Laserfiche WebLink
_ t <br />— <br />a <br />x <br />' CO1 <br />- 1 <br />1 <br />_6 , 7 AO• 1 <br />4 <br />s- <br />1 U3 <br />' <br />1 <br />1 <br />1 0 R <br />,F <br />1 6.,7 ACH <br />, <br />1 <br />1 <br />— <br />8 3EACH <br />1 <br />A' y (_�; 7.2 ACH <br />7.2 ACH <br />d5"�F <br />6� 7.2 ACH <br />7.2 ASH <br />i <br />3 <br />U <br />FIRST FLOOR - CONSTRUCTION VENTILATION - ALTERNATE #1 <br />0' 2' 4' 8' 16' 24' <br />•� <br />W OC <br />v a <br />vL <br />s. o <br />Zc Hn cr <br />CONSTRUCTION VENTILATION NOTES <br />1. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL <br />RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL <br />REVIEW THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE <br />WITH THOSE REQUIREMENTS. CONTRACTOR SHALL STRICTLY ADHERE TO THE LIMITS <br />OF CONSTRUCTION AREA, AND WHERE PHASING APPLIES SHALL ADHERE TO <br />THE PHASING PLAN. ANY WORK OUTSIDE THE CONSTRUCTION AREA SHALL <br />BE COORDINATED WITH THE OWNER AND PERFORMED IN ACCORDANCE WITH THE <br />IRCA REPORT, UNDER THE SUPERVISION OF THE OWNER'S REPRESENTATIVE <br />OR OTHER DESIGNATED ICRA COMMITTEE OFFICER. <br />2. TO THE EXTENT THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR SHALL <br />ENDEAVOR TO MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN AREAS <br />SURROUNDING AND ADJACENT TO THE CONSTRUCTION WORK ZONE, <br />AND ELSEWHERE IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA <br />REPORT WILL REQUIRE MEASURES TO THIS EFFECT INCLUDING ERECTION OF <br />CONSTRUCTION ZONE BARRIERS AND PROVISION OF NEGATIVE AIR PRESSURE IN <br />THE CONSTRUCTION ZONE RELATIVE TO OTHER AREAS OF THE NEW FACILITY. <br />3. IN ADDITION TO MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE <br />CONTRACTOR AT A MINIMUM SHALL PROVIDE EQUIPMENT AND COMPONENTS <br />NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION WORK ZONE <br />RELATIVE TO ADJACENT AREA. EXISTING HVAC SYSTEMS AND COMPONENTS SHALL <br />NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY <br />THE OWNER'S INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS <br />OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE ICRA REQUIREMENTS <br />AND AT A MINIMUM AS FOLLOWS: <br />A. VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE <br />CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED <br />DURING THE CONSTRUCTION DURATION. <br />B. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR <br />APPROVAL BY THE INFECTION CONTROL COMMITTEE. <br />C. CONTRACTOR SHALL PROVIDE PORTABLE HEPA FILTRATION UNITS EQUIVALENT <br />TO ABATEMENT TECHNOLOGIES "HEPA-AIRE PORTABLE AIR SCRUBBERS" OF APPROPRIATE <br />SIZE AND QUANTITY TO MAINTAIN THE NEGATIVE AIR PRESSURE AND AIR CHANGE RATES <br />IN THE CONSTRUCTION ZONE(S), AS REQUIRED BY THE OWNER'S ICRA. <br />D. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE <br />FILTERED PRIOR TO BEING DISCHARGED, AS DIRECTED BY THE ICRA REPORT, <br />E. CONTRACTOR SHALL PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE <br />PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND <br />PROVIDE DOCUMENTATION TO THE OWNER. PROVIDE AND MONITOR NEGATIVE AIR <br />PRESSURE MEASUREMENT DEVICES AND PROVIDE DOCUMENTATION TO THE OWNER, <br />AT ALL ACCESS DOORS BETWEEN THE HOSPITAL PROPER AND THE CONSTRUCTION <br />AREA. SEE KEY NOTE # 1. <br />F. SUPPLY AND RETURN DUCTWORK SHALL NOT BE USED DURING <br />CONSTRUCTION PHASE - SEAL ALL DUCT OPENINGS AIR TIGHT. <br />G. CONTRACTOR SHALL PROVIDE A MINIMUM OF ONE (1) NEGATIVE PRESSURE <br />MACHINE, UNIT WILL RECIRCULATE WITHIN THE CONSTRUCTION ZONE. <br />4. COORDINATE IN ADVANCE ANY REQUIRED EQUIPMENT SHUTDOWN WITH <br />THE OWNER, AND VERIFY BEFORE SHUTDOWN THAT EXISTING OR DESIRED AIR <br />PRESSURE RELATIONSHIPS WILL NOT BE ADVERSELY AFFECTED. <br />KEY NOTES: <br />ONEGATIVE AIR MACHINE WITH HEPA FILTRATION. NEGATIVE AIR MACHINE TO BE LOCATED <br />WITHIN CONSTRUCTION AREA. CONTRACTOR TO PROVIDE AS MANY NEGATIVE AIR UNITS <br />AS REQUIRED TO MAINTAIN MINIMUM OF 0.02-0.03" WG NEGATIVE AIR PRESSURE OR THE <br />NEGATIVE AIR PRESSURE REQUIRED BY THE OWNERS ICRA (WHICHEVER IS MORE <br />STRINGENT) IN AREAS OF WORK DURING ALL PHASES OF CONSTRUCTION. <br />OCONTRACTOR SHALL PROVIDE DIFFERENTIAL PRESSURE GAUGE TO MONITOR <br />CONSTRUCTION ZONE DIFFERENTIAL PRESSURE. <br />SEE NOTE 3E OF THE CONSTRUCTION VENTILATION NOTES; THIS SHEET. <br />OEXISTING MEDICAL GASES: 1 OXYGEN, 1 VACUUM, 1 MEDICAL AIR. <br />TYPICAL OF ALL EXAM ROOMS. <br />�4 EXISTING MEDICAL GAS ZONE VALVE, <br />OEXISTING MEDICAL GAS ALARM PANEL. <br />OEXISTING QUICK RESPONSE A/S HEAD. TYPICAL OF ALL EXAM ROOMS. <br />ov/d <br />�J <br />1� <br />e2 <br />_® <br />e� Z <br />VIS <br />0 <br />0 <br />0 <br />o <br />A <br />�.. co <br />oV=4 <br />1 � <br />. 0 <br />P„4, P <br />•� <br />C.� P�4 <br />COD <br />r0 <br />V <br />1 <br />i„ <br />0 00 <br />` -41 t <br />cc <br />' N <br />O <br />$DATE$ $TIME$ $FILEA$ <br />NO DIVISION 15 WORK IS REQUIRED <br />FOR ALTERNATE #1. <br />Project No. 00000.00 <br />M102 <br />19)2010 BH! PK Arc6ibe* hc. <br />