />OMEGA FURNISHED CABLES TO BE INSTALLED BY X-RAY EQUIPMENT INSTALLERS. <br />10 <br />VARIES <br />VARIES <br />VARIES <br />X-RAY <br />TEAL <br />1 1/2" <br />E.C. SHALL PROVIDE AND INSTALL 3-#1AWG, 1 #1 NEUTRAL AND 1-#6AWG GROUND. EC <br />11 > <br />GENERATOR <br />UNIT <br />SEALTITE <br />SHALL CONNECT TO CIRCUIT BREAKER ON LOAD SIDE OF TEAL UNIT AND CONNECT TO <br />INPUT POWER TERMINALS IN X-RAY GENERATOR CABINET WITH SEALTITE, PLUS TWO <br />CONNECTORS, BETWEEN TEAL UNIT AND REAR OF X-RAY GENERATOR. <br />TEAL <br />1/211 <br />E.C. SHALL PROVIDE AND INSTALL THE FOLLOWING: 2-#10AWG AND 1-#10AWG <br />r� <br />12 <br />RACK <br />CABINET <br />UNIT <br />SEALTITE <br />GROUND. EC SHALL CONNECT TO TO CIRCUIT BREAKER ON LOAD SIDE OF TEAL UNIT <br />AND CONNECT TO INPUT POWER TERMINALS IN I-100 RACK CABINET WITH SEALTITE, <br />PLUS TWO CONNECTORS, BETWEEN TEAL UNIT AND REAR OF RACK CABINET. <br />E.C. SHALL PROVIDE AND INSTALL 2-#10AWG AND 1-#10AWG GROUND. EC SHALL <br />13> <br />�CK <br />TEAL <br />1/211 <br />CONNECT TO 15AMP, 1 P, CB IN TEAL UNIT (SURGICAL LIGHT) AND LEAVE 10' TAILS AT <br />CABINET <br />UNIT <br />SEALTITE <br />RACK CABINET WITH SEALTITE, PLUS TWO CONNECTORS, BETWEEN TEAL UNIT AND <br />REAR OF RACK CABINET. REFER TO TEAL UNIT DETAIL AND DETAIL ON SHEET E-9. <br />TEAL <br />1/211 <br />2-#14AWG PLUS GROUND. EC SHALL CONNECT TO 20AMP, 1 P, CB IN TEAL UNIT <br />14 <br />IMAGING <br />UNIT <br />SEALTITE <br />(IMAGING CABINET). CONNECT TO TEAL UNIT WITH A 6FT. PIECE OF 1/2" DIA. SEALTITE. <br />CABINET <br />VERTICAL <br />3/4" <br />2-#14AWG PLUS GROUND. EC SHALL CONNECT TO SURGICAL LIGHT AND LEAVE 10' <br />15 <br />C.ZF-) <br />RISER <br />CONDUIT <br />TAILS AT RACK CABINET. <br />REFER TO TEAL UNIT DETAIL AND ELECTRICAL DETAIL ON SHEET E-9. <br />FINISHED CEILING <br />LINE (TYPICAL). <br />FINISHED FLOOR <br />LINE (TYPICAL). <br />CONDUIT RUNS ARE SHOWN SCHEMATICALLY <br />EC SHALL ENSURE THAT CONDUIT RUNS ARE AS SHORT AS FIELD CONDITIONS WILL ALLOW. <br />FACILITY: <br />Florida Hospital <br />Zephyrhills, FL <br />DRAWN BY: SCALE: <br />Dare Moser 1 /4" = 1' <br />DATE: SHEET: <br />01.30.2012 <br />FILE NAME: <br />FHZ122011 <br />