Laserfiche WebLink
) <br />AB orAB. <br />Anchor Bolt <br />ABV or Abv. <br />Above <br />AC or A/C <br />Air -Conditioner <br />ADJ orADJ. <br />Adjustable <br />AFF or A.F.F. <br />Above Finished Floor <br />AHU orAH.U. <br />Air Handler Unit <br />ALT or ALT. <br />Alternate <br />BC <br />Base Cabinet <br />BF <br />Bifold Door <br />BK SH or Bk Sh <br />BookShelf <br />BLK or BLK. <br />Block <br />BLW or BLW. <br />Below <br />BM or Bm. <br />Beam <br />BOT or Bot. <br />Bottom <br />BP or B.P. <br />Bypass (door) <br />BRG or BRG. <br />Bearing <br />C <br />Carpet <br />CAB <br />Cabinet <br />CIR or Cir. <br />Circle <br />CJ or C/J <br />Control Joint <br />CLG or Clg. <br />Ceiling <br />CMU <br />Concrete Masonry Unit <br />COFF orCoff. <br />Coffered or Tray Ceiling <br />COL or Col. <br />Column <br />COMM or Comm. <br />Community <br />COMP or Comp. <br />Compressor <br />CONNorCONN. <br />Connection <br />CONT or Cont. <br />Continuous <br />CSMT <br />Casement <br />CT or C.T. <br />Ceramic Tile <br />D or D. <br />Dryer <br />DB <br />Door Bell <br />DBL or Dbl. <br />Double <br />DCF <br />Decorative Cementitious Finish <br />DEC or Dec. <br />Decorative <br />DED or Ded. <br />Dedicated (outlet) <br />DIA or Dia. <br />Diameter <br />DISP or Disp. <br />Disposal <br />DIST or Dist. <br />Distance <br />DMF <br />Decorative Masonry Finish <br />DS or D.S. <br />Drawer Stack <br />DTL <br />Detail <br />DV or D.V. <br />Dryer Vent <br />OVP or D.V.P. <br />Diverter Valve (plumbing) <br />DW or D.W. <br />Dishwasher <br />EA or Ea. <br />Each <br />ELEC or Elec. <br />Electrical <br />ELEV or Elev. <br />Elevation <br />EQ <br />Equal <br />EW or E.W. <br />Each Way <br />EXP or Exp. <br />Expansion <br />EXT or Ext. <br />Exterior <br />FBC <br />Florida Building Code <br />FDN or Fdn. <br />Foundation <br />FFB <br />Finsh Floor Break <br />FG <br />Fiberglass (Shower Pan) <br />FIN <br />Finished <br />FIN FLR or FF or Fin. Flr. Finished Floor <br />ABBREVIATIONS <br />FIX or FXD <br />Fixed <br />FLR or Flr. <br />Floor <br />FLR SYS or Fir Sys <br />Floor System <br />FOM or F.O.M. <br />Face Of Masonry <br />FP or F.P. <br />Fireplace <br />FR DR <br />French Door <br />FRT <br />Front <br />FT or Ft. <br />Foot/ Feet <br />FTG or Ftg. <br />Footing <br />FXD GL <br />Fixed Glass <br />GALV or Galy. <br />Galvanized <br />GC or G.C. <br />General Contractor <br />GFI or G.F.I. <br />Ground Fault Interrupter <br />GT or G.T. <br />Girder Truss <br />GYP BD or Gyp. Bd. <br />Gypsum Board <br />HB <br />Hose Bibb <br />HC <br />Hollow Core <br />HDR or Hdr. <br />Header <br />HGT or Hgt. <br />Height <br />HH or H.H. <br />Hand Held (plumbing faucet) <br />HORIZ <br />Horizontal <br />HS <br />Hard Surface (flooring) <br />ILO <br />In Lieu Of <br />INSUL or Insul. <br />Insulation <br />INT or Int. <br />Interior <br />KIWALL or KlWall <br />Kneewall <br />KS or K.S. <br />Knee Space <br />LAUN or Laun. <br />Laundry <br />LAV or Lay. <br />Lavatory <br />LF or L.F. <br />Linear Ft. <br />LL <br />Lintel Length <br />LT <br />Laundry Tub <br />MAS or Mas. <br />Masonry <br />MAX or Max <br />Maximum <br />MC <br />Medicine