My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7209 Greenslope Dr (2)
Zephyrhills
>
Building Department
>
Building Plans
>
7209 Greenslope Dr (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 9:44:41 PM
Creation date
2/25/2025 9:50:58 AM
Metadata
Fields
Template:
Building Plans
Street #
7209
Location
Greenslope Dr
Contractor
Rodder Construction Inc
Building Plans - Permit #
10524
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />0 <br />N <br />S <br />-2 <br />d- <br />MY <br />.-Z+., <br />LOW <br />cfl <br />00 <br />HANGER ROD. PROVIDE A SECTION OF HIGH <br />COMPRESSION STRENGTH <br />INSULATION AT EACH HANGER <br />POINT. INSULATION MAY BE <br />HALF ROUND OR FULL ROUND <br />AND EXTEND 2" BEYOND <br />GALVANIZED SHIELD EACH WAY. <br />I H H I <br />WATER PIPING HANGER <br />THERMAL EXPANSION TANK <br />SUPPORTED FROM STRUCTURE <br />OR ON FLOOR <br />VACUUM RELIEF VALVE <br />CHECK VALVE <br />(TYP) <br />/ '4u <br />-r -LA n <br />TEMPERING VALVE <br />4" HIGH GALVANIZ <br />PAN W/ DRAIN. <br />ELECTRIC WATER HEATER <br />GALVANIZED <br />SHIELD <br />V IYL.71 r%u 1 <br />CHANNEL <br />fON <br />[PE <br />CUTOFF VALVE <br />(TYP) <br />-THERMOMETER <br />ASME TEMP. & PRESS. <br />RELIEF VALVE <br />PIPE FULL SIZE TO <br />AUXILLARY DRAIN PAN. <br />HOSE BIBB <br />DRAIN VALVE <br />DRAIN LINE, PIPE FULL <br />SIZE TO INDIRECT DRAIN <br />CONNECTION. <br />GENERAL PLUMBING NOTES <br />1. EQUIPMENT AND MATERIALS SPECIFIED AND/OR SHOWN ON DRAWINGS <br />SHALL BE FURNISHED (EXCEPT AS NOTED) COMPLETELY INSTALLED, <br />ADJUSTED, AND SHALL BE LEFT IN A SAFE AND SATISFACTORY <br />OPERATING CONDITION. ALL ACCESSORIES, PARTS, AND CONNECTIONS <br />NECESSARY FOR THE OPERATION OF THE EQUIPMENT SHALL BE <br />FURNISHED AND INSTALLED. <br />2. ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW EXCEPT ITEMS <br />THAT ARE CALLED FOR AS BEING REUSED OR FURNISHED BY &HERS. <br />3. ALL EXISTING LOCATIONS ARE TAKEN FROM EXISTING DRAWINGS. IT <br />WILL BE WITHIN THE CONTRACTOR'S SCOPE OF WORK TO VERIFY EXISTING <br />SERVICES AND THE EXACT LOCATION OF PIPES, TO MAKE ALL OFFSETS; <br />AND TO ADD NEW PIPING SYSTEMS TO THE EXISTING PIPING SYSTEMS AS <br />PART OF THE PROJECT CONTRACT. <br />4. CONTRACTOR SHALL CONNECT WATER AND WASTE PIPING TO EQUIPMENT <br />FURNISHED BY THE OWNER OR IN ANOTHER DIVISION OF THIS CONTRACT <br />AS REQUIRED FOR COMPLETE OPERATION. <br />5. MAKE ALL OFFSETS REQUIRED AS PER JOB CONDITIONS. <br />6. CONTRACTOR SHALL COORDINATE AT SITE WITH EXISTING STRUCTURE <br />AND OTHER TRADES BEFORE INSTALLATION OF PLUMBING WORK. <br />7. THE CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS <br />AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO <br />PLUMBING DESIGN/ENGINEERING UNLESS IT HAS BEEN COORDINATED, <br />DRAWN, AND SUBMITTED FOR APPROVAL TO THE ARCHITECT. <br />8. