Laserfiche WebLink
GENERAL CONSTRUCTION NOTES <br />I. ALL ELEVATIONS REFER TO THE NATIONAL GEODETIC VERTICAL DATUM (1929). <br />2. LOCATIONS. ELEVATIONS. AND DIMENSIONS OF EXISTING UTILITIES. STRUCTURES. AND <br />OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE <br />TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL VERIFY THE LOCATIONS. <br />ELEVATIONS. AND DIMENSIONS OF ALL EXISTING UTILITIES. STRUCTURES AND OTHER, <br />FEATURES AFFECTING, THIS WORK PRIOR TO CONSTRUCTION. <br />3. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO <br />CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE OWNER'S ENGINEER OF ANY <br />CONFLICT BEFORE PERFOR",'.NG ANY WORK IN THE AFFECTED AREA. <br />A. THE CONTRAC-.-OIR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND <br />SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO THE VARIOUS !JTILITY COMPANIES IN <br />ORDER TO PERMIT MARKING THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN <br />ADVANCE OF CONSTRUCTION. BY CALLING FLORIDA SUNSHINE STATE ONE CALL_ CENTER <br />OF FLORIDA. INC. AT 1-800-432-4770. <br />5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES. <br />ABOVE OR BELOW GROUND. THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED <br />BY THE CONTRACTOR. <br />6. ALL uNDERGROUND UTILITIES MUST BE IN PLACE AND TESTED OR INSPECTED PRIOR TO <br />ROADWAY BASE AND SURFACE CONSTRUCTION. <br />7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT AND <br />IN:>FECTION REQUIREMENTS Or THE VARIOUS- GOVERNMENTAL AGENCIES. THE <br />CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION. AND <br />SCHEDULE INSPECTIONS ACCORDING TO AGENCY INSTRUCTION. <br />8. AL!_ SPECIFICATIONS AND DOCUMENTS REFERRED TO SHALL BE OF LATEST REVISIONS <br />ANC'/OR LATEST EDITION. <br />ri.. ALL WORK PERFORMED SHALL COMPLY Wi1"H THE REGULATIONS AND ORDINANCES OF THE <br />VARIOUS GOVERNMLNTAL AGENCIES HAVING JURISDICTION OVER THE WORK. <br />10. CON-l-RACTOR SHALL SU'.MIT FOR APPROVAL TO THE OWNER'S ENGINEER SHOP <br />DRA'N'.NGS ON ALL PRECASI AND MANUFACTURED ITEMS. FAILURE TO OBTAIN <br />A.PPFIOVAL BEFORE INST.ALLA;ION MAY RESULT IN REMOVAL AND REPLACEMENT AT <br />CONTRACTOR'S EXPENSE. <br />i AT L_:AST 60RKI�•IG DAYS PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL NOTIFY <br />1HE ENGINEER AND APPROPRIATE AGENCIES AND SUPPLY THEM WITH ALL APPROVED <br />SHOP DRA'I'iINGS, THE CONTRACTOR'S NAME. STARTING DATE. PROJECTED SCHEDULE. <br />AND OTHER INFORMATION AS REQUIRED. ANY WORK PERFORMED PRIOR TO NOTIFYING <br />THE EN',1NEER OR WITHOUT AGENCY INSPECT -OR PRESENT MAY BE SUBJECT TO REMOVAL <br />AND _rF`LACEMEN T AT THE COI'J T RACTOR' S EXPENSE. <br />12. WORK ;-'ERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER <br />t^JI_'RK BEING PERFORMED ON SITE_ BY OTHER CONTRACTORS AND UTILITY COMPANIES. IT <br />Wi!._L SE NE�.:ESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE