Laserfiche WebLink
PANEL SCHEDULE: FC2 EXISTING EXISTING <br />VOLTS: 120/208 TYPE: SQ-D NQOD BOLT -ON <br />PHASE: 3 NEMA: 1 M.L.O. <br />WIRE: 4 KAIC: 10 EXISTING <br />PANEL RATED: 225 A FED FROM: EDP INDOOR <br />PANEL OVERLOAD PROTECTION: 40 A LOCATION: ELECT. 38 SINGLE PANEL <br />SURFACE <br />CRITICAL <br />Load <br />CKT <br />POL <br />A <br />B <br />Classification <br />NO <br />LOAD SERVED <br />CB <br />E <br />NOTE <br />- <br />1 <br />REC. TTB <br />20 A <br />1 <br />0 <br />- <br />3 <br />LINCOLN RM. 1,3,5 <br />20 A <br />1 <br />z.�0 <br />- <br />5 <br />REC. NURSE STATION <br />20 A <br />1 <br />- <br />7 <br />REC. MED. PREP <br />20 A <br />1 <br />0 <br />- <br />9 <br />REC. MED. PREP <br />20 A <br />1 <br />0 <br />- <br />11 <br />REC. MED. PREP <br />20 A <br />1 <br />- <br />13 <br />WASHINGTON RM. 4,6,8 <br />20 A <br />1 <br />0 <br />- <br />15 <br />WASHINGTON RM. 1,2,3 <br />20 A <br />1 <br />0 <br />- <br />17 <br />WASHINGTON RM. 5,7,9 <br />20 A <br />1 <br />- <br />19 <br />LIGHT NURSES STATION <br />20 A <br />1 <br />0 <br />0 <br />23 <br />DUCT HEATER L.R. <br />30 A <br />2 <br />2 <br />-- <br />25 <br />SPACE <br />- <br />1 <br />0 <br />- <br />27 <br />SPACE <br />- <br />1 <br />0 <br />29 <br />SPACE <br />- <br />1 <br />- <br />31 <br />SPACE <br />- <br />1 <br />0 <br />33 <br />SPACE <br />- <br />1 <br />0 <br />35 <br />SPACE <br />- <br />1 <br />- <br />37 <br />SPACE <br />- <br />- <br />1 <br />0 <br />39 <br />SPACE <br />- <br />1 <br />0 <br />- <br />41 <br />SPACE <br />- <br />1 <br />Total <br />Load: <br />0 VA� <br />EXISTING METERED <br />PHASE A <br />PHASE B <br />LOAD <br />X 125% <br />0 kVA <br />0 kVA <br />Notes: <br />1. NEW CIRCUIT FOR PROJECT. PROVIDE A NEW SQ-D QOB 20A/1 P BREAKER. <br />2. REMOVE LOAD AND BREAKER FROM PANEL. RELOCATE TO NORMAL POWER PANEL K. PROVIDE BLANK PLATES. <br />3. CONTRACTOR SHALL TRACE AND IDENTIFY CIRCUITS FEEDING PROJECT AREA. <br />4. PROVIDE AN UPDATED TYPED PANEL DIRECTORY AT PROJECT COMPLETION. <br />5. REFER TO REVISED PANEL FC2 FOR LOAD. <br />PANEL SCHEDULE: FC2 REVISED <br />VOLTS: 120/208 TYPE: SO-D NQOD BOLT -ON <br />PHASE: 3 NEMA: 1 M.L.O. <br />WIRE: 4 KAIC: 10 EXISTING <br />PANEL RATED: 225 A FED FROM: EDP INDOOR <br />PANEL OVERLOAD PROTECTION: 40 A LOCATION: ELECT. 38 SINGLE PANEL <br />SURFACE <br />CRITICAL <br />Load <br />CKT <br />POL <br />A <br />B <br />C <br />A <br />B <br />C <br />POL <br />CKT <br />Load <br />Classification <br />NO <br />LOAD SERVED <br />CB <br />E <br />NOTE <br />NOTE <br />E <br />CB <br />LOAD SERVED <br />NO <br />Classification <br />- <br />1 <br />REC. TTB <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />RECEPTION FAX MACHINE <br />2 <br />- <br />3 <br />LINCOLN RM. 1,3,5 <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />SPARE <br />4 <br />5 <br />REC. NURSE STATION <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />TOUCHSCREEN RECS. <br />6 <br />- <br />- <br />7 <br />REC. MED. PREP <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />REC. NOURISH STATION <br />8 <br />- <br />9 <br />REC. MED. PREP <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />REC. NOURISH STATION <br />10 <br />- <br />11 <br />REC. MED. PREP <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />LINCOLN REC. RM. 2,4,6 <br />12 <br />13 <br />WASHINGTON RM. 4,6,8 <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />LINCOLN REC. RM. 8,10,12 <br />14 <br />-- <br />15 <br />WASHINGTON RM. 1,2,3 <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />LINCOLN REC. RM. 7,9,11 <br />16 <br />- <br />17 <br />WASHINGTON RM. 5,7,9 <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />SPARE <br />18 <br />19 <br />LIGHT NURSES STATION <br />20 A <br />1 <br />0 <br />0 <br />1 <br />20 A <br />QUADS IN