My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7631 Gall Blvd (19)
Zephyrhills
>
Building Department
>
Building Plans
>
7631 Gall Blvd (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 5:14:09 PM
Creation date
2/25/2025 9:51:47 AM
Metadata
Fields
Template:
Building Plans
Street #
7631
Location
Gall Blvd
Contractor
Hutton Construction
Building Plans - Permit #
1555
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />LO <br />7 <br />6 <br />5 <br />2 <br />1 <br />F <br />E <br />C <br />A <br />0 <br />PREFABRICATED MODULE LAYOUT <br />Il -y <br />I � i <br />j <br />A_ <br />�! U M D04R <br />UCR02R OL <br />UMD03R UDT03R <br />aim <br />ULB07R <br />�1! <br />VOLUMETRIC MODULE LAYOUT <br />I <br />FLOOR MODULE LAYOUT <br />ROOF/MEP MODULE LAYOUT <br />4 3 <br />CONSTRUCTION METHODOLOGY <br />PREMANUFACTURED <br />MODULAR <br />COMPONENTS, <br />FACTORY FINISHED <br />klrXAI cri mini <br />FIELD INSTALLED <br />SLIDING DOORS AND <br />STOREFRONT <br />UVN02L <br />r i <br />I <br />DFL10 <br />FA <br />ULB07L <br />UDT04L <br />PREMANUFACTURED PROPOSED PLAN: <br />MODULAR <br />COMPONENTS. SHADED - <br />FACTORY FINISHED PREMANUFACTURED <br />MODULAR COMPONENTS <br />NON -SHADED - <br />FIELD CONSTRUCTED <br />EXISTING PARKING LOT <br />DASHED - <br />EXISTING <br />THIS FACILITY IS DESIGNED AND TO BE CONSTRUCTED AS PART OF A NATIONWIDE PROTOTYPE PROGRAM. PORTIONS OF THE BUILDING SHOWN IN GREY ON THE ABOVE PLAN WILL BE FACTORY MANUFACTURED <br />OFFSITE AND TRANSPORTED TO THE SITE FOR FIELD INSTALLATION AS PART OF THE OVERALL CONSTRUCTION. THESE EL-MENTS INCLUDE BOTH NON-STRUCTURAL (EXAM ROOMS, TOILET ROOMS AND HEADWALLS. <br />AND MILLWORK) AND STRUCTURAL MODULES (WHICH INCLUDE STEEL FRAMING, SUBFLOOR WALLS AND ROOF, AS WELL AS THE MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS WITHIN). AS A RESULT OF THIS <br />PROCESS, COMPLETELY FACTORY FINISHED MODULAR COMPONENTS WILL CONTAIN ITEMS WHICH ARE TRADITIONALLY SUBJECT TO ONSITE INSPECTION THAT. IN THIS CASE WILL BE CONCEALED FROM VIEW UPON <br />THEIR INSTALLATION. FOR EXAMPLE, THE ELECTRICAL AND MED GAS SYSTEMS BEHIND THE EXAM ROOM HEADWALL WILL NOT BE VISIBLE FOR INSPECTION AFTER FACTORY INSTALLATION. <br />STATE CERTIFICATION OF BLOX AS A MANUFACTURER COVERS INSPECTION OF THESE ITEMS. <br />BLOX IS A CERTIFIED MANUFACTURER THROUGH THE STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONA_ REGULATION TO MANUFACTURE MODULAR COMPONENTS FOR INSTALLATION IN SITE - <br />CONSTRUCTED BUILDINGS. BLOX UNITS ARE PRE -APPROVED AND INSPECTED BY STATE OF FLORIDA CERTIFIED DESIGN REVIEWERS AND INSPECTORS IN ACCORDANCE WITH THE RULES AND REGULATIONS DEFINED <br />IN THE FLORIDA ADMINISTRATIVE CODE, CHAPTER 553 PART 1. SYSTEMS, INCLUDING GAS, FIRE ALARM, AND FIRE SPRINKLERS WILL NOT BE PART OF INSPECTIONS LISTED ABOVE AND WILL BE SUBJECT TO <br />APPROVAL BY LOCAL AUTHORITIES. UPON COMPLETION OF MANUFACUTRING, EACH MODULAR COMPONENT WILL BE AFFIXED WITH AN MHD INSIGNIA CONFIRMING COMPLIANCE WITH THE LAWS, RULES AND <br />MANDATORY BUILDING CODES OF THE STATE OF FLORIDA. ONCE THE UNITS HAVE BEEN INSTALLED ON SITE. THE PLUMBING. MECHANICAL AND ELECTRICAL CONNECTIONS BETWEEN