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING <br />PIPING, FIXTURES OR EQUIPMENT DUE TO NEW CONSTRUCTION AND <br />HE SHALL RESTORE EXISTING WORK TO ITS ORIGINAL CONDITION AT NO <br />COST TO THE OWNER. <br />9. ALL PLUMBING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FLORIDA <br />BUILDING CODE, 2007 EDITION WITH THE 2009 SUPPLIMENTS AS WELL AS LOCAL <br />ORDINANCES AND IN COMPLIANCE WITH THE ENERGY CONSERVATION CODE. <br />10. CONTRACTOR SHALL FURNISH AND INSTALL SHOCK ABSORBERS ON PIPING <br />SERVING FIXTURES AND EQUIPMENT WITH QUICK CLOSING VALVES. SIZE OF <br />SHOCK ABSORBERS SHALL BE ACCORDING TO PDI STANDARDS. <br />11. CONTINUITY OF SERVICES: EXISTING BUILDING WILL REMAIN IN USE DURING <br />CONSTRUCTION OPERATIONS. WHEN AN INTERRUPTION OF AN EXISTING SERVICE <br />IS NECESSARY, CONTRACTOR SHALL COORDINATE WITH AUTHORIZED HOSPITAL <br />PERSONNEL BEFORE MAKING THE NECESSARY INTERRUPTION. <br />12. ALL PENETRATIONS THROUGH WALLS AND FLOORS SHALL BE SLEEVED <br />AND/OR PATCHED AS DIRECTED BY THE SPECIFICATIONS. PATCHING <br />SHALL MATCH EXISTING FINISH. (SEE ARCH. DRAWINGS). <br />13. CONTRACTOR SHALL PROVIDE TRAP PRIMERS ON ALL NEW FLOOR DRAINS <br />NOT RECEIVING CONSTANT DISCHARGE FROM FIXTURES AND/OR <br />EQUIPMENT, OR AS REQUIRED BY STATE AND LOCAL CODES. <br />14. ALL VENT TERMINALS SHALL BE A MINIMUM OF 25'-0" AWAY FROM A/C AIR <br />INTAKES, WINDOWS AND DOORS. <br />PLUMBING LEGEND <br />SYMBOL <br />DESCRIPTION <br />SYMBOL <br />DESCRIPTION <br />- <br />COLD WATER <br />BALL VALVE <br />-- <br />HOT WATER <br />BALANCING VALVE (B.V.) <br />— --- <br />HOT WATER RECIRCULATION <br />4- <br />CHECK VALVE (C.V.) <br />— — • — — <br />COLD WATER (BELOW FLOOR) <br />P-1,ETC <br />FIXTURE INDENTIFICATION <br />W <br />WASTE OR SOIL PIPING <br />CAP ON END OF PIPE <br />--V-- <br />VENT PIPE <br />CONNECTION TO EXISTING <br />CD <br />CONDENSATE DRAIN <br />PIPE TURNED UP <br />PIPE TURNED DOWN <br />PLUMBING ABBREVIATIONS <br />COLD WATER <br />F.D. <br />FLOOR DRAIN <br />HOT WATER <br />R.P.B.P. <br />REDUCED PRESS. BACKFLOW PREY. <br />[H.W. <br />. <br />HOT WATER RECIRC <br />A.F.F. <br />ABOVE FINISHED FLOOR <br />VENT <br />C.O. <br />CLEANOUTABOVE CEILING <br />WASTE <br />W.C.O. <br />WALL CLEANOUT <br />. <br />VENT THRU ROOF <br />F.C.O. <br />FLOOR CLEANOUT <br />PLUMBING EQUIPMENT SCHEDULE <br />SYSTEM <br />TYPE <br />MFGR. <br />MODEL <br />EWT <br />LWT <br />STORAGE <br />FLOW <br />TANK <br />REMARKS <br />NO. <br />CAPACITY <br />RECOVERY <br />SIZE <br />EWH-1 <br />ELEC <br />A.O.SMITH <br />DEN-80 <br />60 <br />140 <br />80 <br />51GPH <br />@ 800 <br />24" x <br />0 V, 1 PH, kW <br />GAL. <br />RISE <br />60"H <br />9.0 kW TOTAL. (DUAL <br />DUAL ELEMENT - E <br />EWH-2 <br />SIMULTANEOUS) <br />ET-1 <br />2.1 <br />THERMAL EXPANSION TANK: <br />- <br />AMTROL <br />ST-5-C <br />- <br />GAL. <br />MAX. ACCEPTANCE VOLUME: <br />ET-2 <br />0.9 GALLON <br />3/4" SYSTEM CONNECTION <br />TV-1 <br />THERMOSTATIC <br />SYMMONS <br />5-230-CK-M-X <br />- <br />115 <br />TEMPERING VALVE, <br />TV-2 <br />ASME 1017 RATED. <br />DRAWING INDEX <br />NUMBER <br />TITLE <br />P0.1 <br />SCHEDULES, LEGEND, NOTES & DRAWING INDEX <br />P1.1 <br />PLUMBING PLAN - NEW CONSTRUCTION <br />PINES,@ - US <br />Project No. 10006.01 <br />Pool <br />$DATE$ $TIME$ $FILEA$ <br />02010 BHIP%Architects, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.