HIS <br />!;C'TIVITIES. Wr'FRE NECESSARY WITH OTHER CONTRACTOR AND UTILITY COMPANIES. <br />I Al. 1 D i ! u ,,bE 1 AREAS WITHIN PURL- I RIGHT-OF-WAY ARE TO BE RESTORED TO OR I C i NAL <br />"(Dr:1DITION OR BETTER. <br />! RCF'AIP AND REPLACEMENT ;DF ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS <br />VORK "HALL. BE RESTORE" TO A CONDITION EQUAL TO OR BETTER THAN EXISTING <br />;OfIDt ONS BEFORE COMMENCING CONSTRUCTION WORK UNLESS SPECIFICALLY <br />EXtV1P :=D BY THE PLANS. ADDITIONAL COSTS ARE INCIDENTAL TO OTHER CONSTRUCTION <br />AND i;tl EYI-I A COMPF"1S^T-",I, IS iC7 BE ALLOWED. <br />ALL. J i S1 URBED AREAS 'PJH T CH AE NOT TO BE SODDED ARE TO BE SEEDED AND MULCHED <br />r^ CD(IT STANF ^RDS /AND vL' INTA,NED UNTIL A SATISFACTORY STAND OF GRASS <br />^RLF. FFIE RI- ":LATORY AGENCY" AND ENGINEER OF RECORD HAVE BEEN <br />C,I'; I`.,F_L,. ANY WASHOUTS. PEGRADIN6. RESEEDING. AND GRASSING ''WORK. AND OTHER <br />WORK '?'FOUIRED. WILL BI= FERFORMED BY THE CONTRACTOR/SUBCONTRACTOR <br />UI'TIL. THE SYSTEM IS ACCEPT-D FOR MAINTENANCE BY THE REGULATORY ACE-NCY AND <br />ENGi'vL' E.R OF RECORD. <br />CL+' i;-R T 7 15G L' THE Fl_O';'C'A STATUTES REQUIRES THAT AN EXSAVA>OR NOTIFY ALL <br />GA': i, T I- L I T I ES A MI N'I,*.'M C` T';' Wti )RK I HG DAYS PRIOR TO EXCAVATING. MAPS SHOW <br />I- - - <br />ICE AI'i=Ry ' P:?A i _ LOCAT I Qi'J CF GAS MAINS AND nr+ �i �.,,.� �T SHOWW SERVICE LINES. THE <br />E \ :7 PR _7P_ R WAY , 0 LOCATE E I THER MAINS OR SERVICE I CE L T'`;ES IS BY AN ON- <br />: T?:�N L TIE r'GLCTiVE GA': PERSONNEL. <br />EXCAVA.,ORS ARE <br />.!JCTE" 1 J L _`'HG;Jt. i E RESPEi : I VE GAS "oMPANY TWO WORK I N;DA't S <br />r 0' .;.: ENTER I i'\.C. :. CONSTRUCT I ON AREA . <br />RA.WINS,�" . ;!ai- C(:: 1TRAI.'IC.+' SI -�.i_!. BE RESPONSIBLE FOR RECORDING <br />INFOFjMAT-101' ON r `>t--T OI- L ,+, ';-,OVEL, Fl 4N5 CONCURRENTL..Y WITI! CONSTRUCTION <br />FROGRF. SS. WT TH 1 (2) 'WEEKS FOLLO`A'i NIG F I NA:. INSPECTION THE CONTRACTOR <br />SH,-,!.!_ S ?M i 'i (iN : ( 1 ) SE I '.)F RECORD DR,i,'r; i i;'_ c TO THE ENG I VEER. THE <br />F 1 N,,L RECORD DRAWI N�-S SHALL f:OMPL 7 W' TH THE F"CLI-r WI NG REQUIREMENTS: <br />L: r ,'6NII NGS Tn PL= L_ .MARK'=D TO RI: CORD ACTUAL CONS i RUCTi ON <br />2. )RAW!'N6 SHALT SHO4i ACTUAL_ !_OC,^TILL: OF ALL W; TER AND WASTEWATER <br />!"PING AND REL.,TF=_) APPURTENANCES. E.OTH ABOVE :'�ND BELOW GROUND. ALL <br />TO P I P I r4�; L.',CA.T I ON : N'ILUD I N'G HORIZONTAL_ d VERTICAL LOCATION'S OF <br />TI_ I Tii a AL'P'JR'.__NAN'',E_S SHALL BI- CLEARLY SHOWN AID REFL.!;ENCED TO <br />PL!�MA'vi='jT '511F?I: A":_ I im-ROv E MENT S. DRAWINGS SHALL ALSO SHOW ACTUAL <br />STALi_LD P I PE MA';- , I I.. CLASS. ETC. <br />3. ;_RA�vINGS SH/aLL CLEAR[_`! SHOW ALL I _LD CHANGE:": OF DIMENSION AND DETAIL <br />I�1Cl111F` I NG CHAT:G;-S ,JADE BY FIELD ORDER OR BY CHANGE ORDER. <br />SH,!