Laserfiche WebLink
DOTE: <br />-HE LOCATIONS FOR THE VAULT CONTAINING THE BACKFLOW PREVENTER, <br />HE POST INDICATOR VALVE. AND THE FIRE DEPARTMENT CONNECTION <br />ARE SITE SPECIFIC. COORDINATE LOCATIONS WITH CIVIL AND <br />ARCHITECTURAL PLANS. <br />SPARE HEAD BOX, PROVIDE THE FOLLOWING: <br />* (6) OF EACH TYPE OF SPRINKLER USED <br />* (1 ) WRENCH FOR EACH TYPE OF SPRINKLER USED <br />FIELD LOCATE ADJACENT TO RISER. <br />WATER MOTOR GONG <br />MOUNT MIN. 7'-6" <br />ABOVE FINISHED GRADE <br />RETARD CHAMBER <br />REQ. ALL <br />INSTALLATIONS <br />0 0! <br />461 <br />p PRESSURE SWITCH <br />AS REQ. BY FIRE <br />0 o ALARM DESIGNER <br />z U' <br />Dl-o <br />o � <br />i <br />OQ JW JLd <br />z � Q 0 Q 0O <br />J <br />Q O <br />00 0 0 <br />ALARM PIPING <br />4" NPS MIN, <br />ALARM VALVE <br />MOUNT 24" - 60" AEE <br />RISER CLAMP <br />GROOVED CONNECTIONS <br />ONLY ALLOWED ON PIPING <br />LESS THAN 6" NPS <br />NOTE: <br />SYSTEM VALVES AND GAUGES SHALL BE <br />ACCESSIBLE FOR OPERATION, INSPECTION, <br />TESTS, AND MAINTENANCE. PER NFPA <br />13,8.1.2. <br />PRESSURE GAUGE TO <br />BE VISIBLE FROM FLOOR <br />RISER MANIFOLD W/ PRESSURE <br />GAUGE, WATERFLOW SWITCH <br />/ & INSPECTOR'S TEST VALVE <br />(GROOVED CONNECTION AUTHORIZED <br />FOR USE ON 6" MANIFOLD ASSY.) <br />MOUNT 36" - 60" AFF <br />CHECK VALVE <br />TO FIRE <br />DEPARTMENT <br />CONNECTION <br />MAIN DRAIN <br />2" NPS MIN. <br />l <br />1 Ow <br />�o <br />z� <br />Q <br />0�0 <br />OUTSIDE STEM & YOKE (OS&Y) <br />GATE VALVE W/ TAMPER <br />SWITCH - CHAIN & LOCK IN Q <br />OPEN POSITION o� <br />z <br />0 <br />O <br />0 <br />Q <br />J <br />S <br />Q <br />0 <br />I <br />0 <br />z_ <br />FIRE PROTECTION DESIGN CRITERIA <br />ROOM NAME <br />NFPA 13 HAZARD CLASSIFICATION <br />DESIGN DENSITY <br />(GPM/SQ FT)(AREA) <br />SPRINKLER HEAD <br />TEMPERATURE RATING <br />DEC F <br />SALES AREA <br />ORDINARY HAZARD GROUP 2 <br />(0.20) (1500) <br />165 <br />BREAK AREA <br />ORDINARY HAZARD GROUP 2 <br />(0.20) (1500) <br />165 <br />OFFICE <br />LIGHT HAZARD <br />(0.10) (1500) <br />165 <br />RESTROOMS <br />LIGHT HAZARD <br />(0.10) (1500) <br />165 <br />HALL <br />LIGHT HAZARD <br />(0.10) (1500) <br />165 <br />RECEIVING/STAGING <br />ORDINARY HAZARD GROUP 2 <br />(0.20) (1500) <br />165 <br />SUPPORT <br />IF NEEDED <br />SUPPLE <br />0 0 <br />a d <br />z ®�1 BRANCH OR <br />_ MAIN <br />N 1 " X 1 /2" <br />REDUCER <br />SLEEVE FLOORL_JMIN. OF 6" NPS FIRE MAIN <br />SUSPENDED <br />PENETRATION <br />CEILING <br />NOTE: <br />ALL RISER VALVES, FITTINGS & EQUIPMENT SHALL BE UL/FM APPROVED RECESSED <br />FOR FIRE PROTECTION SERVICE. INSTALLATION SHALL COMPLY WITH ALL PENDENT <br />NFPA REQUIREMENTS. PROVIDE TAMPER SWITCHES AND SUPERVISORY SPRINKLER HEAD <br />CONTROLS AS REQUIRED. <br />FIRE RISER CONCEPT DETAIL <br />NO SCALE <br />TYPICAL PENDENT SPRINKLER <br />HEAD DETAIL <br />SCALE: NOT TO SCALE <br />CLEVIS I <br />SUPPOR <br />JOIST Of <br />ABOVE - <br />UNDERSIDE <br />OF DECK <br />(IF <br />ICH <br />TYPICAL UPRIGHT SPRINKLER <br />HEAD DETAIL <br />SCALE: NOT TO SCALE <br />FIRE PROTECTION NOTES <br />1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR A COMPLETE TURN KEY <br />INSTALLATION USING UNDERWRITER LABORATORIES UL LISTED PRODUCTS <br />INCLUDING DESIGN, OBTAINING APPROVALS AND COORDINATION WITH OTHER <br />TRADES. INSTALL TO MEET NFPA NO. 13 AND 72 AND THE LOCAL AUTHORITY <br />HAVING JURISDICTION REQUIREMENTS. <br />2, SUBMIT WORKING PLANS AND HYDRAULIC CALCULATIONS SIGNED AND SEALED <br />BY A PROFESSIONAL FIRE PROTECTION ENGINEER REGISTERED IN THE STATE IN <br />WHICH THE PROJECT IS LOCATED, TO AUTHORITIES THAT HAVE JURISDICTION. <br />NORR, LLC DESIGN DOCUMENTS ARE FOR PERMIT PURPOSES, THE DESIGN IS <br />NOT INTENDED TO LIMIT THE CONTRACTOR FROM PROVIDING ANOTHER DESIGN <br />THAT MAY BE MORE ECONOMICAL AND STILL MEET THE REQUIREMENTS OF THE <br />LOCAL AUTHORITY HAVING JURISDICTION. <br />3, WORKING PLANS AND COMPUTERIZED HYDRAULIC CALCULATIONS SHALL BE <br />PREPARED BY A MINIMUM LEVEL 3 N.I.C.E.T. CERTIFIED SPRINKLER LAYOUT <br />DESIGNER. DRAWINGS SHALL BE SIGNED AND THE N.I.C.E.T. CERTIFICATE <br />NUMBER INDICATED ON PLAN. ALL DRAWINGS, INCLUDING AS-BUILTS, SHALL <br />BE SUBMITTED ON DISC USING AUTO CAD. <br />4. THE HYDRAULIC CALCULATIONS SHALL INCLUDE THE PRESSURE DROP THROUGH <br />ALL PIPE, FITTINGS AND DEVICES, INCLUDING THE PRESSURE DROP THROUGH <br />THE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER, FROM THE MOST <br />HYDRAULIC REMOTE POINT OF THE SPRINKLER SYSTEM TO THE LOCATION OF <br />THE TEST HYDRANT. <br />5, SUBMIT DRAWINGS TO LOCAL FIRE DEPT. AND OBTAIN NECESSARY <br />APPROVALS, PERMITS AND CERTIFICATES PRIOR TO SUBMISSION TO THE <br />ENGINEER FOR FINAL REVIEW. <br />6. WHERE REQUIRED BY CODE OR DIRECTED BY LOCAL AUTHORITIES, CONTRACTOR <br />SHALL PROVIDE SEISMIC HANGING & CONSTRAINTS ON ALL PIPING IN <br />COMPLETE ACCORDANCE WITH THE LATEST ISSUE OF THE STATE MECHANICAL <br />BUILDING CODE, LOCAL CODES AND NFPA. <br />7. FIRE PROTECTION CONTRACTOR SHALL PROVIDE A GUARANTEE COVERING ALL <br />DESIGN, INSTALLATION, MATERIAL AND WORKMANSHIP FOR ONE YEAR <br />FOLLOWING DATE OF ACCEPTANCE BY CVS. <br />8. THE HYDRAULIC CALCULATIONS SHALL BE BASED ON THE LATEST FLOW TEST <br />DATA: <br />9. THE FOLLOWING INFORMATION SHALL BE PROVIDED BY THE FIRE PROTECTION <br />CONTRACTOR AT SUBMITTAL OF SHOP DRAWINGS AND CALCULATIONS: <br />a. STATIC PRESSURE PSI: XX <br />b. RESIDUAL PRESSURE PSI: XX <br />c. FLOW GPM: XXXX <br />d. FLOW/TEST HYDRANT LOCATIONS: Hyd.#1-Location. Hyd.#2-Location <br />e. DATE OF TEST: XX-XX-XXXX <br />f. TIME OF TEST: XXXX <br />g. RESPONSIBLE PARTY CONDUCTING TEST: XXXX <br />h. HYDRANT OUTLET DISCHARGE COEFFICIENT: XXXX <br />10. PIPING SHALL BE SLOPED TO DRAIN BACK TO SPRINKLER RISER, AUXILIARY <br />DRAINAGE IN ACCORDANCE WITH NFPA 13 SHALL BE PROVIDED FOR ALL <br />TRAPPED SECTIONS OF PIPE. <br />11, PIPE ALL DRAINS AND INSPECTOR'S TEST TO OUTSIDE, OR DISCHARGE TO A <br />DRAIN APPROVED BY THE OWNER FOR SPRINKLER DISCHARGE, <br />12. PROVIDE AUTOMATIC SPRINKLER BELOW OBSTRUCTIONS 48 INCHES AND WIDER. <br />(PLATFORMS, DUCTWORK, STAIRWAYS, UNIT HEATER, ETC). <br />13, PROVIDE 10 POUND ABC TRIPLE CLASS FIRE EXTINGUISHERS, BASED ON 3000 <br />SQ FT OF FLOOR AREA WITH A MAX OF 75 FT TRAVEL DISTANCE <br />14. REFER TO THE ARCHITECTURAL DRAWINGS FOR REFLECTED CEILING PLANS AND <br />COORDINATE ALL WORK WITH ALL OTHER CONTRACTORS PRIOR TO <br />INSTALLATION OF THE SPRINKLER SYSTEM. <br />_� 15. THE PUBLIC WATER SUPPLY IS NOT SUBJECT TO MICROBIAL INDUCED <br />SEE NOTE� <br />CORROSION (MIC). <br />PITCH SMOOTH BORE <br />BRANCH LINE 1'° CORROSION 16, THE SPRINKLER DESIGN SHALL BE BASED ON STANDARD RESPONSE <br />RESISTANT SPRINKLERS. AT THE CONTRACTOR'S OPTION, EXTENDED COVERAGE SPRINKLER <br />TEST VALVE IN OUTLET GIVING MAY BE USED, IN CONFORMANCE WITH NFPA 13 AND THE AUTHORITY HAVING <br />READILY ACCESSIBLE FLOW JURISDICTION. <br />LOCATION EQUIVALENT TO <br />ONE SPRINKLER <br />PLUG -FOR TESTING 45° ELBOW <br />REMOVE AND INSTALL <br />TEMPORARY SPLASH BLOCK <br />CONNECTION <br />UNION <br />NOTE: TO MINIMIZE CONDENSATION OF WATER IN THE <br />DROP TO THE TEST CONNECTION PROVIDE A NIPPLE -UP <br />OFF OF THE BRANCH LINE. <br />INSPECTOR TEST <br />CONNECTION DETAIL <br />SCALE: NOT TO SCALE <br />FIRE PROTECTION SPECIFICATIONS <br />A. PROVIDE STANDARD RESPONSE AUTOMATIC SPRINKLERS WITH HEAT -RESPONSIVE <br />ELEMENT, 1/2 INCH ORIFICE FOR ORDINARY TEMPERATURE CLASSIFICATION <br />RATING <br />1. CONTRACTOR'S OPTION: PROVIDE EXTENDED COVERAGE SPRINKLERS <br />B. FIRE DEPARTMENT WALL CONNECTION UL-405, CAST IRON BODY, ESCUTCHEON <br />PLATE; BRASS, LUGGED CAPS WITH GASKETS AND BRASS, LUGGED SWIVEL <br />CONNECTIONS, INCLUDE THREADS TO MATCH LOCAL FIRE DEPARTMENT SIZES AND <br />THREADS, EXTENSION PIPE NIPPLES, CHECK DEVICES, AND ESCUTCHEON PLATE <br />WITH MARKING "AUTO SPKR & STANDPIPE" OR AS REQUIRED BY LOCAL <br />AUTHORITY HAVING JURISDICTION. <br />C. ALARM DEVICES <br />3. WATER FLOW INDICATOR: UL 346, VANE TYPE DETECTOR INCLUDING TWO <br />SINGLE -POLE, DOUBLE -THROW SWITCHES FOR ISOLATED ALARM AND AUXILIARY <br />CONTACTS COMPLETE WITH FALSE SIGNAL PREVENTION AND TAMPERPROOF <br />PROTECTION. <br />4. VALVE SUPERVISORY SWITCHES: UL 753, ELECTRICAL, SINGLE -POLE, <br />DOUBLE -THROW WITH NORMALLY CLOSED CONTACTS. INCLUDE DESIGN THAT <br />SIGNALS CONTROLLED VALVE/ INDICATOR -POST VALVE IS IN OTHER THAN FULLY <br />OPEN POSITION. <br />CONSULTANT: <br />SEAL: HENRY D. MONTAGUE, PE 78172 <br />����Illlllfflld <br />"\ C E N SF Oyu>/i <br />,Z:�a No.76172 G <br />�i' STATE OF <br />+,.0 <br />�i��•�' LORIO <br />THIS DR WIN SHALL NOT BE USED FOR <br />CONSTRUCTI PURPOSES UNTIL THE SEAL AND <br />SIGNATURE OF THE RESPONSIBLE REGISTRANT <br />APPEARS ON THE DRAWING„ AND PROPER PERMIT <br />FORMS AND RELATED FEES ARE TRANSMITTED BY <br />THE OWNER, OWNER'S AGENT OR CONTRACTOR <br />TO THE AUTHORITY HAVING JURISDICTION. <br />DATE <br />ISSUED FOR <br />REV <br />03/29/2021 <br />PEMB COORDINATION <br />05/20/2021 <br />CIVIL SUBMISSION <br />05/20/2021 <br />DUKE COORDINATION <br />06/07/2021 <br />PEMB COORDINATION 02 <br />08/09/2021 <br />CIVIL RESUBMISSION 1 <br />08/25/2021 <br />OWNER REVIEW <br />1 1 /08/2021 <br />REVISED ELEVATIONS <br />1 1 /29/2021 <br />PERMIT SUBMITTAL <br />Project Manager <br />Drawn <br />L. LONG <br />R. McCARTHY <br />Project Leader <br />Checked <br />L. LONG <br />H. MONTAGUE <br />Date <br />Dept Mgr Approval <br />02/23/2021 <br />H. MONTAGUE <br />Client <br />PALMETTO ZEPHYRHILLS - GALL BLVD., LLC <br />P.O. Box 1615, <br />Thomasville, GA 31 799 <br />Office: (229) 226-1 1 77 <br />Contact: Daniel Tubb <br />Project <br />DOLLAR GENERAL <br />Corner of Gall Boulevard and C <br />Avenue, <br />Zephyrhills, FL 33542 <br />(City of Zephyrhills) <br />Store #: 23227 <br />Drawing Title <br />FIRE PROTECTION SCHEDULES, <br />NOTES + DETAILS <br />DO NOT SCALE DRAWING <br />Project No. <br />Drawing No. <br />,JCDT.20.0451 <br />FP1 <br />