My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36458 Garden Wall Way
Zephyrhills
>
Building Department
>
Building Plans
>
36458 Garden Wall Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 9:47:58 AM
Creation date
2/19/2025 2:24:18 PM
Metadata
Fields
Template:
Building Plans
Street #
36458
Location
Garden Wall Way
Contractor
Lennar Homes LLC
Building Plans - Permit #
Unknown
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
) <br />CROSS BRACING DETAIL (TYP.) <br />SCALE: N.T.S. <br />TRUSS NOTES: <br />CONV. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />- <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. Dg <br />—+j <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />Vv/ L-IVU L/�VI I III--- vvL1 <br />1 <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />TB <br />PRE-ENG. TRUSS <br />2X4 BLOCKING <br />2X4 DIAGONAL AT 8'-0" O.C. BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />MAX & EACH END ALTERNATE A CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />----LWOOD TRUSS J <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE: N.T.S. <br />PORCH SLAB SEE <br />EXTEND <br />SLAB 1 1/2" <br />/T(2) #5's CONT. T&B w/ <br />#3 STIRRUPS AT 4'4' <br />WHEN DEPTH <br />EXCEEDS 30" <br />GRADE <br />T G <br />PORCH SILL 15 <br />SCALE: N.T.S. <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />2X4 CONT. AT <br />T & B CHORD <br />TRUSS <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />10d TOP & BOTTOM <br />OR SIMPSON H2.5Aw/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7X 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />2x6 RAFTERS FOR SPANS 4FT TO 8FT <br />2X4 RAFTERS FOR SPANS LESS THAN <br />4FT @ 2'-0"0.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO BEAM <br />CONC. MASONRY <br />STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL @INTERIOR BEARING <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />SEE FLOOR PLAN SEE PLAN FOR <br />FOR BRG. OR REQ'D STAIR INFO. <br />NON-BRG. WALL IF CONCRETE STAIRS <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />2° <br />a <br />-' - 4 <br />Z CO <br />PORCH SLAB SEE <br />N <br />FOUNDATION PLAN _' "a <br />w <br />- <br />(2) #5's CONT. T&B - <br />ri W J <br />w/ #3 STIRRUPS AT - <br />�, Z <br />4'-0" WHEN DEPTH <br />r <br />EXCEEDS 30" <br />LOWER OR <br />sk <br />GARAGE SLAB <br />1'-4" <br />AL <br />SEE PLAN <br />LARGE STEP <br />DOWN <br />1�7 <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />2X4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�A TRUSS <br />G.T. <br />ADD 2X4 ALONGSIDE, <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER A USSES HIP <br />SIDE OR BOTH IF REQ'D) G.T <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />z <br />O <br />Q <br />W <br />J <br />W <br />w <br />w <br />C0 <br />SCALE: N.T.S. <br />WOOD POST. SEE FLR <br />PLAN FOR SIZE & BASE <br />CONNECTION SEE <br />PLAN <br />EXTEND <br />^ _ , SLAB 1 1/2" <br />° 7 WHEN DEPTH (2) #5's CONT. T&B w/ <br />77 <br />- 411.