\! L CLEARLY SHOW AL_ L 'AT': S NOT ON ORIGINAL LONTR�.CT <br />u'I h'GS BU 1 CONS ERUCTED I N THE F 1 E-D , AL L EGU I PMENT AND PIPING <br />TI0N SHALL BIF CARI-Y SIiOWN. <br />5. !_O AT i i,i1S OF ALL MANr';iL_ ES. HYDRANTS. VALVE.:. & VALVE BOXES SHAI.L BE <br />I+)WN A'VALVES SHALL BE REFERENCED FRC;Iv+ AlLEA T TWO (?) AND I_!_ <br />'Ri-:i EF?AFi_ THREE PERMAN'LNT POINTS. <br />N{1VINr & GRADING 7FSTING AND nASPECTI0,N REQUIREMENTS <br />I. T'-'L CCU, RAC TOR 1S RESPONSIBLE FOR CUORDINATING APPLICABLE TESTING WITH THE <br />`)C.ILS Fkk3INEER. <br />"I. C:LS ENGIi,!EER TO SUPPLY THE ENGINEER WITH A PHOTOCOPY OF ALL COMPACTION <br />ESTS .,.AID ASPHALT RESULTS. THE SOILS ENGINEER IS TO CERTIFY TO THE ENGINEER <br />OF kECORD IN WRITING T-HAT ALL TESTING REQUIREMENTS REQUIRED BY THE LOCAL <br />AGENCY AND THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) FOR <br />THE IMPROVEMENTS AS REQUIRED BY THE CONSTRUCTION DRAWINGS HAVE BEEN SATISFIED. <br />3. CONTRACTOR 1-0 RE/IEW' SOIL REPORTS AND BORINGS PRIOR TO BIDDING THE PROJECT <br />AND COMMEi!C I NG CONS i RUCTI ON. <br />CLEARING AND SITE PREPARATION NOTES <br />WATER SYSTEM NOTES <br />I. <br />PRIOR TO ANY SITE CLEARING. ALL TREES SHOWN TO REMAIN ON THE CONSTRUCTION <br />!• <br />A VERTICAL CLEARANCE OF 18 INCHES SHALL BE MAINTAINED BETWEEN SANITARY SEWERS <br />PLANS SHALL BE PROTECTED IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY'S <br />AND WATER MAINS. IF CLEARANCE CANNOT BE ACHIEVED BY ADJUSTING WATER MAINS <br />TREE ORDINANCE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THESE TREES <br />THE SANITARY SEWER SHALL BE CONSTRUCTED OF DUCTILE IRON CLASS 54 A MINIMUM <br />IN GOOD CONDITION. NO TREES SHOWN TO REMAIN SHALL BE REMOVED WITHOUT WRITTEN <br />OF 10 FEE1 ON BOTH SIDES OF THE CONFLICT POINT. AS AN ALTERNATIV17 THE <br />APPROVAL FROM THE OWNER. ONLY "GRADING BY HAND" IS PERMITTED WITHIN THE CANOPY <br />SANITARY SEWER MAY BE PLACED IN A SLEEVE OR ENCASED IN CONCRETE FOR THE <br />LINE OF TREES THAT ARE TO REMAIN. <br />REQUIRED 10 FEET ON EACH SIDE OF THE CONFLICT POINT. <br />2. <br />THE CONTRACTOR IS TO PREPARE THE SITE PRIOR TO BEGINNING ACTUAL CONSTRLICTION <br />2• <br />A HORIZONTAL SEPARATION OF 10 FEET SHALL BE MAINTAINED BETWEEN WATER MAINS <br />IN ACCORDANCE WITH THE SOILS TESTING REPORT. COPIES OF THE SOILS REPORT ARE <br />AND SANITARY SEWER. <br />AVAILABLE THROUGH THE OWNER OR THE SOILS TESTING COMPANY. QUESTIONS <br />REGARDING SITE PREPARATION REQUIREMENTS DESCRIBED IN THE SOILS REPORT ARE TO <br />3. <br />ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. <br />BE DIRECTED TO THE SOILS TESTING COMPANY. <br />4. <br />ALL WATER SYSTEM WORK SHALL CONFORM WITH LOCAL REGULATORY STANDARDS AND <br />3. <br />CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE SITE NECESSARY <br />SPECIFICATIONS. <br />FOR CONSTRUCTION. DISTURBED AREAS W'.I_L_ BE SEEDED. MULCHED. OR PLANTED WITH <br />OTHER APPROVED LANDSCAPE MATERIAL