Cabinet <br />MFR or Mfr. <br />Manufacturer <br />MGT <br />Management (room) <br />MIN or Min <br />Minimum <br />MIR or Mir. <br />Mirror <br />ML or M.L. <br />Microlam <br />MONO or Mono <br />Monolithic <br />MW or MICRO or Micro. <br />Microwave <br />NTS or N.T.S. <br />Not to Scale <br />OE or 0. E. <br />Owner's Entry <br />OPNG or Opn'g. <br />Opening <br />OPT or Opt. <br />Optional <br />PC <br />Pull Chain <br />PED or Ped. <br />Pedestal <br />PH <br />Phone <br />PKT or Pkt. <br />Pocket (Door) <br />PL or P.L. <br />Parallam <br />PLF <br />Pounds per linear foot <br />PLNT SHLF or Pit. Sh. <br />Plant Shelf <br />PLT HT or Pit. Ht. <br />Plate Height <br />PSF <br />Pounds per square foot <br />PT or P.T. <br />Pressure Treated <br />PW or P.W. <br />Pre -wire <br />PWDR or Pwd. <br />Powder Room <br />RA or R/A or R.A. <br />Return Air <br />RAD or Rad. <br />Radius <br />RAG or Rag. <br />Return Air Grill <br />REC or Rec. <br />Recessed <br />RECEPT <br />Receptacle <br />REF or Ref. <br />Refrigerator <br />REINF <br />Reinforcing <br />REQD or Req'd. <br />Required <br />RM or Rm. <br />Room <br />RND or Rnd. <br />Round <br />RO or R.O. <br />Rough Opening <br />RS, R/S, R/SH or R&S <br />Rod and Shelf <br />SC <br />Solid Core <br />SD or SD. <br />Smoke Detector <br />SGD <br />Sliding Glass Door <br />SH or Sh. <br />Shelves <br />SHT <br />Sheet <br />SHWR or Shwr. <br />Shower <br />SL or S.L. <br />Side Lights <br />SPECS or SPECS. <br />Specifications <br />SPF or S.P.F. <br />Spruce Pine Fir <br />SO FT or SF or S.F. <br />Square Foot (feet) <br />SO or Sq. <br />Square <br />STO <br />Storage <br />SW or S.W. <br />Shear Wall <br />SYP or S.Y.P. <br />Southern Yellow Pine <br />TB <br />Towel Bar <br />TEMP or Temp. <br />Tempered <br />THIKN or Thik'n. <br />Thicken <br />TOB or T.O.B. <br />Top of Block <br />TOM or T.O.M. <br />Top of Masonry <br />TOP or T.O.P. <br />Top of Plate <br />TP <br />Toilet Paper Holder <br />TR <br />Towel Ring <br />TRANS WDW or Trans. <br />Transom Window <br />TYP or Typ. <br />Typical <br />UC or u.c. <br />Under Counter <br />UCL <br />Under Cabinet Lighting <br />UNO or U.N.O. <br />Unless Noted Otherwise <br />V or v. <br />Valve (shower or tub/shower) <br />VB <br />Vanity Base <br />VERT or Vert <br />Vertical <br />VLorV.L. <br />Versalam <br />VTR or VTE <br />Vent through Roof / Exterior <br />W or w <br />Washer <br />W/ or w/ <br />With <br />WA or WA. <br />Wedge Anchor <br />WC or W/C or W.C. <br />Water Closet (toilet) <br />WD or Wd <br />Wood <br />WDW HDR or WDW. HDR. <br />Window Header <br />WH or W.H. <br />Water Heater <br />WIC or W.I.C. <br />Walk-in Closet <br />WM or W.M. <br />Wall Mounted (plumbing fixture) <br />WP <br />Water Proof(ing) <br />WS <br />Water Softener <br />WWF <br />Welded Wire Fabric (Mesh) <br />PLAN REVISIONS <br />DATE VERSION DESCRIPTION <br />04/25/ 12 1.0 <br />06/25/12 2.0 <br />08/11 /15 3.0 <br />03/06/18 4.0 <br />06/01 / 18 4.1 <br />06/07/18 4.2 <br />12/19/20 5.0 <br />NEW BASE PLAN <br />GRADE BEAM FOUNDATION <br />2015 NEW CODE UPDATE <br />VISED SGD, LA <br />REV. 06.23.22 <br />REVISED DINING WINDOW TO 35-SH <br />FBC 2020 CODE UPDATE <br />INDEX OF DRAWINGS <br />SHEET DESCRIPTION <br />SHEET <br />No. <br />CS <br />COVER SHEET <br />1.1 <br />FIRST FLOOR PLAN <br />1.2 <br />SECOND FLOOR PLAN <br />2.1 <br />EXTERIOR ELEVATIONS <br />2.2 <br />EXTERIOR ELEVATIONS <br />3 <br />ELECTRICAL PLAN <br />4 <br />ROOF PLAN <br />5 <br />FOUNDATION PLAN <br />6.1 <br />FIRST FRAMING PLAN <br />6.2 <br />SECOND ROOF FRAMING PLAN <br />7 <br />LINTEL PLAN AND DETAILS <br />SN STRUCTURAL NOTES <br />SN1 DETAILS <br />S3 DETAILS <br />S4 DETAILS <br />S5 DETAILS <br />S6 DETAILS <br />ST STAIR DETAILS <br />SS RETROFIT DETAILS <br />D1 SECTIONS & DETAILS <br />D2 SECTIONS & DETAILS <br />WP WATERPROOFING DETAILS <br />PA1.0 PRODUCT APPROVAL NUMBERS <br />PA1.1 PRODUCT APPROVAL NUMBERS <br />--------------- <br />---------- <br />— — — — — — — — — — — — <br />PA1.2 PRODUCT APPROVAL NUMBERS <br />PA1.3 PRODUCT APPROVAL NUMBERS <br />SH1.0 HURRICANE SHUTTER PRODUCT APPROVAL <br />SH1.1 HURRICANE SHUTTER PRODUCT APPROVAL <br />n SH1.2 HURRICANE SHUTTER PRODUCT APPROVAL <br />Fzf7l El 1711 <br />� SH1.3 HURRICANE SHUTTER PRODUCT APPROVAL <br />SH1.4 HURRICANE SHUTTER PRODUCT APPROVAL <br />E]E:1E11::11]E]F-1 <br />SH1.5 HURRICANE SHUTTER PRODUCT APPROVAL <br />00 F-1 [:::] - _ _ <br />MEAN ROOF 15 FT. HIGH TYPICAL <br />FOR SINGLE STORY HOMES <br />MEAN ROOF 30 FT. HIGH TYPICAL <br />FOR 2 STORY HOMES <br />THIS DRAWING AND DESIGN IS VALID <br />FOR 12 MONTHS AFTER THE DATE IT <br />IS SIGNED AND SEALED OR WHILE <br />CURRENT CODE IS VALID <br />CODE REFERENCES ARE SUMMARIES <br />OF CODE SECTIONS. <br />SEE FBCR (CURRENT VERSION) FOR <br />COMPLETE CODE INFORMATION. <br />Notice to Builder & All Subcontractors <br />It is the intent of Designer/Engineer listed in the titleblock of these <br />documents that these documents be accurate, providing Licensed <br />Professionals clear information. Every attempt has been made to <br />prevent error. The Builder and all subcontractors are required to <br />review all the information contained in these documents, prior to <br />the commencement of any work. The Designer/Engineer are not <br />responsible for any plan errors, omissions,or misinterpretations <br />undetected and not reported to the Designer / Engineer prior to <br />construction. All construction MUST be in accordance to the <br />information found in these documents. Any questions regarding <br />the information found in these plans should be directed to our <br />Office at (407) 880-2333 immediately. No backcharges will be <br />considered for reimbursement by the Designer/Engineer without <br />advanced notification and approval by the Designer/Engineer. <br />Payments will be made in accordance to the terms of the <br />agreement. <br />Control of Construction Site <br />The Designer/Architect and engineer of record (EOR) have no <br />control over the construction site and shall not be responsible in <br />any manner for control of the construction site including, but not <br />limited to, scheduling and sequencing of work, jobsite safety, and <br />ventilation of the building and thereby shall not be responsible for <br />the indoor air