PANEL SCHEDULE: FC2 EXISTING EXISTING
<br />VOLTS: 120/208 TYPE: SQ-D NQOD BOLT -ON
<br />PHASE: 3 NEMA: 1 M.L.O.
<br />WIRE: 4 KAIC: 10 EXISTING
<br />PANEL RATED: 225 A FED FROM: EDP INDOOR
<br />PANEL OVERLOAD PROTECTION: 40 A LOCATION: ELECT. 38 SINGLE PANEL
<br />SURFACE
<br />CRITICAL
<br />Load
<br />CKT
<br />POL
<br />A
<br />B
<br />Classification
<br />NO
<br />LOAD SERVED
<br />CB
<br />E
<br />NOTE
<br />-
<br />1
<br />REC. TTB
<br />20 A
<br />1
<br />0
<br />-
<br />3
<br />LINCOLN RM. 1,3,5
<br />20 A
<br />1
<br />z.�0
<br />-
<br />5
<br />REC. NURSE STATION
<br />20 A
<br />1
<br />-
<br />7
<br />REC. MED. PREP
<br />20 A
<br />1
<br />0
<br />-
<br />9
<br />REC. MED. PREP
<br />20 A
<br />1
<br />0
<br />-
<br />11
<br />REC. MED. PREP
<br />20 A
<br />1
<br />-
<br />13
<br />WASHINGTON RM. 4,6,8
<br />20 A
<br />1
<br />0
<br />-
<br />15
<br />WASHINGTON RM. 1,2,3
<br />20 A
<br />1
<br />0
<br />-
<br />17
<br />WASHINGTON RM. 5,7,9
<br />20 A
<br />1
<br />-
<br />19
<br />LIGHT NURSES STATION
<br />20 A
<br />1
<br />0
<br />0
<br />23
<br />DUCT HEATER L.R.
<br />30 A
<br />2
<br />2
<br />--
<br />25
<br />SPACE
<br />-
<br />1
<br />0
<br />-
<br />27
<br />SPACE
<br />-
<br />1
<br />0
<br />29
<br />SPACE
<br />-
<br />1
<br />-
<br />31
<br />SPACE
<br />-
<br />1
<br />0
<br />33
<br />SPACE
<br />-
<br />1
<br />0
<br />35
<br />SPACE
<br />-
<br />1
<br />-
<br />37
<br />SPACE
<br />-
<br />-
<br />1
<br />0
<br />39
<br />SPACE
<br />-
<br />1
<br />0
<br />-
<br />41
<br />SPACE
<br />-
<br />1
<br />Total
<br />Load:
<br />0 VA�
<br />EXISTING METERED
<br />PHASE A
<br />PHASE B
<br />LOAD
<br />X 125%
<br />0 kVA
<br />0 kVA
<br />Notes:
<br />1. NEW CIRCUIT FOR PROJECT. PROVIDE A NEW SQ-D QOB 20A/1 P BREAKER.
<br />2. REMOVE LOAD AND BREAKER FROM PANEL. RELOCATE TO NORMAL POWER PANEL K. PROVIDE BLANK PLATES.
<br />3. CONTRACTOR SHALL TRACE AND IDENTIFY CIRCUITS FEEDING PROJECT AREA.
<br />4. PROVIDE AN UPDATED TYPED PANEL DIRECTORY AT PROJECT COMPLETION.
<br />5. REFER TO REVISED PANEL FC2 FOR LOAD.
<br />PANEL SCHEDULE: FC2 REVISED
<br />VOLTS: 120/208 TYPE: SO-D NQOD BOLT -ON
<br />PHASE: 3 NEMA: 1 M.L.O.
<br />WIRE: 4 KAIC: 10 EXISTING
<br />PANEL RATED: 225 A FED FROM: EDP INDOOR
<br />PANEL OVERLOAD PROTECTION: 40 A LOCATION: ELECT. 38 SINGLE PANEL
<br />SURFACE
<br />CRITICAL
<br />Load
<br />CKT
<br />POL
<br />A
<br />B
<br />C
<br />A
<br />B
<br />C
<br />POL
<br />CKT
<br />Load
<br />Classification
<br />NO
<br />LOAD SERVED
<br />CB
<br />E
<br />NOTE
<br />NOTE
<br />E
<br />CB
<br />LOAD SERVED
<br />NO
<br />Classification
<br />-
<br />1
<br />REC. TTB
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />RECEPTION FAX MACHINE
<br />2
<br />-
<br />3
<br />LINCOLN RM. 1,3,5
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />SPARE
<br />4
<br />5
<br />REC. NURSE STATION
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />TOUCHSCREEN RECS.
<br />6
<br />-
<br />-
<br />7
<br />REC. MED. PREP
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />REC. NOURISH STATION
<br />8
<br />-
<br />9
<br />REC. MED. PREP
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />REC. NOURISH STATION
<br />10
<br />-
<br />11
<br />REC. MED. PREP
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />LINCOLN REC. RM. 2,4,6
<br />12
<br />13
<br />WASHINGTON RM. 4,6,8
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />LINCOLN REC. RM. 8,10,12
<br />14
<br />--
<br />15
<br />WASHINGTON RM. 1,2,3
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />LINCOLN REC. RM. 7,9,11
<br />16
<br />-
<br />17
<br />WASHINGTON RM. 5,7,9
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />SPARE
<br />18
<br />19
<br />LIGHT NURSES STATION
<br />20 A
<br />1
<br />0
<br />0
<br />1
<br />20 A
<br />QUADS IN CONF. PHONE
<br />20
<br />21
<br />Space
<br />-
<br />0
<br />0
<br />1
<br />20 A
<br />LIGHT ELECTRICAL RM.
