Laserfiche WebLink
0� <br />PACE OF BUILDING — <br />BASE BID <br />FURNISH AND INSTALL STANDARD PRE - <br />TRUSSES AT 24" O.C. REFER TO SPECIFIC <br />REFER TO THE ROOF <br />FRAMING PLAN. <br />TRUSS BEARING OF THE APPARATUS BA <br />AND THE TRUSS BEARING OF THE ADMIN <br />8'-V A.PF THE BASE BID SHALL ALSO Its <br />AI w.11 <br />00 <br />"17,00, <br />—71 <br />I� <br />II1 <br />/0 <br />.L SLOPE. <br />RIDGE <br />1 <br />000 <br />�1 <br />loo <br />�a <br />Ca <br />07 <br />d <br />-1 <br />El <br />T� <br />bill- 11 <br />q <br />da <br />i <br />�y <br />wsune�o wooD <br />� <br />et au SECTION¢simm. <br />ISTRATION AREA SHALL E <br />icLUCK es Iry <br />MOISTURE RESISTANT GYP. BD. ANCHORED TO BOTTOM OF <br />TRUSSES AT APPARATUS BAY, THE FASCIA, PLASHING, ETC. SHALL <br />BE SIMILAR TO THAT INDICATED IN DETAIL <br />ROOFING SYSTEM <br />ASPHALT SHINGLE ROOFING SYSTEM ON 1 LAYER OF 30 LB PELT <br />ON 5/8" COX PLYUJOOD. <br />126 I Nrd Avenue North, Sulte 02 <br />Safety Harbor, Florlda 346W <br />Phone: (813) 125-0111 Pax: (813) 125-020% <br />ArdNt emre * PlamInge (ng <br />• <br />W <br />'_ <br />1 <br />W <br />CL <br />WPM <br />cM <br />�cr)cc <br />X <br />Ogg <br />LL L1' <br />0 <br />C� <br />LL <br />W <br />w <br />�to <br />cv) <br />J <br />J <br />_ <br />to <br />a: <br />a. <br />a. <br />W <br />W <br />N <br />N <br />noT.no.revision <br />/ <br />issue <br />date <br />I <br />GENERAL REVISIONS <br />12/W <br />2 <br />GENERAL REVISIONS <br />02AS <br />drawings <br />ROOF PLAN AND DETAILS <br />i <br />Project sheet <br />BGSS-21 <br />date <br />SEPT. 15, 1998 44 <br />drawn <br />RSB <br />