IMMEDIATELY FOLLOWING CONSTRUCTION. <br />5. <br />CONFLICTS BETWEEN 'WATER AND STORM bH S NITARY SEWER TO BE RESOLVED BY <br />ADJUSTING THE WATER LINES AS NECESSARY. <br />4. <br />THE TOP 4" TO 6" OF GROUND REMOVED DURING CLEARING AND GRUBBING SHALL BE <br />STOCKPILED AT A SITE DESIGNATED BY THE OWNER TO BE USED FOR LANDSCAPING <br />6. <br />CONTRACTOR TO INSTALL TEMPORARY BLOW -OFFS AT THE END OF WATER SERVICE <br />PURPOSES. UNLESS OTHERWISE DIRECTED BY THE OWNER. <br />LATERALS TO ASSURE ADEQUATE FLUSHING AND DISINFECTION. <br />5. <br />ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHALL BE DISPOSED OF OFF- <br />7. <br />THRUST BLOCKING SHALL BE PROVIDED AT ALL FITTINGS AND HYDRANTS AS SHOWN ON <br />SITE IN ACCORDANCE WITH APPLICABLE REGULATIONS. <br />DETAILS. <br />6. <br />CONTRACTOR TO OBTAIN ALL NECESSARY PERMITS AND APPROVALS PRIOR TO REMOVING <br />8. <br />MATERIALS AND CONSTRUCTION METHODS FOR WATER DISTRIBUTION SYSTEM SHALL BE <br />ANY EXISTING STRUCTURES. <br />IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY CODES. PLANS. AND <br />SPECIFICATIONS FOR CONSTRUCTION. LATEST REVISION THEREOF AND SUPPLEMENTAL <br />7. <br />IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL UTILITY COMPANIES TO <br />SPECIFICATIONS THERETO. APPROVAL AND CONSTRUCTION OF ALL POTABLE WATER <br />DISCONNECT OR REMOVE THEIR FACILITIES PRIOR TO REMOVING OR DEMOLISHING ANY <br />SERVICE MAIN EXTENSIONS AND CONNECTIONS MUST BE COORDINATED THROUGH THE <br />EXISTING STRUCTURES FROM THE SITE. <br />LOCAL REGULATORY AGENCY DEPARTMENT OF PUBLIC UTILITIES. <br />8. <br />THE LOCATION OF ALL EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN DETERMINED <br />FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE <br />CONTRACTOR/SUBCONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR <br />ACCURACY PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY. IT SHALL BE THE <br />CONTRACTOR'S/SUBCONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITIES <br />AND TO MAKE THE NECESSARY ARRANGEMENTS FOR ANY RELOCATIONS OF THESE <br />UTILITIES WITH THE OWNER OF THE UTILITY. THE CONTRACTOR /SUBCONTRACTOR SHALL <br />WATER SYSTEM TESTING AND INSPECTION REQUIREMENT NOTES <br />EXERCISE CAUTION WHEN CROSSING ANY UNDERGROUND UTILITY. WHETHER SHOWN ON <br />THE PLANS OR LOCATED BY THE UTILITY COMPANY. ALL UTILITIES WHICH INTERFACE <br />WITH THE PROPOSED CONSTRUCTION SHALL BE RELOCATED BY THE RESPECTIVE UTILITY <br />I. <br />ALL COMPONENTS OF THE WATER SYSTEM. INCLUDING FITTINGS. THRUST BLOCKING. <br />HYDRANTS. CONNECTIONS. AND VALVES SHALL REMAIN UNCOVERED UNTIL PROPERLY <br />COMPANIES AND THE CONTRACTOR/SUBCONTRACTOR SHALL COOPERATE "'TTH THE <br />PRESSURE TESTED AND ACCEPTED BY THE OWNER'S ENGINEER. PRESSURE TESTS TO <br />UTILITY COMPANIES DURING RELOCATION OPERATIONS. ANY DELAY OR INCONVENIENCE <br />CAUSED TO THE CONTRACTOR/SUBCONTRACTOR BY THE VARIOUS