THE UNITS AND FIELD <br />CONSTRUCTION WILL FALL UNDER THE JURISDICTION OF THE LOCAL INSPECTION AUTHORITIES. <br />PREFABRICATION SCOPE <br />EXCEPT AS NOTED BELOW, ALL ARCHITECTURE, STRUCTURE, AND MEP WORK WILL <br />BE PREFABRICATED AND ARRIVE ON SITE AS PART OF A MODULE. <br />ON SITE CONSTRUCTION SCOPE INCLUDES: <br />• ALL SITEWORK <br />• ALL UNDER FLOOR UTILITIES. <br />• FOUNDATIONS. RE: STRUCTURAL. <br />• SET MODULES INCLUDING WELDING MODULE FRAMES TO BASE PLATES. <br />• ROOF DRAIN TIE-INS. <br />• ROOF SEAMS (CONNECTING SECTIONS OF PREFABRICATED ROOFING BETWEEN <br />MODULES). <br />• INSTALL COPING CAP. <br />• EXPANSION JOINT AND FLASHING AT CONNECTION POINT OF NEW AND EXISTING <br />BUILDINGS. <br />• RTU INSTALLATION ON ROOF CURB AND OTHER MECHANICAL EQUIPMENT. <br />• STOREFRONT AND WINDOWS. <br />• HANG INTERIOR DOORS. <br />• INSTALL SLIDING ENTRY DOORS. <br />• EXTERIOR AND INTERIOR STOREFRONT INSTALLATION. <br />• MAKE MEP CONNECTIONS BETWEEN MODULES. <br />• CONNECT FIRE SPRINKLER PIPE AND PRESSURE TEST. <br />• CONNECT PLUMBING SYSTEMS AND PRESSURE TEST. <br />• CONNECT DUCTWORK AND VARIABLE REFRIGERANT FLOWS (VRF) HVAC SYSTEMS AND <br />CHARGE REFRIGERANT. <br />• START UP OF ALL EQUIPMENT. <br />• PIECE IN DRYWALL TO COVER SEAMS BETWEEN MODULES (MAJORITY INSTALLED AT <br />FACTORY). <br />• ELECTRICAL POWER TO EQUIPMENT AND MODULES. <br />• LOW VOLTAGE AND DDC CONTROLS TRIM OUT. <br />• FIRE ALARM AND TESTING. <br />• INSTALL CEILING TILE PER A106. <br />• POUR SELF LEVELING FLOOR UNDERLAYMENT AND INSTALL ALL FINISH FLOORING. <br />• SIGNAGE. <br />• DENTAL EQUIPMENT INSTALLATION. <br />• TEST AND BALANCE. <br />• INSTALL ALL LOOSE FURNITURE AND EQUIPMENT. <br />CONSTRUCTION SEQUENCE <br />441- <br />t <br />r <br />1 t <br />�rt <br />FOUNDATION: <br />(FIELD CONSTRUCTED) <br />FOUNDATIONS AND BASE <br />PLATES PLACED FOR <br />STRUCTURAL MODULES <br />STRUCTURAL MODULES: <br />(PREMANUFACTURED) <br />PREMANUFACTURED <br />MODULES WHICH INCLUDE <br />ROOF ARE TRUCKED TO SITE <br />AND HOISTED BY CRANE <br />INTO PLACE ON <br />FOUNDATIONS WHERE THEY <br />ARE FIELD WELDED ONTO <br />FIELD INSTALLED BASE <br />PLATES. TPO ROOF IS <br />PREINSTALLED AND SEAMED <br />TOGETHER ON SITE. <br />PANELIZED ENCLOSURES <br />INSTALLED. <br />EXTERIOR <br />(PREMANUFACTURED) <br />PREMANUFACTURED EXTERIOR <br />PANEL IS INSTALLED FOR <br />RAINSCREEN SYSTEM. FINAL <br />ROOFING TIE-INS <br />COMPLETION: <br />(FIELD CONSTRUCTED) <br />SITE BUILT INTERIOR FRAMING <br />AND FINISHING COMPLETE. <br />EXTERIOR SITEWORK <br />COMPLETED <br />RETAIL CLINIC <br />ADDITION TO <br />ZEPHYRHILLS <br />WALMART 706 <br />GA PROJECT No: 20CE14 <br />GIATTINA AYCOCK <br />ARCHITECTURE STUDIO INC. <br />2625 5th Avenue North, Building C <br />• Bessemer, AL 35020 <br />P: 205.933,9060 <br />GASTUDIO.COM <br />ISSUE SCHEDULE <br />REVISION SCHEDULE: <br />NUM. DESCRIPTION DATE <br />NOTES & LEGEND <br />CURRENT DRAWING SET <br />PERMIT SET <br />ISSUE DATE: 11/25/2020 <br />DRAWN BY: JLM. CHB <br />SHEET: <br />CONSTRUCTION <br />OVERVIEW <br />I A001 <br />ototype 11 /23/2020 11:31:41 AM 2 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.