CONF. PHONE <br />20 <br />21 <br />Space <br />- <br />0 <br />0 <br />1 <br />20 A <br />LIGHT ELECTRICAL RM. <br />22 <br />- <br />23 <br />SPACE <br />- <br />0 <br />0 <br />1 <br />20 A <br />PROJECTOR PLUG EDUC. RM. <br />24 <br />- <br />Receptacle <br />25 <br />Receptacle Room 5, 2 <br />20 A <br />1 <br />1 <br />1080 <br />1507 <br />1 <br />20 A <br />Lighting Rooms 5, 3, 32 <br />26 <br />Lighting; LTG <br />Receptacle <br />27 <br />Receptacle Room 3, 32, 31 <br />20 A <br />1 <br />1 <br />V1080 <br />1887 <br />1 <br />20 A <br />Lighting Rooms 16, 19, 26 <br />28 <br />Lighting; LTG <br />Receptacle <br />29 <br />Receptacle Room 31, 28 <br />20 A <br />1 <br />1 <br />1080 <br />0 <br />SPACE <br />30 <br />Receptacle <br />31 <br />Receptacle Room 24, 25 <br />20 A <br />1 <br />1 1 <br />1080 <br />0 <br />- <br />SPACE <br />32 <br />Receptacle <br />33 <br />Receptacle 26 <br />20 A <br />1 <br />1 <br />720 <br />0 <br />- <br />SPACE <br />34 <br />Receptacle <br />35 <br />Receptacle Room 25, 21, 19 <br />20 A <br />1 <br />1 <br />1080 <br />0 <br />SPACE <br />36 <br />Receptacle <br />37 <br />Receptacle Room 16 <br />20 A <br />1 <br />1 <br />720 <br />200 <br />38 <br />Lighting; LTG <br />39 <br />Lighting Room 24, 25, 21 <br />20 A <br />1 <br />1 <br />1708 <br />0 <br />3 <br />3 <br />30 A <br />SPD <br />40 <br />Power <br />Lighting; LTG <br />41 <br />Lighting Room 2, 3, 32, 31, 28 <br />20 A <br />1 <br />1 <br />1857 <br />0 <br />42 <br />Total <br />Load: <br />4587 VA <br />5395 VA <br />4017 <br />VA <br />EXISTING METERED <br />PHASE A <br />PHASE B <br />PHASE C <br />LOAD <br />X 125% <br />Lighting <br />3980 VA <br />125.00% <br />4975 VA <br />Power <br />200 VA <br />100.00% <br />200 VA <br />Receptacle <br />6840 VA <br />100.00% <br />6840 VA <br />LTG <br />3066 VA <br />100.00% <br />3066 VA <br />14 kVA <br />15 kVA <br />Notes: <br />1. NEW CIRCUIT FOR PROJECT. <br />2. PROVIDE AN UPDATED TYPED PANEL DIRECTORY AT PROJECT COMPLETION. <br />3. PROVIDE A SURGE PROTECTOR DEVICE FOR PANEL. CONNECT PER MANUFACTURER SPECIFICATIONS. PQ PROTECTION (POWER LOGICS, INC.) MODEL PQC100 OR APPROVED EQUAL. <br />4. AMPERAGE = 27.8A / 10KVA (INCLUDES EXISTING LOADS). <br />California I Florida I Nevada <br />Peninsula Engineering, INC. <br />MEP&FP <br />2016 ALDEN ROAD <br />ORLANDO, FL 32803 <br />CA 3089 <br />VOICE: (407) 246.1688 <br />FAX: (407) 246-1664 <br />http://www.peffia.com <br />Email to. pe!Qpeffla.com <br />JOB II: 15384 <br />Copyright - All Ideas, designs, <br />D <br />methods and plans indicated or <br />represented by this drawing are <br />owned by and the property of <br />Peninsula Engineering, Inc. and <br />were created, evolved and <br />_ <br />developed for use on and in <br />connection with the specified <br />Project. None of the ideas, <br />PENINSULA <br />designs, arrangements, methods <br />or plans shall be used by or <br />disclosed to any person, firm or <br />ENGINEERING <br />corpoefor any purpose <br />whatsoeverver without the written <br />permission of Peninsula <br />INC. <br />Engineering, Inc. <br />©opyright <br />2015 <br />ARCHISPEC, INC <br />ARCHITECTURAL SPECIFICATIONS <br />653 Mallory Hill Drive Lady Lake, FL 32162 <br />P: 352.430.0987 <br />REVISIONS: <br />3 1 03/03/17 1 REVISION #2 <br />PROJECT TITLE: <br />ZEPHYRHILLS HEALTH & REHAB <br />CENTER <br />SKILLED NURSING -10 BED <br />CONVERSION <br />PROJECT ADDRESS: <br />7350 DAIRY RD. ZEPHYRHILLS, FL. 33540 <br />PROJECT NUMBER: <br />FLTSP15008 <br />SHEET TITLE: <br />PANEL SCHEDULES - ELECTRICAL <br />f '�I IeoYc\Irinno\rinrirmontc\iF4R/1 7FP1-IVPWl1 I C WPAI TN R. MI=WAP r9=K1T1=R iAnnonr,oif1n r+nm rift <br />JI <br />- <br />- - <br />PROJECT NORTH <br />TRUE NORTH <br />171/ <br />E602 - <br />© 2015 Studio+ <br />