UTILITIEU SHALL BE <br />BE IN ACCORDANCE WITH WATER DEPARTMENT SPECIFICATIONS. CONTRACTOR TO <br />INCIDENTAL TO THE CONTRACT AND NO EXTRA COMPENSATION WILL BE ALLOWED. <br />NOTIFY OWNER'S ENGINEER AND COUNTY INSPECTORS 48 HOURS IN ADVANCE OF <br />PERFORMING TESTS. <br />2. <br />CONTRACTOR TO PERFORM CHLORINATION AND BACTERIOLOGICAL SAMPLING AND OBTAIN <br />CLEARANCE OF DOMESTIC WATER SYSTEM. COPIES OF ALL BACTERIOLOGICAL TESTS TO <br />BE SUBMITTED TO OWNER'S ENGINEER. <br />PAVING AND GRADING NOTES <br />1. <br />THE CONTRACTOR; SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST <br />COLLAPSE AND WILL PROVIDE BRACING SHEETING OR SHORING AS NECESSARY. <br />TRENCHES SHALL BE KEPT DRY WHILE PIPE AND APPURTENANCES ARE BEING PLACED. <br />DEWATER I NG SHALL BE USED AS REQUIRED. <br />SANITARY SEWER NOTES <br />2. <br />CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE NECESSARY DEWATERING PERMITS FROM <br />I. <br />A HORIZONTAL SEPARATION OF 10 FEET SHALL BE MAINTAINED BETWEEN WATER MAINS AND <br />THE LOCAL WATER MANAGEMENT DISTRICT OR OTHER REGULATORY AGENCY. <br />SANITARY SEWER. <br />3. <br />PROPOSED SPOT ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE <br />2. <br />ALL SANITARY SEWER WORK SHALL CONFORM WITH LOCAL REGULATORY STANDARDS AND <br />GRADE UNLESS OTHERWISE NOTED ON DRAWINGS. <br />i <br />SPECIFICATIONS. <br />4. <br />IF CLRBING IS REQUIRED, IT WILL BE PLACED AT THE EDGE OF ALL PAVEMENT. <br />3. <br />SANITARY SEWER MAINS AND LATERALS SHALL HAVE A MINIMUM COVER OF THREE (3) FEET <br />AND SHALL BE INSTALLED ACCOMPANIED BY A METAL TAPE SIMILAR TO "TERRATAPE" <br />�. <br />IT N1o.Y BE NECESSARY TO FIELD ADJUST PAVEMENT ELEVATIONS TO PRESERVE THE ROOT <br />COLORED GREEN AND LAID ONE FOOT ABOVE THE PIPE. <br />SYSTEMS OF TREES SHOWN TO BE SAVED. CONTRACTOR TO COORDINATE WITH OWNER'S <br />ENGINEER PRIOR TO ANY ELEVATION CHANGES. <br />q-g t7-6& wcj) 5 <br />6. <br />CONTRACTOR TO PROVIDE A 1/2" BITUMINOUS EXPANSION JOINT MATERIAL WITH SEALER <br />r <br />3"I �`�Y�'�l�'��'� �'1`'N� 60-r <br />AT ABUTMENT OF CONCRETE AND ANY STRUCTURE. <br />7. <br />ALL PAVEMENT MARKINGS SHALL CONFORM TO FDOT STANDARD INDEX NO. 17346. <br />SANITARY SEWER TESTING AND INSPECTION REQUIREMENT NOTES <br />SHEETS 1-7. <br />I. <br />ALL GRAVITY SEWER PIPING SHALL BE SUGJECT TO A VISUAL INSPECTION BY ThE OWNER'S <br />3. <br />CONTRACTOR SHALL TRIM. TACK. AND MATCH EXISTING PAVEMENT AT _OCATIONS WHERE <br />ENGINEER. CONTRACTOR TO NOTIFY THE ENGINEER 4C' HOURS IN ADVANCE TO SCHEDULE <br />NEW PAVEMENT MEETS EXISTING PAVEMENT. <br />INSPECTION. <br />9. <br />CONTRACTOR IS TO PROVIDE EROSION CONTROL/SEDIMENTATION BARRIER (HAY BALES <br />OR SILTATION CURTAIN) TO PREVENT SILTATION OF ADJACENT PROPERTY. STREETS. <br />AND STORM SEWERS. IN ADDITT(.