Laserfiche WebLink
UTILITY WARNING NOTE <br />AWVMROUND OR UNDERGROUND UTILITIES MAY ®E IN THE AREA OF <br />THIS PROJECT - PROCEED WITH CAUTION - CALL THE UTILITY <br />OWNERS) 5 DAYS IN ADVANCE OF EIZGINNINd WORK. <br />PLANS OF PROPOSED <br />NEW FIRE STATION FACILITY <br />AT <br />DAIRY ROAD <br />ZEPHYRHILLS, FLORIDA <br />\/ICENIT*' MAP <br />T�iird <br />— <br />Nlart�i/ <br />- <br />SaFst <br />Harbor/ <br />Florida <br />34&'BE� <br />ARCHITECTS PROJECT NO.: <br />5G98- 21 <br />t <br />ZONING INFORMATION: <br />REFER TO SURVEY <br />OCCUPANCY CLASSIFICATION: <br />MIXED OCCUPANCY: RESIDENTIAL/STORAGE <br />SEPARATION REQUIREMENT: II1/2 HOURS <br />CONSTRUCTION CLASSIFICATION: <br />tYPE vl -UNPROTECTED <br />SPRINKLERS. NOT REQUIRED <br />BUILDING HEIGHT: <br />2'1'-V ACTUAL HEIGHT <br />BUILDING AREA: <br />DORMITORY/OFFICES: <br />APPARATUS BAY: <br />TOTAL SQUARE FOOTAGE: <br />PARKING 1 PER BED: = TOTAL SPACES <br />PUBLIC SPACES: <br />HANDICAP SPACES: <br />TOTAL SPACES: <br />INDEX <br />COVER SHEET <br />SURVEY <br />CIVIL DRAWINGS <br />C-1 <br />GENERAL NOTES <br />C-2 <br />SITE PLAN <br />0-3 <br />UTILITY PLAN <br />C-4 <br />PAVING, GRADING, AND DRAINAGE PLAN <br />C-5 <br />SITE DETAILS <br />C-b <br />UTILITY DETAILS <br />ARCHITECTURAL DRAWINGS <br />A-1.0 FLOOR PLAN AND ENLARGED PLANS <br />A-2.0 REFLECTED CEILING PLAN AND DETAIL <br />A-3.0 ROOF PLAN AND DETAILS <br />A-4.0 EXTERIOR ELEVATIONS <br />A-5.0 WALL SECTIONS <br />A-5.1 WALL SECTIONS <br />A-5.2 WALL SECTIONS <br />A-b.3 WALL SECTIONS <br />A-5.4 WALL SECTIONS AND DETAILS <br />A-6.0 SCHEDULES, DOOR DETAILS AND MOUNTING HEIGHTS <br />A-1.0 INTERIOR ELEVATIONS <br />A-1.1 INTERIOR ELEVATIONS AND MILLWORK SECTIONS <br />A-112 MILLWORK SECTIONS <br />A-" SIGN AND FLAG POLE DETAILS <br />STRUCTURAL DRAWINGS <br />5-1.0 FOUNDATION PLAN AND DETAILS <br />6-20 ROOF FRAMING PLAN AND DETAILS <br />M.E.P. DRAWINGS <br />P-1.0 PLUMBING PLAN AND PLUMBING RISER DIAGRAM <br />P-2V PLUMBING SCHEDULES AND DETAILS <br />M-1.0 HVAC PLAN, GENERAL NOTES, AND MECHANICAL SCHEDULES <br />M-2.0 HVAC DETAILS <br />E-1.0 ELECTRICAL SITE LIGHTING PLAN AND DETAILS <br />E-2:0 LIGHTING FLOOR PLAN, L®GEND, AND FIXTURE SCI.IEDULES <br />E-3.0 POWER PLAN AND POWER RISER <br />E-4.0 FIRE ALARM RISER DIAGRAM AND PANEL SCHEDULE <br />DATE ISSUED: SEPTEMBER 1rp, 1998 <br />PROJECT PHASE: <br />I � <br />PROJECT: <br />NEW P I RS STATION PAC I L I T1' <br />SHEET I OF 3 <br />