Laserfiche WebLink
I N <br />l l 112 <br />I— —JI <br />— — <br />17'-10" <br />V I TERMINATION BAR - SEAL ALL <br />BOX HEADER BY PEMB —�� AROUND. FASTEN @ 12" O.C. MAX <br />STUCCO WALL SYSTEM ON i EDPM MEMBRANE GUTTER LINER <br />GLASS -MAT GYPSUM BOARD <br />SINGLE -PLY PRIMER <br />METAL BUILDING PANEL BY TERMINATION BAR - SEAL ALL <br />PEMB ILAROUND. FASTEN @ 12" O.C. MAX <br />T/O EAVE STRUT <br />14'-4" <br />2 GUTTER DETAIL <br />Q <br />B <br />LOCATI( <br />(ABOVE <br />SATELL <br />WEATH I <br />PARAPE <br />PREFEF <br />NON -PE <br />MOUNT <br />SKYWAI <br />#611006 <br />1 ROOF PLAN NORTH rrTA <br />��) <br />METAL BUILDING STRUCTURE AND <br />ROOF SYSTEM BY PEMB <br />METAL BUILDING INSULATION BY <br />GC <br />PARAPET GUTTER BY PEMB. GC TO <br />CUT AND BEND PEMB GUTTER TO <br />ACCOMMODATE SCUPPERS. <br />TERMINATION BAR - WRAP <br />INSULATION FACE AROUND BAR, <br />TYP. FASTEN @ 12" O.C. MAX <br />Q <br />BOX HEADER BY PEMB — <br />STUCCO WALL SYSTEM ON <br />GLASS -MAT GYPSUM BOARD <br />METAL BUILDING PANEL BY <br />PEMB <br />HEADER/SILL PROVIDED BY <br />PEMB. FIELD CUT AND <br />INSTALLED BY GC. <br />PREFINISHED 14GA METAL <br />SCUPPER BY GC. <br />B.O. SCUPPER <br />1/2" V.I.F. <br />12"D x 1 2"h X 1 8"W SCUPPER <br />COLLECTOR BOX <br />6" x 6" SQUARE DOWNSPOUT <br />PROVIDED BY GC <br />Q <br />N <br />rn <br />JOINT COVER AS <br />CORNER FLASHING <br />1'-0\" �� <br />17'-10" <br />U <br />00 <br />t X1 1 /2'i <br />SCUPPER/GUTTER DETAIL <br />Q <br />Scale: 1 1/2" = V-0" <br />FASTEN SCUPPER @ 4" O.C. MAX <br />FLASHING CENTERED OVER EDGE <br />OF SCUPPER FLANGE <br />EDPM MEMBRANE GUTTER LINER <br />SINGLE -PLY PRIMER <br />TERMINATION BAR - SEAL ALL <br />AROUND. FASTEN @ 12" O.C. MAX <br />METAL BUILDING STRUCTURE AND <br />ROOF SYSTEM BY PEMB <br />METAL BUILDING INSULATION BY <br />GC <br />PARAPET GUTTER BY PEMB. GC TO <br />CUT AND BEND PEMB GUTTER TO <br />ACCOMMODATE SCUPPERS. <br />TERMINATION BAR - WRAP <br />INSULATION FACE AROUND BAR, <br />TYP. FASTEN @ 12" O.C. MAX <br />Q <br />17'-10" <br />BOX HEADER BY PEMB — <br />HEADER/SILL PROVIDED BY <br />PEMB. FIELD CUT AND <br />INSTALLED BY GC. <br />CONTINUOUS SEALANT <br />B.O. OVERFLOW SCUPPER <br />14' - 1 /2" V.I. F. <br />STUCCO WALL SYSTEM ON <br />GLASS -MAT GYPSUM BOARD - <br />METAL BUILDING PANEL BY <br />PEMB <br />�f <br />�. 19'-0" <br />7. 22'-0" <br />�. 