Laserfiche WebLink
FINISH ROOF EDGE TO MATG" <br />EXI5TIN6 G0NDITION5; PATGI <br />S REPAIR LIGHTWEIGHT <br />GONGRETE ROOFING 5Y5TEN <br />TO MATCH EXI5TIN6 <br />*T.O. DECK _ <br />Y 13'-4 1/2" <br />NEW 5OLDIER GOUR5E; ALI6 <br />WITH EXI5TIN6 BUILDING <br />GONDITION5 <br />FB.O. BEAM <br />�' I12'-O" <br />START NEW RUNNING BOND <br />GOUR51N6 AT TOP OF <br />EXI5TIN6 5OLDIER GOUR5E <br />T.O. SOLDIER GC <br />�110'-O" <br />T.O. BEAM <br />E.0. BEAM <br />FILL IN EXI5TIN6 OPENING WITH NEW # S <br />BRIGK VENEER TO MATCH EXI5TIN6; INFI <br />GAVITY WITH 2X METAL 5TUD5 a I6" OL <br />GAVITY WITH R-19 BATT INSULATION; 5HE <br />EXTERIOR 6RADE PLYWOOD; OVERLAP I <br />BARRIER WITH EXISTING TO ELIMINATE P <br />INFILTRATION; AL16N INTERIOR 6YP5UM <br />WITH F.O. EX15TIM <br />T.O. BEAM <br />Y 2'-10 1/4" — <br />* B.O. E3EAM <br />2'_O" <br />T.O. SLAB <br />O'_0" <br />Exterior Wall Section - Reno <br />ALL DIMEN51ON5 TO BE FIELD VERIFIED; NOTIFY HFR OF ANY 015GREPANGIE5 SCALE: 3/4" = 1'-0" <br />Exterior Elevation - Reno <br />SCALE: 3/16" = 1'-0" <br />EX15TI%; FRAME WINDOW GAVITY WITH 2X WOOD 5TUD5 ® I6" O.G.; FILL CAVITY <br />WITH R-IQ BATT INSULATION; 5HEATH WITH EXTERIOR GRADE PLYWOOD; <br />OVERLAP NEW VAPOR BARRIER WITH EX15TIN6 TO ELIMINATE M015TURE <br />INFILTRATION; AL16N INTERIOR 6YPSUM 5HEATHIN6 WITH F.O. EXI5TIN6 <br />Exterior Elevation - Reno <br />SCALE: 3/16" = 1'-0" <br />SOLDIER COURSE AT EDGE OF <br />7F; PROVIDE NEW METAL ED6E TO <br />TGH EXI5TIN6; PATGH 4 REPAIR <br />5TIN6 ROOF 5Y5TEM A5 NEEDED <br />•1 :•v <br />•• • <br />00,090 _� :• Ro"M <br />5TIN6 BRIGK WALL 4 <br />DIER GOLRH <br />AM <br />w <br />H <br />I IS <br />ARCHITECTURE <br />ENGINEERING <br />3680 Pleasant Hill Road <br />Suite 200 <br />Duluth, Georgia 30096 <br />p 770.622.9858 <br />f 770.622.9535 <br />www.hillfoleyrossi.com <br />© Copyright (as dated below). <br />This drawing and all reproductions thereof are the <br />property of Hill Foley Rossi & Associates, LLC(HFR). <br />It is intended for the sole use of the project named <br />hereon. Reproduction without the written consent of <br />HFR is unlawful. All copies are to be returned to HFR <br />upon project completion. <br />1 sealed: 02-13-2019 1 <br />IS <br />G,�•Ilk ;r <br />��(�Y T, <br />N <br />0 <br />� <br />4_0 <br />c <br />r <br />O <br />CU <br />CD <br />d. <br />N <br />J <br />Q <br />O <br />- <br />LL <br />N <br />Z <br />-C <br />N <br />O <br />O <br />_ <br />2 <br />W <br />L <br />0 <br />IL <br />CL <br />a) <br />Cn <br />N <br />40 <br />C: <br />C: <br />> <br />'a <br />M <br />0 <br />O <br />.2 <br />a <br />O <br />-o <br />O <br />L <br />m <br />•— <br />� <br />Z <br />Q) <br />ef' <br />=- <br />= <br />H <br />ti <br />N <br />02/13/19 Construction <br />mk I date issue <br />Renovation <br />Exterior <br />Elevations <br />A201 <br />HFR 18.945 <br />