`._ <br />-_ #3 STIRRUPS AT 4'-0" <br />PORCH SLAB SEE � I <br />FOUNDATION PLAN EXCEEDS 30" <br />GRADE <br />• -Z <br />V-4" <br />ENTRY PORCH SILL �14 <br />SCALE: N.T.S. <br />WOOD OR MASONRY ABOVE <br />MASONRY PIER SEE FLOOR PLAN <br />FOR COLUMN INFO WOOD OR MASONRY <br />INTEGRATE MASONRY ABOVE MASONRY <br />KNEEWALL INTO CMU BASE OR PIER SEE FLOOR <br />MAIN HOUSE PER ELEVATION IF PLAN FOR COLUMN I <br />REQUIRED INFO <br />MASONRY KNEE WALL MAX 3 <br />COURSES w/ TOP K.O. COURSE CMU BASE W/ (1) #5 <br />1 <br />I <br />w/ (1) #5 CON <br />REQ'D @ MID <br />I <br />I <br />I <br />1 <br />11 1 <br />1 <br />I I <br />1 <br />I <br />1 <br />1 <br />I <br />1 <br />T. FILLED CELL VERTICAL EACH <br />SPAN MAX 6-8" CORNER FILLED 1 1 <br />MAX 3 SOLID. SEE ELEV. j <br />COURSE FOR BASE SIZE <br />(3) #5's EA. WAY <br />1 <br />PORCH SLAB SEE <br />s <br />Ak <br />SLAB LEVEL FOUNDATION PLAN <br />(2) #5's CONT T&B w/ <br />CONTRACTOR TO INSTALLSEE CUT <br />SECTION FOR #3 STIRRUPSWHEN DEPTH - • n N <br />MIN 3" x 3" WEEP HOLE <br />ALONG w/ PITCHING SLAB MORE INFO EXCEEDS 30" <br />V-4" <br />TO DRAIN WATER <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />SIMPSON LSTA18 <br />ENTRY PORCH SILL �16 <br />SCALE: N.T.S. <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />WOOD WALL <br />OR TRUSS. 2X4 CONT. W/ (2) <br />SEE PLAN 16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />/TRUSS OR <br />/ ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL <br />SCALE: N.T.S. <br />2x4 #2 SYP NAILER. NA <br />TO STUDS w/ (3) 16d @ <br />EACH STUD - TOENAIL <br />EACH TRUSS TO <br />NAILER w/ (3) 10d <br />ROOF AND EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />VERIFY FLOOR JOIST W/ RIM <br />BOARD OR FLOOR GABLE W/ <br />FRAMING PLAN <br />SIMPSON LUS26 w/ (8) 10d • <br />NAILS OR IF 2 PLY TRUSS SEE FLOOR FRAMING PLAN <br />SIMPSON LUS26-2 w/ (8) 16d AND J/S6 FOR MORE INFO. <br />NAILS TO LEDGER VERIFY WITH PLAN FOR <br />2X8 #2 SYP CONT. LEDGER W/ LOCATION AND DIRECTION <br />(4) 16d NAILS ATTACH NAILS (IF PARALLE SEE 2/D2 FOR <br />INTO END OF EACH FLOOR BLOCKING INFO) <br />TRUSS, 24" O.C. MAX. (AT EACH <br />SIDE OF G.T. INSTALL (4) NAILS MASONRY WALL <br />EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF s <br />SCALE: 1/2" = 1'-0" <br />COMMON TRUSS <br />W/ INTERIOR BRG. <br />SEE PLAN FOR <br />CONNECTIONS <br />INFO. <br />W/ (12) 10d NAILS ---------- 5Ct HLAN L. <br />SIMPSON HUC410 w/ (14) F <br />CENTERED AT I I I I I FOR CANT. <br />I I 16d INTO HEADER & (6) ": -TRUSS/ <br />SPLIT TO TIE 10d INTO BEAM - SEE I <br />BEAMS TOGETHER I I I ( OP WAL <br />I I ROOF PLAN FOR MORE I I <br />I INFO I EE PLAN <br />I I COLUMNOSIZE & BASE I I I I 7/16" OSB FLITCH PLATE SHEATHING REQ'D FROM BOTTOM MIN. (2) 2x8 #2 SYP <br />I Y2 CDX PLYWOOD OR 16' O.S.B. <br />HEADER. SEE Q/S4 FOR <br />SEE FLOOR