19'-0" <br />IC <br />co L <br />X, 1 /2" <br />L�-- --� <br />OVERFLOW SCUPPER DETAIL <br />O <br />Scale: 1 1/2" = V-0" <br />FASTEN OVERFLOW SCUPPER @ 4" <br />O.C. MAX <br />FLASHING CENTERED OVER EDGE <br />OF SCUPPER FLANGE <br />EDPM MEMBRANE GUTTER LINER <br />SINGLE -PLY PRIMER <br />TERMINATION BAR - SEAL ALL <br />AROUND. FASTEN @ 12" O.C. MAX <br />METAL BUILDING STRUCTURE AND <br />ROOF SYSTEM BY PEMB <br />METAL BUILDING INSULATION BY <br />GC <br />PARAPET GUTTER BY PEMB. GC TO <br />CUT AND BEND PEMB GUTTER TO <br />ACCOMMODATE SCUPPERS. <br />TERMINATION BAR - WRAP <br />INSULATION FACE AROUND BAR, <br />TYP. FASTEN @ 12" O.C. MAX <br />GENERAL NOTES: <br />1.) INSTALL EPDM GUTTER LINEAR BEFORE PEMB BACKER PANEL AND ROOF PANELS <br />2.) INSTALL TERMINATION BAR IN ACCORDANCE WITH FIRESTONE DETAIL FF-T-1. <br />3.) REF SMACNA FIGURE 1-30 FOR OVERFLOW SCUPPERS. <br />4.) GC ATTACH SCUPPER BOX TO PARAPET GUTTER TO ENSURE POSITIVE DRAINAGE TO <br />COLLECTOR BOX ENSURE WATER TIGHT TRANSITION <br />5.) GC TO PROVIDE CONTINUOUS SEALANT AT ALL MATERIAL TRANSITIONS <br />6.) REF SMACNA FIGURE 1-32B FOR DOWNSPOUTS <br />7.) REF SMACNA FIGURE 1-25F FOR CONDUCTOR HEAD <br />8.) REF SMACNA FIGURE 1-26 FOR THROUGH -WALL SCUPPERS <br />CONSULTANT: <br />SEAL: JOHN BENEDICT POLSINELLI, AR96059 <br />F Ft <br />AR96059 <br />'rr•:resrr <br />a N 1 <br />THIS DRAWING SHALL NOT BE USED FOR <br />CONSTRUCTION PURPOSES UNTIL THE SEAL AND <br />SIGNATURE OF THE RESPONSIBLE REGISTRANT <br />APPEARS ON THE DRAWING, AND PROPER PERMIT <br />FORMS AND RELATED FEES ARE TRANSMITTED BY <br />THE OWNER, OWNER'S AGENT OR CONTRACTOR <br />TO THE AUTHORITY HAVING JURISDICTION. <br />DATE <br />ISSUED FOR <br />REV <br />03/29/2021 <br />PEMB COORDINATION <br />05/20/2021 <br />CIVIL SUBMISSION <br />05/20/2021 <br />DUKE COORDINATION <br />06/07/2021 <br />PEMB COORDINATION 02 <br />08/09/2021 <br />CIVIL RESUBMISSION 1 <br />08/25/2021 <br />OWNER REVIEW <br />1 1 /08/2021 <br />REVISED ELEVATIONS <br />1 1 /29/2021 <br />PERMIT SUBMITTAL <br />Project Manager <br />Drawn <br />L. LONG <br />S. KORTMAN <br />Project Leader <br />Checked <br />L. LONG <br />G. KARANFILOVSKI <br />Date <br />Dept Mgr Approval <br />02/23/2021 <br />L. LONG <br />Client <br />PALMETTO ZEPHYRHILLS - GALL BLVD., LLC <br />P.O. Box 1615, <br />Thomasville, GA 31 799 <br />Office: (229) 226-1 177 <br />Contact: Daniel Tubb <br />Project <br />DOLLAR GENERAL <br />Corner of Gall Boulevard and C <br />Avenue, <br />Zephyrhills, FL 33542 <br />(City of Zephyrhills) <br />Store #: 23227 <br />Drawing Title <br />ROOF PLAN AND GUTTER DETAILS <br />DO NOT SCALE DRAWING <br />Project No. <br />Drawing No. <br />JCDT.20.0451 <br />A10 <br />