quality, or the effects thereof, for any reason <br />whatsoever. The Designer/Architect and FOR has no duty to <br />IL lr= 114 114 Jk 11 protect, without limitation, the residence, construction site, <br />materials, or equipment, from moisture, mold, fungus, fire, theft, <br />vandalism, trespass, or any other peril or condition, at any time, <br />expressly including, but not limited to, the period of time before <br />construction, during the construction of the project, or after <br />construction and the Designer/Architect and FOR has no duty to <br />take any action or preventive measures to protect such property <br />against any such peril at any time for any reason. <br />Care and Maintenance <br />Yearly maintenance and inspections by the builder/homeowner <br />are necessary for the future life of this home. Care must be taken <br />to check windows and doors for caulking, remove leaves and <br />debris off roofs, make sure that water flow is away from the <br />house and have your home repainted every 3 - 5 years to protect <br />1763 the coatings. The designer and engineer of record are not <br />responsible for the upkeep of the home and will not be held <br />liable for instances that may occur over the normal life of the <br />home without proper maintenance. <br />N <br />0 <br />N <br />c <br />0 <br />d <br />.�-. <br />Z <br />> W <br />cI o <br />C W= C N N <br />CO <br />.. � L" <br />_Rom <br />N d O 10 <br />Q r.+ N � <br />N <br />c <br />e <br />LJ <br />r 3 3 <br />UJI <br />ma <br />co <br />>>z•=� <br />N �• <br />N <br />a �+ <br />J z <br />LX <br />E E It t 4 l f will�i <br />.am'1' <br />'p I.N L* <br />JP <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 <br />Florida Building Code - <br />Residential 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />Q <br />o <br />O <br />fV y <br />" a000 F. m <br />N O A <br />Q <br />W <br />Qj Cr -V J , <br />C -r LL W <br />_ <br />13 <br />J LL _LL 'L <br />W <br />c co a <br />W <br />a o <br />Q mN� <br />m <br />Z <br />L W <br />W <br />Ln 04 <br />NZ a <br />Z <br />N OU <br />W <br />OO <br />Ur ") <br />Z N M <br />J — <br />a <br />N <br />E3 <br />V) <br />M <br />z v <br />4--r0M <br />U <br />� a <br />Orla <br />s <br />V) <br />t <br />I <br />< <br />�s <br />o <br />o <br />� <br />w <br />M <br />� <br />LL <br />(p <br />wo <br />g a <br />11 <br />>o <br />E O <br />V <br />W z <br />Z <br />oa <br />t— <br />�0 <br />R� <br />�1°a <br />UO <br />�U <br />ZoE <br />a � <br />�oo <br />a <br />ww <br />C <br />=U <br />mf <br />Z <br />ZR <br />Ofs] J <br />`gym <br />aw <br />Z z <br />V! <br />3 <br />o� <br />LLa <br />Cg <br />z <br />gZ <br />0w <br />W <br />� <br />S� <br />�r <br />M <br />v <br />zza <br />o�3 <br />0 C:) <br />= <br />> LOB <br />X <br />O <br />C9 <br />N <br />N <br />Co Lo <br />N <br />:3 <br />LO <br />A <br />Co <br />LO <br />a. <br />U) m <br />N <br />N <br />V7 <br />T <br />QLO <br />N <br />hi <br />M <br />N <br />M r— <br />u L <br />d <br />? <br />N <br />m <br />c <br />a. <br />E <br />U S <br />Q p <br />JOB <br />NO: <br />23-06124 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />C S <br />