PLAN I CONNECTION INFO I REQ'D ONLY WHEN OF WALL TO ROOF SHEATHING <br />I I --- --- REQ'D CONNECTIONS <br />FOR COLUMN SIZE L _ _ _ _ _ J I INDICATED ON BM. ABOVE W/ 8d NAILS @ 4" O.C. IN <br />& ADDITIONAL INFO. 7/16" OSB FLITCH PLATE J SEE FLOOR PLAN OR SCHEDULE/PLAN FIELD, EDGES & BOUNDARIES <br />REQ'D ONLY WHEN COLUMN SIZE & BASE 2x4 #2 SPF STUDS @ <br />OPTION A SC INDICATON ED <br />OPTION B CONNECTION INFO OPTION C <br />12" O.C. W/ USP SPT22 <br />@ BASE & SPT24 @ <br />TOP <br />EXTERIOR SHEATHING COMMON BM. TO POST ATTACHMENT <br />ATTACHED PER <br />NAILING SCHEDULE <br />CONTRACTOR TO INSTALLSEE CUT <br />SECTION FOR #3 STIRRUPSWHEN DEPTH - • n N <br />MIN 3" x 3" WEEP HOLE <br />ALONG w/ PITCHING SLAB MORE INFO EXCEEDS 30" <br />V-4" <br />TO DRAIN WATER <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />SIMPSON LSTA18 <br />ENTRY PORCH SILL �16 <br />SCALE: N.T.S. <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />WOOD WALL <br />OR TRUSS. 2X4 CONT. W/ (2) <br />SEE PLAN 16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />/TRUSS OR <br />/ ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL <br />SCALE: N.T.S. <br />2x4 #2 SYP NAILER. NA <br />TO STUDS w/ (3) 16d @ <br />EACH STUD - TOENAIL <br />EACH TRUSS TO <br />NAILER w/ (3) 10d <br />ROOF AND EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />VERIFY FLOOR JOIST W/ RIM <br />BOARD OR FLOOR GABLE W/ <br />FRAMING PLAN <br />SIMPSON LUS26 w/ (8) 10d • <br />NAILS OR IF 2 PLY TRUSS SEE FLOOR FRAMING PLAN <br />SIMPSON LUS26-2 w/ (8) 16d AND J/S6 FOR MORE INFO. <br />NAILS TO LEDGER VERIFY WITH PLAN FOR <br />2X8 #2 SYP CONT. LEDGER W/ LOCATION AND DIRECTION <br />(4) 16d NAILS ATTACH NAILS (IF PARALLE SEE 2/D2 FOR <br />INTO END OF EACH FLOOR BLOCKING INFO) <br />TRUSS, 24" O.C. MAX. (AT EACH <br />SIDE OF G.T. INSTALL (4) NAILS MASONRY WALL <br />EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF s <br />SCALE: 1/2" = 1'-0" <br />COMMON TRUSS <br />W/ INTERIOR BRG. <br />SEE PLAN FOR <br />CONNECTIONS <br />INFO. <br />W/ (12) 10d NAILS ---------- 5Ct HLAN L. <br />SIMPSON HUC410 w/ (14) F <br />CENTERED AT I I I I I FOR CANT. <br />I I 16d INTO HEADER & (6) ": -TRUSS/ <br />SPLIT TO TIE 10d INTO BEAM - SEE I <br />BEAMS TOGETHER I I I ( OP WAL <br />I I ROOF PLAN FOR MORE I I <br />I INFO I EE PLAN <br />I I COLUMNOSIZE & BASE I I I I 7/16" OSB FLITCH PLATE SHEATHING REQ'D FROM BOTTOM MIN. (2) 2x8 #2 SYP <br />I Y2 CDX PLYWOOD OR 16' O.S.B. <br />HEADER. SEE Q/S4 FOR <br />SEE FLOOR PLAN I CONNECTION INFO I REQ'D ONLY WHEN OF WALL TO ROOF SHEATHING <br />I I --- --- REQ'D CONNECTIONS <br />FOR COLUMN SIZE L _ _ _ _ _ J I INDICATED ON BM. ABOVE W/ 8d NAILS @ 4" O.C. IN <br />& ADDITIONAL INFO. 7/16" OSB FLITCH PLATE J SEE FLOOR PLAN OR SCHEDULE/PLAN FIELD, EDGES & BOUNDARIES <br />REQ'D ONLY WHEN COLUMN SIZE & BASE 2x4 #2 SPF STUDS @ <br />OPTION A SC INDICATON ED <br />OPTION B CONNECTION INFO