-)N. CONTRACTOR SHALL F-LACE STRAW. MULCH. OR OTHER <br />SUITABLE MATERIAL_ I7jN GROUND IN AREAS WHERE CONSTRUCTION RELATED TRAFFIC IS <br />TO ENTER AND EXIT THE SITE. IF. IN THE OPINION OF T,E ENGINEER AND/OR LOCAL_ <br />AUTHORITIES. EXCESST'✓E QUANTITIES OF EARTH ARE TRANSPORTED OFF -SITE EITHER <br />BY NATURAL DRAINAGE OR BY VEHICULAR TRAFFIC. THE CONTRACTOR IS TO REMOVE <br />SAID EARTH TO T'IE SATISFACTION OF THE ENGINEER AND/OR AUTHORITIES. <br />10. <br />IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION. THE CONTRAC1OR <br />SHALL STABILIZE THE AFFECTED AREA USING SPRINKLING. IRRIGATION. OR OTHER <br />;y,_".EPTABL.E METHODS. <br />11. <br />THERE IS TO BE NO DISCHARGE (I.E. PUMPING. SHEET FLOW. SWALE. DITCH. ETC.) <br />IN10 EXI'_TING DITCHES OR CANALS WITHOUT THE USE OF SETTLING PONDS. IF THE <br />CONTRACTOR DESIRES TO DISCHARGE INTO THE EXISTING DITCHES OR CANALS A <br />SETTLING POND PLAN PREPARED BY THE CONTRACTOR MUST BE SUBMITTED TO AND <br />APPROVED BY THE ENGINEER OF RECORD AND LOCAL REGULATORY AGENCY PRIOR TO <br />CONSTRUCTION. <br />DRAINAGE SYSTEM CONSTRUCTION NOTES <br />I. STANDARD IND'LXES R:=FER TO THE LATEST EDITION OF FDOT "ROADWAY AND TRAFFIC <br />DESIGN STANDARDS". <br />2. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE CLASS III (ASTM C-76) WITH <br />RUBBER GASKET JOINTS UNLESS OTHERWISE NOTED ON PLANS. ALL DRAINAGE STRUCTURES <br />SHALL BE IN ACCORDANCE WITH FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS UNLESS <br />OTHERWISE NOTED ON PLANS. <br />3. P'DE LENGTHS SHOWN ARE APPROXIMATE AND TO THE CENTER OF DRAINAGE STRUCTURES <br />WITH THE EXCEPTION OF MITERED END AND GLARED END SECTIONS WHICH ARE <br />INCLUDED IN LENGTHS. <br />4. ALL DRAINAGE STRUCTURE GRATES AND COVERS WITHIN TRAFFIC AREAS SHALL BE <br />TRAFFIC RATED FOR H-20 LOADINGS. <br />5. CONTRACTOR TO SOD THE DETENTION POND AS INDICATED ON PLANS WITHIN ONE WEEK <br />FOLLOWING CONSTRUCTION OF THE POND. <br />6. ALL STORM DRAINAGE STRUCTURES 'DEEPER THAN TEN (10 ) FEET TO HAVE LADDER BARS. <br />7. CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE NECESSARY DEWWATERING PERMITS FROM <br />THE LOCAL WATER MANAGEMENT DISTRICT OR OTHER REGULATORY ,GENCY. <br />8. PROTECTION OF EXISTING STORM SEWERS SYSTEMS: <br />DURING CONSTRUCTION. ALL STORM SEWER INLETS IN THE VICINITY OF THE PROJECT <br />SHALL BE PROTECTED BY SEDIMENT TRAPS SUCH AS SECURED HAY BALES. SOD. STONE. <br />ETC.. WHICH SHALL BE MAINTAINED AND MODIFIED AS REQUIRED BY CONSTRUCTION <br />PROGRESS. <br />9. MATERIALS AND CONSTRUCTION METHODS FOR STREETS AND STORM DRAINAGE. <br />CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY AND <br />THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD <br />AL"D BRIDGE CONSTRUCTION. 