<br />22
<br />-
<br />23
<br />SPACE
<br />-
<br />0
<br />0
<br />1
<br />20 A
<br />PROJECTOR PLUG EDUC. RM.
<br />24
<br />-
<br />Receptacle
<br />25
<br />Receptacle Room 5, 2
<br />20 A
<br />1
<br />1
<br />1080
<br />1507
<br />1
<br />20 A
<br />Lighting Rooms 5, 3, 32
<br />26
<br />Lighting; LTG
<br />Receptacle
<br />27
<br />Receptacle Room 3, 32, 31
<br />20 A
<br />1
<br />1
<br />V1080
<br />1887
<br />1
<br />20 A
<br />Lighting Rooms 16, 19, 26
<br />28
<br />Lighting; LTG
<br />Receptacle
<br />29
<br />Receptacle Room 31, 28
<br />20 A
<br />1
<br />1
<br />1080
<br />0
<br />SPACE
<br />30
<br />Receptacle
<br />31
<br />Receptacle Room 24, 25
<br />20 A
<br />1
<br />1 1
<br />1080
<br />0
<br />-
<br />SPACE
<br />32
<br />Receptacle
<br />33
<br />Receptacle 26
<br />20 A
<br />1
<br />1
<br />720
<br />0
<br />-
<br />SPACE
<br />34
<br />Receptacle
<br />35
<br />Receptacle Room 25, 21, 19
<br />20 A
<br />1
<br />1
<br />1080
<br />0
<br />SPACE
<br />36
<br />Receptacle
<br />37
<br />Receptacle Room 16
<br />20 A
<br />1
<br />1
<br />720
<br />200
<br />38
<br />Lighting; LTG
<br />39
<br />Lighting Room 24, 25, 21
<br />20 A
<br />1
<br />1
<br />1708
<br />0
<br />3
<br />3
<br />30 A
<br />SPD
<br />40
<br />Power
<br />Lighting; LTG
<br />41
<br />Lighting Room 2, 3, 32, 31, 28
<br />20 A
<br />1
<br />1
<br />1857
<br />0
<br />42
<br />Total
<br />Load:
<br />4587 VA
<br />5395 VA
<br />4017
<br />VA
<br />EXISTING METERED
<br />PHASE A
<br />PHASE B
<br />PHASE C
<br />LOAD
<br />X 125%
<br />Lighting
<br />3980 VA
<br />125.00%
<br />4975 VA
<br />Power
<br />200 VA
<br />100.00%
<br />200 VA
<br />Receptacle
<br />6840 VA
<br />100.00%
<br />6840 VA
<br />LTG
<br />3066 VA
<br />100.00%
<br />3066 VA
<br />14 kVA
<br />15 kVA
<br />Notes:
<br />1. NEW CIRCUIT FOR PROJECT.
<br />2. PROVIDE AN UPDATED TYPED PANEL DIRECTORY AT PROJECT COMPLETION.
<br />3. PROVIDE A SURGE PROTECTOR DEVICE FOR PANEL. CONNECT PER MANUFACTURER SPECIFICATIONS. PQ PROTECTION (POWER LOGICS, INC.) MODEL PQC100 OR APPROVED EQUAL.
<br />4. AMPERAGE = 27.8A / 10KVA (INCLUDES EXISTING LOADS).
<br />California I Florida I Nevada
<br />Peninsula Engineering, INC.
<br />MEP&FP
<br />2016 ALDEN ROAD
<br />ORLANDO, FL 32803
<br />CA 3089
<br />VOICE: (407) 246.1688
<br />FAX: (407) 246-1664
<br />http://www.peffia.com
<br />Email to. pe!Qpeffla.com
<br />JOB II: 15384
<br />Copyright - All Ideas, designs,
<br />D
<br />methods and plans indicated or
<br />represented by this drawing are
<br />owned by and the property of
<br />Peninsula Engineering, Inc. and
<br />were created, evolved and
<br />_
<br />developed for use on and in
<br />connection with the specified
<br />Project. None of the ideas,
<br />PENINSULA
<br />designs, arrangements, methods
<br />or plans shall be used by or
<br />disclosed to any person, firm or
<br />ENGINEERING
<br />corpoefor any purpose
<br />whatsoeverver without the written
<br />permission of Peninsula
<br />INC.
<br />Engineering, Inc.
<br />©opyright
<br />2015
<br />ARCHISPEC, INC
<br />ARCHITECTURAL SPECIFICATIONS
<br />653 Mallory Hill Drive Lady Lake, FL 32162
<br />P: 352.430.0987
<br />REVISIONS:
<br />3 1 03/03/17 1 REVISION #2
<br />PROJECT TITLE:
<br />ZEPHYRHILLS HEALTH & REHAB
<br />CENTER
<br />SKILLED NURSING -10 BED
<br />CONVERSION
<br />PROJECT ADDRESS:
<br />7350 DAIRY RD. ZEPHYRHILLS, FL. 33540
<br />PROJECT NUMBER:
<br />FLTSP15008
<br />SHEET TITLE:
<br />PANEL SCHEDULES - ELECTRICAL
<br />f '�I IeoYc\Irinno\rinrirmontc\iF4R/1 7FP1-IVPWl1 I C WPAI TN R. MI=WAP r9=K1T1=R iAnnonr,oif1n r+nm rift
<br />JI
<br />-
<br />- -
<br />PROJECT NORTH
<br />TRUE NORTH
<br />171/
<br />E602 -
<br />© 2015 Studio+
<br />
|