Laserfiche WebLink
V- <br />INFECTION CONTROL MEASURES: <br />1. The Contractor shall obtain from the hospital a copy of the infection control risk assessment iICRAI prepared for <br />this project. The contractor shall review the requirements in this report and preform all work In <br />N accordance with those requirements. The contractor shall strictly adhere to the limits of the construction area, <br />and where phasing applies shall adhere to the phasing plan. Any work outside the construction are shall be <br />coordinated with the faclllty and preformed In accordance with the /RCA report, under the supervision <br />of the hospital's representative or other designated ICRA committee officer. <br />Y, <br />v- <br />O _ <br />2. To the extent that it is required by the ICRA the contractor shall endeavor to maintain existing levels of <br />Indoor air quality in areas surrounding and adjacent to the construction work zone, and elsewhere In the <br />foclIlly.It should be anticipated that the ICRA report will require measures to this effect Including erection <br />of construction zone barriers and provisions for negative air pressure in the construction zone relative <br />to other areas of the facility. Failure to comply with construction and maintenance of construction barriers <br />will result In the cesatlon of work until the barriers are brought Into compliance. <br />J.Contractor to monitor room to assure room maintain negative pressure. <br />4. Any requirement for interruption or shut down of utilities made necessary by this construction shall be <br />coordinated with the facility of least one week prior to Interruption. <br />5. Contractor shall endevor to minimize any disruption of surrounding areas of the hospital <br />6. All debris will be removed in covered carts. Wheels will be cleaned <br />prior to entering the building from outside or from the construction area <br />Fire retardant wood noiler <br />Close open ducts with 6 mll <br />fireretardant poly <br />Seal with duct tape <br />Close ceiling space with 6 mil fire retor, <br />Poly Seal a?l Joint penetrations with duct <br />Seal around all pipe and duct <br />penetrations in the partition and <br />poly barrier with duct tape <br />r-2- TEMPORARY ICRA WALL <br />Al,l 314 ' • 1'-0' <br />;ticol ceiling file <br />Te <br />psum wall board re <br />h occupied side with <br />paint <br />D Go J%' Metal studs <br />1' O.C. <br />foints <br />1th ram -tuck <br />>r equal <br />I ' ICRA FLOOR PLAN <br />Al / 1116 ' , r'-0' <br />TRUE <br />PLAN <br />NORTH <br />NORTH <br />U <br />U <br />�•1 <br />C�4 <br />N <br />O <br />N <br />00 <br />U o rn <br />JX <br />O <br />o, <br />►� C 00 V <br />N w M <br />O �' Z <br />0No w a <br />C1 <br />O <br />N <br />H <br />� p U <br />y N <br />� M <br />Q o o y <br />3 H <br />r� <br />C� <br />Cd <br />U <br />Vi <br />V-4 <br />. rl <br />� N <br />c4 Cd <br />O � <br />1� <br />Cd <br />O <br />Project No. 12010.00 <br />AIJ <br />I©2012 BH/PK Architects, Inc. <br />311312012 9:02:23 AM ...\A1-1 ICRA Plan - 2nd Floor.dgn <br />