1996. OR LATEST REVISION THEREOF AND SUPPLEMENTAL <br />SPECIFICATIONS THERETO. <br />10. CLASS "B" TYPE I BEDDING SHALL BE USED UNLESS INDICATED OTHERWISE ON THE <br />DRAWINGS. OR BY THE ENGINEER. <br />TESTING AND INSPECTION REQUIREMENTS <br />I. THE STORM DRAINAGE PIPING SYSTEM SHALL BE SUBJECT TO A VISUAL INSPECTION <br />BY THE OWNER'S ENGINEER PRIOR TO THE PLACEMENT OF BACKFILL. CONTRACTOR <br />TO NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTION. <br />2. THE CONTRACTOR SHALL MAINTAIN THE STORM DRAINAGE SYSTEMS UNTIL FINAL <br />ACCEPTANCE OF THE PROJECT. THE STORM SYSTEM WILL BE INSPECTED BY THE OWNER'S <br />ENGINEER PRIOR TO APPROVAL FOR CERTIFICATE OF OCCUPANCY PURPOSES. <br />SAFETY NC -TES <br />I. DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT. ALL SAFETY <br />REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR HIS REPRESENTATIVE SHALL. <br />BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING FUCLIC AND THE <br />SAFETY OF HIS PEF.SOIJNEL. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE <br />PROVISIONS SET FORTH BY OSHA IN THE FEDERAL. REGISTER OF HE DEPARTMENT OF <br />TRANSPORTATION. <br />2. THE MINIMUM STANDARDS AS SET FORTH IN THE CURRENT EDITION OF THE. STATE OF <br />FLORIDA. MANUAL ON TRAFFIC CONTROL AND SAFE PRACTICES FOR STREET AN1, HIGHWAY <br />CONSTRUCTION. MAINTENANCE AND 'JTILITY OPERATIONS SHALL BE FOLLOWED N THE <br />DESIGN APPLICATION. INSTALLATION, MAINTENANCE. .AND REMOVAL OF ALL T'A.FFIC <br />CONTROL DEVICES. WARNING DEVICES. AND BARRIERS NECESSARY 1-0 PROTECT TF•E <br />PUBLIC AND WORKMEN FROM HAZARDS WITHIN THE PROJECT LIMITS. <br />3. ALL TRAFFIC CONTROL MARKINGS AND DEVICES SHALL CONFORRM TO THE PROVI IGINS SET <br />FORTH IN E <br />T <br />F0 R THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES PREPARED BY, IE U.S. <br />DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION. <br />4. iL SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY AND L':FORCE <br />ALL APPLICABLE SAFETY REGULATIONS. THE ABOVE INFORMATION F',�,S BEEN ROV I DED <br />FOR THE CONTRACTOR'S INFORMATION ONLY AND DOES NOT IMPLY THAT THE 01; ;E (3,1 <br />ENGINEER WILL INSPECT AND/OR ENFORCE SAFETY REGULAi.,0,NS. <br />r <br />L *w <br />MO&O'dap <br />-7`p --- <br />126 Third Avenue North. Suite 102 <br />Safety larbor. Florida 34695 <br />Phone: (813) 725-0111 Fax: !813) 725-0209 <br />Architecture -Planning Engineering <br />AAC002095 cao006092 <br />5300 WEST CYPRESS STRF;ra <br />SUITE 300 <br />TAMPA. FLORIDA 33307 <br />Ph.i813) 877-7275 <br />POST, BUCELk Y, SCNUN B JERNIGAN, :4C. <br />i <br />.J <br />L LJ <br />Ir <br />a <br />v <br />n <br />� <br />LL <br />1 <br />CL <br />I.jj <br />Ld <br />ter; <br />1 . <br />Q <br />CD <br /><.. <br />I <br />r� <br />-- <br />T <br />r <br />L L <br />1 <br />1 <br />I� <br />rev'sij) - <br />no. ."sue e <br />Or" PEP ! GMMENT'-: 3 28/03 ; <br />- ;rOw'ings- - <br />I <br />GENERAL. (NOTES <br />I <br />p r o j e.- t -- I ' f, (ea t - --1 <br />i <br />BG9R-21 <br />r-... _ <br />ciate <br />SEPT. -C• 1993 <br />drown ! I <br />l RW <br />16-SEFI-19913 <br />I \...1vil\zepl-1yr \eo,�str\gi."note+_,.ci.arl <br />