OPTION C <br />12" O.C. W/ USP SPT22 <br />@ BASE & SPT24 @ <br />TOP <br />EXTERIOR SHEATHING COMMON BM. TO POST ATTACHMENT <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />- - <br />XXI(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />- <br />16" FLOOR SYSTEM <br />FLOOR GIRDER <br />SEE PLAN FOR <br />SEE PLAN FOR <br />DIRECTION <br />CONNECTION <br />SECTION @ <br />FLOOR <br />CONNECTION(`�22� <br />SCALE: N.T.S. <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON (2) HTS20 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A F A <br />SEE PLAN FOR <br />TOP OF BEAM <br />® I <br />_J <br />SEE PLAN FOR <br />CANT. IF <br />INDICATED <br />CORNER SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />XX <br />COMMON BM. ATTACHMENT <br />SCALE: N.T.S <br />SCALE: N.T.S. <br />MIDDLE <br />BM. SPLICE OVER <br />CENTER OF POST <br />SEE PLAN MAX. <br />24" STEPS <br />SEE PLAN FOR OPT. <br />STAIR INFO. IF <br />CONCRETE STAIRS <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />GARAGE OR <br />LOWER SLAB <br />SEE PLAN <br />V d C .d. B. <br />7 _- iy Z <br />r2 <br />SECTION <br />SCALE: N.T.S. <br />2X4 #2 SYP P.T. PLATE W/ <br />V EPDXY ANCHOR OR <br />J-BOLT OR Y2" TITEN HD <br />ANCHOR @ 24" O.C. W/ <br />MIN. 6" EMBEDMENT <br />d a <br />MAIN HOUSE <br />SLAB <br />(2) #5's CONT. T&B <br />W/ #3 STIRRUPS AT <br />4'-0" WHEN DEPTH <br />EXCEEDS 30" <br />GARAGE MONO/ 21 <br />eat <br />eat <br />0 <br />cv <br />®ca <br />c� <br />>- W <br />o= <br />=_ <br />C fd CU N <br />��-a <br />N=o- <br />0, a N = <br />N G ip <br />Q Ci N <br />E c <br />a) - . _ ¢ <br />3 rn <br />'Cu <br />e <br />Cc <br />4�� <br />a <br />+4%E d tJ <br />`,•�9r1'<Y$ j/ < i k I.I�ib�li"•``��'��i <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />W E <br />a <br />0 <br />0 <br />V 2 co a) N w <br />11 <br />o " of In n <br />N cnr- - <br />N! coa 3 u <br />a <br />Z — -o a 1 <br />_ <br />o o <br />cpN� Y <br />W pj C) m w <br />Z COLO MZ <br />N Q <br />Z U O <br />MLLW O❑ <br />Z N M <br />z <br />o� <br />z o � <br />Q <br />M <br />�N z <br />Q) �_ o <br />w � <br />U <br />owo <br />N <br />�N <br />U <br />w <br />J Ewig <br />f—' — <br />U o 0 <br />Q <br />o <br />Cl)w <br />coi <br />o � <br />J zo >N <br />06 CL E w� Q� <br />zo <br />E oa <br />no <br />Ko SOU <br />U <br />0, <br />z a) <br />CD wo ww <br />J <br />L ¢ o W <br />to I <br />z mO <br />Z 0O� <br />mw <br />Jz� zz <br />N 8 go <br />W 0 Q� w <br />U ¢� �r <br />Y <br />� aLL <br />w� <br />o w< =o <br />o a <br />CJD <br />s� o- <br />V Z¢TU� <br />C O i <br />.o <br />`n N <br />> L O I..L <br />(D rn <br />ca <br />c� <br />C:) C) <br />Q ) (� <br />I— m N <br />c LO <br />C) N 0 <br />00 O L47 <br />�N T <br />r\ <br />a) w cM 04 o <br />(a <br />z <br />zE r Cz <br />IL _j Q 0 <br />JOB NO: 22-09402 <br />SCALE : AS NOTED <br />SHEET NO. <br />D 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.