My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38360 Springhead Ln
Zephyrhills
>
Building Department
>
Building Plans
>
38360 Springhead Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 1:02:15 PM
Creation date
2/19/2025 2:35:54 PM
Metadata
Fields
Template:
Building Plans
Street #
38360
Location
Springhead Ln
Contractor
D R Horton
Building Plans - Permit #
3549
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID. 64039112-CEE7-4F45-AD73-562F11EFF3F4 <br />TRADITIONAL HARD -COAT - <br />STUCCO INSTALLED IN <br />ACCORDANCE WITH THE <br />MANUFACTURER'S OR THE <br />PORTLAND CEMENT ASSC. <br />(PCA) RECOMMENDATIONS <br />WITH THE MOST <br />RESTRICTIVE <br />CONTROLLLING. <br />VERTICAL AND HORIZ <br />CONTROL JOINTS AS REQ'D <br />FASTEN ZIP SYSTEM <br />SHEATHING AS REQUIRED BY <br />ENGINEER -OF -RECORD AND/OR <br />LOCAL BUILDING CODE <br />TOP EDGE OF WEEP SCREED TAPED TO <br />WALL SHEATHING WITH ZIP SYSTEM@ <br />TAPE OR ADHESIVE BACKED FLASHING <br />(MUST MEET AC148) 1 <br />CODE -APPROVED VINYL WEEP <br />SCREED TO LAP CMU WALL MIN 2" <br />CMU MASONRY WALL <br />*ZIP SYSTEM@ SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />METAL LATH <br />ONE LAYER OF WATER -RESISTIVE <br />VAPOR -PERMEABLE BARRIER WITH A <br />PERFORMANCE AT LEAST EQUIVALENT <br />TO GRADE D BUILDING PAPER. <br />ZIP SYSTEM ® TAPE <br />(INSTALLED OVER ALL JOINTS <br />IN ZIP SYSTEM SHEATHING.) <br />OVERLAP TAPE A MIN <br />V AT ALL T-JOINTS <br />1/8" GAP RECOMMENDED AT <br />PANELEDGES <br />ZIP SYSTEMS ® SHEATHING WITH <br />HARD COAT STUCCO AT 2ND LEVEL <br />BLOCK TO FRAME TRANSITION) <br />hese construction details are provided to assist in the installation of Zip System ®pproduct(s) <br />and may not apply to every situation Manufacturer accepts no responsibility or hability for the use <br />of these or other construction details <br />i <br />WALL ASSEMBLY <br />VINYL/WOOD/FIBER CEMENT <br />SIDING (INSTALLED IN <br />ACCORDANCE WITH <br />CLADDING MANUF'S <br />INSTALLATION <br />RECOMMENDATIONS) ZIP <br />SYSTEMS @ SHEATHING <br />WOOD OR LT. GA. METAL <br />STUDS. <br />1/8" GAP RECOMMENI <br />PANELEDGES <br />ZIP SYSTEM ® TAPE <br />(INSTALLED OVER AL <br />JOINTS IN ZIP SYSTEI <br />SHEATHING.) <br />OVERLAP TAPE A MIN <br />OF 1" AT ALL T-JOINT: <br />1/8" GAP RECOMMEN <br />FASTEN ZIP SYSTEM <br />REQUIRED BY ENGIN <br />AND/OR LOCAL BUILL <br />CMU N <br />*ZIP SYSTEM® SHEATHING IS APPRUVtU I U <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />ZIP SYSTEMS ® SHEATHING WITH <br />LAP SIDING AT 2ND LEVEL <br />BLOCK TO FRAME TRANSITION) <br />hese construction details are provided to assist in the installation of Zip System ® product(s) <br />and may not apply to every situation Manufacturer accepts no responsibility or liability for the <br />use of these or other construction details. <br />WALL ASSEMBLY <br />VINYL/WOOD/FIBER CEMENT <br />SIDING (INSTALLED IN <br />ACCORDANCE WITH <br />CLADDING MANUF'S <br />INSTALLATION <br />RECOMMENDATIONS) ZIP <br />SYSTEMS ® SHEATHING <br />WOOD OR LT. GA. METAL <br />STUDS. <br />1/8" GAP RECOMMENDED AT <br />PANELEDGES <br />ZIP SYSTEM ® TAPE (INSTALL <br />OVER ALL JOINTS IN ZIP SYS7 <br />SHEATHING.) <br />OVERLAP TAPE A MINIMUM OF <br />V AT ALL T-JOINTS <br />1/8" GAP RECOMMENDED AT I <br />FASTEN ZIP SYSTEM @ SHEA <br />ENGINEER -OF -RECORD AND/( <br />*ZIP SYSTEMO SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />ZIP SYSTEMS ® SHEATHING WITH <br />LAP SIDING AT SLAB ON GRADE <br />These construction details are provided to assist in the installation of Zip System ®product(s) <br />and may not apply to every situation Manufacturer accepts no responsibility or liability for the <br />use of these or other construction details. <br />TRADITIONAL HARD -COAT - <br />STUCCO INSTALLED IN <br />ACCORDANCE WITH THE <br />MANUFACTURER'S OR THE <br />PORTLAND CEMENT ASSC. <br />(PCA) RECOMMENDATIONS <br />WITH THE MOST <br />RESTRICTIVE <br />CONTROLLLING. <br />METAL LATH <br />MORTAR SETTING BED ON <br />ONE LAYER OF WATER -RESISTIVE <br />TOP OF MORTAR SCRATCH <br />VAPOR -PERMEABLE BARRIER WITH A <br />COAT IN ACCORDANCE <br />PERFORMANCE AT LEAST EQUIVALENT <br />WITH MANUFACTURER'S <br />TO GRADE D BUILDING PAPER. <br />INSTALLATION <br />/--ZIP SYSTEM@ SHEATHING* <br />RECOMMENDATIONS <br />WOOD OR LT, GA. METAL STUDS <br />Y <br />TOP EDGE OF WEEP SCREED <br />TAPED TO WALL SHEATHING WITH <br />ZIP SYSTEM& TAPE OR ADHESIVE <br />FOUNDATION <br />BACKED FLASHING. (MUST MEET <br />AC148) <br />VERTICAL AND HORIZONTAL <br />A <br />CONTROL JOINTS AS NEEDED. <br />DESIGNER -OF -RECORD TO SPECIFY <br />a. ^ <br />TYPE AND LOCATION. <br />CODE -APPROVED WEEP <br />^ <br />SCREED AT BASE OF WALL <br />*ZIP SYSTEM@ SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />ZIP SYSTEMS® HARD COAT <br />STUCCO AT SLAB ON GRADE <br />These construction details are provided to assist in the installation of Zip System ® product(s) and ma I not apply to <br />every situation. Manufacturer accepts no responsibility or liability for the use of these or other construction details <br />NATURAL OR MANUF — <br />STONE VENEER. <br />INSTALL IN <br />ACCORDANCE <br />WITH MANUFACTURER'S <br />RECOMMENDATIONS <br />FOUNDATION <br />DRIP EDGE FLASHING OR WEEP SCREED <br />IN ACCORDANCE WITH <br />MANUFACTURER'S <br />RECOMMENDATIONS AT BASE OF ZIP <br />SYSTEM WALL SHEATHING <br />r— p <br />IT U <br />L0 <br />cy <br />W APEX � <br />(1) <br />W <br />w X <br />z_ <br />U <br />00 <br />w <br />w <br />z <br />(D <br />z <br />w t S (D <br />Q true design studios <br />0_ <br />O <br />—1 9000 REGENCY SQUARE BLVD. N <br />ILL Z SUITE 100, JACKSONVILLE, FL 32211 <br />904.821.5200 p <br />O <br />12 <br />0 ' <br />041HOMN <br />d A <br />E <br />O <br />J <br />LL ,r <br />Q <br />U <br />z <br />(D <br />O <br />J <br />O <br />z <br />U <br />w <br />F- <br />x <br />W <br />w U) <br />o <br />w <br />m <br />z w <br />w <br />z O w <br />a <br />w J Q 0 <br />Q > <br />z qq w o <br />o ,�, �' w <br />0 M w w <br />i= W a <br />r V— <br />U) x <br />0 <br />O z <br />1 O <br />O 0 <br />z w <br />U z <br />� Abbott Park a <br />x <br />w - LL <br />n- LOT 020-03-1 B w <br />Q <br />ZIP SYSTEM@ SHEATHING.* <br />LATH <br />*ZIP SYSTEM@ SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />WOOD OR LT. GA. METAL STUDS <br />ONE LAYER OF WATER -RESISTIVE <br />VAPOR -PERMEABLE BARRIER WITH A <br />PERFORMANCE AT LEAST <br />EQUIVALENT TO GRADE D BUILDING <br />PAPER <br />TOP EDGE OF DRIP EDGE FLASHING <br />TAPED TO ZIP SYSTEM SHEATHING <br />SURFACE W/ ZIP SYSTEM TAPE OF <br />ADHESIVE <br />BACKED FLASHING. (MUST MEET AC148) <br />ZIP SYSTEMS® SHEATHING w/ <br />ADHERED STONE AT SLAB ON GRADE <br />These construction details are provided to assist in the installation of Zip System ® product(s) and may not apply to <br />every situation Manufacturer accepts no responsibility or liability for the use of these or other construction details <br />U <br />U) <br />0 <br />LJJ <br />PROJECT NO <br />F- <br />2021.014970 <br />z <br />DRAWN <br />CD <br />w <br />CHKD JAC <br />U— <br />O <br />w <br />J <br />U <br />(n <br />0 <br />zz <br />Q <br />co <br />12-29-2021 (D <br />z <br />REVISIONS: < <br />No. Description Date 0 <br />-- - w <br />U) <br />— w <br />w <br />V) <br />0 <br />A405 z <br />O <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.